THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN
ARC INSIGHTS
By Harry Forbes
INSIGHT# 2003-37MP&H
SEPTEMBER 10, 2003
The US Blackout of 2003 is a classic
example which illustrates the need for
effective Critical Condition
Management. Both the process and
power industries have wrestled with
this need, but independently.
2003 Blackout:
A Case for Critical Condition Management
Keywords
US Blackout, Critical Condition Management (CCM), NERC
Summary
CCM applications detect, monitor, and guide human operators through
periods of abnormal operation. These applications have become more ac-
cepted in process manufacturing, especially in the chemical and
petrochemical industries. The properties of these abnormal periods have
much in common with the details that have been reported thus far concern-
ing the Eastern US blackout of August, 2003.
Yet applications for dealing with abnormal situa-
tions have been developed independently in the
process and power industries and without much
awareness in either camp of the related work done
by others. Most major automation suppliers have
partnered with application specialists to deliver
CCM solutions.
In the future, US power system operations, operating policies, and practices
will become much more harmonized among geographic regions. This har-
monization will include more advanced online condition diagnostic tools
such as those developed for critical applications both in the process and
power industries.
0
10
20
30
01530456075
Number of Abnormal Events vs. Minutes Before Blackout
ARC Insights, Page 2
Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com
Analysis
The North American Electric Reliability Council (NERC) sets the highest
level operating policies for the US and Canadian electric grid. NERC is a
policy-making organization, not an agency responsible for the implementa-
tion of policy. Policies of NERC are embodied in their operating manual,
which governs the content of policies and procedures
developed by operating organizations. Thus NERC pol-
icy is implemented by a wide variety of organizations
that exercise the operating responsibility for parts of the
North American electric grid. These same organizations
contribute time and personnel to NERC for the devel-
opment and refinement of NERC policy.
The NERC Control Area Concept
Operation of grid assets is performed by numerous op-
erating entities. Each entity has responsibility for a
particular subset of the grid, referred to as its ā€œcontrol
areaā€. The control area may include all types of assets (Generation, Trans-
mission, and Distribution) or only some types, such as Distribution
components. The North American grid is the aggregate of all these control
areas, plus the interconnections between various control areas, over which
energy can be transferred.
In the traditional model of a vertically in-
tegrated electric utility, control areas were
highly autonomous and largely responsi-
ble for both the operations and the
reliability of service in their own area. In-
terconnections served merely to enhance
the overall system stability and reliability.
During the 1990s the US government man-
dated open access to the transmission
system and utility companies restructured
toward organizations which would operate
in emerging wholesale electric markets.
NERC Transmission Policy
NERC has as its highest operating policy goal the prevention of cascading
outages such as occurred on August 14th 2003. The preamble to the NERC
Supplier Product Name
Emergin WirelessOffice
Gensym Optegrity
Honeywell @sset.MAX
Matrikon ProcessGuard
Nexus Oz
OSIsoft PI System
PAS AMOplus
Software Products Used for CCM
Control Area 1
Area Power Distribution
Area Power Generation
Area
Transmission
Components
interconnection
Control Area 2
interconnection
Control Area 3
Control Area 1
Area Power Distribution
Area Power Generation
Area
Transmission
Components
Control Area 1
Area Power DistributionArea Power DistributionArea Power Distribution
Area Power GenerationArea Power Generation
Area
Transmission
Components
Area
Transmission
Components
interconnection
interconnection
Control Area 2Control Area 2
interconnection
interconnection
Control Area 3Control Area 3
Conceptual View of an Electrical Control Area
ARC Insights, Page 3
Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com
operating manual states: ā€œAll control areas shall operate so that instability, un-
controlled separation, or cascading outages will not occur as a result of the most
severe single contingency."
The term ā€œmost severe single contingencyā€ refers to any potential failure
