This document provides an instruction manual and parts list for various pumps. It includes specifications for 5 pumps to be used on a ship including their type, flow rate, power requirements and other details. The document provides safety, installation, operation and maintenance instructions for horizontal gear pumps. It describes the pump components, proper installation including alignment, start-up procedures, preventative maintenance, and rules for assembly and disassembly.
Liebherr R 944 C Hydraulic Excavator Service Repair Manual SN:16469 and upjknsmekmd
This is the Highly Detailed factory service repair manual for theLIEBHERR R 944 C HYDRAULIC EXCAVATOR, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.LIEBHERR R 944 C HYDRAULIC EXCAVATOR Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General Information
Tools
Technical Data / Maintenance Guidelines
Engine
Coupling / Splitterbox
Hydraulic System
Hydraulic Components
Electrical System
Swing Gear
Swing Ring
Travel Gear
Track Components
Special Attachments / Additional Installations
Cab / Heater / Air Conditioning System
Central Lubrication
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveLIEBHERR R 944 C HYDRAULIC EXCAVATOR Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
If you have a Perkins powered generator/machine and you don't know the engine model of your engine, this should help you. you still contact me @ +2348020549787 0r +2347033848463. if you don't seem to understand.
Caterpillar Cat DP30N Forklift Lift Trucks Service Repair Manual SN:T14E-4000...kjkemmd
This is the Highly Detailed factory service repair manual for theCATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Chassis and Mast: Foreword
Chassis and Mast: General Information
Chassis and Mast: Cooling System
Chassis and Mast: Electrical System
Chassis and Mast: Electrical System-Schematics
Chassis and Mast: Controllers
Chassis and Mast: Power Train
Chassis and Mast: Clutches
Chassis and Mast: Manual Transmission
Chassis and Mast: Power shift Transmission
Chassis and Mast: Front Axle and Reduction Differential
Chassis and Mast: Rear Axle
Chassis and Mast: Brake System
Chassis and Mast: Steering System
Chassis and Mast: Hydraulic System
Chassis and Mast: Mast and Forks
Chassis and Mast: Service Data
S4S Diesel Engine: General Information
S4S Diesel Engine: Maintenance Standards
S4S Diesel Engine: Special Tools
S4S Diesel Engine: General Instructions
S4S Diesel Engine: Disassembly and Engine Main Parts
S4S Diesel Engine: Inspection and Repair, Engine Main Parts
S4S Diesel Engine: Reassembly, Engine Main Parts
S4S Diesel Engine: Fuel System
S4S Diesel Engine: Lubrication System
S4S Diesel Engine: Cooling System
S4S Diesel Engine: Inlet and Exhaust System
S4S Diesel Engine: Electrical System
S4S Diesel Engine: Adjustment, Bench Test, Performance Tests
S4S Diesel Engine: Troubleshooting
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
Liebherr R 944 C Hydraulic Excavator Service Repair Manual SN:16469 and upjknsmekmd
This is the Highly Detailed factory service repair manual for theLIEBHERR R 944 C HYDRAULIC EXCAVATOR, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.LIEBHERR R 944 C HYDRAULIC EXCAVATOR Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General Information
Tools
Technical Data / Maintenance Guidelines
Engine
Coupling / Splitterbox
Hydraulic System
Hydraulic Components
Electrical System
Swing Gear
Swing Ring
Travel Gear
Track Components
Special Attachments / Additional Installations
Cab / Heater / Air Conditioning System
Central Lubrication
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveLIEBHERR R 944 C HYDRAULIC EXCAVATOR Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
If you have a Perkins powered generator/machine and you don't know the engine model of your engine, this should help you. you still contact me @ +2348020549787 0r +2347033848463. if you don't seem to understand.
Caterpillar Cat DP30N Forklift Lift Trucks Service Repair Manual SN:T14E-4000...kjkemmd
This is the Highly Detailed factory service repair manual for theCATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Chassis and Mast: Foreword
Chassis and Mast: General Information
Chassis and Mast: Cooling System
Chassis and Mast: Electrical System
Chassis and Mast: Electrical System-Schematics
Chassis and Mast: Controllers
Chassis and Mast: Power Train
Chassis and Mast: Clutches
Chassis and Mast: Manual Transmission
Chassis and Mast: Power shift Transmission
Chassis and Mast: Front Axle and Reduction Differential
Chassis and Mast: Rear Axle
Chassis and Mast: Brake System
Chassis and Mast: Steering System
Chassis and Mast: Hydraulic System
Chassis and Mast: Mast and Forks
Chassis and Mast: Service Data
S4S Diesel Engine: General Information
S4S Diesel Engine: Maintenance Standards
S4S Diesel Engine: Special Tools
S4S Diesel Engine: General Instructions
S4S Diesel Engine: Disassembly and Engine Main Parts
S4S Diesel Engine: Inspection and Repair, Engine Main Parts
S4S Diesel Engine: Reassembly, Engine Main Parts
S4S Diesel Engine: Fuel System
S4S Diesel Engine: Lubrication System
S4S Diesel Engine: Cooling System
S4S Diesel Engine: Inlet and Exhaust System
S4S Diesel Engine: Electrical System
S4S Diesel Engine: Adjustment, Bench Test, Performance Tests
S4S Diesel Engine: Troubleshooting
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCATERPILLAR CAT DP30N FORKLIFT LIFT TRUCKS Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
KUBOTA D1005-E3B DIESEL ENGINE Service Repair Manualjksemndmm
This is the Highly Detailed factory service repair manual for theKUBOTA D1005-E3B DIESEL ENGINE, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.KUBOTA D1005-E3B DIESEL ENGINE Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Engine Identification
General Precautions
Maintenance Check List
Check and Maintenance
Special Tools
Engine Body
Closed Breather
Half-Floating Head Cover (D1305-E3B / E3BG)
Governor
Boost Compensator
Troubleshooting
Servicing Specifications
Tightening Torques
Checking, Disassembling and Servicing
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveKUBOTA D1005-E3B DIESEL ENGINE Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
VOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Manualfujdfjjskrtekme
This is the Highly Detailed factory service repair manual for theVOLVO EC460B LC EC460BLC EXCAVATOR, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.VOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General
Safety
1 Standard Parts, Service
2 Engine with Mounting and Equipment
3 Elec. System, Warning System, Information System, Instruments
4 Power Transmission
5 Frame and Crawler Unit
6 Machinery House, Cab, Exterior Trim Parts Anywhere
7 Hydraulic System, Digging, Handling, Grading Equipment
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveVOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
Compair cyclon-3 air compressor user manual-parts supplierdaisy Airmax
shanghai airmax co.,ltd is the compair compressor parts supplier. we can provide the complete filters replacement for Compair screw air compressors. please contact info@aircompressor-filter.com
KUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Manualjksemndmm
This is the Highly Detailed factory service repair manual for theKUBOTA V2607-DI-T-E3B DIESEL ENGINE, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.KUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Engine Identification
General Precautions
Maintenance Check List
Check and Maintenance
Special Tools
Feature
Engine Body
Lubricating System
Cooling System
Fuel System
Intake and Exhaust System
Exhaust Gas Recirculation System
Troubleshooting
Servicing Specifications
Tightening Torques
Checking, Disassembly and Servicing
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveKUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
CATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Ma...jknsekmdmd
This is the Highly Detailed factory service repair manual for theCATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General Information
Cooling System
Electrical System
Power Train
Power shift Transmissions
Front Axle and Reduction Differential
Rear Axle
Brake System
Steering System
Hydraulic System
Mast and Forks
Service Data
Options
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
American History. Liberty Education Series on Gloucester, Virginia Links and News website. Incredible content you just do not find all in one place. Visit us. Free downloads are available.
KUBOTA D1005-E3B DIESEL ENGINE Service Repair Manualjksemndmm
This is the Highly Detailed factory service repair manual for theKUBOTA D1005-E3B DIESEL ENGINE, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.KUBOTA D1005-E3B DIESEL ENGINE Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Engine Identification
General Precautions
Maintenance Check List
Check and Maintenance
Special Tools
Engine Body
Closed Breather
Half-Floating Head Cover (D1305-E3B / E3BG)
Governor
Boost Compensator
Troubleshooting
Servicing Specifications
Tightening Torques
Checking, Disassembling and Servicing
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveKUBOTA D1005-E3B DIESEL ENGINE Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
VOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Manualfujdfjjskrtekme
This is the Highly Detailed factory service repair manual for theVOLVO EC460B LC EC460BLC EXCAVATOR, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.VOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General
Safety
1 Standard Parts, Service
2 Engine with Mounting and Equipment
3 Elec. System, Warning System, Information System, Instruments
4 Power Transmission
5 Frame and Crawler Unit
6 Machinery House, Cab, Exterior Trim Parts Anywhere
7 Hydraulic System, Digging, Handling, Grading Equipment
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveVOLVO EC460B LC EC460BLC EXCAVATOR Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
Compair cyclon-3 air compressor user manual-parts supplierdaisy Airmax
shanghai airmax co.,ltd is the compair compressor parts supplier. we can provide the complete filters replacement for Compair screw air compressors. please contact info@aircompressor-filter.com
KUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Manualjksemndmm
This is the Highly Detailed factory service repair manual for theKUBOTA V2607-DI-T-E3B DIESEL ENGINE, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.KUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
Engine Identification
General Precautions
Maintenance Check List
Check and Maintenance
Special Tools
Feature
Engine Body
Lubricating System
Cooling System
Fuel System
Intake and Exhaust System
Exhaust Gas Recirculation System
Troubleshooting
Servicing Specifications
Tightening Torques
Checking, Disassembly and Servicing
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveKUBOTA V2607-DI-T-E3B DIESEL ENGINE Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
CATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Ma...jknsekmdmd
This is the Highly Detailed factory service repair manual for theCATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST, this Service Manual has detailed illustrations as well as step by step instructions,It is 100 percents complete and intact. they are specifically written for the do-it-yourself-er as well as the experienced mechanic.CATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Workshop Manual provides step-by-step instructions based on the complete dis-assembly of the machine. It is this level of detail, along with hundreds of photos and illustrations, that guide the reader through each service and repair procedure. Complete download comes in pdf format which can work under all PC based windows operating system and Mac also, All pages are printable. Using this repair manual is an inexpensive way to keep your vehicle working properly.
Service Repair Manual Covers:
General Information
Cooling System
Electrical System
Power Train
Power shift Transmissions
Front Axle and Reduction Differential
Rear Axle
Brake System
Steering System
Hydraulic System
Mast and Forks
Service Data
Options
File Format: PDF
Compatible: All Versions of Windows & Mac
Language: English
Requirements: Adobe PDF Reader
NO waiting, Buy from responsible seller and get INSTANT DOWNLOAD, Without wasting your hard-owned money on uncertainty or surprise! All pages are is great to haveCATERPILLAR CAT DP40K FORKLIFT LIFT TRUCKS CHASSIS AND MAST Service Repair Workshop Manual.
Looking for some other Service Repair Manual,please check:
https://www.aservicemanualpdf.com/
Thanks for visiting!
8
American History. Liberty Education Series on Gloucester, Virginia Links and News website. Incredible content you just do not find all in one place. Visit us. Free downloads are available.
Pool linings pdf document aqua middle east fzcAdolfsmith69
Aqua is the largest Industrial Group swimming pool equipments in Middle East Dubai. we Deal all swimming pool equipment and accessories and prefabricated swimming pools in UAE.
Water treatment systems - filtration, desinfection, desalination, reverse osmosys, ultrafiltration, ion excange systems, softeners, waste water treatment, MBR systems
Pumps accessories pdf document aqua middle east fzcAdolfsmith69
Aqua is the Biggest Industrial Group swimming pool equipments in Middle East Dubai. we Deal swimming pool equipment and supplies swimming pool equipment and accessories in dubai.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Water billing management system project report.pdfKamal Acharya
Our project entitled “Water Billing Management System” aims is to generate Water bill with all the charges and penalty. Manual system that is employed is extremely laborious and quite inadequate. It only makes the process more difficult and hard.
The aim of our project is to develop a system that is meant to partially computerize the work performed in the Water Board like generating monthly Water bill, record of consuming unit of water, store record of the customer and previous unpaid record.
We used HTML/PHP as front end and MYSQL as back end for developing our project. HTML is primarily a visual design environment. We can create a android application by designing the form and that make up the user interface. Adding android application code to the form and the objects such as buttons and text boxes on them and adding any required support code in additional modular.
MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software. It is a stable ,reliable and the powerful solution with the advanced features and advantages which are as follows: Data Security.MySQL is free open source database that facilitates the effective management of the databases by connecting them to the software.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Forklift Classes Overview by Intella PartsIntella Parts
Discover the different forklift classes and their specific applications. Learn how to choose the right forklift for your needs to ensure safety, efficiency, and compliance in your operations.
For more technical information, visit our website https://intellaparts.com
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesChristina Lin
Traditionally, dealing with real-time data pipelines has involved significant overhead, even for straightforward tasks like data transformation or masking. However, in this talk, we’ll venture into the dynamic realm of WebAssembly (WASM) and discover how it can revolutionize the creation of stateless streaming pipelines within a Kafka (Redpanda) broker. These pipelines are adept at managing low-latency, high-data-volume scenarios.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
7. INSTRUCTION MANUAL 7
RC, RCV, RCA Series
-Gear DisplacementPumps
I
MIF-2300101-I
CONTENTS 3-05-00
1.- GENERAL INFORMATION
1.1. Manual Scope
1.2. Manufacturer's Detalls
1.3. Technical and Post-SalesServlce
1.3.1. Requesting Assistance
1.3.2. Obtalnlng Replacement Parts
2.- SAFETY
2.1. IdentMcatlon of Safety lnsl?uctlons
22. Quallflcstlons and Tralnlng of Personnel
2.3. Rlsks incurred by fallure to follow the
safely Instructions. Valldlty of
Guarantees.
2.4. Compllance with regulations concerning
safety at work
2.5. Operational Hazards
2.6. Safety Instructions for maintenance,
inspection and assembly.
2.7. ~rdhlbltlonof unauthorlied modMcations
2.8. Safety Instructions for users and Installers.
3.-TRANSPORTATION AND STORAGE
3.1. Packaging and protection
3.2. Storage l n ~ u c t l o n s
3.3. Transport and Handling
4.- EQUIPMENT DESCRIPTION
4.1. Shaft seal
42. Surge or Bypass valve
5.- INSTALLATION
5.1. Mountlng
5.1.1. Anchoring bolts
51.2. Levelling up
5.2. Alignment
5.2.1 Flexlble coupling
5.2.2 Rlgld coupllng
5.3. Plpework unlons
5.4. Auxlllaryflttlngs
6.- BEFORESTARTING
6.1. Pump testing
62. Elecklc motor tesUng
6.3. Petrol or diesel engine testlng
7.- STARTINGAND OPERATING
7.1. Starting the unit
73. Checklng
8.- PREVENTATNEMAINTENANCE
8.1. Monitoring the pumpmotor assembly
8.2. Troubleshooting
9.- RULESFOR ASSEMBLY AND DISASSEMBLY
9.1. Driver
91.1. Rlgld coupling
9.1.2. Flexlble coupllng
9.2. Mechanicalseal
9.3. Retainers
9.4. Packlng gland
9.5. Pump
10.- LUBRICATION
10.1. Grease Lubrlcatlon
10.1.1. Changlng Grease
10.12. GreaseType
8. 8
GENERALINFORMATION
1.1.- Manual Scope
The informationgiven in this manual is applicable to
the allthe pumpscomprisingtheseries listedinsection
4. Inthecaseof doubtthe Spanish languageversion
of the manual will be consideredauthoritative.
