22ME926
- INTRODUCTION TO BUSINESS INTELLIGENCE AND
ANALYTICS, ADVANCED INTEGRATION TECHNIQUES
Introduction to
Industry 4.0
Industry 4.0 represents the fourth industrial revolution,
characterized by the integration of advanced technologies like
automation, data analytics, and cyber-physical systems into
manufacturing and other industries. This transformation is
reshaping how businesses operate and deliver products and
services.
by Sengottaiyan K Assistant Professor
What is Industry 4.0?
Connectivity
The integration of smart,
connected devices and
systems that can
communicate and exchange
data.
Automation
The use of intelligent
machines and systems to
perform tasks with minimal
human intervention.
Data Analytics
The ability to collect,
analyze, and derive insights
from large amounts of data
to improve decision-making.
Cyber-Physical Systems
The merging of the physical
and digital worlds, enabling
real-time monitoring and
control of industrial
processes.
Key Technologies of Industry 4.0
Internet of Things (IoT)
Interconnected devices that can
communicate and exchange
data, enabling real-time
monitoring and optimization.
Artificial Intelligence (AI)
Advanced algorithms and
machine learning that can
analyze data, automate
decision-making, and drive
innovation.
Big Data and Analytics
The ability to collect, process,
and derive insights from large
volumes of structured and
unstructured data.
Benefits of Adopting Industry 4.0
1 Improved Efficiency
Increased productivity,
reduced waste, and
optimized processes
through automation and
data-driven decision-
making.
2 Enhanced Quality
Consistent, reliable, and
high-quality products and
services through real-time
monitoring and control.
3 Cost Savings
Reduced operational costs,
maintenance expenses, and
inventory levels through
predictive analytics and
optimization.
4 Increased Flexibility
Ability to quickly adapt to
changing market demands
and customer preferences
through flexible, agile
production.
Challenges of Implementing Industry 4.0
Technological Complexity
Integrating and managing a
wide range of advanced
technologies, systems, and data
sources.
Cybersecurity Risks
Protecting interconnected
systems and data from cyber
threats and ensuring data
privacy.
Organizational Change
Overcoming resistance to
change and upskilling the
workforce to embrace new
technologies and processes.
Industry 4.0 in Manufacturing
1
Smart Automation
Automated manufacturing processes with real-time
monitoring and control systems.
2
Predictive Maintenance
Leveraging sensor data and analytics to predict and
prevent equipment failures.
3
Customized Production
Flexible, on-demand production to meet individual
customer requirements.
Industry 4.0 in Supply Chain Management
End-to-End Visibility
Real-time tracking and tracing
of products and materials
throughout the supply chain.
Demand Forecasting
Leveraging data analytics to
improve demand forecasting
and inventory optimization.
Logistics Optimization
Automated route planning,
fleet management, and
transportation optimization.
Industry 4.0 in Healthcare
Remote Monitoring
Wearable devices and IoT sensors for real-time patient monitoring and early detection.
Robotic Surgery
Advanced, precision-guided surgical robots for minimally invasive and complex procedures.
Predictive Analytics
Using data-driven insights to predict and prevent health issues, optimize
treatments, and improve patient outcomes.
Preparing Your Organization for Industry 4.0
Assess Readiness
Evaluate your organization's current capabilities, infrastructure, and resources to identify areas for improvement.
Develop a Strategy
Create a clear, comprehensive plan for implementing Industry 4.0 technologies and transforming your operations.
Invest in Talent
Upskill your workforce and hire the necessary talent to support the adoption and integration of new technologies.
The Future of Industry 4.0
1 Increased Automation
Intelligent machines and
robots will take on an even
greater role in
manufacturing and other
industries.
2 Personalized Products
Highly customized and
personalized products will
become the norm,
catering to individual
customer preferences.
3 Sustainable Operations
Industry 4.0 technologies
will drive more eco-
friendly and resource-
efficient production
processes.
4 Predictive Maintenance
Advanced analytics will
enable proactive
maintenance and
minimize unplanned
downtime across
industries.
Introduction to
Lean Production
System
Lean production is a systematic approach to eliminating waste and
improving efficiency in manufacturing and business processes. It
focuses on optimizing workflows, reducing inventory, and
empowering employees to drive continuous improvement.
by Sengottaiyan K Assistant Professor
The Principles of Lean
1 Value
Identify and focus on
creating value for the
customer.
2 Value Stream
Analyze the end-to-end
process to eliminate
waste.
3 Flow
Ensure a smooth,
continuous flow of work.
4 Pull
Produce only what the
customer needs, when
they need it.
Eliminating Waste
Overproduction
Making more than the
customer needs.
Transportation
Unnecessary movement of
materials, information, or
people.
Inventory
Excess raw materials, work-
in-progress, or finished
goods.
Motion
Unnecessary movement of
people or equipment.
Just-in-Time Production
1
Pull System
Products are made only when the customer orders them,
reducing waste and inventory.
2
Small Batches
Producing in small, frequent batches improves responsiveness
and reduces defects.
3
Leveled Production
Maintaining a consistent production pace to avoid bottlenecks
and overloads.
Continuous Improvement (Kaizen)
Incremental Changes
Kaizen focuses on making small,
incremental improvements rather
than large, disruptive changes.
Employee Involvement
Kaizen relies on the collective
knowledge and ideas of all
employees to identify and solve
problems.
Ongoing Process
Kaizen is a never-ending cycle of
continuous improvement, ensuring
the organization is always evolving
and adapting.
5S Workplace Organization
Sort
Eliminate unnecessary items and
organize the work area.
Set in Order
Arrange essential items in a
logical, efficient manner.
Shine
Keep the work area clean and
well-maintained.
Standardize
Establish consistent procedures and best practices.
Sustain
Continuously monitor and improve the 5S system.
Visual Management
Display Key Information
Use visual tools like signs, charts,
and indicators to communicate
important data and metrics.
Identify Problems Quickly
Visual management makes it easier
to spot issues and deviations from
standard processes.
Empower Employees
Visual management gives
employees the information they
need to make informed decisions
and take action.
Standardized Work
1 Documented
Processes
Standardized work
involves creating
detailed, written
procedures for each task
and operation.
2 Consistency and
Quality
Standardized work
ensures a consistent,
high-quality output by
reducing variation in
processes.
3 Continuous Improvement
Standardized work provides a stable foundation for
identifying and implementing improvements.
Lean Leadership and Culture
Empowerment
Lean leaders empower employees to identify and solve
problems.
Servant Leadership
Lean leaders support and facilitate the work of their
teams.
Continuous Learning
Lean leaders foster a culture of continuous learning
and improvement.
Implementing Lean in Your Organization
1
Assess Readiness
Evaluate your organization's culture, processes, and
willingness to change.
2
Develop a Plan
Create a detailed implementation plan with clear goals,
timelines, and responsibilities.
3
Pilot and Iterate
Start with a pilot project, gather feedback, and continuously
improve the approach.
Introduction to
Smart and
Connected
Business
Smart and connected business leverages the power of
technology, data, and automation to drive innovation, improve
efficiency, and enhance customer experiences. This presentation
will explore the key trends and strategies behind this
transformative approach to modern enterprise.
by Sengottaiyan K Assistant Professor
The Rise of the Internet of Things (IoT)
Sensors
IoT sensors collect real-time data from the physical world.
Connectivity
Devices connect to the cloud, enabling remote monitoring and control.
Analytics
Data is analyzed to uncover insights and drive intelligent decision-making.
Leveraging Data and
Analytics for Competitive
Advantage
Predictive Maintenance
Analyze sensor data to
predict equipment failures
and schedule proactive
maintenance.
Personalized
Customer Experiences
Use customer data to
deliver tailored products,
services, and interactions.
Operational Optimization
Identify inefficiencies and optimize processes to improve
productivity and cost-savings.
Automating Processes for
Increased Efficiency
1 Identify
Analyze business processes to pinpoint repetitive,
rules-based tasks.
2 Automate
Implement robotic process automation (RPA) to
execute these tasks.
3 Scale
Expand automation across the organization to drive
efficiency and cost savings.
Enhancing Customer Experience through
Connectivity
Omnichannel Support
Provide seamless, personalized
experiences across multiple
touchpoints.
Predictive Analytics
Use customer data to anticipate
needs and proactively offer
solutions.
Intelligent Automation
Leverage chatbots and virtual
assistants to streamline
customer interactions.
Optimizing Supply Chain
and Logistics
1 Real-Time Visibility
Track inventory,
shipments, and asset
locations in real-time.
2 Automated
Warehousing
Utilize robotics and AI
to optimize storage,
picking, and packing.
3 Predictive Logistics
Forecast demand and plan routes to minimize delays and
costs.
Cybersecurity Considerations in a Connected World
Secure IoT Devices
Implement robust security
protocols to protect connected
devices.
Data Encryption
Safeguard sensitive
information through advanced
encryption techniques.
Incident Response
Develop comprehensive plans
to detect, respond, and
recover from cyber threats.
Workforce Transformation
and Upskilling
Identify Skills Gap
Assess current employee capabilities and future skill
requirements.
Upskill Workforce
Provide targeted training and development opportunities.
Foster Innovation
Empower employees to embrace new technologies and
processes.
Implementing a Smart and Connected Strategy
Assess Readiness
Evaluate your organization's
digital maturity and
infrastructure capabilities.
Prioritize Initiatives
Identify and focus on the most
impactful smart and connected
use cases.
Manage Change
Develop a comprehensive
change management plan to
drive adoption.
The Future of Smart and
Connected Businesses
1 Hyper-Automation
Integrate AI, machine
learning, and advanced
analytics to automate
end-to-end processes.
2 Intelligent Ecosystems
Foster collaborative
networks of connected
devices, partners, and
customers.
3 Sustainability and Resilience
Leverage smart solutions to reduce environmental impact
and build business continuity.
Smart factories are a key aspect of the Industry 4.0
movement, which seeks to integrate digital technologies
into the manufacturing process to create a more efficient,
autonomous, and connected production system. By
leveraging a range of technologies, including the Internet of
Things (IoT), artificial intelligence (AI), and machine
learning, smart factories are able to collect and analyze
vast amounts of data in real time, allowing manufacturers
to identify inefficiencies and bottlenecks in the production
line and make adjustments on the fly.
Smart factories
https://industry40thinktank.com/what-is-smart-factory-four-zero/
what is smart factory 4.0 FAQs​
1. What is a smart factory?
2. What is Industry 4.0?
3. What are the benefits of a smart factory?
4. What are the key technologies used in a smart
factory?
5. How can a company implement a smart
factory?
Benefits-Smart Factory
Smart factories use connected equipment and devices to allow for
evidence-based decision-making to optimise efficiency and productivity
throughout the manufacturing process.
Delivering an agile, iterative production process can extend the
capabilities of both devices and employees, leading to lower costs,
reduced downtimes and less waste in the manufacturing industry.
Identifying and then reducing or eliminating underused or misplaced
production capabilities increases efficiency and output with little
investment in new resources.
The benefits of digitalising a factory include those related to planning,
quality control, product development and logistics as each is assessed and
optimised based on real feedback.
There are also long term benefits to be gained through the introduction
of machine learning to the process. By collecting and analysing data, it is
possible to schedule preventive and predictive maintenance - based on
accurate real-life information - to avoid production line shutdowns.
https://www.twi-global.com/technical-knowledge/faqs/what-is-a-
smart-factory#Benefits
1. Level One: Basic Data Availability
At this level, a factory or facility is not really ‘smart’ at all. There is data available but it
is not easily accessed or analysed. Data analysis, where it is done, is time consuming and
can add inefficiencies to your production process.
2. Level Two: Proactive Data Analysis
At this level, the data can be accessed in a more structured and understandable form.
The data will be centrally available and organised with visualisation and displays assisting
with its processing. This all allows for proactive data analysis, although there will still be
a level of effort involved.
3. Level Three: Active Data
At this level, the data can be analysed with the assistance of machine learning and
artificial intelligence, creating insight without as much human supervision. The system is
more automated than at level two and can predict key issues or anomalies to proactively
predict potential failures.
4. Level Four: Action-Oriented Data
The fourth level builds on the active nature of level three to create solutions to issues
and, in some instances, undertake action to alleviate a problem or improve a process
with no human intervention. At this level, data is collected and analysed for issues before
solutions are generated and, where possible, actioned with very littl e human input
The Four Levels of Smart Factories
What Technologies are used in a Smart Factory
Sensors
Cloud Computing
Big Data Analytics
Virtual and Augmented Reality
Digital Twins
What are the Key Principles of a Smart Factory
The key principles behind the factory of the future are
connectivity alongside data analysis and diagnostics;
leading to less shutdowns, improved processes and
optimised facilities.
