Nuclear decommissioning contracting
structures - lessons learned
John Houlden
Nuclear decommissioning contracting
structures – lessons learned
Background – Nuclear decommissioning
in the UK
 A busy decade for UK nuclear
decommissioning contracting
 NDA’s role in decommissioning and
clean-up of the UK’s civil public sector
nuclear sites:
- Early nuclear research facilities
- Magnox nuclear power plants
- Processing plant and facilities at
Sellafield
 NDA’s (and its contractors’)
experience has shaped the UK’s
nuclear decommissioning sector
 The market and contracts have
changed significantly over the last 10
years Sites designated to the NDA
Nuclear decommissioning contracting
structures – lessons learned
NDA’s decommissioning contract
models
 The NDA’s contract models influence the rest of the sector:
- Largest buyer – contracts are a barometer for the maturity of the wider market
- End customer – terms/risk allocation agreed between NDA and SLCs are flowed down to
supply chain
 Two/three? generations of NDA decommissioning contract model:
- Management & Operations Contracts (M&O) – Sellafield, LLWR, Magnox, RSRL
- Site Licence Company Agreements (SLCAs) – Dounreay (2010), Magnox and RSRL (2014)
- Strategic partner? – Sellafield (2015)
Risk
M&O
Cost plus
Future?
Fixed Price
SLCA
TCIF
Future?
TC
Nuclear decommissioning contracting
structures – lessons learned
NDA’s Contracting Framework
Parent Body Organisation
Site Licence Company
(including employees
contributed by the PBO known
as the secondees)
2nd tier Subcontractors
NDA
Regulators
Ownership
of SLC
Parent Body
Agreement
M&O/SLCA
Statutory
Consultation
Requirement
Sub-contract(s)
Statutory and/or
Licence or consent
Overview of the key parties, relationships and contracts:
Nuclear decommissioning contracting
structures – lessons learned
Legal issues: contract
Cost
Time
Quality
Delivery
Nuclear decommissioning contracting
structures – lessons learned
Legal issues: getting to contract
Process:
Contract Notice PQQ Dialogue
Final
Tender Clarification/
Contract
PHASE 3:
Refined Solutions
PHASE 2:
Detailed Solutions
[Downselect?]
PHASE 1:
Outline Solutions
[Downselect?]
Decision/
Standstill
Only period for
negotiation
 Key issues:
 Compliance with EU procurement law
 Time/costs
 Competitive pressure
Nuclear decommissioning contracting
structures – lessons learned
Lessons learned
Nuclear decommissioning contracting
structures – lessons learned
Contact Details
John Houlden
Partner
Tel: 0117 902 2796
Email: john.houlden@burges-salmon.com
Nuclear decommissioning contracting
structures – lessons learned
This presentation gives general information only and is not intended to be an exhaustive statement of the law. Although we have taken
care over the information, you should not rely on it as legal advice. We do not accept any liability to anyone who does rely on its content.

More Related Content

Viewers also liked

BIFNAMay2014_SAKAI_spread
BIFNAMay2014_SAKAI_spreadBIFNAMay2014_SAKAI_spread
BIFNAMay2014_SAKAI_spread
Josh Steele
 
Shrestha_Hopkin'sLaw
Shrestha_Hopkin'sLawShrestha_Hopkin'sLaw
Shrestha_Hopkin'sLaw
Dinesh Shrestha
 
practicum final paper
practicum final paperpracticum final paper
practicum final paper
Asha Boisselle
 
Total Decom Delegate pack 2014
Total Decom Delegate pack 2014Total Decom Delegate pack 2014
Total Decom Delegate pack 2014
TotalDecom
 
single_page_camp_broch-3
single_page_camp_broch-3single_page_camp_broch-3
single_page_camp_broch-3
Amie Heasley
 
Optimización integrada del sistema de producción utilizando análisis nodal
Optimización integrada del sistema de producción utilizando análisis nodalOptimización integrada del sistema de producción utilizando análisis nodal
Optimización integrada del sistema de producción utilizando análisis nodal
Aquiles Labra Fernandez
 
InfoBPJS
InfoBPJSInfoBPJS
InfoBPJS
Muhamad Iqbal
 
Sana Resume
Sana ResumeSana Resume
Sana Resume
Sana Sayyed
 
alphorm.com - Formation Exchange Server 2013 (70-341)
alphorm.com - Formation Exchange Server 2013 (70-341)alphorm.com - Formation Exchange Server 2013 (70-341)
alphorm.com - Formation Exchange Server 2013 (70-341)
Alphorm
 

