1. NETWORK MODERNIZATION ACCEPTANCE REPORT
Area Kepulauan Riau
Cluster ID 2G Cluster 8
Regional Central Sumatera
Band 2G
Customer Telkomsel
FINAL ACCEPTANCE
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 1/15 Version: 1.0
CLUSTER
ACCEPTANCE
2. MODERNIZATION CERTIFICATE
Reference Number: - - -
Band: 2G
Area: Riau Daratan
Cluster ID: 1st
Tier 118
Modernization Ericsson Equipment
Modernization Start Date: 6 Nov 2015
Modernization Finish Date:
Previous Configuration:
BSC Name BVTBK1 Cluster Name Cluster 8
Macro NE 14 NE IBS NE -
Micro NE - Total Sites 14 NE
New Configuration:
BSC Name BVTBK1 Cluster Name Cluster 8
Macro NE 14 NE IBS NE -
Micro NE - Total NE 14 NE
PT. Ericsson hereby certifies that the relevant parts of the works referred to in this Conditional Acceptance Certificate complies
with the Network Expansion Procurement Agreement, in particular the Specifications and this has successfully passed the
Acceptance Tests on the particular cluster basis.
The required Documentation is attached with this certificate.
Counter Signatures:
Telkomsel EID
Name: Joko Widodo Name: Rikie Eka Cahyadi
Position: SQA Manager
Position: Customer Project Manager
Date: Date:
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 2/15 Version: 1.0
3. 1. Content:
1. Content:............................................................................................................................................................................3
2. Executive Summary..........................................................................................................................................................4
3. Network Modernization Cluster Overview......................................................................................................................4
4. NE List..............................................................................................................................................................................6
5. OSS Statistics KPI Evaluation..........................................................................................................................................6
6. Drive Test Performance Evaluation..................................................................................................................................8
6.1 Drive Test and Static Test Point Location Map....................................................................................................8
6.2 Mobile Drive Test KPI Evaluation......................................................................................................................9
6.3 Static Drive Test KPI Evaluation..........................................................................................................................9
6.4 Drive Test Result Plot.........................................................................................................................................10
6.5.1 Cell Coverage Area...............................................................................................................................10
6.5.2 RxLevel Sub (dBm) – Idle Mode.........................................................................................................10
6.5.3 RxQual Sub – Dedicated Mode............................................................................................................11
6.5.4 SQI (Speech Quality Index) – Dedicated Mode...................................................................................12
7. Activities.........................................................................................................................................................................13
8. Recommendation............................................................................................................................................................13
9. Daily Chart Post Modernization OSS KPI.....................................................................................................................14
10. Panoramic Info.............................................................................................................................................................15
List of Figure:
Figure 1: Central Sumatera Modernization Area..................................................................................................................4
Figure 2: 2G Cluster 8..........................................................................................................................................................5
Figure 3: Baseline Calculation..............................................................................................................................................6
Figure 4: Scoring Calculation...............................................................................................................................................6
Figure 5: Drive Test Route...................................................................................................................................................8
Figure 6: Static Test Location...............................................................................................................................................8
Figure 7: Coverage Area by Cell Id (Baseline)..................................................................................................................10
Figure 8: Coverage Area by Cell Id (Post Modernization)................................................................................................10
Figure 9: RxLevSub (Baseline)..........................................................................................................................................11
Figure 10: RxLevelSub (Post Modernization)....................................................................................................................11
Figure 11: RxQualSub (Baseline).......................................................................................................................................11
Figure 12: RxQualSub (Post Modernization).....................................................................................................................12
Figure 13: SQI (Baseline)...................................................................................................................................................12
Figure 14: SQI (Post Distribution).....................................................................................................................................13
List of Table:
Table 1: Cluster Site List......................................................................................................................................................6
Table 2: Target OSS Statistics KPI Values..........................................................................................................................7
Table 3: Post Modernization OSS Statistics KPI Values.....................................................................................................7
Table 4: Summary of OSS Statistics KPI Review................................................................................................................7
Table 5: Static Test Locations..............................................................................................................................................9
Table 6: Mobility Drive Test KPI Evaluation......................................................................................................................9
Table 7: Static Test Result....................................................................................................................................................9
Table 8: Activity Summary................................................................................................................................................13
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 3/15 Version: 1.0
4. Table 9: Panoramic.............................................................................................................................................................15
2. Executive Summary
This document is an official BSS Network Modernization KPI Acceptance Report which indicates that the Implementation Procedure
has been performed and the KPI measurement result has fulfilled the acceptance value. Ericsson is glad and proud to conclude that
since the Modernization Period, an impressive improvement to Telkomsel’s network performance has been achieved. There were a
lot of activities that had been carried out to improve the network performance.