A smart factory is based around using the latest
technologies and connectivity to drive improvements to
processes.
Using technologies such as IoT and artificial intelligence
allows for a more responsive, yet also predictive, line;
making the most of the available resources to deliver
cost-effective and efficient manufacturing.
Smart Factories and Cybersecurity
Since smart factories are reliant on computing and digital
systems, cyber security needs a special mention.
Data protection and privacy are vital for any business and, as
soon as industry is digitised, cybersecurity needs to be
addressed. In some instances, industry will share data with
other companies for the benefit of everybody, for example,
with safety issues. However, your components, processes and
other data need to be protected from accidental error or even
deliberate hacking.
Cybersecurity issues may create a further cost that needs to
be considered when deciding if your smart factory benefits are
worth the expense in setting up.
Creating a Smart Factory
Upgrading a factory so that is ‘smart’ can seem like it would be an expensive
exercise, but you can make fast and effective changes without having to replace
every machine in your manufacturing chain.
If you assess your manufacturing chain and pick out the most important parts, you
can quickly make changes that will benefit the entire process. Analysing these key
areas may then provide information as to what should be improved next.
This analysis should be undertaken with a diverse team driving it, including
specialists in different areas of the business. The more you can involve the
workforce in the improvements, the more effective the changes will be.
Employees may also need training to ensure they can use any new equipment.
Indeed, rather than needing fewer people in the workforce, the skills your
employees require will change as they monitor systems, collate data and action
improvements, inspections or repairs.
Engineers will need to work with management and I.T. systems specialists to find
areas for upgrading, and a plan should be drawn up to look into optimising
processes, increasing sales, reducing costs and saving time across the whole
manufacturing process.
Introduction to Business Intelligence and Analytics,
Advanced Integration techniques,
Business intelligence integration incorporates data
mining, data visualization, business analytics,
infrastructure, data tools, and best practices to
assist businesses and organizations. Speed to
insight, flexible self-service analysis, and
empowered business users are prioritized by BI
integration.
https://www.domo.com/learn/article/an-intro-to-business-
intelligence-integration
BI integration stages
The utilization of data in routine business operations is a comprehensive endeavor. Business intelligence
integration comprises five critical stages, which are as follows:
1. Data gathering
Business intelligence is the process of obtaining information from various data sources, and then using that
information to inform business decisions. This information could come from a variety of on-premise or cloud
sources, such as databases, data warehouses, or other business automation apps.
2. Data evaluation
Business intelligence integration aims to create meaningful knowledge from data sets that exist within the
systems of an organization. It entails assessing present trends, forecasting future trends, and integrating and
summarizing different types of information in order to improve business processes.
3. Situation awareness
Business intelligence helps contextualize data for the business and its happenings. Understanding the context of
data and making judgments is known as situation awareness.
4. Risk evaluation
Business intelligence aims to assist you in evaluating any present potential risks, benefits, and costs of one
course of action over another. It involves digging into the data that influences your decisions and helps you
understand the associated risks.
5. Supporting decisions
Using information wisely is the goal of business intelligence integration. For you to take preemptive action, it
tries to alert you to significant occurrences like subpar employee performance or market shifts, depending on
the metrics you track. It helps you make the right decisions and analysis to increase customer satisfaction,
employee morale, and sales, for example. It provides you with the information you require at the appropriate
time.
Advantages of BI integration
1. Governed and trusted data
BI systems improve data analysis and data organization. When using traditional data analysis, users must visit many databases to find
the answers to their questions. These internal databases can now be combined with external data sources using modern BI
integration to create a single data warehouse. Every department in a business has access to the same data at once, which eliminates
data silos.
2. Increased organizational effectiveness
By utilizing BI integration, leaders may gain access to data, acquire a thorough picture of their operational processes, and evaluate
the performance of specific departments against that of the larger organization. Taking a broad view of the company can help
leaders spot possibilities.
BI integration frees up more time for enterprises to use data to develop new products and programs for their business because they
spend less time gathering reports and conducting data analysis.
3. Increased employee satisfaction
Thanks to BI solutions, IT organizations and analysts can respond more quickly to business user requirements. With little training,
departments that previously couldn’t access their data without contacting analysts or IT professionals may now conduct in-depth
data analysis.
4. Quicker analysis and clear dashboards
Data analysis is made simple and intuitive through business intelligence integration, enabling non-technical individuals to tell stories
with data without learning any programming languages. Dashboards composed of simple, effective visualizations help business users
of all skill levels comprehend critical insights.
5. Better decision making
Better business decisions are made possible by accurate data and quick reporting capabilities. Leaders are no longer required to
wait days, or even months, for reports. When using BI tools that provide access to real-time data, users don’t have to deal with the
possibility of obsolete information.
6. Competitive advantage
When businesses are aware of their performance in the market, they can be more competitive. Companies can use BI to stay ahead
of sectoral changes, track seasonal market shifts, and foresee clients’ wants.
7. Enhanced customer experience
Integration of business intelligence can directly impact customer happiness and experience. By effectively analyzing pertinent data,
Best practices for streamlining BI integration
An efficient integration plan is essential for successful BI integration in an organization.
A successful integration is made possible by the following best practices:
Consider data security
Security measures are essential to have in place while implementing BI in order to
safeguard your information assets from data breaches. Secure your organization’s data
by configuring authentication or authorization protocols and establishing protocols for
secure data processing.
Develop a BI strategy
There is a reporting procedure in place for every business. Before establishing a new BI
technology, it’s crucial to assess current systems and determine which areas could be
improved. Based on that data, you can create a unique design for your
BI integration strategy depending on your particular business structure.
Install data integration software
The complete integration process will take some time. Choose a business intelligence
solution according to your specific business characteristics and needs.
You may want to purchase a business-ready BI solution. Full-stack BI tools are a great
option. These solutions use built-in connectors to take data from many sources, convert
it into the necessary format, and load it into the target system linked to BI tools.
Therefore, investing in them would accomplish both integration and reporting goals.
BI integration stages
Data gathering. Business intelligence is the process of obtaining
information from various data sources, and then using that
information to inform business decisions.
•Data evaluation
•Situation awareness
•Risk evaluation
•Supporting decisions.
https://open.ocolearnok.org/informationsystems/chapter/chapter-
6-introduction-to-business-intelligence-and-analytics/
EXAMPLE: HOW TESLA USES BIG DATA
EXAMPLE: DATA MINING AT NETFLIX
https://open.ocolearnok.org/informationsystems/chapter/chapter-
6-introduction-to-business-intelligence-and-analytics/
EXAMPLE: THE “BALANCED SCORECARD”
DISCUSSION QUESTIONS:
1. What is business intelligence and how can it be used to improve organizational
performance?
2. What is big data and how has it changed the way companies approach decision-
making?
3. How does data mining differ from traditional statistical analysis?
4. How can visualization be used to communicate insights from data?
5. What are the ethical considerations of using data analytics in business?
6. What is machine learning and how can it be used in business intelligence?
7. How can companies maximize the value of their data assets?
8. What are some common challenges companies face when implementing business
intelligence and analytics solutions?
9. How can businesses use predictive analytics to identify patterns and trends?
Industrial internet of things (IIoT)
https://www.techtarget.com/iotagenda/definition/Industrial-
Internet-of-Things-IIoT
The industrial internet of things (IIoT) is the use of smart sensors, actuators
and other devices, such as radio frequency identification tags, to enhance
manufacturing and industrial processes. These devices are networked
together to provide data collection, exchange and analysis. Insights gained
from this process aid in more efficiency and reliability. Also known as the
industrial internet, IIoT is used in many industries, including manufacturing,
energy management, utilities, oil and gas.
IIoT uses the power of smart machines and real-time analytics to take
advantage of the data that dumb machines have produced in industrial
settings for years. The driving philosophy behind IIoT is that smart machines
aren't only better than humans at capturing and analyzing data in real time,
but they're also better at communicating important information that can be
used to drive business decisions faster and more accurately.
Which industries are using IIoT?
Numerous industries use IIoT, including the following:
The automotive industry. This industry uses industrial robots, and IIoT can help
proactively maintain these systems and spot potential problems before they can
disrupt production. The automotive industry also uses IIoT devices to collect data
from customer systems, sending it to the company's systems. That data is then
used to identify potential maintenance issues.
The agriculture industry. Industrial sensors collect data about soil nutrients,
moisture and other variables, enabling farmers to produce an optimal crop.
The oil and gas industry. Some oil companies maintain a fleet of autonomous
aircraft that use visual and thermal imaging to detect potential problems in
pipelines. This information is combined with data from other types of sensors to
ensure safe operations.
Utilities. IIoT is used in electric, water and gas metering, as well as for the
remote monitoring of industrial utilities equipment such as transformers.
What are the benefits of IIoT?
IIoT devices used in the manufacturing industry offer the following benefits:
Predictive maintenance. Organizations can use real-time data generated from IIoT systems to predict when a
machine needs to be serviced. That way, the necessary maintenance can be performed before a failure
occurs. This can be especially beneficial on a production line, where the failure of a machine might result in a
work stoppage and huge costs. By proactively addressing maintenance issues, an organization can achieve
better operational efficiency.
More efficient field service. IIoT technologies help field service technicians identify potential issues in
customer equipment before they become major issues, enabling techs to fix the problems before they affect
customers. These technologies also provide field service technicians with information about which parts they
need to make a repair. This ensures technicians have the necessary parts with them when making a service
call.
Asset tracking. Suppliers, manufacturers and customers can use asset management systems to track the
location, status and condition of products throughout the supply chain. The system sends instant alerts to
stakeholders if the goods are damaged or at risk of being damaged, giving them a chance to take immediate
or preventive action to remedy the situation.
Increased customer satisfaction. When products are connected to IoT, the manufacturer can capture and
analyze data about how customers use their products, enabling manufacturers and product designers to build
more customer-centric product roadmaps.
Improved facility management. Manufacturing equipment is susceptible to wear and tear, which can be
exacerbated by certain conditions in a factory. Sensors can monitor vibrations, temperature and other factors
that could lead to suboptimal operating conditions.
Who are IIoT vendors?
There are numerous vendors that offer IIoT platforms, including the following examples:
ABB Ability. ABB specializes in connectivity, software and machine intelligence.
Aveva. Acquired by Schneider Electric in early 2023, Aveva develops AI, digital
transformation, IIoT and IoT edge platforms for original equipment manufacturers and
end users.
Cisco IoT. Cisco offers platforms for network connectivity, connectivity management,
data control and exchange as well as edge computing.
Fanuc. Fanuc combines robotics, automation and advanced analytics to provide
industrial IoT offerings.
GE Predix Platform. This IIoT software platform helps connect, optimize and scale
digital industrial applications.
Plataine. Plataine specializes in using AI to generate actionable insights in
manufacturing.
Siemens Insights Hub. Insights Hub offers industrial IoT based on AI and advanced
analytics.
Business Systems Integration: A Definition
Business systems integration is the process of connecting
different parts of an enterprise system to enable
efficient and effective communication and data flow
between them. It involves combining various applications
such as customer relationship management (CRM),
financials, enterprise resource planning (ERP), human
resources, and more.
The main goal is to ensure that all the systems are
working together in harmony, with no duplication or gaps
in data storage or retrieval.
https://www.clarity-ventures.com/how-to-guides/step-by-step-
guide-to-business-system-integration
Advanced Integration techniques
https://estuary.dev/data-integration-strategy/
Cloud Integration
Cloud-based Integration uses cloud services for data storage, processing, and integration. One
of the key benefits of cloud-based integration is scalability. With cloud services, you can easily
scale your data storage up or down and process resources based on your needs. This scalability
eliminates the need for you to invest in additional hardware or infrastructure, saving you both
time and money.
Cloud services also allow you to access your data anytime, anywhere, and from any device as
long as you have an internet connection. They can seamlessly integrate with other cloud-based
applications and services for a connected and cohesive workflow.
Extract, Transform, Load is a 3-step process where you first pull data
from various sources, then transform it into a format that fits your
needs, and finally load it into a unified database. By extracting and
combining data from multiple sources, you can create a centralized
and unified view of your data.
Change Data Capture (CDC) is a technique that identifies and
captures changes made in a database and applies them to another
data repository. Its primary purpose is to enable real-time data
integration by efficiently identifying and transferring only the modified
data.