The manufacturerreservesthe rightto modifytechni-
cal details of the equipment.
1.2.- Manufacturer's Details
This pump is a product of BOMBAS iTUR, S.A., Co
Urteta- Zarautz (Guiprizcoa) Spain.
1.3.- Technical and post-sales service
The identificationnumber ofthe pump must&!i3Y~ be
quoted in all orders for replacement parts and when
calling for Technical Assistance or Post-Sales
Assistance. This number may be found on the pump
name plate.
1.3.1 .-Requesting Assistance
Whenassistanceisrequiredtheusershouldcontac
either the nearest Technical Support Departmen
or the Client Services ~ e ~ a r t m e n iat Head-Office
1.3.2.- Obtaining Replacement Parts
WARNING: Only replacement parts which havt
been supplled directly by -BOMBAS ITURn wll
have been checked and approved by tht
manufacturer.Theinstallationoruseofunauthorise~
parts may, undercertaincircumstances,adverse13
affect the normal running and the safety of thl
equipment.The manufacturertakesnoresponsibilit
fo; damage resultingfrom or as a consequence c
the use of non-originalparts and accessories.
When ordering spare parts please indicate th'
following:
- PUMPMODEL
- IDENTIFICATIONNUMBER
- TYPE AND REFERENCENUMBEROF PAR
AS GIVEN INTHE CROSS-SECTIONAL DIE
GRAM (PLEASE INDICATE DIAGRAM NUhr
BER)
- NUMBER OF PARTS REQUIRED
-SAFETY
This instruction manual indicates the basic instru~
tions to be observed during the installation, Nnnir
and maintenance of the equipment. It is theref01
essentialthatthepersonnelinchargeofthepumpre6
the manual before assembling or starting the pum
The manual must then always be kept available nei
the pump installation.
2.1 .-Identification of Safety Instructions
e
T
C
I-
2-
19
re
id
P.
ar
In this manual special safety instructions are marked
with the following symbols:
Failuretoobservesafetyinst~ctionsmarked
a i t h this symbol may affect personal and
installationsafety.
Failuretoobservesafetyinstructionsmarked
kiththissymbolmayentailthe riskof electric
shock
lwARNlNol -Failuretoobservesafetyinstructionsmarked
with this symbol may affect the pump
mechanism and its normal running.
Markingswill befoundonthe equipment itself inorder 1
to:
- Indicatethe direction of rotation (arrows)
- Permit the identificationof auxiliary connections.
These markingsmust always be respectedand must
be kept fully legible.
2.2.- Qualifications and Training of Personnel
The personnel responsible for the running, mainte-
nance, inspection and assembly of this equipment
must be authorised and adequately qualified. The
scope of the responsibility and the supervision of
personnel must be determinedby the plant operator.
The plantoperatormust ensureto hissatisfaction;hat
the instruction manual has been understood by all
personnel.
2.3.- Risks incurred by failure to follow the safety
instructions. Validity of guarantees.
'Bombas ITUR, S.A.' will notaccept responsibilityfor
the consequences of any failure to comply with the
current health and safety regulations, during the
handling, installation or operating of equipment
manufacturedby it.
The operating condiions of the pump may not be
altered from those stated at the time of ordering
without notifying the manufacturer.
The inappropriate use of the pump, itsuse outsideits
normal operating conditions and its assembly or
disassembly by unqualifiedpersonnelcanjeopardise
the following:
Human life
The pump mechanismand its accessories
The normalfunctioningofthepumpequipment.
Duringits periodof validity the guarantee offeredby
'Bombas ITUR' will be honouredonly ifthe following
conditions are met:
-The instructionsgiven inthis manualhave been
followed correctly.
-The equipmenthas not beentaken apalt excepl
by personneleither authorised by our Technical
Support Department or sent directly from oul
factory.
2.4.- Compliancewithregulations concerning safety at
work.
National Safety legislation must be observed.
Failuret00bse~ethese rules may place people, tht
environment andlor the equipment, at risk Itwill alsc
invalidate any claims for compensationarising.
Allsafetyregulationsmustbeobserved.Thisinclude!
manufacturer's instructions concerning the use o
electrical materialto be usedin conjunctionwith higl
voltage power-supplies.
2.5.- Operational Hazards.
Thenormalrunningofthepumpmayentailoperation6
risks arisingfrom the following:
-Pumpedliquid;itsnature,pressure,temperature.
- Rotatingparts
-Type of drive
- Inappropriate installation
- Overload
9. 2.6.- Safety Instructions for maintenance, inspection
and assembly.
It is the responsibility of the plant operator to ensure
thatmymaintenance,inspectionorassembIybecarried
out by authorised and adequately qualified personnel
who mustbefamiliarwiththeworkto bedoneandhave
readthis manualthoroughly.
No work may be carried out on the equipment except
when it has been withdrawn from service and fully
stopped.
If the installationdeals with dangerous liquids it mLst
be decontaminated prior to any work on the pump.
Theindividualmanualsshouldbereferredto fordetaiis
of the maintenanceof specific partsof the equipmenl
such as the motor.
Once any work on the pump is finished all protection
and safety measuresmust be replaced and put back
into operation.
All auxiliary connections must be reconnected anc
made ready for operation before the pump is se
running.
When the pump is being stalted for the first time thc
appropriate instructionsshould be followed.
The use of gloves is recommendedduring handlinga
this eouiomentas it contains many small piecessucl~ -
as nu&, bolts etc. which could cause minor cuts an1
abrasions to the hands.
Thefollowing instructionsare intendedto avoidopera
tional hazardsin the use of this equipment:
. .n e oumoed w v cause bums. 0 0 i s ~ t h u
s W r h ~ e sW w .
. . It istherefore essentid%
- Tighten all threaded connections fully, both on th
pump unit itselfandon allthe auxiliary connection!
usinga tighteningtoque.
-Ensure thatthe gasketsandsealsare correctlyfm
and are in good condition.
- Control the temperatureandflow of any leaks fro1
around the area of the mechanical seal or packir
gland. Drain away any such leaks and discharg
them in a safe place.
- Take the necessary precautions to avoid dire
contactwiththe pumpedliquidwheneverthepump
filled or primed.
-Beforetakingthe pump apart cleanoutthe insideI
pouring cleaningfluid in through the inlet pipe al
emptying it through the drain outlet.
-Takethenecessaryprecautionsto avoidcontactwil
the pump when it is being used to pump liquids :
temperatures higherthan N°C.
-Take the necessary precautionsto avoid the risk I
explosion if pumping liquids with a high vapol
pressure. Do not allow the liquidto becometrappc
inthe pump when it is stopped. Openthe suction1
deliveryvaivesorfdavent connectiontothe inletsic
of thepumpwhichdischargesthefluidinasafe plac
-Ensurethatthere are norotatingpartswhich are n
protected by the comsponding covers (eg. tl
coupling guard)
7
- To avoid the danger of serious accidents do not
allow loose clothingto come nearthe machineand
tie back long hair.
- Do nottry to free jammed rotating partsmanually if
the machineis connectedto power.
A~Isafetv rules for the oumD rnotorldrive must be
followed,
Incorrect installation could give rise to cracking or
fracture of the pump casing and be a hazardto both
personnelandthe environment. It istherefore essen-
tial to:
- Ensure proper venting of the pump before it is pul
into operation.
- Check that all the necessary auxiliary circuits are
working correctly beforestartingthe pump.
Check that the suction valves are fully opened.
Overloadconditions
- Do not exceed the maximum pemlittedvalues (o
temperature,outputpressure,intakepressure,r.p.m.
stated in the offer of sale and in the technica
specification.
- Do not exceed the maximum load on the inlet o
outlet lines.
nn-1
ewi~ment.The customer should therefore take thl-
necessarv stem to avoidthis risk.
2.7.- Prohibition of unauthorised modifications
The manufacturer. <<BOMBASITURn, must b
consulted if the customer wishes to make an
modificationstothe pumpunit.Forsafetyreasonson1
spares and accessories authorised by 4OMBA
ITURmmaybe used.The manufacturerwillaccept n
responsibilityfor lossor damageifunauthorisedpa0
are used.
2.8.- Safety Instructions for users and installers.
The installer must give notice of any safety risi
& e m andnotoperatethe pumpuntilsuchproblen
have been resolved. The operator must give notic
immediately of any change in, or modificationto, tt
equipment that may pose a safety risk. Unsa
equipmentmustbedismantledandtakenoutofsenrice.
I.- TRANSPORTATIONAND STORAGE
3.1.- Packaging and protection
After painting .BOMBAS ITUR>hcarries out the
following protectivemeasures:
- All openings are plugged with plastic or adhesive
stoppers.
, - With the exceptionof those in stainlesssteel, all the
visiblemechanicalsurfacesarecoatedwith atempo-
rary layer of peeloff varnish.
-To avoidmovementduringhandlingandtransporta-
tionthe equipmentissecurelypackaged. Depending
on the customer's requirements the pump may be
packedinanopenwoodencrate, Inaclosedwooden
box or on a wooden pallet andcoveredin thermally
bonded plastic.
This protection is intendedfor use during transporta-
tion andshort-tennstore6 only.Thefollowingstorage~ ~
instructionsmustbe obterved at all times.
10. lo
3.2.- Storage Instructions
These instructions are for storage of less than
12monthsfromdate ofdespatch. Inthecaseof
storage for longer periods please request
manufacturer's long-term storage instructions.
Beforestoraoe;
-This equipment must bestoredin a dry enclosure,
rotectedfrom impacts, sunlight, dust andflooding.
WARNING3-Pumps shouldnot be stackedeven when the'
typsofpackingallowsit.
I - Bothclose coupledandbearingstool pumps
Amust be stored on the original factory supplied
pallets or in any other way that is stable.
-The pumpand itsauxiliary conduitsmustbeempty
of pumped liquid.
- It is advisable to cover unpainted areas with a
protectivefilm (such as vaseline).
-Apply oil or liquid rust-proofto the wear ringfaces
via the suction flangeto avoid them seizing up.
- Pumps supplied on a movable base plate
(trolley etc) should be secured by use of the
brakes or lockingmechanism fined
- The electric motor and the cables must be
disconnectedand the terminalbox lidclosed.
-Electricalpanelsmust bedisconnectedandplaced
vertically.
After storaoe:
- Remove the temporary protection (part 3.1) and
check the state of all componentsvisually.
-If the pump has been stored and out of use for a
prolongedperiod(morethan6 months)it is neces-
sary to:
Changethe gland packing (imodel uses it).
Renewthe bearinglubricant.
Check the state of the couplings.
Check that the installationis level.
Check all the auxiliary connections.
-Followingashortstorageperioditwillsufficeto turn
the pump shaft manually to free up the impeller
mechanism.
- For the motor and all the other related elements.
carry out the steps described in the 'after storage'
section of the respective manuals.
3llowthestepsgivenin'startingthe pump'section.
If the equipment is going to be left unusedfor a
longperiodandthereisapossiblwof freezingil
shouldbedrainedmmpletelytoavoidanyriskoi
damage being causedby freezing of the liquid
inside.
3.3.- Transport and Handling
The,transport andhandlingof this equipmentmustbe
csrned out using means capable of supporting the
load.The weight is usuallyindicatedon the invoiceor
on the name plate. If it is not and there is a doubt
concerning the suitability of the handling equipment,
please contact the manufacturer, 'Bombas ITUR'.
In order to ease handling, eye-bolts are fitted where
necessary to the base plate upon which the pump
equipment stands. However, the whole unit should
neverbeliftedbythe eyeboltsintendedfor liftingone ol
its parts, such as the motor or pump. Do not use the
necks and flangesonthe pumpand plpework nor the
mgs or futings to lift the pump unit.
2WARNIN Ifthe pumpis to be lifteduslnge sling thls must
pass underthe body of thepump andmotor in the
caseofunitsmountedonamovablebase-plateanc
under the houslngin the case of verticalpumps.
M
- EQUIPMENT DESCRIPTION.
RCpumps, RCVpumps(verticalversionof RC) andRCA
pumps are gear displacement pumps with axial in-line
suctionanddelivery.RC-OOandRC-01sizesaresupplied
in close coupled configuration and are not available in
vertical versions.
CLOSE COUPLED
RC (BareshaR)
RCV (VERTICAL)
RCA series pumps include an internal thermal isolation
chamber.
This manual outlines installation In a fixed location.
According to the size and type of pump ordered a
number of pieces may be deliberately omitted such
that certain parts of this manualwill not be applicable
to all pumps. These parts may be, for example:
- Retainers, mechanicalseal or packing gland.
- Roller bearing or friction bearing.
-Type of motor
(7 Thepumponlyhas one or otherof these systems
/1 These pumps are only suitable for clean, solid-free
liquids.
The sound pressure of these pumps is less than 96
dB(A) at any momentof operation(giventhat the flow
is above the minimum requiredfor each model). The
sound power is lessthan 110 dB(A).
4.1. Shafl seal
Models RC-00and RC-01use retainersand all other
models use mechanicalseals or packing-gland.
4.2. Surge or by-pass valve.
All pumps in this family have an internal surge valve
which recirculatesthe liquid if the delivery pressure
exceeds ratedpressure. This protects the pump anc
installationfrom excess pressure.
As aruleof thumbthisvalveshouldbeset to 2 kgtcm'
abovethe pressurestatedinthe orderandshouldnu
be changed by the user. The valve is always locater:
next to the pump delivery flange.
AUnauthorisedchangesto this valve run the risko
excesspressure (which maydamage pipeworko,
pump) andlor destructionof the motoron acwun
of the excess load.
A Thesefefyvalveshouldnotbeusedtoregulatethc
flow or the discharge pressureas this maycaust
dangerous heatingof the liquid.
11. -INSTALLATION
The design of the pipework, anchoring and
other parts of the installation is not the
res~onsibilitvof the manufacturer. rrUR offers
information&dsuggestionsby wayofguidelines
only and cannot assume responsibilityfor the
design, assemblyandrunningofaninstallation.
Werecommendthecustomerwnsultaspecialist
inmountings,pipework, wellsetc. tocomplement
the information supplied by us and thereby
ensure correct running.
5.1.- Mounting
The unitcanbemountedonalargefoundation.
Thisfoundationmustprovideaflat, levelsurface.
The unit is to be attached to this platform by
anchoringboltsdesignedto avoidvibrationcaused
by operation of the pump.
5.1.I.-Anchoring bolts
'Bombas ITUR' can supply the anchoring bolts.
They are fitted as follows:
Mode of use:
- Place the equipment over its base.
- Drillholesinthe baseinthe pointscorresponding
to the anchoring points into which to fnthem.
- Level up the unit.
- Once the equipment is locatedon itsfoundation
andthe boltsarefid intothe holes,pourcement
(do not use quick setting cement) into the holes
and allow 48 hours for it to dry.
- Level up again and tightenthe bolts.
5.1.2.- Levelling up
A conventionalspirit-levelmay be usedto levelupthe
unit.The unit mustbelevelledUDbothlenuthwavsand-crossways.
If it is necessary to level the base plate by using
wedges small pieces of cut sheet metal should be
used. Bondthemwith askinofcementto preventthem
from deformingwhen the bolts are tightened.
Once levellinghas been completed it is wise to fn a
lock-nuttoeachoftheboltssothatthey donotbecome
loose during operation.
