150 SVS is situated in the heart of
the business district of Glasgow.
The client had a requirement to
create an office space to
accommodate 109 staff and to
also include for the two sides of the
Business, Insurance and Finance.
Datum’s scope of works was to
divide the open office space into
three areas, the third being a
directors suite, with each division
being self sufficient.
This also included the creation of
meeting rooms, manager’s office
and a breakout area to include a
Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk
150 St. Vincent Street | GLASGOW
Client
Towergate Risk Solutions
Location
City Centre
Glasgow, Scotland
Sector
Insurance / Finance
Project
Fitout to include M&E
Description
Move personnel from two
locations into 150 SVS
Contract Duration
4 Months
Size
2,300 Sq. Mt. or
25,000 Sq. FT
Case StudyCase StudyCase StudyCase Study
Nigel Uttley, MD
“Because we believe
that the most important
part o f your office is YOU”
fully functioning kitchen and a
comfort space for employees to
relax.
Due to the location and access to
the breakout areas, our challenge
was to re-design the mechanical
and electrical layout to allow these
areas to function seamlessly.
Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk
Castlegate Park | DUDLEY
Case StudyCase StudyCase StudyCase Study
Located in the iconic building that
used to be Rentokil Initial, Footman
James, the Classic Motor Vehicle
Insurers moved from Cradley
Heath to their new home in Dudley
during the Christmas Break.
Datum’s remit was to create a
space that was unlike the usual call
centre environment.
Following numerous design
meetings, it was agreed meeting
rooms, offices, kitchens and open
office areas had to include for
feature walls and manifestation
logos on glazing to make this
project work.
The raised access floors in the
ground floor open office areas were
strengthened to allow for classic
motorcycles and cars to be
displayed.
Externally, the barrier entrance to
the carpark was totally refurbished
to allow staff automatic entrance
and visitors via an intercom.
The project was completed over a two
month period which resulted in the
client’s desired finish, on time and on
budget for their flagship office.
“Because we believe
that the most important
part o f your office is YOU”
Client
Footman James
Location
Dudley
Sector
Classic Car Insurance
Project
Fitout and M&E
Description
Move offices from Cradley
Heath and create new Head
Office at Dudley
Contract Duration
2 Months
Size
2,100 Sq. Mt. or
22,500 Sq. FT
Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk
1 Portland Street | MANCHESTER
Nigel Uttley, MD
Client
Fusion
Location
Picadilly, Manchester
Sector
Insurance
Project
Fitout
Description
Move offices from the north
of the city and create new
offices in the south
Contract Duration
6 Weeks
Size
264 Sq. Mt. or
2850 Sq. FT
Case StudyCase StudyCase StudyCase Study
“Because we believe
that the most important
part o f your office is YOU”
Located in the heart of the
Business District of Manchester, 1
Portland Street is situated adjacent
to the central tram station.
Our brief was to relocate Fusion
Ltd from the north to the south of
Manchester and to include in the
floor plate a meeting room,
breakout area, the Managing
Director’s office and an open plan
office to accommodate 20 people.
One of the main constraints of the
project was the construction of the
building as it had internal columns
in the office that were at unequal
distances apart to allow the
perimeter walls of the building to
be fully glazed.
Thus creative space planning was
a key element.

More Related Content

What's hot

S7-Reference Majid Mokabberian
S7-Reference Majid MokabberianS7-Reference Majid Mokabberian
S7-Reference Majid Mokabberian
Majid Mokabberian
 
Tek Recruitment Solutions Retained Presentation Jan 12
Tek Recruitment Solutions Retained Presentation Jan 12Tek Recruitment Solutions Retained Presentation Jan 12
Tek Recruitment Solutions Retained Presentation Jan 12
GChandler
 
New john cunliffe Cv
New john cunliffe CvNew john cunliffe Cv
New john cunliffe Cv
John Cunliffe
 
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
Mark McClean
 
Structural design engineer
Structural design engineerStructural design engineer
Structural design engineer
Samuel Ogbodo
 
Introduction to Results Staffing-Norma Devine
Introduction to Results Staffing-Norma DevineIntroduction to Results Staffing-Norma Devine
Introduction to Results Staffing-Norma Devine
Norma Devine
 
PMS Engineering Pvt Ltd Corporate Profile
PMS Engineering Pvt Ltd Corporate ProfilePMS Engineering Pvt Ltd Corporate Profile
PMS Engineering Pvt Ltd Corporate Profile
pmsengineering services
 
new heigthts reference
new heigthts referencenew heigthts reference
new heigthts reference
Marius Gerber
 

What's hot (20)