IoT Platform
An IoT platform serves as a mediator between the
world of physical objects and the world of actionable
insights. By combining numerous tools and
functionalities, Internet of Things platforms empower
you to develop unique hardware and software
products for gathering, storing, analyzing, and
managing the abundance of data generated by your
connected devices and assets
Amazon Web Services (AWS) IoT
Microsoft Azure IoT
Oracle IoT
Particle
IRI Voracity
ThingWorx IIoT Platform
Google Cloud IoT
Cisco IoT Cloud Connect
Salesforce IoT Cloud
IBM Watson IoT
Most Popular IoT Platforms
https://www.sam-solutions.com/blog/top-iot-platforms/
UNIT II
INTEGRATION OF THE PLM SYSTEM
WITH OTHER APPLICATIONS
https://www.arenasolutions.com/what-is-plm/plm-integrations/
Disconnected Systems Result in Errors and Inefficient
Workflows
Today’s manufacturing ecosystem
consists of a diverse mix of product
teams and supply chain partners from
across the globe. They often rely on
multiple, disjointed software
applications to design, develop, and
maintain a product. Teams must switch
from one system to another and
manually re-enter data to keep product
information up to date and move
processes along. This can be a labor-
intensive task that results in errors and
costly delays.
Enterprise PLM solutions serve as the single source of truth for managing the product
bill of materials (BOM) and associated quality and change processes. Integrating PLM with
upstream and downstream enterprise systems ensures a smooth handoff of product
information between design, quality, and production teams. Because data is automatically
updated and transmitted across all systems, everyone has full visibility into any changes or
issues. Ultimately, they can work more efficiently to get high-quality products to market on
time and on budget without any surprises.
Upstream Systems:
Engineering Design Solutions: Integration with design solutions such as
mechanical CAD (MCAD) and electronic design automation (EDA) software facilitates
earlier design reviews and feedback from downstream product teams and supply chain
partners. This ensures design for manufacturability (DFM) and reduces costs associated
with scrap and rework.
Downstream Systems:
Enterprise Resource Planning (ERP): Integration with ERP systems ensures that manufacturing receives the
latest released design information, eliminating production errors and resulting scrap or rework. In addition,
teams can easily monitor inventory, supply chain activities, and financial operations.
Manufacturing Execution Systems (MES): Integration with MES enables real-time collection of data on events
that take place on the factory floor. This data can be used to help manufacturing teams optimize their
efficiency.
Electronic Component Databases: Integration with component databases like SiliconExpert and Octopart
provides greater visibility into critical component details such as market availability, cost, and
environmental compliance information. This helps organizations mitigate supply chain risks, avoid product
delays, and meet regulatory requirements.
Customer Relationship Management (CRM) Systems: Integration with CRM systems like Salesforce,
ServiceMax, and Zendesk provides product teams centralized access to critical customer feedback and
data. This can help further inform product development and quality processes and improve customer
satisfaction.
Companies that integrate PLM with ERP and other enterprise systems are
more likely to realize these benefits:
Enhanced collaboration across the organization
Decreased product scrap and rework
Cost reduction
Greater efficiency/streamlined operations
Improved accuracy/product quality
Better inventory tracking
Improved cost analysis
Streamlined environmental, export control, and quality
compliance
Accelerated time to market
Increased customer satisfaction
Greater profitability
DIFFERENT APPLICATION INTEGRATION APPROACHES
There are various methods that can be used to connect enterprise systems. Some require minimal IT
resources whereas others may involve more extensive coding or customization for deployment.
Application Programming Interface (API)
An API is an intermediary that is used for point-to-point integrations, enabling two different software
systems to talk directly to each other and securely exchange data and functionality. Because APIs
have a defined architecture and protocol for sharing information, they simplify the integration
process. Typically, SaaS PLM vendors will provide customers their own APIs for integration. REST APIs
are well-documented, fast, and can be implemented as needed to support greater scalability.
Electronic Data Interchange (EDI)
An It automates and replaces paper-based transactions such as invoices and purchase orders. EDEDI is
a standard electronic format that is used to move business documents from one organization’s
computer system to another. Is can be challenging to implement and maintain due to the unique and
ever-changing requirements of each business.
Middleware
Middleware is software that lies between the applications and their operating system. It functions as a
“hidden” translation layer between systems, enabling communication and data management
capabilities beyond what is provided in the operating system. This approach is used when more
complex business rules are needed, or a large volume of data is transmitted between systems.
Middleware requires extensive programming and can be costly to configure and maintain. It does not
allow for scalability.
A PRODUCT STRUCTURE CONTAINS DOCUMENTS AND
MATERIALS TO COMPLETELY DESCRIBE A PRODUCT
https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/add30a34af294d51a0ccd83db28791f9/
c3c16f6e86fa49a68cb1d19c9f29b4b9.html
MODELING OF PRODUCT STRUCTURES
https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/
add30a34af294d51a0ccd83db28791f9/4deb2d635c4945b7b1eff40c7616cd4b.html
TRANSFER FILE
 Basic of PLMXML Export/Import
 PLMXML is a very powerful tools for importing/exporting data and file from Teamcenter to external
system and vice-verse. PLMXML is Siemens PLM sponsors XML schema for exporting/importing metadata as
well files from Teamcenter to other system,
 The advantage of PLMXML is its flexibility of defining rule for data extraction and import make it one of
the widely use tool for integration and data exchange. It is also widely used in teamcenter other module
like report builder and integration. For defining the rules, admin module is present where new rules can
be created or modified existing rules. This rules are called Transfermode. In this blog we will discuss in
detail the transfermode and its child rules.
 Transfer Mode:
 Transfermode encapsulate the rules which defines import/export data from teamcenter. It basically govern
the Export/Import rules and meta data which required to be extracted from Teamcenter. Transfer mode
mainly consist of
 · Closure Rule
 · Filter Rule
 · Property Set
ref: https://teamcenterplm.blogspot.com/2012/08/basic-of-plmxml-exportimport.html
ENTERPRISE RESOURCE PLANNING
ENTERPRISE RESOURCE PLANNING (ERP)
 Enterprise resource planning (ERP) is a software
system that helps you run your entire business,
supporting automation and processes in finance,
human resources, manufacturing, supply chain,
services, procurement, and more.
Ref:https://www.investopedia.com/terms/e/erp.asp
TYPES OF ERP SYSTEM
 On-Premise ERP
 Cloud ERP
 Industry-Specific ERP
 Open-Source ERP
 Small Business ERP
 Tiered ERP
ERP SOLUTIONS PROVIDERS
 Oracle Corp. (ORCL)
 SAP (SAP)
 Microsoft (MSFT)
SIX KEY BENEFITS OF ERP
https://www.sap.com/products/erp/what-is-erp.html#:~:text=In%20accounting%2C
%20the%20acronym%20ERP,reporting%20and%20analysis%2C%20and%20more.
 Enterprise resource planning systems include a variety
of different modules. Each ERP module supports
specific business processes – like finance, procurement,
or manufacturing – and provides employees in that
department with the transactions and insight they need
do their jobs. Every module connects to the ERP
system, which delivers a single source of truth and
accurate, shared data across departments.
COMMON ERP MODULES
COMPONENTS OF AN ENTERPRISE RESOURCE
PLANNING SYSTEM
ERP HISTORY: THE RAPID EVOLUTION OF ERP
ERP AT ANY SIZE: WHAT ARE MY OPTIONS
 ERP isn’t just for global enterprises. ERP solutions are designed for businesses of all sizes – small, midsize, and large.
You can also get industry- and company-specific functionality to meet unique business needs. Regardless of your
business sector and size, you’ll want to plan your ERP implementation project carefully, following best practices.

 Small business ERP
 ERP software for small businesses can help you move beyond spreadsheets and efficiently manage every aspect of your
growing company – from sales and customer relationships to financials and operations. Small business ERP tools are
typically in the cloud, quick to install, and designed to grow with you.

 Mid-Market ERP
 Today, ERP software designed for mid-market companies and subsidiaries benefit from built-in analytics, rapid
deployment, and best practices for dozens of different business processes – financials, HR, supply chain management,
and more. Midsize ERP tools help growing businesses scale and compete, even with limited resources. Modular,
cloud-based enterprise ERP systems are also a popular choice for midmarket companies with complex processes or
plans for rapid growth.

 Enterprise ERP
 Large companies with global or subsidiary operations need a robust, market-leading ERP system with embedded AI,
machine learning, and analytics – and intelligent automation to transform business models and processes. ERP systems
can be deployed on premise, in the cloud, or in a hybrid scenario depending on business need. They can integrate with
existing databases or, ideally, run on newer, powerful in-memory databases.

 Many companies are modernizing and upgrading their on-premise ERP systems to cloud deployments. This requires
careful planning of your ERP upgrade, as well as an ERP evaluation and review of your deployment options.
ERP FAQS
 What is an ERP software system?
 What is ERP cloud software?
 What is ERP in accounting?
 How do I know I'm ready for an ERP system?
THE MOST WIDELY USED ERP MODULES INCLUDE:
 Finance: The finance and accounting module is the backbone of most ERP systems. In addition
to managing the general ledger and automating key financial tasks, it helps businesses track
accounts payable (AP) and receivable (AR), close the books efficiently, generate financial
reports, comply with revenue recognition standards, mitigate financial risk, and more.
 Human resources management: Most ERP systems include an HR module that provides core
capabilities such as time and attendance and payroll. Add-ons, or even entire
human capital management (HCM) suites, can connect to the ERP and deliver more robust HR
functionality – everything from workforce analytics to employee experience management.
 Sourcing and procurement: The sourcing and procurement module helps businesses procure
the materials and services they need to manufacture their goods – or the items they want to
resell. The module centralizes and automates purchasing, including requests for quotes,
contract creation, and approvals. It can minimize underbuying and overbuying, improve
supplier negotiations with AI-powered analytics, and even seamlessly connect with buyer
networks.
 Sales: The sales module keeps track of communications with prospects and customers – and
helps reps use data-driven insights to increase sales and target leads with the right
promotions and upsell opportunities. It includes functionality for the order-to-cash process,
including order management, contracts, billing, sales performance management, and sales
force support
THE MOST WIDELY USED ERP MODULES INCLUDE(CONT..)
 Manufacturing: The manufacturing module is a key planning and execution component of ERP
software. It helps companies simplify complex manufacturing processes and ensure production is in
line with demand. This module typically includes functionality for material requirements planning
(MRP), production scheduling, manufacturing execution, quality management, and more.
 Logistics and supply chain management: Another key component of ERP systems, the
supply chain module tracks the movement of goods and supplies throughout an organization’s supply
chain. The module provides tools for real-time inventory management, warehousing operations,
transportation, and logistics – and can help increase supply chain visibility and resilience.
 Service: In an ERP, the service module helps companies deliver the reliable, personalized service
customers have come to expect. The module can include tools for in-house repairs, spare parts, field
service management, and service-based revenue streams. It also provides analytics to help service
reps and technicians rapidly solve customer issues and improve loyalty.
 R&D and engineering: Feature-rich ERP systems include an R&D and engineering module. This module
provides tools for product design and development, product lifecycle management (PLM), product
compliance, and more – so companies can quickly and cost-effectively create new innovations.
 Enterprise asset management: Robust ERP systems can include an EAM module – which helps asset-
intensive businesses minimize downtime and keep their machines and equipment running at peak
efficiency. This module includes functionality for predictive maintenance, scheduling, asset operations
and planning, environment, health and safety (EHS), and more.
UNIT III DIGITAL TWIN BASICS
 Introduction, Industrial Revolution Facts, Industry
4.0 Environment, Technologies Transforming
Industry 4.0. Basic Concepts of Digital Twin:
Evolution of Pairing, Definition and Features of
Digital Twins, Digital Twin Timeline.
UNIT IV DIGITAL TWIN
Features and Implementation of Digital Twin: Digital Twin Terminologies &
Essentials, Working of Digital Twins. Building Blocks of Digital Twin: Digital
Twin Building Blocks, Digital Twin Technology Drivers & Enablers. Types of
Digital Twin: Based on Product, Process, Based on Functionality, Based on
Maturity, Characteristics of a Good Digital Twin Platform. Digital Twin:
Benefits, Impacts and Challenges: Barriers of Digital Twin Implementation
 What is a Digital Twin?
 A Digital Twin of any device/system is a working model of all
components (at micro level or macro level or both) integrated
and mapped together using physical data, virtual data, and
interaction data between them to make a fully functional
replica of the device/system and that too on a digital medium.