These measurements were collected, post processed and analyzed according to the agreed process as specified in the BSS
Network Modernization KPI Acceptance Methodology / Procedures. For a description of the used equipment, the details for particular
measurements and the process for data collection and processing please refer to the above-mentioned document. This KPI
Acceptance Report is made according to the agreement document describing the area and the applicable design rules and values.
This document will be submitted in Hardcopy and Softcopy included supporting data.
3. Network Modernization Cluster Overview
Central Sumatera Modernization program Zone 1 covers Padang, Pekanbaru and Batam area. The modernization area is divided in
to 13 normal clusters and 242 1st tier clusters as presented in Figure 1.
Figure 1: Central Sumatera Modernization Area
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 4/15 Version: 1.0
5. Cluster 8 consists of 14 NE in the area of Kepulauan Riau outer city.
Figure 2: 2G Cluster 8
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 5/15 Version: 1.0
7. CLUSTER TDR SDSR HOSR TBF UL EST SR TBF DL EST SR TBF COM SR
2G Cluster 8 1.32 94.49 97.75 99.74 99.86 98.80
Table 2: Target OSS Statistics KPI Values
Table 3 shows the Post Modernization KPI values for 5 consecutive days in daily basis and the aggregation of 5 consecutive days
KPI.
DATE TDR SDSR HOSR TBF_DL_EST_SR TBF_UL_EST_SR TBF_COMP_SR
2/13/2016 1.02 99.30 98.74 99.85 99.75 98.75
2/14/2016 1.41 99.10 98.41 98.73 99.23 98.54
2/15/2016 1.16 99.26 98.68 99.77 99.75 98.68
2/16/2016 1.10 99.32 98.65 99.83 99.72 98.76
2/17/2016 1.13 99.28 98.74 99.80 99.77 98.74
Average After 1.17 99.25 98.64 99.60 99.64 98.69
Table 3: Post Modernization OSS Statistics KPI Values
The above OSS statistics KPIs have been evaluated following agreed OSS statistics KPI scoring methodology. KPI scoring is
applied to avoid clusters can’t be accepted due to one KPI value not meet the baseline while the other value has already met.
Table 4 shows the comparison of OSS statistics KPI values and the final score of each KPI.
KPI Target MIP
Post
Modernization
Value
Delta Score Comment
SDSR 95.59 99.25 83.04 31.85 IMPROVE
HOSR 97.98 98.64 32.95 21.00 IMPROVE
TDR 1.18 1.17 1.41 28.00 IMPROVE
TBF_DL_EST_SR 99.88 99.60 -226.51 0.00 DEGRADE
TBF_UL_EST_SR 99.76 99.64 -49.04 0.00 DEGRADE
TBF_COMP_SR 98.92 98.69 -21.08 7.20 MAINTAIN
FINAL SCORE 88.05
Table 4: Summary of OSS Statistics KPI Review
The OSS statistics KPI evaluation result shows that both OSS statistics KPI acceptance criterias are not Passed due to has spike 14
Feb 2016 .
• 4 OSS KPIs >= Modernization Target – 30%
• Total OSS KPIs Acceptance Score >= 100
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 7/15 Version: 1.0
8. 6. Drive Test Performance Evaluation
6.1 Drive Test and Static Test Point Location Map
Figure 5 shows the map of agreed drive test route.
Figure 5: Drive Test Route
Figure 6: Static Test Location
No SiteID SiteName Longitude Latitude
1 TBK225D Merald5 103.365041 1.02957
2 TBK295G Paya Labu 103.34462 1.0385
3 TBK297G Bukit Pongkar 103.36552 1.08706
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 8/15 Version: 1.0
9. 4 TBK517G Pantai Pelawan 103.31437 1.05107
5 TBK295D Paya Labu 103.34462 1.0385
Table 5: Static Test Locations
6.2 Mobile Drive Test KPI Evaluation
Table 7 shows the comparison of baseline and post modernization drive test KPI. It shows that all KPIs are improved.
Mobile Test KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Handover Success Rate (HOSR) 100.00 100.00 0.00 0.00 Maintain
Call Setup Success Rate (CSSR) 89.66 96.30 6.64 6.64 Improved
Drop Call Rate 4.00 0.00 -4.00 -4.00 Improved
RxLev Sub -85 63.00 90.00 27.00 72.97 Improved
SQI >18 86.00 96.00 10.00 71.42 Improved
RxQual 0-5 85.00 96.00 11.00 73.33 Improved
Table 6: Mobility Drive Test KPI Evaluation
6.3 Static Drive Test KPI Evaluation
Table 8 show the comparison of static drive test KPI results. The comparison shows that the post modernization KPIs are
improved compare to the baseline.