Equipmentsuppliedmountedona movablebase
platemustbesecuredbyuseof thebrakesorthe
fixing mechanism fittedprior to start up.
Inthe standardversion all RC, RCV and RCA pumps
include a flexible coupling except RC-00 and RC-01
sizes (closecoupled) which have a rigid,coupling.
Equipment supplled in the form of a complete
motor-pumpunitwill already have beenalignedin
the factoty. However, owing to movements that
may be caused duringtranspoltation and mount-
ing tt must be realigned before use.
MI1
I I'
The unit mustalwaysbe alignedonce allparts
are assembledandit is readyfor start up.
The correct alignment of the standard ITUR drive
coupling consist of ensuring that it is both parallel
andconcentricbychockingupthe motor as neces-
sary.
- Measurethedistancebetweenthecouplingendsin
four posm'ons 90' apart between the faces of the
couplingusingamicrometer.Allfour measurements
shouldbethe same (-3mm). The maleandfemale
couplingshould never be butted up together.
-Take the following measurements:
The maximumrecommendedtolerancesfor ITUR
couplings, with andwithout a spacer betweenthe
motorandthepump,ama ~ e ninthefollowinatable. . . - -(all measurements in mm):
NB Refer to the manualprovidedif other types ol
drive couplings are used.
5.2.2.- Rigid Coupling
All units are factory aligned and this alignment is
not lost unlessthe unit is dismantled. If this is the
casethe following steps should betaken once re-
assembled:
-Check that all the flange supporting surfaces
betweenthemotorandpumparecleanandsmooth.
- Insert the motor shafl into the pump without
forcingit so as to avoiddamage to the bearings.
- Checkalignmentbetweenbothshaftsturningthe
assembly by hand and measure possible
misalignmentwith a comparator.
5.3.- Plpework unlons
Strain on the pump collar can cause misalignment ol
the flanges. To reduce strain the flanges must be
parallel and concentric. The bolts or studs usedto fix
the flanges must passfreely through the holes drilled
inthem. Donotforgetto placeasealorgasketbetween
rts of the joint.
Donotusethepumpitselfasastrucfuralmembei
of the installafion~The inlet and outlet pipe:
shouldnotplace anvstrainon the pump necks
above the 'maxlmum Ilmits. Use indebendenl
braces to holdthe welght and the strein of the
plpework. Payattention to the direction of flow
lnbicatedIn the diagrams.
)I4
12. Diameters of pipes, valves and fittings must be calcu-
lated on the basis of friction losses foreseen in the
installationdesignandsuchthatliquidvelocitymatches
itsviscosity.
JNItisadvisabletouseacoarsefilter
inthe inlet pipe to avoidthe pump drawing in lumpsof
dirt and debris larger than the permitted size. Elbows
andsharpcuwesinthe pipeworkshouldbeavoided,as
shouldfittings thatproduceabruptnarrowingorwidening
of the pipe (such as cones, valves etc)
THE OUTLET PIPE should generally be of a greater
diameter than the mouth of the pump. A gate-valve
should also be fitted to regulate the flow and avoid
overloadingthe motor. This valve can also be usedto
isolatethe pump for maintenance.
I ifhosesare usedin eitherthe inletor outlet they
Amust be able to withstand pump pressures and
adequatelyrestrainedto preventtheir movemenl
causingdamage or injury.
IF OPERATED AS A FLOODED PUMP the inlet line
mustbeairiight andnormallyof adiametergreaterthan
thatofthemouthofthe pump.Thediffusercone maybe
either eccentric or concentric. Fit a gate valve for
isolationduring maintenance.
theinletlinemustbecompletelyairtightandriseupward:
towardsthe pumpatallpoints.The diameterofthepipt
shouldno&ly begreater thanthatof the mouthof the
pump. The diiser cone used for this configuratior
needs to be eccentric with the upper part horizontal
Checkthat undernormalworkingconditionsthe NPSt
(Net Positive Suction Head) is at least 0.5m less thar
that provided by the installation. In order to avoid tht
pump emptyingwhen stopped(andthus needingto bl
re-primed) itis necessaryto fhafootvalveatthe endo
the inlet lineor includetwo elbows inthe pipesto forn
a siphon makingthe pump self priming.
IMPORTANTNOTE:Itisrewrnmendedthatthelengthof
diisor wnes be 7 times the difference between the
internaldiametenattheconeenlranceandexit
5.4.- Auxlllary flttlngs
Exceptforthe externalelectricalandpipeworkconnec
tionstheunitisnormallvsu~~liedassembledandreap. ..
for immediate use.
The cooling of the mechanicalseal or packinggland
Derformedbv the external recirculationof the pumps. .
iiquid(Plan PI-11). Followthe detailedinstructionsi
the annex to this manualwhenever it is necessary I
attachthe auxiliary fttings used by these devices.
1
/!~ote that any auxiliary pipework fined is only de-
sianedto wiihstandtheinternalforcesaeneratedbv
prohibited.
RCA pumps also have an inlet and outlet for heating
liquid in the upper part of the casing. The heating
chamber includesdrainconnectionsonthe underside.
lNLET OUTLET
heating
fluid
heating
fluid
rain age plugs
i.- BEFORE STARTING
Thepumpmaybestartedonlywhenallthemechanical
hydraulicandelectricalconnectionslistedinChapter; !
'INSTALLATION' have been made. To start the puml
proceed as follows.
6.1 .-Testing the pump
When starting the pump for the first time or after i
lengthy periodof inactivity it is essentialto prime it a!
follows:
- Disconnectthe powerfromthe motoror removeth~
batteries.
-Open a vent in the deli~erypipe before the st01
valve andfit a vent valve.
- Pourliquidintothe outlet pipeuntilitoverflowsfror
the vent.
-Whilst primingthe pumpturn the pump shaft mar
ualiy to free it.
- Closethe vent-valve.
Befom,stattingthepumpallparts of the drive-sha
protecbon, suchas the drive-shaftguard, mustbe,
hed(screws t&&m@.
6.2.- Testing the electric motor
-When connectingelectricalpowercheckcarefullythi
the voltageandcurrentsuppliedbythe mainsnetwol
are the same as the nominal voltage and curre
indicated on the motor's name plate.
- Followthe instructions given in the motor manual.
-1 -~tartthemotormomentarilylocheckthedim~k
ofrotation.Thismustbethesameasthatindia
ed by the arrowmarkedon the pump casing
bracket. If the directionof rotation is not wrre
two phases in the motor terminal box must 1
changedover (if it is three phase).
13. 6.3.- Testing the diesel or petrol engine
Follow the manufacturer's instructions supplied with
the motor.
.-STARTING AND RUNNING
7.1.- Starting the pump unit
- Before starting the pump unit go through all the
sections of Chapter 6: 'BEFORE START UP'.
- All the valves on the inlet side must be fully opened
andthe outletvalve partiallyclosedbeforestartingthe
pump. Once the pump has reached operating
speed and all air has been eliminatedfrom the inlet,
the pump may be regulated by adjusting the outlet
valve.
- If the motor protector cuts out on start up the outlet
should be closed a little, thereby further restricting
flow, untilthe motor starts normally.
/iThepumpmustNEVERbeoperatedwithareduced
or zero flow as the recirculatingliquidcontainedin
thepump willrapidlyoverheatleadingto the riskof
explosionowingto thehighpressuresthatcanbuild
up within the casing.
A-Do not operate the pump with the suction or
delive~yvalves closed.
8.- PREVENTITWEMAINTENANCE.
8.1.-Pump-motor monitoring.
13
7.2.- Checking during running
Durinathe first few M e s of oweration:
Pumpwsh mechanicalseal:
- Check that there is no leakage whatsoever through
the mechanical seal. If there is the seal must be
checked andlor replaced immediately.
Pump sealed with gland packing:
- Ifthere isnoleakagewhatsoeverimmediatelyloosen
the packing gland until it drips slowly.
- If there is excessive leakage leave it to settle for 10
minutesthentightenthe gland 116of atum and leave
to settle for another 5 minutes. Repeatthis process
untila drip rateof between20to 60 drips a minuteis
obtained.
After several hours omration:
- Check the bearing temperature by placing E
thermocouple on the nearest housing. The norma
temperature can reach40°above ambient tempera.
ture but mustnwex exceed 90%
No Operationdescrlptlon Procedure Frequency Follow up
1 COMPIEIE PUMPOVDI~L~UL Performchecks and 2.3,4. 5, 6, 7. 8
dismantle pump Annually 9.10, 11.12
See manualpt. 9
2 Check for leaksthrough mechanical seal Vlsual Inspection Weekly 13
3 Check for leaksfrom retainers Vlsual Inspection Weekly 14
4 Check for leaksfrom packing gland Vlsual Inspection Weekly 15.16
5 Check for leaks betweenflanges Vlsual Inspection Monthly 12
6 Check for leaksbetweenRangesand unions Visual inspection Monthly 12
7 Check bearlngtemperature With thermocouple Threemonthly 8. 10
Dismantle housing
8 Check for loss of normaloperatingcharacteristics Instrument reading Aaxrrdlng to use Check
installation, 1
9 Check tightness of bolts -anchorbob, motorto base- Manually Six-monthly 18
plate, pump to base-plate, covers to case, housingshlm
to houslng, flanges to casing
10 Check gear wear Dismantlecaslng Annually
Vlsual lnspection
1I Check wear to shaft and bearlngs Dismantle cover Annually
Vlsual lnspection
12 Replacegaskets Manually Eachtlme
dlsmantled
13 Replacemechanical seal See manualpt. 9.2 On detection of leaks
14 Replaceretalneffi See manualpt 9.3 Every4000 hours
15 Tighten packlng gland Manually When leaks
excessive
16 Replacegland packlng See manualpt 9.4 Every4000 hours
17 Replacerubberpads Incoupling See manualpt. 9.1 Annually
18 Check and alignwupllng See manualpt 5.2 Slx-monthly
and everytime
dlsmantled
19 Check surge valve sprlng Manually Blennlally
14. PROBLEMS I CAUSES REMEDIES
I I
2.- lnsufflclent flow
c) Plpework, filter or impeller obstructed
d)&r enters via suction pipe.
e) Surge valve Incorrectlyadjusted.
Ia) Suction or dellvery valves badly
adjusted.
a)Open hem.
b)Change motor connections.
I.- Pump d o w not move liquid.
c) Dismantle and unblock.
d)Check pipe is alfflght
e) Adjust valve (Technical Senice).
Ib) Incorrect rotational speed
a)Valves (suctiorddellvery)closed.
b)Incorrectrotational direction.
(c) Pump badly primed.
d) Alr enters via sealsystem.
e) Pipes blocked.
f) Gearswom.
a) Openihe suctionvalve fully and lookfor
operating polnt using dellveryvalve.
b)Measure speed, check voltage
of motor powersupply.
I
~~ ~
c) Refill pump and plpes, evacuate alr
carefully. Id) Dismantleand check seal.
e) Clean out plpes.
f) Dlsmantleand replacegears.
Ie) Excessivefriction In rotating
parts (bearings, wear rings).
3.: Excessive absorbed
power
Ie)~ismantlepump and check
assembly andlor wear of all components.
I
a)Liquid denslty or viscosity too higher
man normal.
b) Motorand pump badly aligned.
c) ObstnrctionInsidepump or Installation.
d) Bearings (.) worn or badly assembled.
a) Reducedesign point or change
motor.
b)Allgn coupling.
c) Dlsmantleand clean.
d) Replaceor check assembly.
I I
i.- Bearing temperature
too high.
a) Replacebearings(.) and retit beatings.
Grease if necessary.
4.- Excesshrenolse
and vlbratlon
i.-Leakagethrough
mechanicalseal or retainer
a)Bearings (.) worn, badly assembled
or under-lubricated.
b)Shalt bent or off-centre.
c) Gears wom or badly assembled.
d) Pipes straining against pump.
e) Foundationslack rigldlty or anchor bolts
1wse.
f) Pump motor misalignment
g) Pump cavitabng.
h)Plpe diameters lnsufiiclent
a)Bearings(.) badlyWed.
b)Coupllng badly Wed, wlthoutadequate
spacing betweentwo parts.
c) Motor pump mlsallgnment
d)Beatings under-lubricated.
e) Plpes stralningagainst pump.
f) Pump cavitating.
7.- Bearings or gears
wear out rapidly
b)DlsmenUe and replace.
c) Replaceor re-assembly.
d)Check Installation.
e) Remakefoundation or tighten bolts.
f) Check and clean pumpmotor union.
g) Improve sucuon. Consult manufacturer.
h ) Mlarger plpes if possible.
a)Adjust them In housings.
b) Check coupllng.
c) Align ihe mupllng.
d)Clean Internal condub.
e)Brace plpeworkan level up unit
f) Improvesuction. Consult manufacturer.
a) Contactsurfaces very worn.
b)Mechanicalseal spring broken
or has lost eldclty.
c) Mechanical seal 0-rings broken, misshapen
or have lost eldclty.
d)Seal or retainer Incorrectly flned.
a)Dismantleand replaceseal.
b) Dlsmanbeand replaceseal.
c) Dlsmantleand replacesleebing.
d)Dlsmantle, check and replace If damaged.
(*) Roller or friction beatings
e)Retdner brokenor worn.
a)Shan off-centre or bent
b)Gears wom.
c) Mlsallgnmentof pump and motor.
d) Plpes strelnlng agalnst pump.
e)Presence of solids In llquld.
e) Dismantleand replace retainer.
a)Dlsmantleand replace.
b) Replacethem.
c)Allgn wupllng.
d) Bracepipesand level up unit.
e) Fit an adequatefllter.
15. 3.- RULES FOR ASSEMBLY AND DISASSEMBLY
Before beginningto dismantle the pump ensure that:
A-The pump cannot be accidentally started during
mamtenance. The motor must be disconnected
from power either by removing fuses, unplugging,
openingthe circuitbreaker etc. or by removing the
batterypowersupply.
/j- The pump is drainedof all liquidand cleanedovt
with an appropriate cleaner if the pumped liquidis
hazardous(hot, toxic, inflammable etc).
9.1.-Drive Coupling
DISMANTLING:
1.- Removethe couplingguard.
2.- Uncouplethe pump from the motor (see dia-
gram) Release the motor fixing bolts and re-
moveitalongwiththe malepartof thecoupling.
3.- If it isnecessaryto repairthe pump releasethe
nutsjoining thecasingtothe cover andthe rear
foot.
4.- If it is necessaryto remove the coupling use a
puller.Donothiithecouplingto removeitasthis
may seriously damage the bearings or ball
races.
ASSEMBLY:
1.-Assemble the pump(if ithasbeendismantled)
andtightenthe cover fixing bolts.
2.- Coupleupthemotortothe pump. Putthemotor
inplaceinsertingthe malepartof the coupling.
Put inthe bolts but DO NOTtightenthem until
alignment has been completed.
3.- Align the coupling(see Manualsection 5.2.1).
4.- Replacethe coupling guard or protection.
9.1.2.- Rlgld coupling.
DISMANTLING:
1.-Free the pump unit (see section 9.5) leaving onl'
the pump and shaft.
2.- Undo the clamp screw.
3.- Removethe motor.
ASSEMBLY:
Followthe same steps as for dismantling but in th
reverse order, then align as described In pt. 5.2.2.
-
9.2.- Mechanical seal
ASSEMBLY:
-Assemble the fixed Dart of the mechanicalseal.
-Fit the rotating part of the seal over the bushing 01
shaft taking care not to damage the o-ring.