 This digital twin of the physical system is not intended to
outplace the physical system but to test its optimality and
predict the physical counterparts’ performance characteristics.
 You can know of the system’s operational life course, the
implication of design changes, the impact of environmental
alters and a lot more variables using this concept. Talking about
life course, it invites me to aromatize your awareness of the
concept with its origin.
REF:https://www.geeksforgeeks.org/introduction-to-digital-twin/
Brief History of Digital Twin
The concept and model of the Digital Twin was officially put forward in 2002 by Dr.
Michael Grieves as the conceptual model underlying Product Lifecycle
Management (PLM). The concept was being practiced since the 1960s by NASA.
They used basic twinning ideas for space programming at that time. They did this
by creating physically duplicated systems at ground level to match the systems in
space.
Example : When NASA developed a digital twin to assess and simulate conditions
on board Apollo 13. The efforts were made keeping in mind only a particular
mission and because of that, this concept didn’t gain recognition until 2002
after Dr. Grieves presented it with all the elements including real space, virtual
space and the spreading of data and information flow between real and virtual
space.
The concept of integrating the digital and physical parts as one entity has
remained the same since its emergence. Although the terminology has changed
over the years till 2010 when it was subsequently called ‘Digital Twin’ by John
Vickers of NASA in a 2010 Roadmap Report.
A Digital Twin consists of three distinct parts:
 1. The physical part ,
 2. The Digital Part ,
 3. The Connection Between the Two
 Types of Digital Twins:
 1. Asset Twins
 2. System Twins
 3. Process Twins
ADVANTAGES OF DIGITAL TWINS
 Enhanced Operational Efficiency
 Predictive Maintenance
 Process Optimization
 Data-Drivn Decision-Making
 Rich Insights
 Reduced Uncertainty
 Fostering Innovation and Collaboration
 Sustainability and Environmental Impact
 What Was the Industrial Revolution?
 The Industrial Revolution was a period of major mechanization
and innovation that began in Great Britain during the mid-18th
and early 19th centuries and later spread throughout much of
the world. The British Industrial Revolution was dominated by
the exploitation of coal and iron.
 The American Industrial Revolution, sometimes referred to as
the “Second Industrial Revolution,” began during the
Gilded Age in the 1870s and continued through World War II.
The era saw the mechanization of agriculture and
manufacturing and the introduction of new modes of
transportation, including steamships, the automobile, and
airplanes
https://www.investopedia.com/terms/i/industrial-revolution.asp
EVOLUTION OF PAIRING, DEFINITION AND FEATURES OF DIGITAL TWINS, DIGITAL TWIN TIMELINE
 Digital twin technology evolution stage.
https://www.researchgate.net/publication/
360537125_Digital_Twin_Technology_Evolution_Stages_and_Impleme
ntation_Layers_With_Technology_Elements/figures
DIGITAL TWIN ESSENTIAL TECHNOLOGIES AND
APPLICATION SERVICES.
TRADITIONAL DIGITAL TWIN EVOLUTION
MODEL.
CONCEPTUAL DIAGRAM OF DIGITAL TWIN
EVOLUTION STAGE.
DIGITAL TWIN IMPLEMENTATION LAYERS
DIGITAL TWIN TECHNOLOGY ELEMENTS ACCORDING TO THE IMPLEMENTATION LAYERS.
CHALLENGES OF DIGITAL TWINS
 Data management
 Data security
 IoT development
 System integration.
 Supplier collaboration
 Complexity
 Use cases and examples of digital twins
 The initial deployments of digital twins were
mostly directed at the design, production and
maintenance of extremely high-value,
physically large equipment, such as airplanes,
buildings, bridges and power-generation plants
where mechanical failure can be life
threatening or cause financial losses that
exceed the significant expense and effort of
developing a digital twin.
 The following industries are seeing the most
activity in planning or deploying digital twins:
 Manufacturing.
 Utilities and energy
 Healthcare.
 Urban planning and construction
 Automotive.
Building Blocks of Digital Twin : Digital Twin Building
Blocks, Digital Twin Technology Drivers & Enablers.
 Digital twins are virtual replicas of physical assets, systems, or processes that help in monitoring, analyzing,
and optimizing performance. Here’s a breakdown of the key building blocks, technology drivers, and enablers
for digital twins:
 Building Blocks of Digital Twins
 Data Collection: Gathering data from various sources such as sensors, IoT devices, and existing databases.
 Modeling: Creating a virtual model using CAD files, BIM software, or other modeling tools.
 Integration: Combining real-time data streams with the virtual model for continuous monitoring and analysis.
 Simulation: Running simulations to predict performance and identify potential issues.
 Visualization: Using 3D visualization tools to provide an immersive view of the digital twin.
 Analytics: Applying algorithms and AI for predictive maintenance and performance optimization
 Technology Drivers
 Internet of Things (IoT): IoT devices provide the necessary data for creating and updating digital twins.
 Artificial Intelligence (AI): AI helps in analyzing data and making predictions.
 Cloud Computing: Cloud platforms offer the storage and computational power needed for digital twins.
 Big Data: Handling and processing large volumes of data is crucial for accurate digital twins.
 Edge Computing: Processing data closer to the source reduces latency and improves real-time decision-
making3
 Enablers
 Building Information Modeling (BIM): BIM provides detailed digital representations of physical and functional
characteristics.
 Geographic Information Systems (GIS): GIS helps in integrating spatial data with digital twins.
 Cyber-Physical Systems (CPS): CPS integrates computation, networking, and physical processes.
 Standards and Protocols: Ensuring interoperability and data exchange between different systems and devices.
 Characteristics of a Digital Twin platform include123
:Connectivity: Digital twins are connected to real-world
data sources such as sensors and IoT devices.
 Homogenization: They enable the homogenization of data
from various sources.
 Reprogrammable and smart: Digital twins allow physical
products to be reprogrammed.
 Real-time data integration: Continuously updated with real-
time data.
 Simulation and modeling: Used for modeling and simulating
behavior.
BARRIERS OF DIGITAL TWIN
IMPLEMENTATION
https://www.digitaltwinconsortium.org/glossary/glossary/
THIS EFFICIENT PRODUCTION FLOOR UTILIZES DIGITAL TWIN TECHNOLOGY TO CONNECT ALL
OPERATIONS FROM BEGINNING TO END
https://www.digikey.com/en/articles/the-digital-twin-concept-and-
how-it-works
DIGITAL TWINS HELP UNDERSTAND THE PRESENT AND PREDICT THE
FUTURE
SIX-LAYER ARCHITECTURE OF DIGIT
AL TWIN
THE DIGITAL TWIN AUTOMOTIVE RE
VOLUTION
APPLICATIONS
DIGITAL TWINS SIMPLIFY SYSTEM AN
ALYSIS
UNIT V DIGITAL THREAD
 Digital Thread Definition, Data Storage in the
Digital Thread, Data Sharing and The Digital
Thread, Strategic issues in implementing the digital
thread, Technologies used in the Design Process,
Cyber infrastructure Components of the Digital
Thread and Digital Thread on the Shop Floor
DIGITAL THREAD DEFINITION
 A digital thread is a data-driven communication framework
that connects traditionally siloed elements in manufacturing
processes and provides an integrated view of an asset
throughout the manufacturing lifecycle. In addition to
technology, the establishment of a digital thread requires
business processes that help weave data-driven decision
management into the manufacturing culture.
 Digital threads capture and share data across processes using
a range of technologies, such as computer-aided design
software, product lifecycle management systems and
internet of things (IoT) sensors.
https://www.ptc.com/en/industry-insights/digital-thread
DIGITAL THREAD VS. DIGITAL TWIN
 The terms digital thread and digital twin are
related concepts used in the context of
manufacturing systems, but they refer to different
aspects of a product's lifecycle.
 A digital thread functions as a communication
framework that makes it easier for asset and
product data to flow smoothly throughout their
lifecycles. A digital twin is a virtual model or a
digital replica of an actual physical object or
system and offers a more detailed view for analysis
and optimization.
 Digital thread, also known as digital chain is defined
as “the use of digital tools and representations for
design, evaluation, and life cycle management.”.[2]
It
is a data-driven architecture that links data gathered
during a Product lifecycle from all involved and
distributed manufacturing systems.[3]
This data can
come from any part of product's lifecycle, its
transportation, or its supply chain.[3]
Digital thread
"enables the collection, transmission, and sharing of
data and information between systems across the
product lifecycle" to enable real-time decision
making, gather data, and iterate on the product.
https://www.challenge.org/insights/digital-twin-and-digital-thread/
 What are the threats to digital thread adoption?
 Data issues
 It is difficult to gain a holistic view of a product's lifecycle and ensure every
stakeholder has access to the latest data due to information across organisations often
being isolated in separate systems. Inconsistent data formats and a lack of
standardisation, both within an organisation and across industries, can cause
confusion; data interoperability is key to creating a digital thread.
 Security concerns
 An interconnected system reliant on large amounts of data are vulnerable to cyber-
attacks. As with all emerging technologies, unidentified vulnerabilities will be present
for malicious actors to abuse. To combat this, organisations should adopt clear data
governance policies and procedures to manage access and control.
 Cultural and organisational challenges
 Implementing a digital thread often requires significant changes to workflows and
stakeholder mindsets, often leading to resistance to adoption. This can be combated
by properly informing all employees, educating them on the importance of the digital
thread. Additionally, organisations may need to train employees to manage data or
software tools required for digital thread implementation.
https://www.amrc.co.uk/news/digital-thread-frequently-asked-
questions
 What kind of infrastructure is needed to support digital thread implementation?
 A successful digital thread implementation relies on a robust IT infrastructure that can
handle data integration, storage, and analysis across the entire product lifecycle. The
key components include:
 Product Lifecycle Management (PLM) System: This serves as the backbone of the
digital thread, storing and managing all product data throughout its lifecycle, from
design inception to service and end-of-life.
 Enterprise Resource Planning (ERP) System: The ERP system integrates with the PLM to
provide data on manufacturing processes, inventory management, and financial aspects
of production.
 Scalable storage and computing resources: The volume of data generated from various
sources within the digital thread can be significant. Depending on the complexity of
operations, cloud-based storage or high-performance computing capabilities may be
required to handle data processing and analysis.
 Advanced analytics tools: Extracting meaningful insights from the vast amount of data
collected can require advanced analytics tools like machine learning and artificial
intelligence to identify patterns, predict trends, and optimise processes.
 Secure network infrastructure: A secure network infrastructure is crucial to protect
sensitive data within the digital thread from cyberattacks and unauthorised access.
 HIGHLIGHTS-DT
 Digital threads interlink all the data related to a
product throughout its life cycle—data from within
and outside the enterprise.
 Digital threads can deliver significant business
value—improved time to market, enhanced product
quality, increased operational efficiency—by
streamlining complex processes.
 Establishing an enterprise digital thread is a long-
term, incremental, continuous transformation
journey for a company.
https://www.tcs.com/what-we-do/services/iot-digital-
engineering/white-paper/digital-threads-product-data-value
AN ENTERPRISE DIGITAL THREAD CAN HELP OVERCOME THE CHALLENGES AROUND
ACCESSING ACCURATE PRODUCT DATA.
DATA STORAGE IN THE DIGITAL THREAD
DATA SHARING
Data Sharing
What is data sharing?
Data sharing is the process of making the same data resources available to
multiple applications, users, or organizations. It includes technologies,
practices, legal frameworks, and cultural elements that facilitate secure data
access for multiple entities without compromising data integrity. Data sharing
improves efficiency within an organization and fosters collaboration with
vendors and partners. Awareness of the risks and opportunities of shared data
is integral to the process.
https://aws.amazon.com/what-is/data-sharing/
#:~:text=Data%20sharing%20is%20the
%20process,applications%2C%20users%2C%20or
%20organizations.
 What are the risks of data sharing?
 Data disclosure has potential regulatory, competitive, financial, and security risks. We
outline some critical threats below.
 Privacy disclosure
 Every single organization has legal and ethical obligations to safeguard the privacy of
the customer data they own. They have to take appropriate measures to share data
without compromising privacy. Privacy-preserving technologies like encryption and
redaction allow for safe data sharing.
 Data misinterpretation
 Lack of communication between data producers and consumers can result in analytical
misinterpretation. Analysts may make incorrect assumptions when explaining reports
and outcomes. For example, a reduction in customer orders in a particular month may
be attributed to a lower marketing budget, although the real reason could be a delay in
product availability.