that causes a disturbance within the control area. Any such event, no mat-
ter how serious, cannot be allowed to destabilize the control area. At any
time if any single such event would destabilize a control region and/or its
interconnections, then that control regions is no longer operating within
ā€œsingle contingency coverageā€. It is the responsibility of regional system
operators to manage their power system configuration so that these abnor-
mal conditions are avoided. If their operations move outside this
boundary, the NERC operating poli-
cies specifies that they may remain in
this state for a maximum of 30 min-
utes. Furthermore the NERC policies
regarding emergency operations dic-
tate that a control area experiencing or
anticipating an operating emergency
shall communicate its status to
neighboring systems. These commu-
nications are to include notification of
conditions such as the lack of single
contingency coverage.
Events of the August 2003 Blackout
The complete sequence of events that occurred on August 14th 2003 is be-
ing investigated in detail by numerous agencies. Nevertheless, key events
leading up to the blackout have been detailed by NERC, AEP, and ITC
(which owns and operates transmission assets in Michigan). Some of these
event chronologies are listed on the websites of these organizations.
The sequence of abnormal events began at about 2 PM with a trip of a 550
MW generating unit. The sequence of events then follows a classic pattern
as the both the number and severity of abnormal events continue to build
during the next two hours and 11 minutes (see the Figure on Page 1). Dur-
ing that time system operators had to deal with the continuing degradation
of the power transmission system they were charged with operating.
Shortly before to 4:11 PM the abnormal events arrived in a virtual ava-
t=0 t=30
Control area
can withstand a
first contingency
event.
Time in Minutes
Operating Security
Limit Violation
Occurs
Control area
CANNOT
withstand a first
contingency
event.
Must be < 30
minutes.
Control area
can withstand a
first contingency
event.
t=0 t=30
Control area
can withstand a
first contingency
event.
Control area
can withstand a
first contingency
event.
Time in Minutes
Operating Security
Limit Violation
Occurs
Control area
CANNOT
withstand a first
contingency
event.
Must be < 30
minutes.
Control area
can withstand a
first contingency
event.
Control area
can withstand a
first contingency
event.
The NERC Single Contingency Coverage Criterion
ARC Insights, Page 4
Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com
lanche. Plotting the cumulative number of abnormal events versus their
time to before the blackout began shows that operators were confronted
with a continuously changing power system configuration during the entire
evolution of the sequence. Only two periods between major abnormal
events were longer than 15 minutes.
Key Questions Remaining To Be Answered
The international investigation of the blackout is likely to fork into two dis-
tinct areas of study. The first and simpler task is to assemble and
reconstruct the physical events that transpired, including the transient
loads on various equipment and the reasons for equipment responses. This
will be a matter of weeks, not months. The second, and far more difficult
task, will analyze both the communications between control centers and the
actual operator actions in terms of their conformance to written operating
procedures. The task force must also determine if the existing procedures,
had they been scrupulously followed, could have prevented the events
which eventually transpired. The answers to these questions will lead to
concrete recommendations concerning future policy changes, but that sec-
ond task will take months, not weeks. The US Congress is not likely to wait
that long before making up its own mind and taking some action of its own.
Recommendations
ā€¢ Both CCM systems and procedures for emergency operation must be
periodically tested to insure their feasibility and effectiveness.
ā€¢ Human factors in abnormal operation are as critical as automation func-
tions.
Please help us improve our deliverables to you ā€“ take our survey linked to this
transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further
information, contact your account manager or the author at hforbes@arcweb.com.
Recommended circulation: All MAS-P and H clients. ARC Insights are published
and copyrighted by ARC Advisory Group. The information is proprietary to ARC
and no part of it may be reproduced without prior permission from ARC.

