SlideShare a Scribd company logo
1 of 10
Download to read offline
Resume of KR SATHEESH KUMAR (Senior solution
integrator - Ericsson)
Personal Detail:
Total years of Telecom experience : 9+ Years
Passport status : Valid
Passport Expiry Date : 31-12-2017
Address : 3/26, Nithyanand sagar apartment,
Block-B, Madhavaram high
road,Permabur,Chennai-600011
Telephone : +918056111751
Date of Birth : 06-05-1986
Passport Number : G6931131
Professional Detail:
Seeking challenging assignment on all conversions
(Integration/Expansion/Up gradation) of Ericsson Charging System Access
Nodes.
• Having 9+ years of professional experience in Telecom IN and CORE
network on both implementation and operational support.
• Presently working as Senior Solution Integrator - Data charging domain
with EGI.
• Have good knowledge about Policy services (Gx[Legacy/Proxy], Sy,
Esy, DTR, Ro, INAP, CS1+, CAP and SCAPv1/v2 protocols.
• Hands on experience in performing SS7/CIP-IP configuration on
Charging System-Access node integration.
Languages:
Mother Tongue: Tamil
Fluent In: Tamil and English
Selection of Assignments:
Ericsson Assignment:
Assignment Title: Installation and Integration of OCC nodes for America
Movil - Claro Peru CBIO16 project.
Client: AMX Claro, Peru (RLAM)
Task: From 15-04-2016 to 25-09-2016.
• Started with installing Test bed OCCs for this Green field project on 2 Sites in a
2 node Cluster Setup.
• Successfully completed the First DATA and SCAPv2 service demonstrated
to customer on Test OCC as a part of initial milestone of CBIO16 Migration
project.
• Provided onsite support for installing 18 production OCC nodes in 2 Sites in a 3
node cluster setup.
• Installed 22 OCCs (HP ProLiant Gen9) in total on HOT standby setup with
software level ICP1601 +EP03A (OCC3.0.3 version) onsite.
• Integrated OCC with DRA (Huawei) node on Gy traffic and with OLM/CMS
for SCAPv2 traffic.
• Integrated OCC with SDP (SCAPv2_CIP-IP, CIP_IP) and AF nodes.
• Integrated OCC with Spectrum OSS for Fault management (ALARMS).
• Integrated OCC with ENIQ OSS for Performance management (Statistical
report generation).
• Configured backup server and integrated OCC nodes on NFS backup type for
backup storage.
• Support extended for performing both Functional and Hardware UAT cases for
OCC nodes along with Customer for the Drop1 nodes.
• Prepared Installation report document based on the installation, integration and
configuration logs available for the OCC nodes.
Assignment Title: Installation and Integration of OCC nodes for Digicel
WIFI calling project.
Client: Digicel, JAMAICA (RLAM)
Task: From 27-09-2015 to 15-04-2016.
• Successfully performed First call with customer for OCC voice(Ro) over
WIFI.
• Successfully completed the Customer Functional ATP for OCC nodes after
first VoWifi call test and sign-off obtained from the customer thereby.
• Involved in final solution design and integration for OCC voice(Ro) over WIFI
project and initial solution discussion for SMS over WIFI services.
• Installed 2 OCC (HP ProLiant Gen9) on cold standby setup with software level
ICP1504 (OCC2.8.3 version) onsite.
• Integrated OCC with MTAS (IMS) node on Ro interface.
• Integrated OCC with SDP(Ro_CIP-IP)nodes.
• Prepared Charging system LLD based on the installation and integration input
performed on the OCC nodes.
Assignment Title: Support for OCC Volte service Integration.
Client: Ooredoo, KUWAIT
Task: From 01-08-2015 to 15-09-2015.
• Project outline obtained from the region team for VOLTE service integration in
existing OCC servers.
• Solution Design analysis done for understanding the SOW.
Assignment Title: CCN LSV – NFNT Tester.
Client: BUSS DU T&V CCN LSV, Ericsson INDIA
Task: From 17th
Nov 2013 to 31-07-2015.
• Job role - NFNT Tester, verify CCN and OCC ICP release on LSV
suite(Regression Testing).
• Provided testing support for TSP EP/TLM verification on customer raised TR
thereby co-ordinate with TSP to conclude on issues.
• Tested Policy services (Sy,Esy,Gx) behavior on new ICP builds.
• Customer CCN PCs(Product Customization) Functional Testing Document
verification review. Provide feedback to PC team to add/delete Call Test Cases
based on the requirement.
• Performed OCC upgrade both by System Replacement and Update by patching
on LSV suite based on ICP/PCP release requirement.
• Maiden installation performed on CCN (NSP5, NSP6 nodes) and OCC (Single,