 Low data quality
 Data consumers may have limited control over the quality and availability of data. They
may have to deal with missing or duplicate data, questions about validity, lacking data
documentation, and similar issues. Hidden biases against a particular gender, race,
religion, or ethnic group may also be present in the dataset.
CYBER INFRASTRUCTURE COMPONENTS OF THE DIGITAL
THREAD AND DIGITAL THREAD ON THE SHOP FLOOR

22ME926Introduction to Business Intelligence and Analytics, Advanced Integration techniques.pptx

  • 1.
    22ME926 - INTRODUCTION TOBUSINESS INTELLIGENCE AND ANALYTICS, ADVANCED INTEGRATION TECHNIQUES
  • 3.
    Introduction to Industry 4.0 Industry4.0 represents the fourth industrial revolution, characterized by the integration of advanced technologies like automation, data analytics, and cyber-physical systems into manufacturing and other industries. This transformation is reshaping how businesses operate and deliver products and services. by Sengottaiyan K Assistant Professor
  • 4.
    What is Industry4.0? Connectivity The integration of smart, connected devices and systems that can communicate and exchange data. Automation The use of intelligent machines and systems to perform tasks with minimal human intervention. Data Analytics The ability to collect, analyze, and derive insights from large amounts of data to improve decision-making. Cyber-Physical Systems The merging of the physical and digital worlds, enabling real-time monitoring and control of industrial processes.
  • 5.
    Key Technologies ofIndustry 4.0 Internet of Things (IoT) Interconnected devices that can communicate and exchange data, enabling real-time monitoring and optimization. Artificial Intelligence (AI) Advanced algorithms and machine learning that can analyze data, automate decision-making, and drive innovation. Big Data and Analytics The ability to collect, process, and derive insights from large volumes of structured and unstructured data.
  • 6.
    Benefits of AdoptingIndustry 4.0 1 Improved Efficiency Increased productivity, reduced waste, and optimized processes through automation and data-driven decision- making. 2 Enhanced Quality Consistent, reliable, and high-quality products and services through real-time monitoring and control. 3 Cost Savings Reduced operational costs, maintenance expenses, and inventory levels through predictive analytics and optimization. 4 Increased Flexibility Ability to quickly adapt to changing market demands and customer preferences through flexible, agile production.
  • 7.
    Challenges of ImplementingIndustry 4.0 Technological Complexity Integrating and managing a wide range of advanced technologies, systems, and data sources. Cybersecurity Risks Protecting interconnected systems and data from cyber threats and ensuring data privacy. Organizational Change Overcoming resistance to change and upskilling the workforce to embrace new technologies and processes.
  • 8.
    Industry 4.0 inManufacturing 1 Smart Automation Automated manufacturing processes with real-time monitoring and control systems. 2 Predictive Maintenance Leveraging sensor data and analytics to predict and prevent equipment failures. 3 Customized Production Flexible, on-demand production to meet individual customer requirements.
  • 9.
    Industry 4.0 inSupply Chain Management End-to-End Visibility Real-time tracking and tracing of products and materials throughout the supply chain. Demand Forecasting Leveraging data analytics to improve demand forecasting and inventory optimization. Logistics Optimization Automated route planning, fleet management, and transportation optimization.
  • 10.
    Industry 4.0 inHealthcare Remote Monitoring Wearable devices and IoT sensors for real-time patient monitoring and early detection. Robotic Surgery Advanced, precision-guided surgical robots for minimally invasive and complex procedures. Predictive Analytics Using data-driven insights to predict and prevent health issues, optimize treatments, and improve patient outcomes.
  • 11.
    Preparing Your Organizationfor Industry 4.0 Assess Readiness Evaluate your organization's current capabilities, infrastructure, and resources to identify areas for improvement. Develop a Strategy Create a clear, comprehensive plan for implementing Industry 4.0 technologies and transforming your operations. Invest in Talent Upskill your workforce and hire the necessary talent to support the adoption and integration of new technologies.
  • 12.
    The Future ofIndustry 4.0 1 Increased Automation Intelligent machines and robots will take on an even greater role in manufacturing and other industries. 2 Personalized Products Highly customized and personalized products will become the norm, catering to individual customer preferences. 3 Sustainable Operations Industry 4.0 technologies will drive more eco- friendly and resource- efficient production processes. 4 Predictive Maintenance Advanced analytics will enable proactive maintenance and minimize unplanned downtime across industries.
  • 13.
    Introduction to Lean Production System Leanproduction is a systematic approach to eliminating waste and improving efficiency in manufacturing and business processes. It focuses on optimizing workflows, reducing inventory, and empowering employees to drive continuous improvement. by Sengottaiyan K Assistant Professor
  • 14.
    The Principles ofLean 1 Value Identify and focus on creating value for the customer. 2 Value Stream Analyze the end-to-end process to eliminate waste. 3 Flow Ensure a smooth, continuous flow of work. 4 Pull Produce only what the customer needs, when they need it.
  • 15.
    Eliminating Waste Overproduction Making morethan the customer needs. Transportation Unnecessary movement of materials, information, or people. Inventory Excess raw materials, work- in-progress, or finished goods. Motion Unnecessary movement of people or equipment.
  • 16.
    Just-in-Time Production 1 Pull System Productsare made only when the customer orders them, reducing waste and inventory. 2 Small Batches Producing in small, frequent batches improves responsiveness and reduces defects. 3 Leveled Production Maintaining a consistent production pace to avoid bottlenecks and overloads.
  • 17.
    Continuous Improvement (Kaizen) IncrementalChanges Kaizen focuses on making small, incremental improvements rather than large, disruptive changes. Employee Involvement Kaizen relies on the collective knowledge and ideas of all employees to identify and solve problems. Ongoing Process Kaizen is a never-ending cycle of continuous improvement, ensuring the organization is always evolving and adapting.
  • 18.
    5S Workplace Organization Sort Eliminateunnecessary items and organize the work area. Set in Order Arrange essential items in a logical, efficient manner. Shine Keep the work area clean and well-maintained. Standardize Establish consistent procedures and best practices. Sustain Continuously monitor and improve the 5S system.
  • 19.
    Visual Management Display KeyInformation Use visual tools like signs, charts, and indicators to communicate important data and metrics. Identify Problems Quickly Visual management makes it easier to spot issues and deviations from standard processes. Empower Employees Visual management gives employees the information they need to make informed decisions and take action.
  • 20.
    Standardized Work 1 Documented Processes Standardizedwork involves creating detailed, written procedures for each task and operation. 2 Consistency and Quality Standardized work ensures a consistent, high-quality output by reducing variation in processes. 3 Continuous Improvement Standardized work provides a stable foundation for identifying and implementing improvements.
  • 21.
    Lean Leadership andCulture Empowerment Lean leaders empower employees to identify and solve problems. Servant Leadership Lean leaders support and facilitate the work of their teams. Continuous Learning Lean leaders foster a culture of continuous learning and improvement.
  • 22.
    Implementing Lean inYour Organization 1 Assess Readiness Evaluate your organization's culture, processes, and willingness to change. 2 Develop a Plan Create a detailed implementation plan with clear goals, timelines, and responsibilities. 3 Pilot and Iterate Start with a pilot project, gather feedback, and continuously improve the approach.
  • 23.
    Introduction to Smart and Connected Business Smartand connected business leverages the power of technology, data, and automation to drive innovation, improve efficiency, and enhance customer experiences. This presentation will explore the key trends and strategies behind this transformative approach to modern enterprise. by Sengottaiyan K Assistant Professor
  • 24.
    The Rise ofthe Internet of Things (IoT) Sensors IoT sensors collect real-time data from the physical world. Connectivity Devices connect to the cloud, enabling remote monitoring and control. Analytics Data is analyzed to uncover insights and drive intelligent decision-making.
  • 25.
    Leveraging Data and Analyticsfor Competitive Advantage Predictive Maintenance Analyze sensor data to predict equipment failures and schedule proactive maintenance. Personalized Customer Experiences Use customer data to deliver tailored products, services, and interactions. Operational Optimization Identify inefficiencies and optimize processes to improve productivity and cost-savings.
  • 26.
    Automating Processes for IncreasedEfficiency 1 Identify Analyze business processes to pinpoint repetitive, rules-based tasks. 2 Automate Implement robotic process automation (RPA) to execute these tasks. 3 Scale Expand automation across the organization to drive efficiency and cost savings.
  • 27.
    Enhancing Customer Experiencethrough Connectivity Omnichannel Support Provide seamless, personalized experiences across multiple touchpoints. Predictive Analytics Use customer data to anticipate needs and proactively offer solutions. Intelligent Automation Leverage chatbots and virtual assistants to streamline customer interactions.
  • 28.
    Optimizing Supply Chain andLogistics 1 Real-Time Visibility Track inventory, shipments, and asset locations in real-time. 2 Automated Warehousing Utilize robotics and AI to optimize storage, picking, and packing. 3 Predictive Logistics Forecast demand and plan routes to minimize delays and costs.
  • 29.
    Cybersecurity Considerations ina Connected World Secure IoT Devices Implement robust security protocols to protect connected devices. Data Encryption Safeguard sensitive information through advanced encryption techniques. Incident Response Develop comprehensive plans to detect, respond, and recover from cyber threats.
  • 30.
    Workforce Transformation and Upskilling IdentifySkills Gap Assess current employee capabilities and future skill requirements. Upskill Workforce Provide targeted training and development opportunities. Foster Innovation Empower employees to embrace new technologies and processes.
  • 31.
    Implementing a Smartand Connected Strategy Assess Readiness Evaluate your organization's digital maturity and infrastructure capabilities. Prioritize Initiatives Identify and focus on the most impactful smart and connected use cases. Manage Change Develop a comprehensive change management plan to drive adoption.
  • 32.
    The Future ofSmart and Connected Businesses 1 Hyper-Automation Integrate AI, machine learning, and advanced analytics to automate end-to-end processes. 2 Intelligent Ecosystems Foster collaborative networks of connected devices, partners, and customers. 3 Sustainability and Resilience Leverage smart solutions to reduce environmental impact and build business continuity.
  • 33.
    Smart factories area key aspect of the Industry 4.0 movement, which seeks to integrate digital technologies into the manufacturing process to create a more efficient, autonomous, and connected production system. By leveraging a range of technologies, including the Internet of Things (IoT), artificial intelligence (AI), and machine learning, smart factories are able to collect and analyze vast amounts of data in real time, allowing manufacturers to identify inefficiencies and bottlenecks in the production line and make adjustments on the fly. Smart factories
  • 36.
  • 37.
    what is smartfactory 4.0 FAQs​ 1. What is a smart factory? 2. What is Industry 4.0? 3. What are the benefits of a smart factory? 4. What are the key technologies used in a smart factory? 5. How can a company implement a smart factory?
  • 38.
    Benefits-Smart Factory Smart factoriesuse connected equipment and devices to allow for evidence-based decision-making to optimise efficiency and productivity throughout the manufacturing process. Delivering an agile, iterative production process can extend the capabilities of both devices and employees, leading to lower costs, reduced downtimes and less waste in the manufacturing industry. Identifying and then reducing or eliminating underused or misplaced production capabilities increases efficiency and output with little investment in new resources. The benefits of digitalising a factory include those related to planning, quality control, product development and logistics as each is assessed and optimised based on real feedback. There are also long term benefits to be gained through the introduction of machine learning to the process. By collecting and analysing data, it is possible to schedule preventive and predictive maintenance - based on accurate real-life information - to avoid production line shutdowns. https://www.twi-global.com/technical-knowledge/faqs/what-is-a- smart-factory#Benefits
  • 39.
    1. Level One:Basic Data Availability At this level, a factory or facility is not really ‘smart’ at all. There is data available but it is not easily accessed or analysed. Data analysis, where it is done, is time consuming and can add inefficiencies to your production process. 2. Level Two: Proactive Data Analysis At this level, the data can be accessed in a more structured and understandable form. The data will be centrally available and organised with visualisation and displays assisting with its processing. This all allows for proactive data analysis, although there will still be a level of effort involved. 3. Level Three: Active Data At this level, the data can be analysed with the assistance of machine learning and artificial intelligence, creating insight without as much human supervision. The system is more automated than at level two and can predict key issues or anomalies to proactively predict potential failures. 4. Level Four: Action-Oriented Data The fourth level builds on the active nature of level three to create solutions to issues and, in some instances, undertake action to alleviate a problem or improve a process with no human intervention. At this level, data is collected and analysed for issues before solutions are generated and, where possible, actioned with very littl e human input The Four Levels of Smart Factories
  • 40.