More Related Content

What's hot

Power System Operation with Reduced System Strength for Inverter-connected Ge...
Power System Operation with Reduced System Strength for Inverter-connected Ge...Power System Operation with Reduced System Strength for Inverter-connected Ge...
Power System Operation with Reduced System Strength for Inverter-connected Ge...Power System Operation
Ā 
Dynamic lightning protection system
Dynamic lightning protection systemDynamic lightning protection system
Dynamic lightning protection systemRahul Goyal
Ā 
Seminar presentation
Seminar presentationSeminar presentation
Seminar presentationAfzal Tiwari
Ā 
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...Determining Multiple Fault Ride-Through Requirements for Generating Systems i...
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...Power System Operation
Ā 
IRJET- A Review Paper on Power Quality Issues and Monitoring Techniques
IRJET- A Review Paper on Power Quality Issues and Monitoring TechniquesIRJET- A Review Paper on Power Quality Issues and Monitoring Techniques
IRJET- A Review Paper on Power Quality Issues and Monitoring TechniquesIRJET Journal
Ā 
Interconnection power system
Interconnection power systemInterconnection power system
Interconnection power systemNovia Putri
Ā 
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET Journal
Ā 
REAL-TIME APPLICATIONS OF PHASOR MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...
REAL-TIME APPLICATIONS OF PHASOR  MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...REAL-TIME APPLICATIONS OF PHASOR  MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...
REAL-TIME APPLICATIONS OF PHASOR MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...Power System Operation
Ā 
An approach for a multi-stage under-frequency based load shedding scheme for...
An approach for a multi-stage under-frequency based  load shedding scheme for...An approach for a multi-stage under-frequency based  load shedding scheme for...
An approach for a multi-stage under-frequency based load shedding scheme for...IJECEIAES
Ā 
Power System Contingency Ranking Using Fast Decoupled Load Flow Method
Power System Contingency Ranking Using Fast Decoupled Load Flow MethodPower System Contingency Ranking Using Fast Decoupled Load Flow Method
Power System Contingency Ranking Using Fast Decoupled Load Flow Methodpaperpublications3
Ā 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET Journal
Ā 
Power Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research TopicsPower Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research TopicsMatlab Simulation
Ā 
A Review of power quality problems, standards and solutions
A Review of power quality problems, standards and solutionsA Review of power quality problems, standards and solutions
A Review of power quality problems, standards and solutionsIRJET Journal
Ā 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
Ā 
Improving Frequency Stabilization in Power System Network using Optimization ...
Improving Frequency Stabilization in Power System Network using Optimization ...Improving Frequency Stabilization in Power System Network using Optimization ...
Improving Frequency Stabilization in Power System Network using Optimization ...ijtsrd
Ā 
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...Power System Operation
Ā 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 ReportJoshua Chokera
Ā 
Smart Grid Overvoltage Protection
Smart Grid Overvoltage ProtectionSmart Grid Overvoltage Protection
Smart Grid Overvoltage ProtectionMike Nager
Ā 

What's hot (20)

Power System Operation with Reduced System Strength for Inverter-connected Ge...
Power System Operation with Reduced System Strength for Inverter-connected Ge...Power System Operation with Reduced System Strength for Inverter-connected Ge...
Power System Operation with Reduced System Strength for Inverter-connected Ge...
Ā 
Dynamic lightning protection system
Dynamic lightning protection systemDynamic lightning protection system
Dynamic lightning protection system
Ā 
Seminar presentation
Seminar presentationSeminar presentation
Seminar presentation
Ā 
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...Determining Multiple Fault Ride-Through Requirements for Generating Systems i...
Determining Multiple Fault Ride-Through Requirements for Generating Systems i...
Ā 
IRJET- A Review Paper on Power Quality Issues and Monitoring Techniques
IRJET- A Review Paper on Power Quality Issues and Monitoring TechniquesIRJET- A Review Paper on Power Quality Issues and Monitoring Techniques
IRJET- A Review Paper on Power Quality Issues and Monitoring Techniques
Ā 
Interconnection power system
Interconnection power systemInterconnection power system
Interconnection power system
Ā 
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
IRJET-Review on Power Quality Enhancement in weak Power Grids by Integration ...
Ā 
REAL-TIME APPLICATIONS OF PHASOR MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...
REAL-TIME APPLICATIONS OF PHASOR  MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...REAL-TIME APPLICATIONS OF PHASOR  MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...
REAL-TIME APPLICATIONS OF PHASOR MEASUREMENT UNITS (PMU) FOR VISUALIZATION, ...
Ā 
An approach for a multi-stage under-frequency based load shedding scheme for...
An approach for a multi-stage under-frequency based  load shedding scheme for...An approach for a multi-stage under-frequency based  load shedding scheme for...
An approach for a multi-stage under-frequency based load shedding scheme for...
Ā 
Power System Contingency Ranking Using Fast Decoupled Load Flow Method
Power System Contingency Ranking Using Fast Decoupled Load Flow MethodPower System Contingency Ranking Using Fast Decoupled Load Flow Method
Power System Contingency Ranking Using Fast Decoupled Load Flow Method
Ā 
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
Ā 
Power Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research TopicsPower Quality Monitoring System Projects Research Topics
Power Quality Monitoring System Projects Research Topics
Ā 
A Review of power quality problems, standards and solutions
A Review of power quality problems, standards and solutionsA Review of power quality problems, standards and solutions
A Review of power quality problems, standards and solutions
Ā 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
Ā 
IJET-V3I2P17
IJET-V3I2P17IJET-V3I2P17
IJET-V3I2P17
Ā 
Improving Frequency Stabilization in Power System Network using Optimization ...
Improving Frequency Stabilization in Power System Network using Optimization ...Improving Frequency Stabilization in Power System Network using Optimization ...
Improving Frequency Stabilization in Power System Network using Optimization ...
Ā 
Grid Codes Comparison SWEDEN
Grid Codes Comparison SWEDENGrid Codes Comparison SWEDEN
Grid Codes Comparison SWEDEN
Ā 
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Grid Codes Comparison ERCOT,ISO New England, ISO California , PJM , New York ...
Ā 
Wind Exchange 2015 Report
Wind Exchange 2015 ReportWind Exchange 2015 Report
Wind Exchange 2015 Report
Ā 
Smart Grid Overvoltage Protection
Smart Grid Overvoltage ProtectionSmart Grid Overvoltage Protection
Smart Grid Overvoltage Protection
Ā 