Session Fail Over, Manager Fail Over).
Assignment Title: New SDPs integration with Live CCN for MTN Congo.
Job Role: Senior Solution Integrator.
Client: MTN, Lintel DRC
Task: From 28th
Oct 2013 to 15th Nov 2013.
• Project outline obtained from the region team for the integration of 2 new SDP
platforms with the Live existing CCN.
• Solution Design analysis done for understanding further on the SOW.
Assignment Title: Corrupt CCN CDR Analysis support for Africell Congo.
Job Role: Senior Solution Integrator.
Client: Africel, Lintel DRC
Task: From 7th
Oct 2013 to 25th
Oct 2013
• Provided detailed analysis on the issue raised by the customer for corrupt CCN
CDR’s post analyzing the CCN Alarm log from the node.
• CCN support may be extended for the activity at EMM end for fixing some
indexing issue on CCN CDR, waiting for the communication from the region
for the same.
Assignment Title: CCN NSP6.0 Maiden installation in Test Lab.
• Worked on maiden installation of CCN NSP 6.0 in Ericsson Lab setup.
Previous Assignments:
Organization: Nokia Solutions and Networks (Formerly, Nokia Siemens
Networks)
Position: CS Core Specialist
Project Scope: 2nd level NSS product line support Nokia R4 MSS and
MGW.
Customer: Viettel
Country: Vietnam
Duration: 12th
Feb 2013 to 12th
Jul 2013
Assignment Title: Tier-2 NSS product line support Nokia R4 MSS and
MGW for Viettel Vietnam customer.
• Extended Tier-2 support to Viettel VMN customer for handling CS Core
Technical query and Trouble Resolution raised cases.
• Have closed cases with proper resolution, post customer acceptance within
the agreed SLA.
• Positive customer satisfaction feedback obtained on closure of each case.
• Recognized by the CPM for the support provided to customer during
project handover.
Organization: Plintron Global Technologies Private limited, Chennai.
Job Role: Senior Engineer - Projects
Project Scope: Integration and Implementation of Plintron IN and VAS
products
Customer: Lycamobile
Country: United Kingdom
Duration: March 2011 to Feb 2013
Assignment Title: Srilanka Family and Friends bundle minutes for
Lycamobile UK customers
Job Role: Senior Engineer, Projects.
Client: Lycamobile
Task: From Nov 2012 to Jan 2013
• Successfully launched Srilanka Bundle Minute for Lycamobile UK
subscribers having partnered with Global Acquirers for handling the
bundle minutes subscription/call monitoring.
• Involved in preparation of Solution Design Document based on the scope
of the project.
• Charging and subscription API testing performed on integrating
Lycamobile SCP with Global Acquirers.
• User acceptance test performed with the customer based on the feature
implemented.
Assignment Title: ASTRO SMS and CRBT with Comviva using BUY
Solution.
Job Role: Senior Engineer, Projects
Client: Lycamobile
Task: AUG 2012 - Feb 2013
• Business solution proposal partnering Comviva as Content provider
presented to customer to meet their requirement on Astro SMS and CRBT.
• Involved in Solution Design documentation based on the provided SOW.
• Demonstrated the solutions developed by Plintron RnD on test bed and
initial signoff acquired with the customer.
Assignment Title: Lycamobile MVNO Launch in Portugal with Vodafone
PT
Job Role: Senior Engineer, Projects
Client : Lycamobile
Task: Jun 2012 - Aug 2012
• Installation of Plintron MVNO platform on Solaris Servers for Portugal
and perform the UAT cases with Base MNO and other national operators.
• Installed and Integrated the IN Hardware / SS7 Stack configuration .
• Tested varies features ( GPRS / MNP / VOICE / SMS /USSD ).
• Analysis and trouble-shooting-solving of CS related problems.
• Installing customer specific product customizations in Tariff.
Assignment Title: MNP Service launch for Lycamobile Ireland
Job Role: Senior Engineer,Projects
Client: LycaMobile
Task: Nov 2011 – June 2012
• Played a significant role in understanding MNP structure in Ireland and
involved in the project E2E from scrap till launch of service.
• Attended MNP meeting with COMREG (Regulatory for MNP service in
Ireland) representing Lycamobile and discussed on the roadmap for MNP
service launch).
• Involved in various discussions and meeting with Plintron Research and
Development team for their concerns while developing the MNP solution.
• Performed 2 Phase of MNP Buisness and Network testing with the