    What Technologies areused in a Smart Factory Sensors Cloud Computing Big Data Analytics Virtual and Augmented Reality Digital Twins
  • 41.
    What are theKey Principles of a Smart Factory The key principles behind the factory of the future are connectivity alongside data analysis and diagnostics; leading to less shutdowns, improved processes and optimised facilities. A smart factory is based around using the latest technologies and connectivity to drive improvements to processes. Using technologies such as IoT and artificial intelligence allows for a more responsive, yet also predictive, line; making the most of the available resources to deliver cost-effective and efficient manufacturing.
  • 42.
    Smart Factories andCybersecurity Since smart factories are reliant on computing and digital systems, cyber security needs a special mention. Data protection and privacy are vital for any business and, as soon as industry is digitised, cybersecurity needs to be addressed. In some instances, industry will share data with other companies for the benefit of everybody, for example, with safety issues. However, your components, processes and other data need to be protected from accidental error or even deliberate hacking. Cybersecurity issues may create a further cost that needs to be considered when deciding if your smart factory benefits are worth the expense in setting up.
  • 43.
    Creating a SmartFactory Upgrading a factory so that is ‘smart’ can seem like it would be an expensive exercise, but you can make fast and effective changes without having to replace every machine in your manufacturing chain. If you assess your manufacturing chain and pick out the most important parts, you can quickly make changes that will benefit the entire process. Analysing these key areas may then provide information as to what should be improved next. This analysis should be undertaken with a diverse team driving it, including specialists in different areas of the business. The more you can involve the workforce in the improvements, the more effective the changes will be. Employees may also need training to ensure they can use any new equipment. Indeed, rather than needing fewer people in the workforce, the skills your employees require will change as they monitor systems, collate data and action improvements, inspections or repairs. Engineers will need to work with management and I.T. systems specialists to find areas for upgrading, and a plan should be drawn up to look into optimising processes, increasing sales, reducing costs and saving time across the whole manufacturing process.
  • 44.
    Introduction to BusinessIntelligence and Analytics, Advanced Integration techniques, Business intelligence integration incorporates data mining, data visualization, business analytics, infrastructure, data tools, and best practices to assist businesses and organizations. Speed to insight, flexible self-service analysis, and empowered business users are prioritized by BI integration. https://www.domo.com/learn/article/an-intro-to-business- intelligence-integration
  • 45.
    BI integration stages Theutilization of data in routine business operations is a comprehensive endeavor. Business intelligence integration comprises five critical stages, which are as follows: 1. Data gathering Business intelligence is the process of obtaining information from various data sources, and then using that information to inform business decisions. This information could come from a variety of on-premise or cloud sources, such as databases, data warehouses, or other business automation apps. 2. Data evaluation Business intelligence integration aims to create meaningful knowledge from data sets that exist within the systems of an organization. It entails assessing present trends, forecasting future trends, and integrating and summarizing different types of information in order to improve business processes. 3. Situation awareness Business intelligence helps contextualize data for the business and its happenings. Understanding the context of data and making judgments is known as situation awareness. 4. Risk evaluation Business intelligence aims to assist you in evaluating any present potential risks, benefits, and costs of one course of action over another. It involves digging into the data that influences your decisions and helps you understand the associated risks. 5. Supporting decisions Using information wisely is the goal of business intelligence integration. For you to take preemptive action, it tries to alert you to significant occurrences like subpar employee performance or market shifts, depending on the metrics you track. It helps you make the right decisions and analysis to increase customer satisfaction, employee morale, and sales, for example. It provides you with the information you require at the appropriate time.
  • 46.
    Advantages of BIintegration 1. Governed and trusted data BI systems improve data analysis and data organization. When using traditional data analysis, users must visit many databases to find the answers to their questions. These internal databases can now be combined with external data sources using modern BI integration to create a single data warehouse. Every department in a business has access to the same data at once, which eliminates data silos. 2. Increased organizational effectiveness By utilizing BI integration, leaders may gain access to data, acquire a thorough picture of their operational processes, and evaluate the performance of specific departments against that of the larger organization. Taking a broad view of the company can help leaders spot possibilities. BI integration frees up more time for enterprises to use data to develop new products and programs for their business because they spend less time gathering reports and conducting data analysis. 3. Increased employee satisfaction Thanks to BI solutions, IT organizations and analysts can respond more quickly to business user requirements. With little training, departments that previously couldn’t access their data without contacting analysts or IT professionals may now conduct in-depth data analysis. 4. Quicker analysis and clear dashboards Data analysis is made simple and intuitive through business intelligence integration, enabling non-technical individuals to tell stories with data without learning any programming languages. Dashboards composed of simple, effective visualizations help business users of all skill levels comprehend critical insights. 5. Better decision making Better business decisions are made possible by accurate data and quick reporting capabilities. Leaders are no longer required to wait days, or even months, for reports. When using BI tools that provide access to real-time data, users don’t have to deal with the possibility of obsolete information. 6. Competitive advantage When businesses are aware of their performance in the market, they can be more competitive. Companies can use BI to stay ahead of sectoral changes, track seasonal market shifts, and foresee clients’ wants. 7. Enhanced customer experience Integration of business intelligence can directly impact customer happiness and experience. By effectively analyzing pertinent data,
  • 47.
    Best practices forstreamlining BI integration An efficient integration plan is essential for successful BI integration in an organization. A successful integration is made possible by the following best practices: Consider data security Security measures are essential to have in place while implementing BI in order to safeguard your information assets from data breaches. Secure your organization’s data by configuring authentication or authorization protocols and establishing protocols for secure data processing. Develop a BI strategy There is a reporting procedure in place for every business. Before establishing a new BI technology, it’s crucial to assess current systems and determine which areas could be improved. Based on that data, you can create a unique design for your BI integration strategy depending on your particular business structure. Install data integration software The complete integration process will take some time. Choose a business intelligence solution according to your specific business characteristics and needs. You may want to purchase a business-ready BI solution. Full-stack BI tools are a great option. These solutions use built-in connectors to take data from many sources, convert it into the necessary format, and load it into the target system linked to BI tools. Therefore, investing in them would accomplish both integration and reporting goals.
  • 48.
    BI integration stages Datagathering. Business intelligence is the process of obtaining information from various data sources, and then using that information to inform business decisions. •Data evaluation •Situation awareness •Risk evaluation •Supporting decisions. https://open.ocolearnok.org/informationsystems/chapter/chapter- 6-introduction-to-business-intelligence-and-analytics/
  • 49.
    EXAMPLE: HOW TESLAUSES BIG DATA EXAMPLE: DATA MINING AT NETFLIX https://open.ocolearnok.org/informationsystems/chapter/chapter- 6-introduction-to-business-intelligence-and-analytics/
  • 51.
  • 53.
    DISCUSSION QUESTIONS: 1. Whatis business intelligence and how can it be used to improve organizational performance? 2. What is big data and how has it changed the way companies approach decision- making? 3. How does data mining differ from traditional statistical analysis? 4. How can visualization be used to communicate insights from data? 5. What are the ethical considerations of using data analytics in business? 6. What is machine learning and how can it be used in business intelligence? 7. How can companies maximize the value of their data assets? 8. What are some common challenges companies face when implementing business intelligence and analytics solutions? 9. How can businesses use predictive analytics to identify patterns and trends?
  • 54.
    Industrial internet ofthings (IIoT) https://www.techtarget.com/iotagenda/definition/Industrial- Internet-of-Things-IIoT The industrial internet of things (IIoT) is the use of smart sensors, actuators and other devices, such as radio frequency identification tags, to enhance manufacturing and industrial processes. These devices are networked together to provide data collection, exchange and analysis. Insights gained from this process aid in more efficiency and reliability. Also known as the industrial internet, IIoT is used in many industries, including manufacturing, energy management, utilities, oil and gas. IIoT uses the power of smart machines and real-time analytics to take advantage of the data that dumb machines have produced in industrial settings for years. The driving philosophy behind IIoT is that smart machines aren't only better than humans at capturing and analyzing data in real time, but they're also better at communicating important information that can be used to drive business decisions faster and more accurately.
  • 56.
    Which industries areusing IIoT? Numerous industries use IIoT, including the following: The automotive industry. This industry uses industrial robots, and IIoT can help proactively maintain these systems and spot potential problems before they can disrupt production. The automotive industry also uses IIoT devices to collect data from customer systems, sending it to the company's systems. That data is then used to identify potential maintenance issues. The agriculture industry. Industrial sensors collect data about soil nutrients, moisture and other variables, enabling farmers to produce an optimal crop. The oil and gas industry. Some oil companies maintain a fleet of autonomous aircraft that use visual and thermal imaging to detect potential problems in pipelines. This information is combined with data from other types of sensors to ensure safe operations. Utilities. IIoT is used in electric, water and gas metering, as well as for the remote monitoring of industrial utilities equipment such as transformers.
  • 57.
    What are thebenefits of IIoT? IIoT devices used in the manufacturing industry offer the following benefits: Predictive maintenance. Organizations can use real-time data generated from IIoT systems to predict when a machine needs to be serviced. That way, the necessary maintenance can be performed before a failure occurs. This can be especially beneficial on a production line, where the failure of a machine might result in a work stoppage and huge costs. By proactively addressing maintenance issues, an organization can achieve better operational efficiency. More efficient field service. IIoT technologies help field service technicians identify potential issues in customer equipment before they become major issues, enabling techs to fix the problems before they affect customers. These technologies also provide field service technicians with information about which parts they need to make a repair. This ensures technicians have the necessary parts with them when making a service call. Asset tracking. Suppliers, manufacturers and customers can use asset management systems to track the location, status and condition of products throughout the supply chain. The system sends instant alerts to stakeholders if the goods are damaged or at risk of being damaged, giving them a chance to take immediate or preventive action to remedy the situation. Increased customer satisfaction. When products are connected to IoT, the manufacturer can capture and analyze data about how customers use their products, enabling manufacturers and product designers to build more customer-centric product roadmaps. Improved facility management. Manufacturing equipment is susceptible to wear and tear, which can be exacerbated by certain conditions in a factory. Sensors can monitor vibrations, temperature and other factors that could lead to suboptimal operating conditions.
  • 59.
    Who are IIoTvendors? There are numerous vendors that offer IIoT platforms, including the following examples: ABB Ability. ABB specializes in connectivity, software and machine intelligence. Aveva. Acquired by Schneider Electric in early 2023, Aveva develops AI, digital transformation, IIoT and IoT edge platforms for original equipment manufacturers and end users. Cisco IoT. Cisco offers platforms for network connectivity, connectivity management, data control and exchange as well as edge computing. Fanuc. Fanuc combines robotics, automation and advanced analytics to provide industrial IoT offerings. GE Predix Platform. This IIoT software platform helps connect, optimize and scale digital industrial applications. Plataine. Plataine specializes in using AI to generate actionable insights in manufacturing. Siemens Insights Hub. Insights Hub offers industrial IoT based on AI and advanced analytics.
  • 60.
    Business Systems Integration:A Definition Business systems integration is the process of connecting different parts of an enterprise system to enable efficient and effective communication and data flow between them. It involves combining various applications such as customer relationship management (CRM), financials, enterprise resource planning (ERP), human resources, and more. The main goal is to ensure that all the systems are working together in harmony, with no duplication or gaps in data storage or retrieval. https://www.clarity-ventures.com/how-to-guides/step-by-step- guide-to-business-system-integration
  • 61.
  • 62.
    Cloud Integration Cloud-based Integrationuses cloud services for data storage, processing, and integration. One of the key benefits of cloud-based integration is scalability. With cloud services, you can easily scale your data storage up or down and process resources based on your needs. This scalability eliminates the need for you to invest in additional hardware or infrastructure, saving you both time and money. Cloud services also allow you to access your data anytime, anywhere, and from any device as long as you have an internet connection. They can seamlessly integrate with other cloud-based applications and services for a connected and cohesive workflow.
  • 63.
    Extract, Transform, Loadis a 3-step process where you first pull data from various sources, then transform it into a format that fits your needs, and finally load it into a unified database. By extracting and combining data from multiple sources, you can create a centralized and unified view of your data.
  • 64.
    Change Data Capture(CDC) is a technique that identifies and captures changes made in a database and applies them to another data repository. Its primary purpose is to enable real-time data integration by efficiently identifying and transferring only the modified data.