Similar to Power blackout a case for critical condition management

Management of Power System Dynamic Security
Management of Power System Dynamic Security Management of Power System Dynamic Security
Management of Power System Dynamic Security Power System Operation
Ā 
Automatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAutomatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAlexander Decker
Ā 
Differential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency controlDifferential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency controlIRJET Journal
Ā 
Elwerfelli2008
Elwerfelli2008Elwerfelli2008
Elwerfelli2008Gene Rubira
Ā 
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Power System Operation
Ā 
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Power System Operation
Ā 
Wide area protection-and_emergency_control (1)
Wide area protection-and_emergency_control (1)Wide area protection-and_emergency_control (1)
Wide area protection-and_emergency_control (1)Alaa Eladl
Ā 
Report Information from ProQuestJuly 19 2019 1515 .docx
Report Information from ProQuestJuly 19 2019 1515 .docxReport Information from ProQuestJuly 19 2019 1515 .docx
Report Information from ProQuestJuly 19 2019 1515 .docxaudeleypearl
Ā 
An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...journalBEEI
Ā 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
Ā 
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Power System Operation
Ā 
PQ_surveys_FFF.pdf
PQ_surveys_FFF.pdfPQ_surveys_FFF.pdf
PQ_surveys_FFF.pdfSathvikamanda1
Ā 
Application of Neural Networks in Power Systems; A Review
Application of Neural Networks in Power Systems; A ReviewApplication of Neural Networks in Power Systems; A Review
Application of Neural Networks in Power Systems; A ReviewPower System Operation
Ā 
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEM
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEMLATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEM
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEMijiert bestjournal
Ā 
Technical paper 6_2
Technical paper 6_2Technical paper 6_2
Technical paper 6_2Alaa Eladl
Ā 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectioAminu Bugaje
Ā 
IRJET- Feed-Forward Neural Network Based Transient Stability Assessment o...
IRJET-  	  Feed-Forward Neural Network Based Transient Stability Assessment o...IRJET-  	  Feed-Forward Neural Network Based Transient Stability Assessment o...
IRJET- Feed-Forward Neural Network Based Transient Stability Assessment o...IRJET Journal
Ā 
Reliability of the GCC Interconnector
Reliability of the GCC InterconnectorReliability of the GCC Interconnector
Reliability of the GCC InterconnectorPower System Operation
Ā 
The fundamental aspects of system reliability
The fundamental aspects of system reliabilityThe fundamental aspects of system reliability
The fundamental aspects of system reliabilityPower System Operation
Ā 

Similar to Power blackout a case for critical condition management (20)