-Fit the cover tightly.
-Tighten the cover holding nuts.
-Complete assembly of the pump.
DISASSEMBLY:
-To dismanUe the pumpfollowthe same steps as for
assembly, but in the reverse order.
Thefollowingstepsmustbe observediftheseal
is to function correctly:
-Extremecaremustbetakentoavoidintroduc.
ingdirtintothesealduringhandling, especiallj
on the contactingsurfaces. Do not use an)
kindof lubrkan~exceptclean water. ~ l e &
usinga cloth of the type usedbyopticians.
- Take care not to damage the rings during
assembly.
-Do notturn the mechanicalsealwhilst dry.
9.3.- Retainers.
DISMANTLING:
The pump must be completely dismantled to extra(
them (Seept. 9.5, subsectionRCOOand RGO1clos
coupled pumps).
Removethe circlipholdingthe retainersto the cash(
Do not use a sharp edged tool to remove them fror
their housing as this may damage them.
ASSEMBLY:
Always fi the retainerswith the liptowards the insid
of the pump.
1.4.- Packing gland
DISASSEMBLY:
1.- Releasethe gland.
2.- Removetheglandpacking.Ifthelantemringisalsc
removed note its order in the assembly.
ASSEMBLY
1.-Cut the new gland packingto make as many ring:
asare necessary. Viewedfrom abovethe cuts ma!
be straight or at an angle of 45' (see diagram).
2.-It isagoodideato leavealittlefree play(aroundO.!
mm) in the when cuttingthe packing.
3.-Fit the rings one at a time, pushing them dowl
gently as far as they will go. The rings should b~
introducedwlth the cut placed90°from that of t h ~
preceding ring.
4.-Take care to replace the lantern ring in its origina
place.
)I-!
16. 5.- Once the new packing has been inserted check
that the shaft tums freely without any stiff spots.
6.- Itshouldnot bepossibleto screwthe glandinfully,
insert more rings ifnecessaryto prevent this.
7.- Gently tighten the gland nut.
8.-Todeterminethenecessarypacl6ngtightnessfollow
the instructionsgiven in section 7.2 of this Manual.
I UPPER VIEW
I
5.- Pump
It is necessary to dismantle the pump almost com-
pletelyinorderto take outthe shaft, bearings,bushes
(shaft bushing) etc.
Makeuse of the necessary diagrams, parts lists and
the list of recommendedspares.
The following steps give a general guide to disman-
tling the pump:
close-cou~led~.wnps(RGOO and RC-01);
- Undoand removethe pumpcover alongwith th
safety valve.
- Remove the gears.
-Undo andremovethepumpCasingalongwithth
retainers. (See manualpt. 9.3 for details).
- Remove rigid coupling (See pt. 9.1.2).
R C a n d R C V ~ u m u ~ l e dvcx&tx
- For RCV pumps, undo the motor and remove
withitspartofthecoupling.Undoandremoveth
pump lanternhousing. Take off the couplingant
the auxiliary pipes.
-ForRCpumpsremovethecouplingguardandthe1
thecouplingandauxiliarypipesas describedinpl
9.1.1
-Removethe cover onthe motorsideto revealth~
mechanicalseal. See pt. 9.2. for details of sef
dismantling.
- Remove the cover on the opposite side to th
shaft. The roller bearings (in RC-1. R C l M an
RC2models)orfrictionbearingsinothermodel!
will be visible .Then:
- Insmaller models remove the ball bearing:
-Inorderto removethe rollerbearingsit isfir!
necessary to undo and remove the linesha
bearings they contain.
16
- Remove the gears.
-Take off the pump casing.
RCA Dumos;
- Remove the coupling guard and then the
coupling itself as described in pt. 9.1.1 .Also
remove all auxiliary pipes.
- Undo and remove the packing gland. See pt.
9.3.
- Removethe coversstartingonthefar sidefrom
the shaft..
- Undotheprisonersandtheprotectivedeflectors
or washers on both sides.
Undo the bearing holding screws on the driver
side alongwith the bearingcir clips onthe other-
side.
- Striketheshafts gentlywith aplastichammeron
the far side from the coupling.
- Remove the lineshaft bearings thereby freeing
the pump case and gears.
ASSEMBLY.
To assemble the pumpfollow the above instructions
in the reverseorder.
Besure toput eaccofthe partsbackinthe right
place, especially the seal and impeller compo-
nents. 7ighten the impellernutsfully.
0.- LUBRICATION
RCand RCVseriespumpsare Viedwith eitherfriction or
roller bearings which are lubricated by the liquid itself
makingitunnecessaryto takeanyadditionalstepsunless
problems arise.
The models which are fitted with frictionbearings are:
RGOO. RC-01, RC-1, RC-1%. RG2
RCV-1. RCV-1% RCV-2
The models using roller bearingsare:
RCPR, RC2RD, RC9R, RC-4R
The models comprising the RCA series use external
grease lubrication.
Before lubricatingthe pump ensure that
- The pump is stopped and there is no risk of its
accidentally starting.
- The bearinghousingtemperature is lessthan 40°C
so that there isno riskof bumsto the hands. Uses
thermowuple to measuretlts temperature.
10.1.- Greasing (RCA only)
The pump leavesthe factorywiththe bearingsready
greased for the first 1000hours (approx.) operation.
For lubrication purposes a table has been included.
Quantities shown are grams of grease to be applied
to the greasing points approximately every 4000
hours of operation for pumps of the given shaft
diameters (measured on the couplingside).
1; 1 GREASE IQUANTITY(gr)
17. 10.1.1.- Changing the grease.
When changingthe grease the bearings must first
be stripped down and their seats in the base
thoroughly cleaned to remove all traces of the old
grease.
10.12.-Greasetype.
Useconsistency2lithiumgreasewithanti-oxidising
additives. DIN-51502 class K2K.
I1.-APPENDIX.
- Pump.cross-section
- Special instructionsfor electric, diesel and petrolmoton
- Special instructionsfor coupling
- Supplementary diagram of mechanicalseal
- Supplementarydiagrarnofpumpcooling/therrnalisolating
system
Types R G I , RC-1M and R G 2 Sect.NoMIF-2300/00/01
-
Ref.-101
210.1
210.2
320
322
360.'
383
400:
412
420
422
433
452'
461
484
504
507
545
562
636
730
750
751
752
753
755
756
757
670.1
870.:
900
901
902
903
911
920
921
932
940
(.= 1
R=S
(1) pi
Part name
Pump casing
Drlve shaft
Lay shaft
Bearing
Roller bearing
Cover
Lineshaft bearing
Gaskets
O-ring
Retainer
Fell ring
Mechanicalseal
Packlng gland
Gland pacldng
Washer
Bearing retainer flange
Deflector
Friction bearing
Guide pin
Greaser
Connector
Protectingcap
Valve body
Valve seat (1)
Valve seal
Valve tightening sleeve
Spring
Valve tensor
Drivinggear
Followinggear
Eyebolt screw
Screw
Threadedstud
Threaded plug
Filler plug
Valve holding nut
Bearingholding nut
Cir-clio
Key
:3. ...). . ,
res r m m e n d e dfor2years
3 RG1 112does nothave.
Types RCOOand RCOl Sect.NoMIF-2300/00/02
18. nuvy wamuuube Lomplex.
8Kala Bukit Road 2,#01-23
Singapore417841
7 Tel :654748 3888
Fax :6567488858
E-mallpddp?~.:lee@purn~q~ip.W
IS GSTReg No.: M2-0056147-3
SPARE PARTS LIST FOR ITUR RC - 2 / RCV-2
POSITION NO. REFERS TO SPARE PARTS DRAWlNG NO. C -722
19. Singapore 417841
Tel :8567483888
F a:6567488858
Lm-mail: pumpquip@singnctconi.sg
19 GSTReg No.:M2-0056147-3
SPARE PARTS LIST FOR ITUR RC-2 / RCV-2
POSITIDNNO. REFERS TO SPARE PARTS DRAWlNG NO. C -722
'OS, NC
1
2
3
5
6
6 A
7
8
9
10
11
12
12A
13
15
16
18
19
20
21
22
23
' 24
25
26
27
:over for bearing bush
ShafI,driven
3et screw
Sear casing
Sear, driven
Sear, driving
Sunk key
Sasket
3earing bush
:over, mechseal side
Mechanical seal
Vlechanical seal cover
Sasket
set screw
ShafI, driving
sunk key
llalve seat
ilahre spring
fake stem
3asket
3egulator
Zap
Uut
hide pin
Nasher
3earing bush
QTY
1
1
8
1
1
1
2
2
3
1
1
1
1
2
1
1
1.
1
1
1
1
1
4
4
1
1
20. 8 Kaki Buldt Road 2,$01-23
Singapore 417841
Tel :656748 3888
. . Fax:6567488858E-mail: pumpq~~ip@ringnetmm.sg
W GSTReg No.: M7.4056147-3
L I ~
SPARE PARTS LIST FOR ITUR RC-3 R
POSITIONNO. REFERS TO SPARE PARTS DRAWING NO. C -753
'
I I l l I I'l I8 n 4 6 A S 16 9 a I0
21. 8 KakiBukitRoad 2, hl-23
Singapore417841
Tel :65-6748 3888 ' -
. . Fk:656748 8858,
. . . Email: pum~uip@singoet.eom.sg
GSTReg No.:M2-0056147-3
SPARE PARTS LIST FOR lTUR RC-3R
POSITIONNO. REFERS TO SPARE PARTS DRAWING NO. C -753
Sunk key
Shaff ,driving
Hook
Gasket
Mechanical seal
~ o c knut
Washer
Nut
Bolt
Gasket, cover
Plug
Washer.
Cap
Valve spring
Regulating screw
ear ,driving
Gear, driven
Bypass valve
Gear driving key
Bolt
Nut
PipeC/W ming
End cover
Washer
Ball bearing
Bearing housing .mechseal side
Bearing housing. end side
Pump casing
Gasket, main
Sealing gland
shaft, driven
Mechanicalseal cover
Male connector
QTY
1
1
1
1
1
1
16
16
16
2
1
1
1
1
1
1
1
1
2
8
8
1
1
4
4
1
1
1
2
4
1
1
1
22. D RLU~~ noaa L,x u - ~ j
Singapore417841
Tel :65-6748 3888 - .
Fax:85-67488858,
%= E-mail:pumpquip@singnetcomsg
GST Reg No.:M2-0056147-3
.-.-,I
5TUR
SPARE PARTS LIST-. ITUR RC-I( MECHANICAL SEAL ) INTRODUCED WORLD WIDE
r? Item Nos. refer to spare parts drawing No. C-747
in
RC-1 / RCV-1
23. ~ ---.....-
B Kaid Bukit Road 2. MI-23
Singapore417841
Tel :6567483888
? F a:65-67488858
Brnail: purnpquip@singnet.corn.sg
23 GSTReg No.: M2-0056147-3
---.....-
B Kaid Bukit Road 2. MI-23
Singapore417841
Tel :6567483888
F a:65-67488858
&mail: purnpquip@singnet.corn.sg
23 GSTReg No.: M2-0056147-3
SPARE PARTS LIST FOR ITUR RC-1 / RCV-1
PosITION'NO. REFERS TO SPARE PARTS DRAWING NO.
- . . C -747
CODE DESCRIPTION
Gasket
Valve spring
Retum valve
Gasket
Sunk key
Shaft, driving
Mechanical seal
Pump casing-
Guide pin
Gasket
Bearing bush
Bearing bush
Coverfor bearingbush
Plug
Gasket
Gear, driven
Gear, driving
Shaff , driven
Plug
Set screw
Suide pin
set screw
'resure regulator
:ap
Vlechanical seal cover
Page 1
QTY
1
1
1
1
1
1
1
1
2
1
3
1
1
1
1
1
1
1
1
4
2
4
1
1
1
24. 4 X 016 HOLES ---20
- 350 -
Date 13 OCT 08
Dm By NYAN
Dim Unit MM
Scale 1 : 6
Drg No R 200124
Motor 2.2 KW/ 1764 RPM
Power/Supply 440V/ 30/ 60Hz
Full Load Current
Frome Size D lOOL
hsulation
Item NO
IP55
1
Rient LABROY SHlPBUllDlNG & ENGR PTE LTD
lull 182/183/184/185
; e ~ c e FUEL OIL TRANSFER PUMP
PumpQuipEngineeringPte Ltd
8 Kakl Buklt Road 2, #01-23 Slngapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump ITUR RC-2 Horizontal Gear Pump c/w Relief Valve
Capacity lo M3/HR
Total Head 20 M
Matl CI Casing. HT St h r , C St Shofl. Mech Seal
C0uphg CL - 130 I NPSH(Reg)
Weiqht 100 KG I
25. SUCTION 8 DISCHARGE
Date 13 OCT 08
Dm By NYAN
Dim Unit MM
Scale 1 : 10
D,.~NO R 300113
Motor 11 KW / 1184 RPM
Power/Supply 440V/ 301 60Hz
Full Load Current
Frorne Size 0 160 L
Insulation Class F / IP 55
Item No 2
Client LABROY SHlPBUllDlNG dr ENGR PTE LTD
Hull 182/183/1 841185
Senice CLEAN FO TRANSFER PUMP
PumpQuipEngineeringPte Ltd
8 ~ a k i~ u k i t~ o a d2. #01-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump ITUR RC-3R HORlZ GEAR PUMP
Capacity 30 MJ/HR
Head 20 M
Motl CI Casinq, HT St Gears, C St Shaft, Mech Seal
Cou~linsCL - 160 I NPSH(Req)
Weight 300 KG
26. I 3"X 1 4 2 " C CHANNEL I
I ! I I
I1
Client LABROY SHIPBUILDING & ENGR PTE LTD
Hull . 182/183/184/185
Service SLUGE OIL PUMP . .
PumpQuip EngineeringPte Ltd
8 Kaki Buklt Rood 2. #01-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump ITUR RC-1 Horizontal Gear Pump
Capacity 2.6 M3/HR
Total Head 30 M
Matl a Casing, HT St Gaar, C St Shaft Mech Seal
Couplinq CL - 100 I NPSH(Req)
Weiqht 45 KG
Motor 1.1 KW / 1160 RPM
Power/Supply 440V/ 361 60Hz
Full Load Current
Frame Size D SOL
Insulation
Item No 3.
'lass 1IP55
Date 13 OCT 08
Drn By NYAN
Dim Unit MM.
Scale 1 : 6
Drg No R 100136
27.
28. 1. lntroduction
2. Design
3. lnstalllng .-. ...............
4. Piping _
5. Starting
6. Linlng-up
7. Fault-flndlng
@
I Ruby Warehouw Complex.
: 8 Kakl BuknRoad 2. W1-23Slngapom417841
Tel658748388~Fu6587488858
%DeSmithsk I Desmi Modular S
TAGHOLM I D K W NBRRESUNDBY
TELEXBBB~ODENMARK ELEFAXPHONE ~ ~ 8 1 7 8 1 1 1~ 4 5 8 1 7 5 4 ~ lNSTALWTlON lNSTRUCTlONS
29. r R
c 4 Desmi Modular S
PHONE + 6 8 l 7 8 i 11
n m B g 8 2 0 TELEFPJ(+6817H8I
INSTALLATION INSTRUCTIONS
For security reasons the pump is only allowed to operate
againstacloseddischargevalvefor ashorttime(ma. 5-10
minutes and at a max. temperature of 1300 C).