  • 65.
    IoT Platform An IoTplatform serves as a mediator between the world of physical objects and the world of actionable insights. By combining numerous tools and functionalities, Internet of Things platforms empower you to develop unique hardware and software products for gathering, storing, analyzing, and managing the abundance of data generated by your connected devices and assets
  • 67.
    Amazon Web Services(AWS) IoT Microsoft Azure IoT Oracle IoT Particle IRI Voracity ThingWorx IIoT Platform Google Cloud IoT Cisco IoT Cloud Connect Salesforce IoT Cloud IBM Watson IoT Most Popular IoT Platforms https://www.sam-solutions.com/blog/top-iot-platforms/
  • 68.
    UNIT II INTEGRATION OFTHE PLM SYSTEM WITH OTHER APPLICATIONS
  • 69.
    https://www.arenasolutions.com/what-is-plm/plm-integrations/ Disconnected Systems Resultin Errors and Inefficient Workflows Today’s manufacturing ecosystem consists of a diverse mix of product teams and supply chain partners from across the globe. They often rely on multiple, disjointed software applications to design, develop, and maintain a product. Teams must switch from one system to another and manually re-enter data to keep product information up to date and move processes along. This can be a labor- intensive task that results in errors and costly delays. Enterprise PLM solutions serve as the single source of truth for managing the product bill of materials (BOM) and associated quality and change processes. Integrating PLM with upstream and downstream enterprise systems ensures a smooth handoff of product information between design, quality, and production teams. Because data is automatically updated and transmitted across all systems, everyone has full visibility into any changes or issues. Ultimately, they can work more efficiently to get high-quality products to market on time and on budget without any surprises.
  • 70.
    Upstream Systems: Engineering DesignSolutions: Integration with design solutions such as mechanical CAD (MCAD) and electronic design automation (EDA) software facilitates earlier design reviews and feedback from downstream product teams and supply chain partners. This ensures design for manufacturability (DFM) and reduces costs associated with scrap and rework. Downstream Systems: Enterprise Resource Planning (ERP): Integration with ERP systems ensures that manufacturing receives the latest released design information, eliminating production errors and resulting scrap or rework. In addition, teams can easily monitor inventory, supply chain activities, and financial operations. Manufacturing Execution Systems (MES): Integration with MES enables real-time collection of data on events that take place on the factory floor. This data can be used to help manufacturing teams optimize their efficiency. Electronic Component Databases: Integration with component databases like SiliconExpert and Octopart provides greater visibility into critical component details such as market availability, cost, and environmental compliance information. This helps organizations mitigate supply chain risks, avoid product delays, and meet regulatory requirements. Customer Relationship Management (CRM) Systems: Integration with CRM systems like Salesforce, ServiceMax, and Zendesk provides product teams centralized access to critical customer feedback and data. This can help further inform product development and quality processes and improve customer satisfaction.
  • 72.
    Companies that integratePLM with ERP and other enterprise systems are more likely to realize these benefits: Enhanced collaboration across the organization Decreased product scrap and rework Cost reduction Greater efficiency/streamlined operations Improved accuracy/product quality Better inventory tracking Improved cost analysis Streamlined environmental, export control, and quality compliance Accelerated time to market Increased customer satisfaction Greater profitability
  • 73.
    DIFFERENT APPLICATION INTEGRATIONAPPROACHES There are various methods that can be used to connect enterprise systems. Some require minimal IT resources whereas others may involve more extensive coding or customization for deployment. Application Programming Interface (API) An API is an intermediary that is used for point-to-point integrations, enabling two different software systems to talk directly to each other and securely exchange data and functionality. Because APIs have a defined architecture and protocol for sharing information, they simplify the integration process. Typically, SaaS PLM vendors will provide customers their own APIs for integration. REST APIs are well-documented, fast, and can be implemented as needed to support greater scalability. Electronic Data Interchange (EDI) An It automates and replaces paper-based transactions such as invoices and purchase orders. EDEDI is a standard electronic format that is used to move business documents from one organization’s computer system to another. Is can be challenging to implement and maintain due to the unique and ever-changing requirements of each business. Middleware Middleware is software that lies between the applications and their operating system. It functions as a “hidden” translation layer between systems, enabling communication and data management capabilities beyond what is provided in the operating system. This approach is used when more complex business rules are needed, or a large volume of data is transmitted between systems. Middleware requires extensive programming and can be costly to configure and maintain. It does not allow for scalability.
  • 74.
    A PRODUCT STRUCTURECONTAINS DOCUMENTS AND MATERIALS TO COMPLETELY DESCRIBE A PRODUCT https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/add30a34af294d51a0ccd83db28791f9/ c3c16f6e86fa49a68cb1d19c9f29b4b9.html
  • 75.
    MODELING OF PRODUCTSTRUCTURES https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/ add30a34af294d51a0ccd83db28791f9/4deb2d635c4945b7b1eff40c7616cd4b.html
  • 76.
    TRANSFER FILE  Basicof PLMXML Export/Import  PLMXML is a very powerful tools for importing/exporting data and file from Teamcenter to external system and vice-verse. PLMXML is Siemens PLM sponsors XML schema for exporting/importing metadata as well files from Teamcenter to other system,  The advantage of PLMXML is its flexibility of defining rule for data extraction and import make it one of the widely use tool for integration and data exchange. It is also widely used in teamcenter other module like report builder and integration. For defining the rules, admin module is present where new rules can be created or modified existing rules. This rules are called Transfermode. In this blog we will discuss in detail the transfermode and its child rules.  Transfer Mode:  Transfermode encapsulate the rules which defines import/export data from teamcenter. It basically govern the Export/Import rules and meta data which required to be extracted from Teamcenter. Transfer mode mainly consist of  · Closure Rule  · Filter Rule  · Property Set ref: https://teamcenterplm.blogspot.com/2012/08/basic-of-plmxml-exportimport.html
  • 77.
  • 78.
    ENTERPRISE RESOURCE PLANNING(ERP)  Enterprise resource planning (ERP) is a software system that helps you run your entire business, supporting automation and processes in finance, human resources, manufacturing, supply chain, services, procurement, and more. Ref:https://www.investopedia.com/terms/e/erp.asp
  • 79.
    TYPES OF ERPSYSTEM  On-Premise ERP  Cloud ERP  Industry-Specific ERP  Open-Source ERP  Small Business ERP  Tiered ERP
  • 80.
    ERP SOLUTIONS PROVIDERS Oracle Corp. (ORCL)  SAP (SAP)  Microsoft (MSFT)
  • 81.
    SIX KEY BENEFITSOF ERP https://www.sap.com/products/erp/what-is-erp.html#:~:text=In%20accounting%2C %20the%20acronym%20ERP,reporting%20and%20analysis%2C%20and%20more.
  • 82.
     Enterprise resourceplanning systems include a variety of different modules. Each ERP module supports specific business processes – like finance, procurement, or manufacturing – and provides employees in that department with the transactions and insight they need do their jobs. Every module connects to the ERP system, which delivers a single source of truth and accurate, shared data across departments. COMMON ERP MODULES
  • 83.
    COMPONENTS OF ANENTERPRISE RESOURCE PLANNING SYSTEM
  • 84.
    ERP HISTORY: THERAPID EVOLUTION OF ERP
  • 85.
    ERP AT ANYSIZE: WHAT ARE MY OPTIONS  ERP isn’t just for global enterprises. ERP solutions are designed for businesses of all sizes – small, midsize, and large. You can also get industry- and company-specific functionality to meet unique business needs. Regardless of your business sector and size, you’ll want to plan your ERP implementation project carefully, following best practices.   Small business ERP  ERP software for small businesses can help you move beyond spreadsheets and efficiently manage every aspect of your growing company – from sales and customer relationships to financials and operations. Small business ERP tools are typically in the cloud, quick to install, and designed to grow with you.   Mid-Market ERP  Today, ERP software designed for mid-market companies and subsidiaries benefit from built-in analytics, rapid deployment, and best practices for dozens of different business processes – financials, HR, supply chain management, and more. Midsize ERP tools help growing businesses scale and compete, even with limited resources. Modular, cloud-based enterprise ERP systems are also a popular choice for midmarket companies with complex processes or plans for rapid growth.   Enterprise ERP  Large companies with global or subsidiary operations need a robust, market-leading ERP system with embedded AI, machine learning, and analytics – and intelligent automation to transform business models and processes. ERP systems can be deployed on premise, in the cloud, or in a hybrid scenario depending on business need. They can integrate with existing databases or, ideally, run on newer, powerful in-memory databases.   Many companies are modernizing and upgrading their on-premise ERP systems to cloud deployments. This requires careful planning of your ERP upgrade, as well as an ERP evaluation and review of your deployment options.
  • 86.
    ERP FAQS  Whatis an ERP software system?  What is ERP cloud software?  What is ERP in accounting?  How do I know I'm ready for an ERP system?
  • 87.
    THE MOST WIDELYUSED ERP MODULES INCLUDE:  Finance: The finance and accounting module is the backbone of most ERP systems. In addition to managing the general ledger and automating key financial tasks, it helps businesses track accounts payable (AP) and receivable (AR), close the books efficiently, generate financial reports, comply with revenue recognition standards, mitigate financial risk, and more.  Human resources management: Most ERP systems include an HR module that provides core capabilities such as time and attendance and payroll. Add-ons, or even entire human capital management (HCM) suites, can connect to the ERP and deliver more robust HR functionality – everything from workforce analytics to employee experience management.  Sourcing and procurement: The sourcing and procurement module helps businesses procure the materials and services they need to manufacture their goods – or the items they want to resell. The module centralizes and automates purchasing, including requests for quotes, contract creation, and approvals. It can minimize underbuying and overbuying, improve supplier negotiations with AI-powered analytics, and even seamlessly connect with buyer networks.  Sales: The sales module keeps track of communications with prospects and customers – and helps reps use data-driven insights to increase sales and target leads with the right promotions and upsell opportunities. It includes functionality for the order-to-cash process, including order management, contracts, billing, sales performance management, and sales force support
  • 88.
    THE MOST WIDELYUSED ERP MODULES INCLUDE(CONT..)  Manufacturing: The manufacturing module is a key planning and execution component of ERP software. It helps companies simplify complex manufacturing processes and ensure production is in line with demand. This module typically includes functionality for material requirements planning (MRP), production scheduling, manufacturing execution, quality management, and more.  Logistics and supply chain management: Another key component of ERP systems, the supply chain module tracks the movement of goods and supplies throughout an organization’s supply chain. The module provides tools for real-time inventory management, warehousing operations, transportation, and logistics – and can help increase supply chain visibility and resilience.  Service: In an ERP, the service module helps companies deliver the reliable, personalized service customers have come to expect. The module can include tools for in-house repairs, spare parts, field service management, and service-based revenue streams. It also provides analytics to help service reps and technicians rapidly solve customer issues and improve loyalty.  R&D and engineering: Feature-rich ERP systems include an R&D and engineering module. This module provides tools for product design and development, product lifecycle management (PLM), product compliance, and more – so companies can quickly and cost-effectively create new innovations.  Enterprise asset management: Robust ERP systems can include an EAM module – which helps asset- intensive businesses minimize downtime and keep their machines and equipment running at peak efficiency. This module includes functionality for predictive maintenance, scheduling, asset operations and planning, environment, health and safety (EHS), and more.
  • 89.
    UNIT III DIGITALTWIN BASICS  Introduction, Industrial Revolution Facts, Industry 4.0 Environment, Technologies Transforming Industry 4.0. Basic Concepts of Digital Twin: Evolution of Pairing, Definition and Features of Digital Twins, Digital Twin Timeline. UNIT IV DIGITAL TWIN Features and Implementation of Digital Twin: Digital Twin Terminologies & Essentials, Working of Digital Twins. Building Blocks of Digital Twin: Digital Twin Building Blocks, Digital Twin Technology Drivers & Enablers. Types of Digital Twin: Based on Product, Process, Based on Functionality, Based on Maturity, Characteristics of a Good Digital Twin Platform. Digital Twin: Benefits, Impacts and Challenges: Barriers of Digital Twin Implementation
  • 90.
     What isa Digital Twin?  A Digital Twin of any device/system is a working model of all components (at micro level or macro level or both) integrated and mapped together using physical data, virtual data, and interaction data between them to make a fully functional replica of the device/system and that too on a digital medium.  This digital twin of the physical system is not intended to outplace the physical system but to test its optimality and predict the physical counterparts’ performance characteristics.  You can know of the system’s operational life course, the implication of design changes, the impact of environmental alters and a lot more variables using this concept. Talking about life course, it invites me to aromatize your awareness of the concept with its origin. REF:https://www.geeksforgeeks.org/introduction-to-digital-twin/
  • 91.