Management of Power System Dynamic Security
Management of Power System Dynamic Security Management of Power System Dynamic Security
Management of Power System Dynamic Security
Ā 
Automatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAutomatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systems
Ā 
Differential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency controlDifferential game approach for the analysis of two area load frequency control
Differential game approach for the analysis of two area load frequency control
Ā 
Elwerfelli2008
Elwerfelli2008Elwerfelli2008
Elwerfelli2008
Ā 
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Ā 
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Reliability Impacts of Behind the Meter Distributed Energy Resources on Trans...
Ā 
Wide area protection-and_emergency_control (1)
Wide area protection-and_emergency_control (1)Wide area protection-and_emergency_control (1)
Wide area protection-and_emergency_control (1)
Ā 
Report Information from ProQuestJuly 19 2019 1515 .docx
Report Information from ProQuestJuly 19 2019 1515 .docxReport Information from ProQuestJuly 19 2019 1515 .docx
Report Information from ProQuestJuly 19 2019 1515 .docx
Ā 
An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...An investigation on the application and challenges for wide area monitoring a...
An investigation on the application and challenges for wide area monitoring a...
Ā 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
Ā 
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Improving the Reliability of the Distribution Grid Using a Distributed Restor...
Ā 
PQ_surveys_FFF.pdf
PQ_surveys_FFF.pdfPQ_surveys_FFF.pdf
PQ_surveys_FFF.pdf
Ā 
Application of Neural Networks in Power Systems; A Review
Application of Neural Networks in Power Systems; A ReviewApplication of Neural Networks in Power Systems; A Review
Application of Neural Networks in Power Systems; A Review
Ā 
Software Based Transmission Line Fault Analysis
Software Based Transmission Line Fault AnalysisSoftware Based Transmission Line Fault Analysis
Software Based Transmission Line Fault Analysis
Ā 
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEM
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEMLATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEM
LATEST TRENDS IN CONTINGENCY ANALYSIS OF POWER SYSTEM
Ā 
Technical paper 6_2
Technical paper 6_2Technical paper 6_2
Technical paper 6_2
Ā 
Microcontroller based transformer protectio
Microcontroller based transformer protectioMicrocontroller based transformer protectio
Microcontroller based transformer protectio
Ā 
IRJET- Feed-Forward Neural Network Based Transient Stability Assessment o...
IRJET-  	  Feed-Forward Neural Network Based Transient Stability Assessment o...IRJET-  	  Feed-Forward Neural Network Based Transient Stability Assessment o...
IRJET- Feed-Forward Neural Network Based Transient Stability Assessment o...
Ā 
Reliability of the GCC Interconnector
Reliability of the GCC InterconnectorReliability of the GCC Interconnector
Reliability of the GCC Interconnector
Ā 
The fundamental aspects of system reliability
The fundamental aspects of system reliabilityThe fundamental aspects of system reliability
The fundamental aspects of system reliability
Ā 

More from ARC Advisory Group

Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldARC Advisory Group
Ā 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)ARC Advisory Group
Ā 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumARC Advisory Group
Ā 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelARC Advisory Group
Ā 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum ARC Advisory Group
Ā 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...ARC Advisory Group
Ā 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...ARC Advisory Group
Ā 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
Ā 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum ARC Advisory Group
Ā 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...ARC Advisory Group
Ā 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum ARC Advisory Group
Ā 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortARC Advisory Group
Ā 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumARC Advisory Group
Ā 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?ARC Advisory Group
Ā 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
Ā 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersARC Advisory Group
Ā 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsARC Advisory Group
Ā 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesARC Advisory Group
Ā 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingARC Advisory Group
Ā 

More from ARC Advisory Group (20)

Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
Ā 
Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
Ā 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
Ā 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Ā 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
Ā 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Ā 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Ā 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Ā 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Ā 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Ā 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Ā 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Ā 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
Ā 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
Ā 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
Ā 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Ā 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Ā 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Ā 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
Ā 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
Ā 

