1. MATTHEW WARR PROFESSIONAL PORTFOLIO PROJECT OVERVIEW No.2
RESUME/PORTFOLIO | CONFIDENTIAL
Project Title PARAMOUNT CLUB, CENTRE POINT TOWER
Client Century Leisure
M&E Consultant Peter Deer & Associates
Main Contractor Longcross Construction Limited
Value M&E Works £1,300,000
Duration April 2008 – October 2008 (7months)
Contract Type JCT 05 Design and Build
Centre Point Tower is one of the most prestigious
buildings in the West End since its construction in
1966. With Pierre Condou, Paris born
restaurateur, opening an exclusive private
members’ club, Paramount, on the top three
floors, Targetfollow’s 200,000 sq/ft building is
becoming one of the most talked‐about venues in
the West End.
The 32nd floor is now private members’ bar and
restaurant serving modern European fine dining,
as well as ‘comfort food’, while the 33rd floor is a
private champagne and cocktail bar.
Having worked in Centre Point Tower
continually for over 2 years, Trinity was very
familiar with the restrictions and challenges of
working in the building. This combined with our
on‐going relationship with Longcross
Construction led to the successful award of this
project. We worked closely with the client team
to value engineer an M&E scheme which met
the client’s budget. After several rounds of in
depth meetings we agreed upon the optimum
M&E systems solutions.
The scheme included high quality lighting
installations and controls, full air conditioning and
ventilation systems for the restaurant/events areas
and kitchens. Plant space on top of the tower was
at a premium.
The standalone plant and equipment for the club
was carefully selected and engineered so that it
could be moved through the building into its final
location at roof level.