Plintron MNP solution with Base MNO (Vodafone PT)
• Appreciated by the customer for a quick roll out of MNP service, which
held the key for Lycamobile to launch mobile FMVNO service in Ireland.
Assignment Title: Lycamobile MVNO Launch in Germany with Vodafone
Job Role: Senior Engineer, Projects
Client: Lycamobile
Task: From Mar 2011 to Nov 2011
• Interacted with vendors on Platform deliveries and implementations.
Negotiating the plans with different internal, external teams/ vendors &
project stakeholders.
• Installed and Integrated the SCP / SMSC /USSD / IVR / HLR Nodes into
the Network Elements-including SS7/SIGTRAN configurations
• Tested Plintron features and performed AT with customer.
• Analysis and trouble-shooting-solving of CS related problems.
• Installing customer specific product customizations in Database.
Organization: Huawei Telecommunications Private limited, Chennai.
Position: Core Engineer - Projects
Project Scope: Integration and Implementation of Huawei MSS, MGW
Customer: Etisalat DB Telecom Pvt ltd, BSNL 3G,
Country: India
Duration: April 2010 to Mar 2011
Assignment Title: Huawei Telecommunications Pvt Ltd
Job Role: Core Engineer-Projects
Client: Etisalat DB Pvt Ltd, Chennai, India
Task: From April 2010 to March 2011
• Worked as a Core Network Integrator, during this period Installed Core (
MSC / MGW / IGWB ) and Billing real time charging services for Voice,
data, SMS, IVR and USSD call functionalities.
• Involved in MNP core implementation For Etisalat DB Telecom, South
Region.
• Provided Interim Core Network implementation support for BSNL 3G
project in Chennai.
• SS7 Links creation / BICC / TDM routes creations in ATCA MSS.
• New POI integration with other networks based on demand.
• ATP & RA clearance from customers for installed nodes.
Organization: Nokia Siemens Networks Private limited, Chennai.
Position: Core Engineer - Services
Project Scope: Operation and Maintenance support for Nokia Core Network
Elements.
Customer: Vodafone Essar South Private Ltd.
Country: India
Duration: Oct 2007 to Apr 2010
Assignment Title: Nokia Siemens Networks Pvt Ltd
Job Role: Core Engineer
Client: Vodafone Essar South Ltd, Chennai, India
Task: From Oct 2007 to Apr 2010
• Involved in implementation and maintenance of various functional
applications in Nokia CS Core node(Rel 99 and R4 nodes).
• Provided Level2 support for troubleshooting FM related issue.
• Responsible for POI augmentations.
• SS7 link configurations and AT testing.
• Successfully involved in MNP Data Base Loading and testing on a Pilot
MSC for Vodafone Chennai.
• Extensive experience in Routing Calls in Nokia MSS, MSC Based on the
routing Matrix requested by the Corporate.
• Involved in various IR/CAP tests with National/International operators for
roaming ATs.
• Ensured smooth and efficient resolution of customer incidents (Outage
and planned downtime).
• Coordinated with Drive test team for various Call Quality testing.
• Responsible for the Net Act handling HLR, MSC, MSS, MGW & taking
various actions for the alarms reporting on it.
• Involved in participation of an on-call rotation supporting 24x7 critical
production applications.
• Hands on experience on taking Subscriber dumps from the HLR for
reconciliation purpose.
• General maintenance of Switch activities database, taking care of regular
NE backups (MOD and Sytem) and routine activities.
• SPOC for Level-2 Trouble shooting for any FM Related issues in Nokia
MSS.
Education:
• 2007 – Electronics and Communication Engineering, SRM University,
Kattangulatur, Tamil Nadu.
Training:
• Nokia R4 MSS and MGW O&M training, Gurgaon.
• IP training, (NSN)Chennai.
• Huawei ATCA MSS training, Kolkatta.
• Ireland MNP workshop, Plintron, Chennai.
Professional Background:
From To Designation Organisation Location
Oct 2007 Apr
2010
Core Engineer Nokia Siemens
Networks Pvt
Ltd.
Chennai, India
Apr 2010 Mar
2011
Core Engineer -
Projects
Huawei
Telecommunicati
ons Pvt ltd.
Chennai, India
Mar
2011
Feb
2013
Senior engineer -
Projects
Plintron Global
Technologies Pvt
Ltd.
Chennai, India
Feb
2013
July
2013
CS Core Specialist Nokia Siemens
Networks Pvt
Ltd.
Chennai, India
Aug
2013
Till
Date
Senior Solution
Integrator
Ericsson Global
Services India
Pvt Ltd.
Chennai, India
Contact Information:
Name: Satheesh Kumar K R
Mobile: +91 8056111751
Mail Id: k.r.satheesh.kumar@ericsson.com