Recently uploaded

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
Ā 
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
Ā 
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...lizamodels9
Ā 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
Ā 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
Ā 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
Ā 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
Ā 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
Ā 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
Ā 
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...lizamodels9
Ā 
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999Tina Ji
Ā 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
Ā 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
Ā 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
Ā 
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”soniya singh
Ā 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...lizamodels9
Ā 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
Ā 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
Ā 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
Ā 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
Ā 

Recently uploaded (20)

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
Ā 
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow šŸ’‹ Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Ā 
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ā¤ļø8860477959 Escorts 100% Genuine Servi...
Ā 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
Ā 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
Ā 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Ā 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
Ā 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
Ā 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Ā 
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ā¤ļø88604**77959_Russian 100% Genuine Escor...
Ā 
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ā˜Ž 8168257667, @4999
Ā 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
Ā 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Ā 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
Ā 
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”
Call Girls in Mehrauli Delhi šŸ’ÆCall Us šŸ”8264348440šŸ”
Ā 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi āž„9990211544 Top Esc...
Ā 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
Ā 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
Ā 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
Ā 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Ā 

Power blackout a case for critical condition management

  • 1. THOUGHT LEADERS FOR MANUFACTURING & SUPPLY CHAIN ARC INSIGHTS By Harry Forbes INSIGHT# 2003-37MP&H SEPTEMBER 10, 2003 The US Blackout of 2003 is a classic example which illustrates the need for effective Critical Condition Management. Both the process and power industries have wrestled with this need, but independently. 2003 Blackout: A Case for Critical Condition Management Keywords US Blackout, Critical Condition Management (CCM), NERC Summary CCM applications detect, monitor, and guide human operators through periods of abnormal operation. These applications have become more ac- cepted in process manufacturing, especially in the chemical and petrochemical industries. The properties of these abnormal periods have much in common with the details that have been reported thus far concern- ing the Eastern US blackout of August, 2003. Yet applications for dealing with abnormal situa- tions have been developed independently in the process and power industries and without much awareness in either camp of the related work done by others. Most major automation suppliers have partnered with application specialists to deliver CCM solutions. In the future, US power system operations, operating policies, and practices will become much more harmonized among geographic regions. This har- monization will include more advanced online condition diagnostic tools such as those developed for critical applications both in the process and power industries. 0 10 20 30 01530456075 Number of Abnormal Events vs. Minutes Before Blackout
  • 2. ARC Insights, Page 2 Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com Analysis The North American Electric Reliability Council (NERC) sets the highest level operating policies for the US and Canadian electric grid. NERC is a policy-making organization, not an agency responsible for the implementa- tion of policy. Policies of NERC are embodied in their operating manual, which governs the content of policies and procedures developed by operating organizations. Thus NERC pol- icy is implemented by a wide variety of organizations that exercise the operating responsibility for parts of the North American electric grid. These same organizations contribute time and personnel to NERC for the devel- opment and refinement of NERC policy. The NERC Control Area Concept Operation of grid assets is performed by numerous op- erating entities. Each entity has responsibility for a particular subset of the grid, referred to as its ā€œcontrol areaā€. The control area may include all types of assets (Generation, Trans- mission, and Distribution) or only some types, such as Distribution components. The North American grid is the aggregate of all these control areas, plus the interconnections between various control areas, over which energy can be transferred. In the traditional model of a vertically in- tegrated electric utility, control areas were highly autonomous and largely responsi- ble for both the operations and the reliability of service in their own area. In- terconnections served merely to enhance the overall system stability and reliability. During the 1990s the US government man- dated open access to the transmission system and utility companies restructured toward organizations which would operate in emerging