Viewers also liked (9)

BIFNAMay2014_SAKAI_spread
BIFNAMay2014_SAKAI_spreadBIFNAMay2014_SAKAI_spread
BIFNAMay2014_SAKAI_spread
 
Shrestha_Hopkin'sLaw
Shrestha_Hopkin'sLawShrestha_Hopkin'sLaw
Shrestha_Hopkin'sLaw
 
practicum final paper
practicum final paperpracticum final paper
practicum final paper
 
Total Decom Delegate pack 2014
Total Decom Delegate pack 2014Total Decom Delegate pack 2014
Total Decom Delegate pack 2014
 
single_page_camp_broch-3
single_page_camp_broch-3single_page_camp_broch-3
single_page_camp_broch-3
 
Optimización integrada del sistema de producción utilizando análisis nodal
Optimización integrada del sistema de producción utilizando análisis nodalOptimización integrada del sistema de producción utilizando análisis nodal
Optimización integrada del sistema de producción utilizando análisis nodal
 
InfoBPJS
InfoBPJSInfoBPJS
InfoBPJS
 
Sana Resume
Sana ResumeSana Resume
Sana Resume
 
alphorm.com - Formation Exchange Server 2013 (70-341)
alphorm.com - Formation Exchange Server 2013 (70-341)alphorm.com - Formation Exchange Server 2013 (70-341)
alphorm.com - Formation Exchange Server 2013 (70-341)
 

Similar to 2016 TotalDecom Presentation - John Houlden

Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
Eversheds Sutherland
 
Spectrum sharing and licensed shared access: Draft Report
Spectrum sharing and licensed shared access: Draft ReportSpectrum sharing and licensed shared access: Draft Report
Spectrum sharing and licensed shared access: Draft Report
techUK
 
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014 Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Pedro N
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Indonesia
 
Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1
Department of Energy and Climate Change
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
AJITH KUMAR
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
AJITH KUMAR
 
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
Edward Kee
 
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
Global Business Events
 
Richard Callander CV
Richard Callander CVRichard Callander CV
Richard Callander CV
Richard Callander
 
UK Spectrum Policy Forum: Spectrum sharing project update
UK Spectrum Policy Forum: Spectrum sharing project updateUK Spectrum Policy Forum: Spectrum sharing project update
UK Spectrum Policy Forum: Spectrum sharing project update
techUK
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
Chirag Jain
 
NEC Framework Contract webinar
NEC Framework Contract webinarNEC Framework Contract webinar
NEC Framework Contract webinar
Association for Project Management
 
PD190 LNG Fundamentals
PD190 LNG FundamentalsPD190 LNG Fundamentals
PD190 LNG Fundamentals
petroEDGE
 
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
UNDP Eurasia
 
Internal cleaning of fuel tanks
Internal cleaning of fuel tanksInternal cleaning of fuel tanks
Internal cleaning of fuel tanks
Mohamed Basyoni
 
Fac 1 - Sofia, 8 february
Fac 1 - Sofia, 8 februaryFac 1 - Sofia, 8 february
Fac 1 - Sofia, 8 february
Emil Hristov
 
20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary
tespanyo2
 
Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard D Brown CV Jan 16
Richard D Brown CV Jan 16
Richard Brown
 
truSolar Affiliate Webinar
truSolar Affiliate WebinartruSolar Affiliate Webinar
truSolar Affiliate Webinar
truSolar
 

Similar to 2016 TotalDecom Presentation - John Houlden (20)

Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012Energy contracts & disputes presentation slides - 25 September 2012
Energy contracts & disputes presentation slides - 25 September 2012
 
Spectrum sharing and licensed shared access: Draft Report
Spectrum sharing and licensed shared access: Draft ReportSpectrum sharing and licensed shared access: Draft Report
Spectrum sharing and licensed shared access: Draft Report
 
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014 Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
Oil and Gas Contract Law_Contratual Risks Operators and Contrators_Dez. 2014
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
 
Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
AJITHKUMAR_Original
AJITHKUMAR_OriginalAJITHKUMAR_Original
AJITHKUMAR_Original
 
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
 
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
Sam De Silva, Partner - Head of IT and Outsourcing Group at Penningtons Manch...
 