Otherwise there is a risk of damage to the pump and at
worst, of asteamexplosion.Ifthepumproomisunmanned,
the installation of a safety device is highly recommended.
30. 1. Introduction
It Is vltally Important to Install the pump correctly in
order to achleve the ultimate performance and long
Ilfe. Correct lnstallatlon deoends on comoivino wlth. , -the following points:-
2. Design
DESMl MODULAR S is a single-stage self-prlmlng,
centrifugal pump wlth stainless steel shaft and me-
chanlcal shafl seal. The small pumps, sizes 532.25
110, 550-32-135,and S50-32-220, have open Impellers,
all other sizes have closed impellers.
The pump Is sultable for clean or polluted liqulds wlth
temperatures ranging from O0 to 60°C.
The pump has horizontal Inlet on the centre llne and
vertical outlet at the top.
The back of the ImpellerIs equippedwlth relief blades
In order to reduce the axlal load on the bearlngs at.
high revolutlons and pressure.
Relief holes in the Impeller ensure circulation of lip
uids for the shafl sealand prevent, under normal cori.
dltlons, overheatlng of the shaft seal.
The Dumos are oartlcuiarlv suitable for the oumolno
of water in connection wlth coollng systems; cool in^
of dlesel englnes. Irrlgatlon, water lowering, and flre
protection,as baliast and biige pumps, and-as pumps
for fish farms, water works, salvage contractors, ar;
mles, and navles.
The pump should be Installed on a base plate with a
fiat surface to avold dlstortlon. The centre llne of the
shaft Is to be horlzontal.
Bore H7 Is recommended If the pump is to be fltted
wlth a V-belt pulley, to facilitate the fitting, the hub
can be heatedto~aboutlOOO~;..~. . ~ ~ ~~- ~~ .~. .. .
The V-belt oullevcanthen easllv beslid onto the shaft
towards the shoulder. ~lternatfvely,a belt pulley wlth
a taper lock bush can be fltted.
When selecting the V-belt pulley,It is lmportant to ob-
serve the lnstructlons glven in the DESMlnomograms
for the pump size In questlon. If In doubt, ask DESMl
to advise.
If the pump Is to be drlven by a motor through a fiexl-
ble coupling, pump and motor should be mounted on
a common base piate.
Please note the followlng:
1. Avold dlstortlon In the base plate.
2; Avold dlstortlon In the piping.
3. Make sure that pump and motor are correctly
allgned.
I"mm I
I I
no. r ahows dllonmsnt by use of
steel rvlsr and Ullckness pauge.
no.2 show8 dllgnment uslno a dlnl
oau~e.me dl8tancs between the
coupllq halves should be 2 lo 4
mm.
no.2
4. Plplng
The suctlon hose should be fltted very carefully as -)even thy leaks may lmpalr the self-prlmlng. Water-
tightness may be checked by a pressure test.
The suctlon hose should be as short as posslble.
When selectlng make sure that the veloclty of the
water does not exceed 2 mhec.
Use a stralner when PumDlno oolluted Iloulds. The
stralner must be fltted with asieve wlth a'sectlonal
area of flow of 3 x the areaof the stralner. Mesh slze-
see data sheet for pump In questlon.
The pressure hose should be sized for a velocity of
water not exceeding 5 to 6 mlsec. In order to ensure
bleeding of the pump durlng prlmlng It is essential
that the pressure h e Is made so that traps in the
pipework'are avolded. During prlmlng the pump can-
not produce enough pressure to overcome traps.
The plplng should be arranged so that posslble
stresses resuitlng from~fluctuatlonsIn temperature
are not applied to the pump.
Tools for Dismantling and Assembllng of Pump
31. 5. Startlng
5.1 Llquld Filllng
A self-prlmlng pump must flrst be fllled with llquid.
Llquld fllllng takes place at the top of the pump
caslng. Remove the plug, flll the pump, replace the
plug, and the pump Is ready for use.
The liquid also serves as coolant for the shaft seal.
5.2 Start-up
Before start-up do the following:
1. Check that the shaft can rotate freely.
2. Check that the pump caslng Is fllled with water.
3. Start the pump for a moment to check the direc-
tlon of rotation.
If the dlrectlon Is correct (clockwise when viewed
from shaft end) the pump may be started.
6. Lining-up
It is often dlfflcult to calculate the manometrlc dellv-
ery head In advance. It Is, however, declslvely lmpor-
tant for the quantlty of llquld dellvered.
3I
A considerably smaller dellvery head than expected
.will increase the quantlty of llquld dellvered, causlng
Increased power consumption, motor overload, and
perhaps cavltatlon In the pump and the piping. The
Impeller may show slgns of heavy eroslon caused by
cavltatlon (corroslon), whlch may at tlmes render an
impeller unfit for use In a very short tlme. Not unusu-
ally do slrnllar eroslons occur in pipe bends and
valves elsewhere In the plplng system.
Therefore, it Is necessaryto check either the quantlty
of llquld dellvered or the Dower consum~tionof the
pump, e.g. by measuring v'oltage and curient level on
the motor. Together wlth a readlng of the counter
pressure a determinatlon of the ouantltv of water de-
ilvered can be compared agalnsi the characterlstlcs
of the pump.
Should the pump not functlon as Intended, please
proceed accordlng to the followlng fault-flndlng list.
Bear In mind. thouoh. that the ourno was carefullv
checked and testedit'our factoG and that the malo;-
Ity of faults stem from the plplng system.
I
.......
2 Wrong dlrectlon of rotatlon Dlreotlonof rotallon Is changed
to clockwlss when vlewed from
shall end
7. Pump andlorplpework wmngly as 8
. . I dlmenaloned . . 1- . . . '
3. ~lpeworkchoked
4. Pump choked
5. Suctlm llne-IeakslPumptakes
slrlstralner not submerged
8. Suctl~nlllltoo hlgh
m e pump uses too much
Power
Ie cleaned or replaced
me pump le cleaned
LeakageIs found! fault repalred
Check data shad WH CUNB and
NPSH or contact DESMl
me pump does not prlme Is not Illled wlth Flll pump caslng wlth llquld
I
1. R.p.m. too hlgh
2 Countergre&ure too low
3. me llquld Is heavier than
water
4. Forelgnbody In pump
5. Pump and eleotrlc motor not
llned up
8. EIwcBIc motor larunnlng on 2
phase8
.Leaking non.retum llsp in
pump
Wrong dlmctlon of rotstlon
Blgger Vdelt pulley on
pumplChenge r.p.m. of electrlc
mobr
Insen non-retum or check
valvelCDntact DESMl
Contact DESMl
me pump is dlemantled,the
forelpn body Is removed
Pump and motor are llned up.
DESMl coupllng max radlal thmw
02 mm
Check fuses, cable connectlone,
and cable
.AIr 11) drawn In becauae of too
llnle llquld or lesklng suction
line
Forelgn body In non.retum flap la
remmedlAny cdatlng on matlng
lacas la removed
Dlmalon of mtetlon Is changed
to ClOCkW188when vlewed fmm
shall end
I7. All cannot e8cape on preseure Ventilate the Bystem
I .Ids
me pump capaclty
Is unetable
me pump makes nolse
2 Pocket8 Of d r In auctlon llne
3. me pump takes alr
Normally, they dlaappear In a
short t h e
Uquld rssawolr emphl/Sustlon
llns not lvfflclently submerged.
(check)
32. Ruby Warehouse Complex.
m
8Kaki Bukit Road 2. m1-23
Singapore 417841
Tel :6567483888
Fax:656748 8858
Ernail: purn~uip@singnetcom.sg
GSTReg No.: h12-00.56147-3
NEW VERSION . .SPARE PARTLIST-
I I
Item Nos. refer to spare parts drawing No. : 41 96 70
33. .* 33
Ruby Warehouse Complex.
8 Kald Bulat Road 2.MI-23
Singapore 417841
Tel :6567483888
Fax:5567488858
7
E - d : pumpquip@singnetcom.sg
GST Reg No.: M2-0056147-3
.h
SPARE PART LIST - ' S ' MODULAR SERIES
Item Nos. refer to spare parts drawing No. 40 1761A
34. SPARE PART LIST- S70 -50 -
[tern Nos. refer to sparepartsdrawing No.- 41 96 70
-tern
No.-
1
2
3
4
5=
5
6
7
8
9
10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
29
75
76
Part No. Description
'ump casing, RG5
:rew Plug 114" BSP
:rew Plug 112" BSP
Near ring
v
mpeller . 165
lut M I 6
Spring lock M 16
Joint M 16
Sunk key 6x 6x 32
Wech shaft seal
Wech shaft seal
Nater deflector
Lock washer
Ball bearingShhoo"Ia~i~rina~ss.;
Ball bearing-
Sunk key 8 x 7 ~ 3 2
Shaft
Bearing housing
Allen screw MC 8 x 20
Cover, RG5
Gasket
Allen screw MC 8 x 20
Inlet DN70, RG5
Screw MC 8 x 18, AIS1316
Non return flap
Sealing washer
Sealing washer
0-Ring
Plug, 112" F. Safelyvalve
Safely valve 114". 10 Bar
JAN 2mB
35. UK%4BA?FmndZ~?e,
shI.@%AGK*q ww----nllmBI1
'r.I:-(B m
PUhPQUIE' ENGRGFTE LTD ax OWRWsss
:-Plow
SPARE PART LIST - S80-70-2751 DO9
kern Nos. refer to spare parts drawing No. 401761 A
-tern
No.-
1
2
3
4
5=
5-
5
6
7
8
9
10
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
Part No. Description
Pump casing, RG5
Screw plug 114"BSP
Screw plug 314" BSP
Wear ring
Impeller, 235
Nut M 16
Spring lock M 16
Joint M I6
Sunk key 6x 6x 32
Mech shaft seal
Mech shaft seal
Water deflector
Lock washer
Ball bearing
Shoulder ring SS - 30
Ball bearing
Sunk key 8x 7x 25
Shaft
Bearing housing
Allen screw MC 8x 20
Cover, RG5
Gasket
Allen screw MC 8x 20
Suction piece, RG5
Allen screw MC 10x 25
Non return flap
.Sealing washer
Sealing washer
36. Ruby Warehouse Complex.'' 8 K d 5ByldtRoad2. MI-23
Singapore'a7841
.Tel :65-7483888(5 Lines)
Fax:65-7488858 (2Lines)
E-M@,+dw :b@pumpqulp.m.s
GSTReg No.:MUX)56147-3
SPARE PART LIST - S7O-50-220 DO9
item Nos. refer to spare parts drawing No. 40 17 61 A
pa?
tern-No.-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
Part No. Description
Pump casing
Screw plug 114" BSP
Screw plug 112" BSP
Wear ring
Impeller, 220
Nut M I 6
Spring lock M 16
Joint M 16
Sunk key 6 x 6 ~32
Mech shaft seal
Water deflector
Lock washer
Ball bearing
Shwlder ring SS -30
Ball. bearing -
Sunk key 8 x 7 ~ 2 5
Shaft
Bearing housing
Allen screw MC 8 x 20
Cover
Gasket
Allen screw 8x 20
Suction piece
Allen screw MC 10x 25
Non.return flap
Sealing washer
Sealing washer
Pump casing ,complete
Bearing housing, complete
37. Ruby Warehouse Complw: . .~
3iL 8 Kaki BukitRoad 2..# 02-16
Singap'ore417841 ' ' - '
Tel :6567433888,
.. Faa :656748 88%~
engineering p t e itd E-man address: ~e=@~ur&~~p.wm.sg
_ ^ -.-. . _ , ,, . . . . . L.- .... .-;. ....ST P?cLN!!!Q-O0561473.. .,
SPARE PART LIST- 8125-80-275NI D O 9 A ~ ~ , &
Item Nos. refer to spare parts drawing No. 41 96 70
-
Item
No.
1
2
3
4
5
-5-
J-
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
29
29
75
76
28A
9999
Part No. I Qty Description
Pump casing
Screw plug 114" ESP
Screw plug 314" BSP
Wear ring .
Impeller, 275
Nut M 20
Spring lock M 20
Joint M 20
Sunk key l o x 8 x 56
Mech shaft seal. Crane
Water deflector, U40
Lock washer
Ball bearing
Shoulder ring 40150 x 2.5
Ball bearing
Sunk key l o x 8 x 56
Shaft
Bearing housing
Allen screw MC 12x 25
Cover
Gasket
Allen screw MC 12x 25
Suction piece DN 125
Allen screw MC 10x 25
Non return flap
Sealing washer
Sealing washer
' 0' Ring, 228mm
' 0'Ring, 355 mm
Plug 112" for safety vlv
Safety v/v , 18 bar
112" Sealing ring
Plug , RG112"
page 13A
38. Ruby Warehouse Complex.
35 8Kaki Bukit Road 2. #01-23
Singapore417841
Tel :656748 3888 ' .
Fa:656748 8856
Email: pumpquip@siognetcai.sg
GST Reg No.:M2-0056147-3
. .-
SPARE PART LIST - S50-32-135- D O 9
Item Nos. refer to spare parts drawing No. 41 0822 A
39. 39 Ruby Warehouse Complex.
8 Kaki Bukit Road 2. #01-23
SPARE PART LIST - S50-32-135 D O 9
Item Nos. refer to spare parts drawing No. 41 0822 A
-Item-No.-
1
3
5
10
11
14
15
16
17
18
21
22
23
24
25
28
30
31
Part No. Description
Pump casing
Screw plug 112" BSP
Impeller
Mechanical seal
Water deflector
Shoulder ring 25 135x 2
Ball bearing
Sunk key 6 x 6 x20
Shalt
Bearing housing
Gasket
Allen screw MC 6x 16
Suction piece
Allen screw MC 6x 16
Non return flap
S.6i~ii"g~waShei ~.
Lock washer 1-62
Oil seal
Pump casing , complete
Bearing housing , complete
Page 1
40. L 4 "X 2'C CHANNEL I
125 4
4 X 018 HOLES 4 X 018 HOLES
DELIVERY
SUCTION
SCALE 1:10
4 X 016 HOLES -
450
Xent LABROY SHIPBUILDING & ENGR PTE LTD Pump OESMI S70-50-175N / D09-1 Motor 11 KW/ 3500 RPM Date 21 AUG 08
lull 182/183/184/185 Capacity 45 M3/HR Power/Supply 440V/ 301 60Hz Dm By NYAN
iervice BILGE/BALLEST PUMP Head 30 M Full Load Current Dim Unit MM
PurnpQuipEngineeringPte Ltd Matl 8R Cashg, A h Br Imp, St St Shaft,Mech Seal Frame Size 0 160 M Scale 1 : 8
8 Kaki Buklt Road 2, #01-23 Singopore 417841 Couplinq CL-160 I NPSH(Req) Insulation
Tel : (65) 6748 3888 Fax : (65) 6748 8858 Weight 2101KG I Impeller Dia MM Item No
'lass / IP Drg No D 022117
4.