S7-Reference Majid Mokabberian
S7-Reference Majid MokabberianS7-Reference Majid Mokabberian
S7-Reference Majid Mokabberian
 
LEE CV.2
LEE  CV.2LEE  CV.2
LEE CV.2
 
Resume
ResumeResume
Resume
 
Jacqueline Morejon new
Jacqueline Morejon newJacqueline Morejon new
Jacqueline Morejon new
 
AEL_fitter.ref_1
AEL_fitter.ref_1AEL_fitter.ref_1
AEL_fitter.ref_1
 
Cv steven flynn 2015 update
Cv steven flynn 2015 updateCv steven flynn 2015 update
Cv steven flynn 2015 update
 
Tek Recruitment Solutions Retained Presentation Jan 12
Tek Recruitment Solutions Retained Presentation Jan 12Tek Recruitment Solutions Retained Presentation Jan 12
Tek Recruitment Solutions Retained Presentation Jan 12
 
SamBaldridgeResume
SamBaldridgeResumeSamBaldridgeResume
SamBaldridgeResume
 
Kevin Maher CV
Kevin Maher CVKevin Maher CV
Kevin Maher CV
 
COMPANY PROFILE AYRTON CONSTRUCTION
COMPANY PROFILE AYRTON CONSTRUCTIONCOMPANY PROFILE AYRTON CONSTRUCTION
COMPANY PROFILE AYRTON CONSTRUCTION
 
Profile_UGS Group of Companies
Profile_UGS Group of CompaniesProfile_UGS Group of Companies
Profile_UGS Group of Companies
 
New john cunliffe Cv
New john cunliffe CvNew john cunliffe Cv
New john cunliffe Cv
 
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
 
Structural design engineer
Structural design engineerStructural design engineer
Structural design engineer
 
Introduction to Results Staffing-Norma Devine
Introduction to Results Staffing-Norma DevineIntroduction to Results Staffing-Norma Devine
Introduction to Results Staffing-Norma Devine
 
Home depot hiring event 01 22-15
Home depot hiring event 01 22-15Home depot hiring event 01 22-15
Home depot hiring event 01 22-15
 
PMS Engineering Pvt Ltd Corporate Profile
PMS Engineering Pvt Ltd Corporate ProfilePMS Engineering Pvt Ltd Corporate Profile
PMS Engineering Pvt Ltd Corporate Profile
 
Asbestos removal
Asbestos removalAsbestos removal
Asbestos removal
 
Resume
ResumeResume
Resume
 
new heigthts reference
new heigthts referencenew heigthts reference
new heigthts reference
 

Similar to 3 Case Studies x 3

GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company Profile
Martin Tobin
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQ
Rhonan OBrien
 
Amicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_emailAmicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_email
Christopher Maguigan
 
CBRE Office Fit Out Track Record Reduced
CBRE Office Fit Out Track Record ReducedCBRE Office Fit Out Track Record Reduced
CBRE Office Fit Out Track Record Reduced
Nora Vera Jarauta
 
Integral Build Portfolio v1.0
Integral Build Portfolio v1.0Integral Build Portfolio v1.0
Integral Build Portfolio v1.0
Tim Stringer
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012
Tom Stack
 
Retracom Contracting - Capability Statement
Retracom Contracting - Capability StatementRetracom Contracting - Capability Statement
Retracom Contracting - Capability Statement
Shannon Porter
 
presentation document
presentation documentpresentation document
presentation document
Mike Hilton
 
2 Case Study David Lloyd Leisure Dudley
2 Case Study David Lloyd Leisure Dudley2 Case Study David Lloyd Leisure Dudley
2 Case Study David Lloyd Leisure Dudley
Lee-Anne Uttley
 
Pig Specsavers 12pp 2010 Email
Pig Specsavers 12pp 2010 EmailPig Specsavers 12pp 2010 Email
Pig Specsavers 12pp 2010 Email
NicolaSlater
 

Similar to 3 Case Studies x 3 (20)

GCJ Company Profile
GCJ Company ProfileGCJ Company Profile
GCJ Company Profile
 
New Brochure 1 Clm
New Brochure 1   ClmNew Brochure 1   Clm
New Brochure 1 Clm
 
MODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQMODE_Sector-Brochure_Industrial_V1_LQ
MODE_Sector-Brochure_Industrial_V1_LQ
 
Amicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_emailAmicus VIC Capability Statement 2015_email
Amicus VIC Capability Statement 2015_email
 
CBRE Office Fit Out Track Record Reduced
CBRE Office Fit Out Track Record ReducedCBRE Office Fit Out Track Record Reduced
CBRE Office Fit Out Track Record Reduced
 