Richard Callander CV
Richard Callander CVRichard Callander CV
Richard Callander CV
 
UK Spectrum Policy Forum: Spectrum sharing project update
UK Spectrum Policy Forum: Spectrum sharing project updateUK Spectrum Policy Forum: Spectrum sharing project update
UK Spectrum Policy Forum: Spectrum sharing project update
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
NEC Framework Contract webinar
NEC Framework Contract webinarNEC Framework Contract webinar
NEC Framework Contract webinar
 
PD190 LNG Fundamentals
PD190 LNG FundamentalsPD190 LNG Fundamentals
PD190 LNG Fundamentals
 
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
Emission Reduction Purchase Agreement (ERPA) - Buying and Selling Carbon Cred...
 
Internal cleaning of fuel tanks
Internal cleaning of fuel tanksInternal cleaning of fuel tanks
Internal cleaning of fuel tanks
 
Fac 1 - Sofia, 8 february
Fac 1 - Sofia, 8 februaryFac 1 - Sofia, 8 february
Fac 1 - Sofia, 8 february
 
20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary20161213 Maintenance subsea power cables for offshore wind - summary
20161213 Maintenance subsea power cables for offshore wind - summary
 
Richard D Brown CV Jan 16
Richard D Brown CV Jan 16Richard D Brown CV Jan 16
Richard D Brown CV Jan 16
 
truSolar Affiliate Webinar
truSolar Affiliate WebinartruSolar Affiliate Webinar
truSolar Affiliate Webinar
 

Recently uploaded

International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
shivani5543
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
Anant Corporation
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 

Recently uploaded (20)

International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by AnantLLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
LLM Fine Tuning with QLoRA Cassandra Lunch 4, presented by Anant
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 

2016 TotalDecom Presentation - John Houlden

  • 1. Nuclear decommissioning contracting structures - lessons learned John Houlden
  • 2. Nuclear decommissioning contracting structures – lessons learned Background – Nuclear decommissioning in the UK  A busy decade for UK nuclear decommissioning contracting  NDA’s role in decommissioning and clean-up of the UK’s civil public sector nuclear sites: - Early nuclear research facilities - Magnox nuclear power plants - Processing plant and facilities at Sellafield  NDA’s (and its contractors’) experience has shaped the UK’s nuclear decommissioning sector  The market and contracts have changed significantly over the last 10 years Sites designated to the NDA
  • 3. Nuclear decommissioning contracting structures – lessons learned NDA’s decommissioning contract models  The NDA’s contract models influence the rest of the sector: - Largest buyer – contracts are a barometer for the maturity of the wider market - End customer – terms/risk allocation agreed between NDA and SLCs are flowed down to supply chain  Two/three? generations of NDA decommissioning contract model: - Management & Operations Contracts (M&O) – Sellafield, LLWR, Magnox, RSRL - Site Licence Company Agreements (SLCAs) – Dounreay (2010), Magnox and RSRL (2014) - Strategic partner? – Sellafield (2015) Risk M&O Cost plus Future? Fixed Price SLCA TCIF Future? TC
  • 4. Nuclear decommissioning contracting structures – lessons learned NDA’s Contracting Framework Parent Body Organisation Site Licence Company (including employees contributed by the PBO known as the secondees) 2nd tier Subcontractors NDA Regulators Ownership of SLC Parent Body Agreement M&O/SLCA Statutory Consultation Requirement Sub-contract(s) Statutory and/or Licence or consent Overview of the key parties, relationships and contracts:
  • 5. Nuclear decommissioning contracting structures – lessons learned Legal issues: contract Cost Time Quality Delivery
  • 6. Nuclear decommissioning contracting structures – lessons learned Legal issues: getting to contract Process: Contract Notice PQQ Dialogue Final Tender Clarification/ Contract PHASE 3: Refined Solutions PHASE 2: Detailed Solutions [Downselect?] PHASE 1: Outline Solutions [Downselect?] Decision/ Standstill Only period for negotiation  Key issues:  Compliance with EU procurement law  Time/costs  Competitive pressure
  • 7. Nuclear decommissioning contracting structures – lessons learned Lessons learned
  • 8. Nuclear decommissioning contracting structures – lessons learned Contact Details John Houlden Partner Tel: 0117 902 2796 Email: john.houlden@burges-salmon.com
  • 9. Nuclear decommissioning contracting structures – lessons learned This presentation gives general information only and is not intended to be an exhaustive statement of the law. Although we have taken care over the information, you should not rely on it as legal advice. We do not accept any liability to anyone who does rely on its content.