41. I CCHANNEL I I
I
470
I
- - 470
I
1 150
4
1240
SUCTION080 DIN-
8x018
DELIVERY 07ODIN
SCALE 1:10
4 X 018
DIN FLANGE
PN 16
DIN FLANGE
PN 16
Date 13 OCT 08
Dm By NYAN
Dim Unit MM
Scale 1 : 13
Drg No D 032138
Motor 45KW/ 3500 RPM
Power/Supply 440V/ 30/ 60Hz
Full Load Current
Frame Size D 225 MA
Insulation
Item No
/ IP 55
6
:lid LABROY SHIPBUILDkG dr ENGR PTE LTD
lull 182/183/184/185
Service G.S/FIRE MTlNWSHlNG PUMP
PumpQuipEngineeringPte Ltd
8 Kakl Buklt Road 2, #01-23 Singapore 417841
Tel : (65) 6748 3888 FOX: (65) 6748 8858
Pump DESMl S 80-70-275 / D09-2
Capacity 80 MJ/HR
Head 75 M
Matl Br Casinq, Al Br Imp, St St Shaft, Mech Seal
Cou~lina CL-200 I NPSH(Rea)
Weiaht 443 KG lmaeller Dia MM
42. qI, 4"X 2'C CHENNEL I 1I I I
4 X 018 HOLES 74 X 018 HOLES
Date 22 AUG 08
Dm By NYAN
Dim Unit MM
Scale 1 : 10
Drg No D 021044
Motor 15KW/ 3500 RPM
Power/Supply 440V/ 301 60Hz
Full Load Current
Frame Size D 160M
Insulation
Item No
Class I IP
14
Iient LABROY SHIPBUILDING & ENGR PTE LTD
iull 182/183/184/185
jervice EMERGENCY RRE PUMP
PumpQuip EngineeringPte Ltd
8 Kakl Buklt Road 2, #01-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump DESMl S 70-50-220N / 009
Capacity 25 M3/HR
Head 68 M
Matl Br Casing, Al Br Imp, St St Shaft, Mech Seal
Coupling CL-160 I NPSH(Req)
Weiqht 230 KG I Impeller Dia MM
43. Date 25 AUG 08
Drn By NYAN
Dim Unit mm
Scale 1 : 5
Drg No D 022111
Motor 4.6 KW/ 3500 RPM
Power/Supply 440V/30/60 Hz
Full Load Current
Frame Size D 112M
Insulation Class F / IP 55
Item No 1.
lied LABROY SHIPBUILDING & ENGR PTE LlD
lull 182/183/184/185
enice CEMENT COMPRESSOR COWNG PUMP
'umpQuip EngineeringPte Ltd
Kakl aukit Road 2, #01-23 Singapore 417841
el : (65) 6748 3888 Fax : (65) 6748 8858
P u m ~ DESMl S 50-32-135 / DO9
Capacity 15 M3/HR
Head 30 M
Matl Br Cusinq, Al Br Imp, St St Shaft, Mech Seal
Couplinq CL-130 I NPSH(Req)
Weiaht Aporox. 80 ka I
44. I I
I
L 4"XZ"
C CHANNEL
12W -
SUCTION DELNERY
8 018 HOLES
8x018 HOLES
DIN FLANGE DIN FLANGE
PN 16 PN 16
lient LABROY SHIPBLD & ENGR PTE LTD.
uII 182/183/184/185
e ~ c e AIR COND CWNG PUMP
umpQuipEngineeringPte Ltd
Kaki Bukit Road 2, @I-23 Singapore 417841
31 : (65) 6748 3888 Fax : (65) 6748 8858
lient LABROY SHIPBLD & ENGR PTE LTD.
uII 182/183/184/185
m,ipn AIR m n rnrr IN^: PIMP", .."" ,.,,. ..",.., , "",,
umpQuipEngineeringPte Ltd
Kaki Bukit Road 2, @I-23 Singapore 417841
31 : (65) 6748 3888 Fax : (65) 6748 8858
Pump DESMl S 125-80-275N/ DO9
Capacity 80 M3/H
Total Head 30 M
Matl Br Casing, Al Br Imp, St St Shaft, Mech Seal
Couplinq CL - 180 I NPSH (Red
Weiaht 317 ka
I Pump DESMl S 125-80-275N/ DO9
I Capacity 80 M3/H
i T-LA U--A ,A ,.IYLU! ncuu 3U M
Matl Br Casing, Al Br Imp, St St Shaft, Mech Seal
Couplinq CL - 180 I NPSH (Red 1
Weiaht 317 ka I
Motor 15 KW/1750 RPM
Powef/Supplv 440 V/30/60 Hz
Full Load Current
Frame Size D 160 L
Insulation Class F / IP 55
Item No 4
Date 13 OCT 08
Dm By NYAN
Dim Unit mm
Scale 1 : 13
Drg No D 032172
IMotor 15 KW/1750 RPM
IPowef/Supplv 440 V/30/60 Hz
1 L,II I A-A rllrran4
1 Date 13 OCT 08
I Dm By NYAN
I n I I ,,
I Frame Size D 160 L I
Insulation Class F / IP 55
I&-- LI- 1
-
Scale 1 : 13
Drg No D 032172
47. FROM BILGE
FROM PUMP
DISCHARGE 447
2" BSP
-+ISCHARGE
Date 04 SEP 08
Drn By NYAN
Dim Unit MM
Scale 1 : 3
~ r gNO 25505012311.5
Orhg Woter Consumption 15 MShR
Ohkg Water Prermre 4 BAR
Speed NA
Frame Size NA
Insulation NA
Item 5
Client LABROY SHIPBUILDING & ENGR PTE LTO
Hull 182/183/184/185
Service BILGE EJECTOR - .
PumpQuip EngineeringPte Ltd
8 Kaki Bukit Rood.2, #Ol-23 Singapore 417841
Tel : (65) 6748 3888 Fox : (65) 6748 8858
Pump UHAMMERS WE 25-50-50 F / 2311.5
Capacity 5 MS/HR
Head 15 M
Mat1 ALL BRONZE
Discharge Head M
Suction Head 5 M
48. INSTRUCTTONS MANUAL & PARTLIST
FOR
ITUR FRESH / SEA WATER
HII)ROPHORE SYSTEM
Mu& :MZ 311/lM2312M Z 512
HORIZONTAL SELF PRIMING
CENTRIFUGAL
PUMP
P~mPENGINEERlNGSINGAPORE
TEL :65-67483888
FAX :65-67488858
E-mail :enquirv@pumpquipwrnsg
49. INSTRUCTION MANUAL
N-EZ, MZ, MA Series
Multistageliquidring pumps
1.- GENERALINFORMATION
1.1. ManualSmpe
1 2 Manufacturer%Detalls
1.3. Technicaland Post-SalesServlce
1.3.1. Requestingk k t a n c e
1.32 Obtalnlng ReplacementParts
2-SAFETY
21. ldentlficstlon of Safely Instrudons
22 Quallficatlons and Training of Personnel
23. R k k Incurred by faflure to follow (he-........-- .....-. ---,-
sareq~~na~am.vamIly~fouaranties:--'
24. Compliance wlth regulations mncernlng-
safetyat work
25. Operational Hazards
26. Safely InstruMlons for maintenance,
lnspedlonend assembly.
27. PmhlblUonof unauthorlsedmodlficatfons
28. Safely lnstrucilons for users and Installers.
3.- TRANSPORTATIONAND STORAGE
3.1. Packaging and protection
3 2 Storagelnstructlons
3.3. Transportand Handling
4.- EQUIPMENT DESCRlPTlON
5.- INSTALLATION
5.1. MounUng
5.1.1. Anchoring bolk
5.12 Levelling up
5 2 Allgnmant
521. Rlgld Coupllng
5.22 Flexiblemupllng
5.23. Drlve vla pulleys
5.3. Pipeworkunlons
5.4. Auxlllery fittfngs
6.- BEFORESTARTING
6.1. Pump testlng
6 2 Eledrlcmotor tmlng
6.3. Pebol or dlesel englne testlng
7.- STARTING AND OPERATING
7.1. Starling
73. Self-prlmlngopwratlon
0.- PREVENTATIVEMAINTENANCE
9.- RULESFOR ASSEMBLY AND DISASSEMBLY
9.1. Drlver
' 9.1.1. Flexlblemupllng
9.12 Rlgld mupling
9 2 Mechanlcalseal
9.3. Packlnggland
9.4. Pump
10.- LUBRICATION
10.1. Grease Lubrlcatlon
10.1.1.. ChenglngGrease
10.12 Grease Type
11.- APPENDIX
12- CROSS-SECTIONALDIAGRAMS
50. 1.-GENERAL INFORMATION
1.1.- Manualscope
The informationgiven in this manual is applicable to
the all the pumps comprising the series listed in
section4. Inthe case of doubtthe Spanish language
versionofthe manualwillbeconsideredauthoritative.
The manufacturerreservesthe rightto modiiytechni-
cal details of the equipment.
1.2.- Manufacturer's Details
...*...
This pump is a product of ' .' .. . . ... ,,
S.A:&OMBAS iTUR-, C.*Urteta-Zarautz(Guip0zcoa)
Spain.
1.3.- Technical and post-sales service
The identificationnumber o f t h e p u m p m u s t ~ b e
quoted in all orders for replacement parts and when
calling for Technical Assistance or Post-Sales
Assistance. This number may befound on the pump
name plate.
1.3.1.- Requesting Assistance
When assistance is requiredthe user should con-
tact either the nearest Technical Support Depart-
ment or the Client Services Department at Head-
Office.
. 1.3.2.- Obtainlng Replacement Parts
WARNING: Only replacement parts which have
been supplied directly by *BOMBAS ITUR- will
havebeencheckedandapprovedbythe manufac-
turer. The lnstallation:oruseofunauthorisedparts
may, under certain circumstances, adversely af-
fect the normal running and the safety of the
equipment. The manufacturertakes no responsi.
bilay for damageresuiting from or as a.conse.
quence oftheuse of non-originalpartsand acces.
sories.
When-orderingSpar~pa~pleas~.indicate-th~
following:
- PUMP MODEL
- IDENTIFICATION NUMBER
- TYPE ANDREFERENCENUMBER OF PAR]
AS GIVENIN THE CROSSSECTIONALDIA,
GRAM (PLEASE INDICATE DIAGRAM NUM
BER)
- NUMBER OF PARTS REQUIRED
!.-SAFETY
This instructlon manual Indicates the basic lnstruc
tions to be observed during the installation, runnin;
and maintenance of the equipment. It is therefor1
essentialthatthepersonnelinchargeofthepumpreal
the manual before assembling or starting the pump
The manualmustthen always be kept avallabie nea
the pump installation.
2.1.- ldentiflcatlon of Safety lnstructions
Inthis manualspecialsafety instructionsare markel
with the following symbols:
~ailureto observe safety instructlon
al and instaliation safety.
-Failure to observe safety instructlon
.markedwiththksym~rnay,enWSh~0s
of electric shock.
-1 -Failure to observe safety instructlon
marked with this symbol may affect th
pump rnechanlsmand its normal runnln~
9
Markingswillbefound onthe equipmentitself inorder
to:
- Indicatethe direction of rotation (arrows)
- Permitthe identiticationof auxiliary connections.
These markingsmust alwaysbe respectedand must
be keptfully legible.
2.2.- Qualifications and Tralning of Personnel
The personnel responsible for the running, mainte-
nance, inspection and assembly of this equipment
must be authorised and adequately qualified. The
scope of the responsibility and the supervision of
personnel must be determinedbythe plant operator.
The plantoperatormustensuretohissatisfactionthat
the instruction manual has been understood by all
personnel.
2.3.- Rlsks incurred by failure to follow the safety
Instructions. Validity of guarantees.
'Bombas ITUR - . .
S.A.' will
not acceptresponsibilityfor theconsequencesof any
failure to comply with the current health and safety
regulations, duringthehandling,installationoroperating
of equipmentmanufacturedbyit.
The operating conditions of the pump may not be
aitered from those stated at the time of ordering
without notifyingthe manufacturer.
The inappropriateuseof the pump, its use outside Its
normal operating conditions and its assembly or
disassemblyby unqualiiiedpersonnelcanjeopardise
the following:
Human life
The pump mechanism and its accessories
The normal functioning of the pump equip-
ment.
-during.itsperio~of-~alid'rty~thg9uarantee~off~rd.by
'Bombas ITUR'will be honouredonly if the following
conditions aremet:
i-:-The.4nstructions:give.ninthi'smmal:have beer
followedcorrectly.
. The equipmenthasnot beentaken apart excepl
by personneleither authorisedby ourTechnica
Support Department or sent directly from ou!
factory.
2.4.- Compliance wlth regulatlons concerning safetl
at work.
NationalSafety legislation must be observed.
Failureto observethese rules may place people,tht
environmentandlorthe equipment, at rlsk. Itwill alsc
invalidateany claims for compensationarising.
Ailsafetyregulationsmustbeobserved.Thisinclude!
manufacturer's Instructions concerning the use o
, electrical materialto beusedInconjunctionwith hlgl
vokage power-supplies.
2.5.- Operational Hazards.
The norrnalrunnlngofthe pumpmayentailoperation
al rlsks arising fromthe foilowlng:
- Pumped liquid: Bs nature, pressure, tempera
ture...
- Rotating parts
- .
--Type of 'drive
- Inappropriate Installation
. -- Overload
GI
51. 2.6.- Safety Instructions for malntenance, inspection
and assembly.
It is the responsibiirty of the plant operator to ensure
that any maintenance, inspection or assembly be
carried out by authorised and adequately qualified
personnel who must be familiar with the work to be
done and have readthis manualthoroughly.
No workmay be carriedout onthe equipment eicept
when it has been withdrawn from service and fully
stopped.
Once any work on the pump isfinished all protection
and safety measures must be replaced and put back
into operation.
Referto individualmanualsformaintenanceofpallsof
the unit, such as the motor. All manufacturer'ssafety
instructionsmust be followed,
All auxiliary connections must be reconnected and
made ready for operation before the pump is set
running.
When the pump is being started for the first time the
appropriate instructions should befollowed.
The useof gloves is recommendeddurlnghandlingol
this equipment as it contains manysmallpiecessuch
as nuts, bolts etc. which could cause minor cuts and
abrasionsto the hands.
The following instructionsare intendedto avoid oper-
ational hazards in the use of thls equipment:
Al The oum0ed liouidmav cause burns, ooisonino 01
other tvoes of iniurv. It isthereforeessentialto;
-Tighten all threadedconnectionsfully, both on the
pumpunit itselfandonallthe auxiliaryconnections,
using a tightening torque.
- Ensurethatthegasketsandsealsarecorrectlyfittec
and are in good condition.
.--;Mon%orthe-temperatureandtiowof-anyleaksfrorr
aroundthe area of the mechanicalseal or packlng
gland. Drain away any such leaks and discharge
emin a safe place.
.-.&ke the necessary precautions to avold direc
antact withthe pumpedliquidwhenever the puny
isfilled or primed.
- Beforetakingthe pumpapartcleanoutthe insideb)
pouring cleaning fluid in through the Inlet pipe anc
emptying it through the drain outlet The clean in^
fluidused mustnutbecapableofproducingdanger.
ous conditions insidethe pump. Consult manufac.
turer.
- ~ a k ethe necessary precautions to avoid contac
withthe pumpwhen itisbeingusedto pumpliquid:
at temperatures higherthan 409C.
'
- Takethe necessaryprecautionsto avoidthe risk o
explosion. if pumping liquids with a high vapou
pressure. Donotallowthe llquldto becomelrappec
Inthe pumpwhen R Isstopped. Openthe suction o
dellvery valves or llt a vent connection to the lnle
sideofthe pumpwhichdischargesthefluidinasaft
place.
BI For rotatlno a
- Ensurethatthereare norotatingpartswhichare no
protected by the corresponding covers (eg. thc
coupllngguard)
-To avold the danger of serlous accldents do no
allow looseclothingto come nearthe machine anc
tie back long halr.
fl
- Do nottryto freejammed rotatingparts manuallyif
the machine is connectedto power.