PIC Brochure 101615
PIC Brochure 101615PIC Brochure 101615
PIC Brochure 101615
 
Eden Company Profile
Eden Company ProfileEden Company Profile
Eden Company Profile
 
Integral Build Portfolio v1.0
Integral Build Portfolio v1.0Integral Build Portfolio v1.0
Integral Build Portfolio v1.0
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
Retracom Contracting - Capability Statement
Retracom Contracting - Capability StatementRetracom Contracting - Capability Statement
Retracom Contracting - Capability Statement
 
Perth metro
Perth metroPerth metro
Perth metro
 
Scotland at AOG 2020
Scotland at AOG 2020Scotland at AOG 2020
Scotland at AOG 2020
 
presentation document
presentation documentpresentation document
presentation document
 
2 Case Study David Lloyd Leisure Dudley
2 Case Study David Lloyd Leisure Dudley2 Case Study David Lloyd Leisure Dudley
2 Case Study David Lloyd Leisure Dudley
 
Pig Specsavers 12pp 2010 Email
Pig Specsavers 12pp 2010 EmailPig Specsavers 12pp 2010 Email
Pig Specsavers 12pp 2010 Email
 
AStancescu Nov2014
AStancescu Nov2014AStancescu Nov2014
AStancescu Nov2014
 
Lanes PLC | Commercial Refurbishment | MPL Interiors
Lanes PLC | Commercial Refurbishment | MPL InteriorsLanes PLC | Commercial Refurbishment | MPL Interiors
Lanes PLC | Commercial Refurbishment | MPL Interiors
 

3 Case Studies x 3

  • 1. 150 SVS is situated in the heart of the business district of Glasgow. The client had a requirement to create an office space to accommodate 109 staff and to also include for the two sides of the Business, Insurance and Finance. Datum’s scope of works was to divide the open office space into three areas, the third being a directors suite, with each division being self sufficient. This also included the creation of meeting rooms, manager’s office and a breakout area to include a Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk 150 St. Vincent Street | GLASGOW Client Towergate Risk Solutions Location City Centre Glasgow, Scotland Sector Insurance / Finance Project Fitout to include M&E Description Move personnel from two locations into 150 SVS Contract Duration 4 Months Size 2,300 Sq. Mt. or 25,000 Sq. FT Case StudyCase StudyCase StudyCase Study Nigel Uttley, MD “Because we believe that the most important part o f your office is YOU” fully functioning kitchen and a comfort space for employees to relax. Due to the location and access to the breakout areas, our challenge was to re-design the mechanical and electrical layout to allow these areas to function seamlessly.
  • 2. Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk Castlegate Park | DUDLEY Case StudyCase StudyCase StudyCase Study Located in the iconic building that used to be Rentokil Initial, Footman James, the Classic Motor Vehicle Insurers moved from Cradley Heath to their new home in Dudley during the Christmas Break. Datum’s remit was to create a space that was unlike the usual call centre environment. Following numerous design meetings, it was agreed meeting rooms, offices, kitchens and open office areas had to include for feature walls and manifestation logos on glazing to make this project work. The raised access floors in the ground floor open office areas were strengthened to allow for classic motorcycles and cars to be displayed. Externally, the barrier entrance to the carpark was totally refurbished to allow staff automatic entrance and visitors via an intercom. The project was completed over a two month period which resulted in the client’s desired finish, on time and on budget for their flagship office. “Because we believe that the most important part o f your office is YOU” Client Footman James Location Dudley Sector Classic Car Insurance Project Fitout and M&E Description Move offices from Cradley Heath and create new Head Office at Dudley Contract Duration 2 Months Size 2,100 Sq. Mt. or 22,500 Sq. FT
  • 3. Datum Fitout and Refurbishment Ltd t:: 0845 302 6440 e: info@datum-fitout.co.uk www.datum-fitout.co.uk 1 Portland Street | MANCHESTER Nigel Uttley, MD Client Fusion Location Picadilly, Manchester Sector Insurance Project Fitout Description Move offices from the north of the city and create new offices in the south Contract Duration 6 Weeks Size 264 Sq. Mt. or 2850 Sq. FT Case StudyCase StudyCase StudyCase Study “Because we believe that the most important part o f your office is YOU” Located in the heart of the Business District of Manchester, 1 Portland Street is situated adjacent to the central tram station. Our brief was to relocate Fusion Ltd from the north to the south of Manchester and to include in the floor plate a meeting room, breakout area, the Managing Director’s office and an open plan office to accommodate 20 people. One of the main constraints of the project was the construction of the building as it had internal columns in the office that were at unequal distances apart to allow the perimeter walls of the building to be fully glazed. Thus creative space planning was a key element.