wholesale electric markets. NERC Transmission Policy NERC has as its highest operating policy goal the prevention of cascading outages such as occurred on August 14th 2003. The preamble to the NERC Supplier Product Name Emergin WirelessOffice Gensym Optegrity Honeywell @sset.MAX Matrikon ProcessGuard Nexus Oz OSIsoft PI System PAS AMOplus Software Products Used for CCM Control Area 1 Area Power Distribution Area Power Generation Area Transmission Components interconnection Control Area 2 interconnection Control Area 3 Control Area 1 Area Power Distribution Area Power Generation Area Transmission Components Control Area 1 Area Power DistributionArea Power DistributionArea Power Distribution Area Power GenerationArea Power Generation Area Transmission Components Area Transmission Components interconnection interconnection Control Area 2Control Area 2 interconnection interconnection Control Area 3Control Area 3 Conceptual View of an Electrical Control Area
  • 3. ARC Insights, Page 3 Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com operating manual states: ā€œAll control areas shall operate so that instability, un- controlled separation, or cascading outages will not occur as a result of the most severe single contingency." The term ā€œmost severe single contingencyā€ refers to any potential failure that causes a disturbance within the control area. Any such event, no mat- ter how serious, cannot be allowed to destabilize the control area. At any time if any single such event would destabilize a control region and/or its interconnections, then that control regions is no longer operating within ā€œsingle contingency coverageā€. It is the responsibility of regional system operators to manage their power system configuration so that these abnor- mal conditions are avoided. If their operations move outside this boundary, the NERC operating poli- cies specifies that they may remain in this state for a maximum of 30 min- utes. Furthermore the NERC policies regarding emergency operations dic- tate that a control area experiencing or anticipating an operating emergency shall communicate its status to neighboring systems. These commu- nications are to include notification of conditions such as the lack of single contingency coverage. Events of the August 2003 Blackout The complete sequence of events that occurred on August 14th 2003 is be- ing investigated in detail by numerous agencies. Nevertheless, key events leading up to the blackout have been detailed by NERC, AEP, and ITC (which owns and operates transmission assets in Michigan). Some of these event chronologies are listed on the websites of these organizations. The sequence of abnormal events began at about 2 PM with a trip of a 550 MW generating unit. The sequence of events then follows a classic pattern as the both the number and severity of abnormal events continue to build during the next two hours and 11 minutes (see the Figure on Page 1). Dur- ing that time system operators had to deal with the continuing degradation of the power transmission system they were charged with operating. Shortly before to 4:11 PM the abnormal events arrived in a virtual ava- t=0 t=30 Control area can withstand a first contingency event. Time in Minutes Operating Security Limit Violation Occurs Control area CANNOT withstand a first contingency event. Must be < 30 minutes. Control area can withstand a first contingency event. t=0 t=30 Control area can withstand a first contingency event. Control area can withstand a first contingency event. Time in Minutes Operating Security Limit Violation Occurs Control area CANNOT withstand a first contingency event. Must be < 30 minutes. Control area can withstand a first contingency event. Control area can withstand a first contingency event. The NERC Single Contingency Coverage Criterion
  • 4. ARC Insights, Page 4 Ā©2003 ā€¢ ARC ā€¢ 3 Allied Drive ā€¢ Dedham, MA 02026 USA ā€¢ 781-471-1000 ā€¢ ARCweb.com lanche. Plotting the cumulative number of abnormal events versus their time to before the blackout began shows that operators were confronted with a continuously changing power system configuration during the entire evolution of the sequence. Only two periods between major abnormal events were longer than 15 minutes. Key Questions Remaining To Be Answered The international investigation of the blackout is likely to fork into two dis- tinct areas of study. The first and simpler task is to assemble and reconstruct the physical events that transpired, including the transient loads on various equipment and the reasons for equipment responses. This will be a matter of weeks, not months. The second, and far more difficult task, will analyze both the communications between control centers and the actual operator actions in terms of their conformance to written operating procedures. The task force must also determine if the existing procedures, had they been scrupulously followed, could have prevented the events which eventually transpired. The answers to these questions will lead to concrete recommendations concerning future policy changes, but that sec- ond task will take months, not weeks. The US Congress is not likely to wait that long before making up its own mind and taking some action of its own. Recommendations ā€¢ Both CCM systems and procedures for emergency operation must be periodically tested to insure their feasibility and effectiveness. ā€¢ Human factors in abnormal operation are as critical as automation func- tions. Please help us improve our deliverables to you ā€“ take our survey linked to this transmittal e-mail or at www.arcweb.com/myarc in the Client Area. For further information, contact your account manager or the author at hforbes@arcweb.com. Recommended circulation: All MAS-P and H clients. ARC Insights are published and copyrighted by ARC Advisory Group. The information is proprietary to ARC and no part of it may be reproduced without prior permission from ARC.