C ) The pump may still be under pressure when
stopped. Before dismantling releasethe pressure by
openingthe drains (or vents) leadingto a safeplace.
If the pump is connected to lengthy pipes knocking
may occur when the pump is stopped; fit appropriate
measuresto avoidthis.
D) An inaoorooriate lnsrallation mav cause breakaae
of the untandconseauent hazardsforoersonnelandl
orthe environment. It is therefore necessarvto;
- Ensure proper venting of the pump beforeit is put
into operation.
- Checkthat all the necessary auxiliary circuits are
working correctly beforestarting the pump.
- Checkthat the suction valves are fully opened.
El Overloadconditions
- Do not exceedthe maximumpermitted values (of
temperature, output pressure, intake pressure,
r.p.m.)statedintheofferof saleandinthetechnical
speciflcation.
- Do not exceed the maximum load on the Inlet or
outlet lines.
-The pump should be used only in the specified
conditionsandwiththe specifiedliquidas statedin
the offerlorder.
FI Unexoected Interruption of the drive can be
hazardouson account of the soontaneousstartina of
D e Dumoeouioment.The customer shouldrherefore
take the necessarv steosto avoidth:s risk.
G1 When the CONTROI SYSTFM is supplied by a
manufacturer other than ITUR it is the customets
responsibillytoensurethatthe mmpieteunit,including
tk~ontrPL?ysYemsy~.mplik5~ith~af~~yYstan.da~ds..
2.7.- Prohlbltlon of unauthorlsed modifications
The manufacturer, -BOMBAS ITUR-, must be
consulted if the customer wishes to make any
modifications to the pump unit. For safety reasons
onlysparesandaccessorlesauthorisedby*BOMBAS
ITUR" maybe used.The manufacturerwill acceptno
responsibilityforlossordamage if unauthorisedparts
are used.
2.8.- Safety lnstructlons for users and installers.
The installer must give notice of any safety risks
presentandnotoperatethepumpunlilsuchproblems
have been resolved. The operator must give notice
immediatelyof any change in, or modiiicationto, the
equipmentthatmayposeasafetyrisk. Unsafeequip-
ment must be dismantled andtaken out of service.
.-TRANSPORTATIONAND STORAGE
3.1.- Packaging and protection
Aner painting -BOMBAS ITUR- carries out the
following protective measures:
-All openings are pluggedwith plastic or adhesive
stoppers.
-Wahtheexceptlonofthoseinstainlesssteel, allthe
visible mechanicalsuriacesarecoatedwith atem-
.pxary layerof peel olf varnlsh.
-To avoidmovementdurlng handllng andtranspor-
tatlon the equipment is securely packaged.
Depending on the customer's requirements the
pumpmay be packedin an open wooden crate, in
52.
53. Mode of use:
- Placethe equipment over its base.
- Drillholesinthebaseinthepointscorresponding
to the anchoring points into which to fit them.
- Level up the unit. ...-. _:.
- Oncethe equipment is locatedonitsfoundation
and the bolts are Vied into the holes, pour
cement (do not use quick setting cement) into
the holes and allow 48 hoursfor fi to dry.
- Level up again and tightenthe bolts.
.1.2.- Levelllng up
Aconventional spirit-levelmay be usedtolevelupthe
unit. The unit mustbelevelledupbothlengthwaysand.
crossways.
If it is necessary to level the base plate by using
wedges small shims of cut sheet metal should be
used. Bondthemwithaskin ofcementtopreventthem
from deforming when the bolts are tightened.
Oncelevellinghasbeencompleteditiswisetoweldto
each of the nuts to its corresponding bolt so that it
cannot become loose during operation.
Unitssuppliedmountedona movablebaseplate
mustbesecuredby useofthebrakesocthefixing
mechanismf&dprior to start up.
-
5.2.- ~ilgnment
- ~,~~iii~aerivereedun'ri-co-~pnTsz5-ac-om~-~tepumi.-
mQlorassemblyitwillhavealreadybeenalignedinthe
factory. However, it shouldberealiclnedbeforeuseas
it.mihavelost alignmentduring transit or mounting.
2:;
,., .. ....
WARNING. :;The unitmustalwaysbealignedafiermountingiandpreparationfor startlng.
Correctalignment of the couplingconsistsof correct-
ing any devlationfrom parallel or concentricity.
N-EZpumpsarefinedwith a rigidcouplingmade up
of a sleevejoinedto each of the shaftsby means of
cotters and stud boks. Unless it Is defective or the
strain exertedby the pipes Is excessivethere is no
needto realign it.
5.2.2. ~lexlblecoupllng
This type of coupiing is used for MZ and MA type
pumps.
Proceedasfollowsto checktoalignmentofthe rubber
padstined in the ITUR standardcoupllng.
- Use a calibre to measurethe dlstance betweentht
.....-couplingfaces atfour pdints909 dpait.Ttie-dlstanct
should be the same at each measuring point (- :
mm). The malepart s h o u l d ~ b u tupegalnsttht
female.
- Take the foilowlng measurements.
h
The maximum recommended tolerances for ITUR
couplinssWith andwithout spacer. areindicatedinthc
NOTE: forothertypesofcouplihgsreferto the manualsuppliec
5.2.3. Drive vla pulleys
Ifthe pumpisdrivenbypulleystakecareto ensurethatthe)
do notplaceroo muchstrainonthe shafts.
5.3.- Plpework unions
Strainonthepumpcollarcancausemisalignmentofthe
flanges. To reduce strainthe flanges must be parallel
andconcentrlc. p hebonsorstudsusedtofixtheflanges... - .--.--...-.--.--.-.--.--..-.... - .- . .---
must passfreelythrough the holes drilled in them. Do
notfoiget to aseal or gasketbetweenthe partsof
the joint.
-1 DonotusethepumpitseMasastrudoralmembe~
of the installation. The inlet and outlet pipes
shouldnotplace any strain on the pump necks
above the maximum limits. Use independeni
braces to holdthe welght and the strain of th6
pipework Payattention to the direction of flow
indatedInthe diagrams.
The diameters of the pipes, valves and accessories
must be calculated on the basis of the frictlon losses
plannedforthe installationsuchthat theflpw ratesare:
-velocity in outlet pipe: 2 to 3 mlsec
-velocity in inlet pipe: 1to 2 rnlsec.
INIt is advisable to use a large
coarsefilter inthe inlet pipeto avoldthe pumpdrawing
in dirt In new Installations,giventhat some impurities
takeatimetodetach it isadvisabletofii arelativelyfine
filterinthe 1nlet.Thetransversesectionofthisfiltermusl
be greater than or equal to three times the transverse
.section of the Inlet pipe so that it does not produce
excessivefrictlonlosses. Avoid sharpelbowsorfHtlng$
thatDrOdUcesuddennarrowlnoorwldenlno ofthe aloe$. ,
(cones, valves etc.). When &e pump dyaws from E
vacuumvesselHisagoodldeatofkavacuumcompen.
sationtube of 25 mm mlnirnurndiameter between the
pump and the tank (at a point hlgher than the hlghes
posslble liquid level).
54. THE DELIVERY PIPFshouldgenerallybe of agreater
diameter than the mouth of the pump. A gate-valve
should also be fitted to regulate the flow and avoid
overloadingthe rnotor. The use of a check-valveis not
recommendedas it makes self-primingdiiicuk. If one
is used, it should have the lowest possible opening
pressure.
1 If hoses are fined they must be firmly fastened
A before thepump is startedandduringrunningso
as to avoid the risk of whiplashes causedby the
pressuregeneratedby the pump.
ATFD AS A FLOODED PUMP the inlet line
mustbeairtightandnormallyof adiametergreaterthanI IF OPFR
that of the mouth of the pump. The diffuser cone may
be either eccentric or concentric. Fit a gate valve for
isolatlonduring maintenance.
IFOPERATEDASANFGATIVFSUCTIONI IFTPUMP
the inlet line musi be completely airtight and rise
upwardstowards the pump at all points.The diameter
of the pipe should normally be greater than that of the
mouth of the DumD. The diiuser cone used for this
I configuration need; to beeccentricwiththe upperpart
horizontal.Checkthatundernom~alworklngconditions
I the NPSH (NetPos~lveSuctionHeadl Isat leastOSm
less than ;hat provided by the instaliation. As these
pumps are self-drawing there is no need to fa a foot
valve inthe inlet line.
I Thepipe-usedto fill the self-primermust be short
Aso that the time taken to prime the pump is not
greater than 4 minutes with water at room
temperature. Foriiquidsathighertemperatures or
withhighervapourpressurethistime limitmustbe
reduced. Consultmanufacturer.
5.4.- Auxiliary fittings
for immediateuse:
.-..Thamollngiofthemechanicalsealor.~acking:giandIs
perlormed by the recirculation of thepumped liquid.
- Follow. the detailed instructlons~inthe annex to-this
manualwhenever itIsnecessaryto attachthe auxiliary
fittings used by these devices.
ANote that any auxiliary pipework fmed is only
desgnedtowrthstandtheintemdforcesgenewted
bythe circulatingliquid. ThereforesubJectingitto
additlonalforces, for examplebyleanlngon it.is
pmhibited.
1 6.- BEFORE STARTING
Thepumpmaybestartedonlywhenallthemechanlcal,
hydraulic and electricalconnectionslisted In Chapter;
5'1NSTALLATION'havebeenmade.Tostartthepump
proceed as follows.
6.1.- Testlng the pump
When starting the pump for the first time or after a
lengthy perlodof inactivityitIsessentlaltoprlmeit.The
procedure depends on pumptype:
- Disconnectthepowerfromthe rnotor orremovethe
batteries.
- Remove the vent plugs in the inlet and outlet
connections.
-Pourllqlild into the hole In the inlefpip6 i 3 i l - A
overflows from the other.
-Whllst prlmlng the pump turn the pump shaft
manuallyto free k.
- Replacethe plugs.
6 MI
N
Priming should be checked each time the pump is
started.
Beforestaning the pump alparts of the drive-
shaftprotection, such as the drive-shaffguard,
must be in dace and firmlv attached /screws
tlohtened).
6.2.- Testlng the electric motor
Whenconnectingelectricalpowercheckcarefullythat
the voltageandcurrentsuppfledbythemainsnetwork
are the same as the nominal voltage and current
indicatedon the motor's nameplate.
-1 Startthe motormomentarilyto check the direc-
tion of rotation. This mustbe the sameas that
indicated by the arrow marked on the pump
casing or bracket. If the direction of rotation is
notconecttwophasesinthemotorterminalbox
mustbe changedover (if it is three phase).
6.3.- Checking petrol or diesel englne
Follow the manufacturer's instructions supplied with
the englne.
STARTING AND RUNNING
7.1.- Startlng the pump unit
- Before starting the pump unit go through all the
sections of Chapter 6: 'BEFORE STARTING'.
-Allthevalvesonthe inletsidemustbefullyopenedand
the outlet valve partially closed before stalting the
pump. Once the pump has reached its operating
speed and all air has beeneliminatedfromthe inlet,
the pump may be regulated by adjusting the outlet
valve.
- Ifthe motorprotector cuts out on start-u~theoutlet-. ......-.- --.-- ---- ---- ..
should be-closeda little, thereby further restricting
flow;until the motor starts normally.
I.'--Thepump m & 2 'NEVER..beaperated with a
reduced ,zero flow .asthe reclrculathg liquid
. . ~. containedlntheoum~wiiI~~idlrioverheatleadinq
totheriskofex&o&n owlnfitoihe highpressor&
that can buildup within the casing.
7.2.- Checklng durlng running
Pumpwith mechanicalseal:
-Checkthatthereis~oleakaoewhatsoeve~throughthe
mechanicalseal. Ifthere isthe seal mustbechecked
andlor replaced immediately.
Pumpwith packinggland:
-If there Is no leakage at all loosenthe packinggland
until it drips slowly.
-Ifleakageisexcessiveleaveittosettleforten minutes
thentlghtenthepacklng glandli6turnandleaveitfor
another5minutes. Repeatuntilthedr1p.rate isaround
20 to 60 drlps a minute.
After several hours o ~ e r w
- Check the bearing temperature by placing a
l~enocoupleon the. ne.arethouslng,T_he nor@
temperature can reach 40Qabove ambienttempera-
ture but must I~~YBLexceed 9OQC.
55. 8.- PREVENTATIVE MAINTENANCE
8.1.- P u m p m o t o r unlt rnonitorlng 5 s -
No Operation Description Procedure Frequency Follow-up
1 PUMPovERnnuL Performcheck 2.3, 4.5.6.8.
dismantle pump 9. 10. 11. 12. 13.14
See manual ot 9
7 1 Checkfor grease asks Usual lnspecoon Monmly 11. 16. 17
8 Checkfor lossof normaloperatingchaacteristics lnsbumentreading Acmrdingto use Check
iwtallation. 1
9 Checktightness of holdingbolts,flanges, pump to base. Manually WeekJy 19
mver to housing, base to mver, supplement to housing.
flanges to casing.
10 Checkwear oh impellerandrings Dismantle housing Annually
Usual Inspedon
11 Checkwear to shaft and bearings Dismantle housing Annually
Usual inspection
12 Grease housing See manualpt 10 See manualp t 10
13 Changebeadng,... grease See manualpt 10 Evely two years (a)
14 Replacegaskets b u a l t y Eachtime
dismantled
15 Replacemechanical sed See manualpt 9.2 On detectingleaks
16 lightenpackinggland Manually When leaks
bemmeexCe55ive
17 Replacegland packing See manualp t 9.3 Annually
18 ~~!ace~lubber.pads.inthe muplmglb). ~eemanualp t 9.1 .. ~ ~ Annually . .
19 check and align mupling(b) See manualp t 5.2. Weeldy and
eachtime
dismantled
...* <,, .L) Ifthe environment is dusfy,damp or hostile, shorten (he lime beween grease changes
8.2-Troubleshoollng.
I.- Pump does not a)Valves (inlet or outlet) dosed.
move llquld bl lnmrrectrotationaldirection.
cj Air enters via Inletline.
d) Mar headgeneratedis lersthan
requiredfor me Installation.
!.-lnsunident flow a) Valves (suctionor delivery)badly adjusled.
or pressure
b) lnmrrectrotationalspeed.
C) Impellerdearanca excessbe
Id)a r enters seal.
13)ObsbuctionInplpes.
I O ImDellerobsbucledor worn.
g) G a r ringsworn OUL
h) Ea& pressure loo hlgh.
REMEDIES
a) Openvalves
b) changemotor mnnecdons
c) Check Inletline is airlight
d) Increasethe mtationalsoeed.
linot possibleifl a largerimpelleror a blgger
pump. Consultmanufacturer.
a) Openmesuctionvalve mmpletely
and find the operatingpoint by regulating
me odetvaive
b) Measurethe speed, check the voltage on
the motor supply.
c) Checkmldvlessof gasket and mounting
d) Dismantlesealandexamine It
e) clean out pipes;
0DkmantleImpellerand InspectiL
g) Dismantleand replaw.
h) Increaserotationalspeed. If not poslble itis
necsssarylo fit a larger Impellerlpump.Consult
manufamrer.
56. OPERATING
PROBLEM
emperalum excessive
.-Excessive absorbed
lower
.- Excessive nolse
and vibration
6.- Loss ot liquld
lhrough rnechanlcalseal
CAUSE
I Bearingsbadly assembled.
ICoupling badly assembled,insufficient
>acebetweenthe two parts.