Static Test TBK225D KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Attach Success Rate 100.00 100.00 0.00 0.00 Maintain
PDP Context Success Rate 100.00 100.00 0.00 0.00 Maintain
EDGE/GPRS Throughput 25.54 153.71 128.17 172.13 Improved
Static Test BLS295G KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Attach Success Rate 100.00 100.00 0.00 0.00 Maintain
PDP Context Success Rate 100.00 100.00 0.00 0.00 Maintain
EDGE/GPRS Throughput 208.7 301.5 92.8 -85.37 Improved
Static Test TBK297G KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Attach Success Rate 100.00 100.00 0.00 0.00 Maintain
PDP Context Success Rate 100.00 100.00 0.00 0.00 Maintain
EDGE/GPRS Throughput 301.4 318.7 17.3 -8.59 Improved
Static Test TBK517G KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Attach Success Rate 100.00 100.00 0.00 0.00 Maintain
PDP Context Success Rate 100.00 100.00 0.00 0.00 Maintain
EDGE/GPRS Throughput 142.3 182.43 40.13 -94.86 Improved
Static Test BLS295D KPI Value
Delta Unit Comment
Key Performance Indicator Baseline Post Mod
Attach Success Rate 100.00 100.00 0.00 0.00 Maintain
PDP Context Success Rate 100.00 100.00 0.00 0.00 Maintain
EDGE/GPRS Throughput 273.6 297.4 23.8 -13.70 Improved
Table 7: Static Test Result
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 9/15 Version: 1.0
10. 6.4 Drive Test Result Plot
6.5.1 Cell Coverage Area
Figure 7 and Figure 8 show the both baseline and post modernization cells coverage plot.
Figure 7: Coverage Area by Cell Id (Baseline)
Figure 8: Coverage Area by Cell Id (Post Modernization)
6.5.2 RxLevel Sub (dBm) – Idle Mode
Figure 9 and Figure 11 show the plot of RxLevelSub while Figure 10 and Figure 12 show the RxLevSub samples
distribution. The post modernization RxLevelSub is improved compared to the baseline.
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 10/15 Version: 1.0
11. Figure 9: RxLevSub (Baseline)
Figure 10: RxLevelSub (Post Modernization)
6.5.3 RxQual Sub – Dedicated Mode
Figure 13 and Figure 15 show the plot of RxQualSub plot. The post modernization RxLevelSub is improved compared to
the baseline.
Figure 11: RxQualSub (Baseline)
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 11/15 Version: 1.0
12. Figure 12: RxQualSub (Post Modernization)
6.5.4 SQI (Speech Quality Index) – Dedicated Mode
Figure 17 and Figure 19 show the plot of SQI plot. The post modernization SQI is improved compared to the baseline.
Figure 13: SQI (Baseline)
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 12/15 Version: 1.0
13. Figure 14: SQI (Post Distribution)
7. Activities
Tuning activities have been performed in 2G Cluster 08 in order to solve the identified problems, optimize the performance as well as
to achieve the targeted KPIs.
All tuning activities are summarized in Table 9.
No CellID SiteID Problem / Finding Solution Date
1 TB1295F TBK295D Improvement Congestion Layering 26-Jan-16
2 TB1225F TBK225D Improvement Congestion Layering 26-Jan-16
3 TB1515B TBK515G Improvement Congestion Layering 26-Jan-16
4 TB1515C TBK515G Improvement Congestion Layering 26-Jan-16
5 TB1225G TBK225D Improvement Congestion Layering 31-Jan-16
6 TB1295E TBK295D Improvement Congestion Layering 31-Jan-16
7 TB1225E TBK225D Improvement Congestion Layering 31-Jan-16
8 TB1295B TBK295G Improvement Congestion Layering 31-Jan-16
9 TB1297A TBK297G Improvement Congestion Layering 31-Jan-16
Table 8: Activity Summary
8. Recommendation
Availability Tranding not stabil, payload trending show increase after Modernization program, Channel Balancing & Adjust
NumreqEgprsbpc is recommendation to maintain Congestion &TBF Performance
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 13/15 Version: 1.0
14. 9. Daily Chart Post Modernization OSS KPI
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 14/15 Version: 1.0
15. 10. Panoramic Info
Site Existing Physical Configuration
SECTOR LONG LAT HEIGHT AZIMUTH TILT MECH. TILT ELEC.
Site Final Physical Configuration
SECTOR LONG LAT HEIGHT AZIMUTH TILT MECH. TILT ELEC.
Table 9: Panoramic
Company: Ericsson
Cluster KPI Acceptance
Report
Network Modernization
Prepared by: Rudolf S Last Update: 28-Dec-2015
Doc. Number: EID/X/X-15 Page: 15/15 Version: 1.0