    Brief History ofDigital Twin The concept and model of the Digital Twin was officially put forward in 2002 by Dr. Michael Grieves as the conceptual model underlying Product Lifecycle Management (PLM). The concept was being practiced since the 1960s by NASA. They used basic twinning ideas for space programming at that time. They did this by creating physically duplicated systems at ground level to match the systems in space. Example : When NASA developed a digital twin to assess and simulate conditions on board Apollo 13. The efforts were made keeping in mind only a particular mission and because of that, this concept didn’t gain recognition until 2002 after Dr. Grieves presented it with all the elements including real space, virtual space and the spreading of data and information flow between real and virtual space. The concept of integrating the digital and physical parts as one entity has remained the same since its emergence. Although the terminology has changed over the years till 2010 when it was subsequently called ‘Digital Twin’ by John Vickers of NASA in a 2010 Roadmap Report.
  • 92.
    A Digital Twinconsists of three distinct parts:  1. The physical part ,  2. The Digital Part ,  3. The Connection Between the Two
  • 93.
     Types ofDigital Twins:  1. Asset Twins  2. System Twins  3. Process Twins
  • 94.
    ADVANTAGES OF DIGITALTWINS  Enhanced Operational Efficiency  Predictive Maintenance  Process Optimization  Data-Drivn Decision-Making  Rich Insights  Reduced Uncertainty  Fostering Innovation and Collaboration  Sustainability and Environmental Impact
  • 95.
     What Wasthe Industrial Revolution?  The Industrial Revolution was a period of major mechanization and innovation that began in Great Britain during the mid-18th and early 19th centuries and later spread throughout much of the world. The British Industrial Revolution was dominated by the exploitation of coal and iron.  The American Industrial Revolution, sometimes referred to as the “Second Industrial Revolution,” began during the Gilded Age in the 1870s and continued through World War II. The era saw the mechanization of agriculture and manufacturing and the introduction of new modes of transportation, including steamships, the automobile, and airplanes https://www.investopedia.com/terms/i/industrial-revolution.asp
  • 96.
    EVOLUTION OF PAIRING,DEFINITION AND FEATURES OF DIGITAL TWINS, DIGITAL TWIN TIMELINE  Digital twin technology evolution stage. https://www.researchgate.net/publication/ 360537125_Digital_Twin_Technology_Evolution_Stages_and_Impleme ntation_Layers_With_Technology_Elements/figures
  • 97.
    DIGITAL TWIN ESSENTIALTECHNOLOGIES AND APPLICATION SERVICES.
  • 98.
    TRADITIONAL DIGITAL TWINEVOLUTION MODEL.
  • 99.
    CONCEPTUAL DIAGRAM OFDIGITAL TWIN EVOLUTION STAGE.
  • 100.
  • 101.
    DIGITAL TWIN TECHNOLOGYELEMENTS ACCORDING TO THE IMPLEMENTATION LAYERS.
  • 102.
    CHALLENGES OF DIGITALTWINS  Data management  Data security  IoT development  System integration.  Supplier collaboration  Complexity
  • 103.
     Use casesand examples of digital twins  The initial deployments of digital twins were mostly directed at the design, production and maintenance of extremely high-value, physically large equipment, such as airplanes, buildings, bridges and power-generation plants where mechanical failure can be life threatening or cause financial losses that exceed the significant expense and effort of developing a digital twin.
  • 104.
     The followingindustries are seeing the most activity in planning or deploying digital twins:  Manufacturing.  Utilities and energy  Healthcare.  Urban planning and construction  Automotive.
  • 105.
    Building Blocks ofDigital Twin : Digital Twin Building Blocks, Digital Twin Technology Drivers & Enablers.
  • 106.
     Digital twinsare virtual replicas of physical assets, systems, or processes that help in monitoring, analyzing, and optimizing performance. Here’s a breakdown of the key building blocks, technology drivers, and enablers for digital twins:  Building Blocks of Digital Twins  Data Collection: Gathering data from various sources such as sensors, IoT devices, and existing databases.  Modeling: Creating a virtual model using CAD files, BIM software, or other modeling tools.  Integration: Combining real-time data streams with the virtual model for continuous monitoring and analysis.  Simulation: Running simulations to predict performance and identify potential issues.  Visualization: Using 3D visualization tools to provide an immersive view of the digital twin.  Analytics: Applying algorithms and AI for predictive maintenance and performance optimization  Technology Drivers  Internet of Things (IoT): IoT devices provide the necessary data for creating and updating digital twins.  Artificial Intelligence (AI): AI helps in analyzing data and making predictions.  Cloud Computing: Cloud platforms offer the storage and computational power needed for digital twins.  Big Data: Handling and processing large volumes of data is crucial for accurate digital twins.  Edge Computing: Processing data closer to the source reduces latency and improves real-time decision- making3  Enablers  Building Information Modeling (BIM): BIM provides detailed digital representations of physical and functional characteristics.  Geographic Information Systems (GIS): GIS helps in integrating spatial data with digital twins.  Cyber-Physical Systems (CPS): CPS integrates computation, networking, and physical processes.  Standards and Protocols: Ensuring interoperability and data exchange between different systems and devices.
  • 111.
     Characteristics ofa Digital Twin platform include123 :Connectivity: Digital twins are connected to real-world data sources such as sensors and IoT devices.  Homogenization: They enable the homogenization of data from various sources.  Reprogrammable and smart: Digital twins allow physical products to be reprogrammed.  Real-time data integration: Continuously updated with real- time data.  Simulation and modeling: Used for modeling and simulating behavior.
  • 112.
    BARRIERS OF DIGITALTWIN IMPLEMENTATION
  • 113.
  • 115.
    THIS EFFICIENT PRODUCTIONFLOOR UTILIZES DIGITAL TWIN TECHNOLOGY TO CONNECT ALL OPERATIONS FROM BEGINNING TO END https://www.digikey.com/en/articles/the-digital-twin-concept-and- how-it-works
  • 116.
    DIGITAL TWINS HELPUNDERSTAND THE PRESENT AND PREDICT THE FUTURE
  • 119.
  • 120.
    THE DIGITAL TWINAUTOMOTIVE RE VOLUTION
  • 128.
  • 129.
    DIGITAL TWINS SIMPLIFYSYSTEM AN ALYSIS
  • 133.
    UNIT V DIGITALTHREAD  Digital Thread Definition, Data Storage in the Digital Thread, Data Sharing and The Digital Thread, Strategic issues in implementing the digital thread, Technologies used in the Design Process, Cyber infrastructure Components of the Digital Thread and Digital Thread on the Shop Floor
  • 134.
    DIGITAL THREAD DEFINITION A digital thread is a data-driven communication framework that connects traditionally siloed elements in manufacturing processes and provides an integrated view of an asset throughout the manufacturing lifecycle. In addition to technology, the establishment of a digital thread requires business processes that help weave data-driven decision management into the manufacturing culture.  Digital threads capture and share data across processes using a range of technologies, such as computer-aided design software, product lifecycle management systems and internet of things (IoT) sensors. https://www.ptc.com/en/industry-insights/digital-thread
  • 135.
    DIGITAL THREAD VS.DIGITAL TWIN  The terms digital thread and digital twin are related concepts used in the context of manufacturing systems, but they refer to different aspects of a product's lifecycle.  A digital thread functions as a communication framework that makes it easier for asset and product data to flow smoothly throughout their lifecycles. A digital twin is a virtual model or a digital replica of an actual physical object or system and offers a more detailed view for analysis and optimization.
  • 136.
     Digital thread,also known as digital chain is defined as “the use of digital tools and representations for design, evaluation, and life cycle management.”.[2] It is a data-driven architecture that links data gathered during a Product lifecycle from all involved and distributed manufacturing systems.[3] This data can come from any part of product's lifecycle, its transportation, or its supply chain.[3] Digital thread "enables the collection, transmission, and sharing of data and information between systems across the product lifecycle" to enable real-time decision making, gather data, and iterate on the product.
  • 137.
  • 140.
     What arethe threats to digital thread adoption?  Data issues  It is difficult to gain a holistic view of a product's lifecycle and ensure every stakeholder has access to the latest data due to information across organisations often being isolated in separate systems. Inconsistent data formats and a lack of standardisation, both within an organisation and across industries, can cause confusion; data interoperability is key to creating a digital thread.  Security concerns  An interconnected system reliant on large amounts of data are vulnerable to cyber- attacks. As with all emerging technologies, unidentified vulnerabilities will be present for malicious actors to abuse. To combat this, organisations should adopt clear data governance policies and procedures to manage access and control.  Cultural and organisational challenges  Implementing a digital thread often requires significant changes to workflows and stakeholder mindsets, often leading to resistance to adoption. This can be combated by properly informing all employees, educating them on the importance of the digital thread. Additionally, organisations may need to train employees to manage data or software tools required for digital thread implementation. https://www.amrc.co.uk/news/digital-thread-frequently-asked- questions
  • 141.
     What kindof infrastructure is needed to support digital thread implementation?  A successful digital thread implementation relies on a robust IT infrastructure that can handle data integration, storage, and analysis across the entire product lifecycle. The key components include:  Product Lifecycle Management (PLM) System: This serves as the backbone of the digital thread, storing and managing all product data throughout its lifecycle, from design inception to service and end-of-life.  Enterprise Resource Planning (ERP) System: The ERP system integrates with the PLM to provide data on manufacturing processes, inventory management, and financial aspects of production.  Scalable storage and computing resources: The volume of data generated from various sources within the digital thread can be significant. Depending on the complexity of operations, cloud-based storage or high-performance computing capabilities may be required to handle data processing and analysis.  Advanced analytics tools: Extracting meaningful insights from the vast amount of data collected can require advanced analytics tools like machine learning and artificial intelligence to identify patterns, predict trends, and optimise processes.  Secure network infrastructure: A secure network infrastructure is crucial to protect sensitive data within the digital thread from cyberattacks and unauthorised access.
  • 142.
     HIGHLIGHTS-DT  Digitalthreads interlink all the data related to a product throughout its life cycle—data from within and outside the enterprise.  Digital threads can deliver significant business value—improved time to market, enhanced product quality, increased operational efficiency—by streamlining complex processes.  Establishing an enterprise digital thread is a long- term, incremental, continuous transformation journey for a company. https://www.tcs.com/what-we-do/services/iot-digital- engineering/white-paper/digital-threads-product-data-value
  • 143.
    AN ENTERPRISE DIGITALTHREAD CAN HELP OVERCOME THE CHALLENGES AROUND ACCESSING ACCURATE PRODUCT DATA.
  • 146.
    DATA STORAGE INTHE DIGITAL THREAD
  • 148.
    DATA SHARING Data Sharing Whatis data sharing? Data sharing is the process of making the same data resources available to multiple applications, users, or organizations. It includes technologies, practices, legal frameworks, and cultural elements that facilitate secure data access for multiple entities without compromising data integrity. Data sharing improves efficiency within an organization and fosters collaboration with vendors and partners. Awareness of the risks and opportunities of shared data is integral to the process. https://aws.amazon.com/what-is/data-sharing/ #:~:text=Data%20sharing%20is%20the %20process,applications%2C%20users%2C%20or %20organizations.
  • 150.
     What arethe risks of data sharing?  Data disclosure has potential regulatory, competitive, financial, and security risks. We outline some critical threats below.  Privacy disclosure  Every single organization has legal and ethical obligations to safeguard the privacy of the customer data they own. They have to take appropriate measures to share data without compromising privacy. Privacy-preserving technologies like encryption and redaction allow for safe data sharing.  Data misinterpretation  Lack of communication between data producers and consumers can result in analytical misinterpretation. Analysts may make incorrect assumptions when explaining reports and outcomes. For example, a reduction in customer orders in a particular month may be attributed to a lower marketing budget, although the real reason could be a delay in product availability.  Low data quality  Data consumers may have limited control over the quality and availability of data. They may have to deal with missing or duplicate data, questions about validity, lacking data documentation, and similar issues. Hidden biases against a particular gender, race, religion, or ethnic group may also be present in the dataset.
  • 151.
    CYBER INFRASTRUCTURE COMPONENTSOF THE DIGITAL THREAD AND DIGITAL THREAD ON THE SHOP FLOOR