I Misalignmentof pump and motor.
) Under lubricationof bsarings.
) Pipesstaining againstthe pump.
Excess lubricantin bearings.
) Liquidunusually dense or vismus.
) Misalignmentbetweenpump and motor.
) Obsbuctionto mouthsor impeller
insidepump.
I) The headproducedby the pump is less
ian designedlor, hen& flow and
Nressureare hlgher.
I) Exoessivespeed
) Bearingsworn or inmrredy assembled.
1) Excessivefriction betweenmoving
Pans.
i) Bearingsworn, inmrrecw assembled01
badly lubricated.
,)impellers rubbing
:) shanbentor off-mnp.
j) impellersimbalanmdor wom.
3) Pipesstrainingaginst pump.
O'Basenot rigidoranchoringbolls
loose.
3) Pumpandmotor misaligned.
REMEDIES
a) Adjust in situ.
b) Check mupiing
c) Align the coupling.
d) Lubricate bearings.
e) Bramthe pipesand level up the unit.
f) Remove grease from the bearings. Clean
the bearingswith soiventand regrease iL
a) Modifydesign characteristics.
b)Align the coupling
c) Dismantleand dean out pump.
d) Partiallydose the outlet
W e .
e) Regulatespeed
f) Changethem or checkassembly.
g) Dismantle the pump and checkthe
mrrectassembiyof all itsmmponenk.
a) Changebearings, remountthem,
Lubricateif necessary.
b) Checkassembly.
c) Dismantleandreplam.. . .. . ....~.. .. ... .. . .. . . . .
d) Balanceor replamlmpellers.
e)-Bramlhepipesandlevelupthe unit
f)'Remakebasear;tighm boiS.
g) Realignthe mupiing.
a) DimanUeand replaceseal.
b) Dismantleand replamseal.
c) Dismantleand replamseal.
d) Dismantleand replamsleeve.
e) Dismantle, check seal andrephm itdamages
a) Bad wear onseal mntact surfaces.
b) Mechanicalseal spring has
brokenor lostelastidty.
c) Mechanicalseal wings broken.
misshapenor have lostelasticity.
d) Replamablebushingsmred or worn.
e) Seal InmrrecUyassembled.
57. I.- RULES FOR ASSEMBLY AND DISASSEMBLY
Beforedismantling the unit ensure that:
Theyotorcannotbeac~identallystarted.Discon-
nect lt from mainspower (eg remove the fuses,
unplug it, disconnect the circuit breaker etc.) or
removethebatterie~ordisconnecthydraulicpower
(disconnect from driver).
1 Thepumpis empty 01pumpedliqu;dandhas been
A thorouohly cleanedinside ilthe DUmDedliouid is
hazardo& (hot, polluting, inflammable8tc.j
9.1.- Driver.
9.1.1.- Flexlble coupling
DISMANTLING:
1.-Wihdraw the coupling guard.
2.-Detach the pumpfrom the motor as follows:
2.1.- COUPLINGWITHOUT SPACER. Undothe bolts
holding the pump and withdraw It with the
male part of the coupling.
2.2.- COUPLINGWlTH SPACER. Undo the coupling
holding screws and remove the spacer.
3.-If the motor needs to be repaired undothe nuts
holding itonto the base plate.
i(
4.- Useapulierifitisnecessarytoundothecoupling.
Never strike it to extract it as this may seriously
damagethe bearings.
ASSEMBLY:
1.-Mount the motor (if it has beendismounted) anc
tighten the holding screws.
2.-Couple upthe pump as indicated:
.,.
2 1.- CouplmgWITHOUTSPACER.Mountthemotor
insertingthe maled artofthecouolina. Fdths
bolts b a do not thhten until alignment has
t. been completed.
2.2.-COUPLINGWlTH SPACER. FR the male oart ol
the couplinginsertingtheteethbetweenrub.
berpadsinonthefemaleDart. Fitthe sciacel
and~xituslngthescrewsontheplateaildths
male part of the coupling.
3.- Align the coupling (see manual part 5.2.)
4.-Replace the couplingguard.
9.1.2. Rlgld coupllng
In order to dismantle the rigid cou~llnpundo ths
captivestudandthe screws holdingihecomponenl
to be dismantled (motor or pump) to the base ant
pullto remove it.
9.2.- Mechanical seal.
Inorderto galn accessto the mechanicalseal it Isfirs
necessaryto dismantlethe coupling oncethe pump is
separatedfromthehouslngor baseplate.The mechan.
ical seal cover Is lmmedlatelv accessible In N-E2
pumps.Forothertypes(MZ, ~ ~ j t h ebearlnghouslng(s:
needto be dismantled.
Inorder1o.dismantlafhehousingonthe driverside(MZ
MApumps)itlssutflclemto undothe screwsortles ant
withdraw Ii, The houslng on the skle away from thc
drlver (MA)maybedismantledbyremovlngthebearlnc
coverandreleaslngtheshaitnutbeforewhhdrawlngthc
houslng.
Oncethe sealcover is accessible undo its screws anc
removeit. The mechanicalsealwill nowbevisible. The
flxedsullace is anached to the cover and the rnovini
pan sits in its nousing, from which it may easily be
removed.
To assemble itfollow the above steps in reverseorder
Thefollowingstepsmustbefollowedifthesealistoworl
properly.
- Take extreme careto ensure cleanlinessduringthc
handling of mechanical seal parts, especially thc
contact surfaces. Do not use any lubricant excep
cleanwaterandclothsofthetype usedbyopticians
- Takecarenottodamagetheo-ringsduringassembly
- Do not turn the mechanicalseal when dry
9.3.- Packing gland
DISASSEMBLY:
- Releasethe gland.
- Removethe glandpacking. Ifthe lanternringisalso
removed note its order inthe assembly.
ASSEMBLY
- Cutthe newglandpackingto makeas manyringsas
are necessary. Viewed from above the cuts may be
straight or at an angle of 4 9 (see diagram).
- Itis agoodideatoleaveal i l efree play (around0.5
mm) in the when cutting the packing.
- Fitthe rings oneatatime, pushingthemdowngently
asfar asthev willao. The rinas shouldbe introduced
withthe~ut~~acedgo~frornthatoftheprecedingring.
- Take care to replace the lantern ring in its original
place.
- Oncethe new packinghasbeeninsertedcheck thal
the shaft turns freely without any stii spots.
- It should not be possible to screw the gland Infully,
insert more rings if necessaryto prevent this.
- Gently tighten the gland nut.
- Todeterminethe necessarypackingtightnessfollou
the instructionsgiven In section 7.2 of this Manual.
58. In order to dismantlethe pump make use of the cross-
sectional diagram and parls lists attached.
The followingsteps aregive ageneralguidetodisman-
tling the pump (pumpstypes to which the instructions
refer are indicated):
1.- Removethe couplingguard(if fied)followedbythe
coupling, as describedin pt. 9 (N-EZ. MZ, MA).
2.- Separate the pump from its mountingsand pipes.
Onceemptymoveittowherework istobecarriedout
(N-EZ,MZ, MA).
3.- Write a number on each stage and mark, in the
direction of turn of the shaft, the relativeadjustment
(N-EZ,MZ, MA).
4.- Undothe auxiliiary circuits. (N-EZ. MZ, MA).
5.- Undo the bearing cover on the side away fromthe
motor and undo the shaft tightening nut (i fied).
(MA).
6.- Removethenuts/hoklingscrewsonthepumpbearing
housing(s) (MZ, MA).
7.- Remove the mechanical seai(s) or gland packing.
(N-R, MZ, MA).
8.-Undo the nuts on the ties and removethem in the
orderofthestages(wnhtheirrespect:vebearlngsand
impellers) starting on the suction side. (N-EZ. MZ,
To assemble, starl with the delivery casing andfollow
the above steps in reverse order taking the following
precautions:
- Ffithestagesandcasings inthesameorderandlnthe
same relative positlons as they had prior to
dismantling.
- Cleanthe contactareaunderthe gasketsthoroughly.
- Checktheadjustmentbetweenimpellersandstages.
Excessiveclearancewillcauseadropinperformance.
-1 During assembly take care to ensure that a1
parts are in the rightplace, especially the seals
andImpellers.
D.- LUBRICATION.
Before lubricatingthe pump ensure that:
- The pump is fully stopped and may not bc
startedaccidentally.
- Thetemperatureofthebearlnghousingsislest
than40QC.so asnotto riskcausingburnsto thi
hands. Check the temperature with ;
thermocouple.
The elements uponwhich the shaftturns arediieren
in each pump:
-N-EZ.Rollerbearlnginpumpandballrace Inmotor
-MZ. Roller bearing and a ball race in pump.
. - MARoller bearlng and two ball races In pump.
The rollerbearingsare lubricatebythe pumpedllqul~
andthe ball racesbygrease, viatheir correspondln~. .
ballgreasers.
10.1.- Grease Lubrlcatlon
The pump leavestne factorywilh sufficient grease in
the bearings for approximately 1000 hours running.
For oreasina Dumosesa table of grease cluantitles
(grabs) to 69 applied at eacn greasing ~ointevery
2000hoursrunning(approx.)forpumpsofg:ven shaft
diameter (onthe couplingside), has been 'ncl~ded.
1 MODEL I 1
GREASE (grs)
. 5,s
10.1.1 .-Changing the grease
Beforecarryingout acompletegrease cnange it is
firstnecessarytotakethebearingsapadandclean
theseatstho~ouohlvtoremovealltracesof the old" .grease.
10.1.2.- Greasetype
We recommendthe use of lnhiumbased grease
with antioxidant addklves, of consistency 2 and
matching DIN-51502 class K2K.
1.- APPENDIX
- Pump cross-section
-Speclal Instructionsfor the electric motor
no.
- Special inslructlonsforthe driver
-Supplementary diagram of the seal system
-Supplementary diagram of the cooling~heatingsystem,
59. Ruby Warehouse Comple*.
8 KakiBukitRoad 2.#01-a
Singapore417841
Tel :656748 3888
Fm:6567488858
E-mail:pumpqup@singnuwresg
GSTReg No.:M2.6056147-3
B
a SPARE PARTS LIST FOR
1TU.R
lTUR MZ-31 INTRODUCEDWORLD W E
,li
POSITION NO. REFERSTO SPARE PARTSDRAWINGNO. C -0156
60. :pumpvip
7'3 engineering pte l t d
Rubv Warehouse Carnalex
r l SPARE PARTS LIST FOR ITUR M 2-31 12
i 6
POSITIONNO. REFERS TO SPARE PARTS DRAWING NO. C -0156
CODE POS. NO DESCRIPTION QTY
1 Tie bolt 4
Nvt
Plug
Sealing ring
Flange gasket
Companion flange
Bolt
Nvt
Delivery casing side stage
Stage gasket
Suction casing bearing bush
Impeller key
Suction casing
Suction casing stage wver
Impeller IXMZID 18
Stage wver
Delivery casing bearing bush- .
Dd~verycasmg
Bolt
Nut
Set screw
Bearing bracket
Ball bearing
Bearing end wver
Bearing sleeve
Coupling key
Pump shaft
Lock nut
Washer
Coupling half, female
Grease nipple
Middle bearing bush
Intermediate stage
Mechanical seal .td rnm
Seal wver
Gasket
Water deflector
61. TO DIAPHRAGMTANK
RESSURE GUAGE
032 JIS 10K
FLANGE
Date 21 AUG 08
Drn By NYAN
Dim Unit MM
Scale 1 : 7
Drg No ZF 31203
Motor 3 KW/ 1720 RPM
Power/Supply 440V/ 301 60Hz
Full Load Current
Frame Size D 100 L
Insulation
Item No
F/ IP 55
7.
Client LABROY SHlPBUlLOlNG & ENGR PTE LTD . . .
Hull 182/183/1~4/485
Service F.W HVDROPHORE PLANT
PumpQuip Engineering FTe Ltd
8 Kaki ~ u k kRoad 2. #IN-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump ITUR MZ 312/L CENTRIFUGAL PUMP
Capacity 3.5 M3/HR
Head 35 M
Matl CI Casing, Br Imp. St St Shaft, Mech Seal
Coupling CL - 130 I NPSH (Req)
Weiqht 70 KG
62. TO DIAPHRAGMTANK
RESSUREGUAGE
032 JIS 10K
FLANGE
Client LABROY SHlPBUllDlNG & ENGR PTE LTD Pump ITUR MZ 312/L CENlRlNGAL PUMP Motor 3 KW/ 1720 RPM Date 21 AUG 08
Hull 182/183/184/185 Capacity 3.5 M3/HR Power/Supply 440V/ 301 60Hz Dm By NYAN
35 M Full Load CurrentService S.W HYDROPHORE PLANT Head Dim Unit MM
PumpQuipEngineering Pte Ltd Matl Br Casing, Br Imp, St St Shaft, Mech Seal Frame Size D 100 L Scale 1 : 7
8 Kaki ~ u k i tRoad 2. @I-23 Singapore 417841 Coupling CL - 130 I NPSH (Req) Insulation
T ~ I: (65) 6748 3888 FOX : (65) 6748 8858 Item No
F/ IP55 Drg No ZF 31203
Weiqht 70 KG 8
63. Client LABROY SHlPBUlLOlNG & ENGR PTE LTD
Hull 182/183/184/185
Service STERN MRUSTER COOUNG PUMP - .
PumpQuipEngineeringPte Ltd
8 Kakl Buklt Road 2, #01-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump ITUR MZ 312/L CENTRIFUGAL PUMP
Capacity 3 M3/HR
Head -35- M
Matl Br Casing, Br Imp, St St Shaft. Mech Seal
Coupling CL - 112 I NPSH (Req)
Wei~ht 70 KG
Motor 2.5 KW/ 1720 RPM
Power/Supply 440V/ 30/ 60Hz
Full Load Current . .
Frame Size D 100 L
Insulation
Item NO 2
ClassF/ IP 55
Date 25 AUG 08
Om By NYAN
Dim Unit MM
Scale 1 : 7
Drg No ZF 31202.5
64. 680
BOTTOM VIEW
SUCTION & DELIVERY
EL PRIMING
"
PUMP
"
I I I
-BASEPLATE
Date 02 JAN 09
Dm By NYAN
Dim Unit MM
Scale 1 : 10
Drg No 122625-16D
Motor 25 KW/ 1750 RPM
Power/Supply 4 4 0 ~ 1301 60 Hz
Full Load Curent
Frame Size D 180 LC
Insulation
Item
Mass / IP55
1
Mient LABROY SHlPBUllDlNG & ENGRG PTE LTD
Hull T-182b 83/l84/185
Service HYDRAUUC POWER PACK S.W COOLING PUMP
PumpQuipEngineeringPte Ltd
8 Kakl ~ u k ~ tRoad 2, #OI-23 Singapore 417841
Tel : (65) 6748 3888 Fax : (65) 6748 8858
Pump DESMl NSL 125-265B/D16 NON SLF PRIMING CENTRI
Capacity 170 M3/HR
.Total Head 28 M
Matl Br Casing, Ni Al Br Imp, St St Shaft, Mech Seal
Cauplinq N.A. IImp Dia MM
Weight 413 KG I NPSH Reg
65. INSTRUCTIONS MANUAL & PART LIST
FOR
M I S S I O N
MAGNUM
AND
PEDESTAL PUMP
P W Q U L P ENGliWERWG SmTWORE
TEL :65-67483888
FAX :65-67488858
E-mail :enquiry@purnpquip.com.sg