More Related Content

What's hot

Transforming Networks into a NFV-Centric Environment
Transforming Networks into a NFV-Centric EnvironmentTransforming Networks into a NFV-Centric Environment
Transforming Networks into a NFV-Centric EnvironmentADVA
 
Network Simplification
Network SimplificationNetwork Simplification
Network SimplificationRich Terpstra
 
Gopi Krishna Resume_Cards
Gopi Krishna Resume_CardsGopi Krishna Resume_Cards
Gopi Krishna Resume_CardsGopi Subbiah
 
Network Service Benchmarking
Network Service BenchmarkingNetwork Service Benchmarking
Network Service BenchmarkingMichelle Holley
 
Implementing vCPE with OpenStack and Software Defined Networks
Implementing vCPE with OpenStack and Software Defined NetworksImplementing vCPE with OpenStack and Software Defined Networks
Implementing vCPE with OpenStack and Software Defined NetworksPLUMgrid
 
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...PROIDEA
 
Maniteja_Professional_Resume
Maniteja_Professional_ResumeManiteja_Professional_Resume
Maniteja_Professional_ResumeVaddi Maniteja
 
Meganathan_Profile
Meganathan_ProfileMeganathan_Profile
Meganathan_ProfileMeganathan B
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVermaRam Verma
 
An Approach to Overcome Modeling Inaccuracies for Performance Simulation Sig...
An Approach to Overcome Modeling  Inaccuracies for Performance Simulation Sig...An Approach to Overcome Modeling  Inaccuracies for Performance Simulation Sig...
An Approach to Overcome Modeling Inaccuracies for Performance Simulation Sig...Pankaj Singh
 

What's hot (20)

Geetika_Prasher_Resume
Geetika_Prasher_ResumeGeetika_Prasher_Resume
Geetika_Prasher_Resume
 
Transforming Networks into a NFV-Centric Environment
Transforming Networks into a NFV-Centric EnvironmentTransforming Networks into a NFV-Centric Environment
Transforming Networks into a NFV-Centric Environment
 
Network Simplification
Network SimplificationNetwork Simplification
Network Simplification
 
Christopher_Reder_2016
Christopher_Reder_2016Christopher_Reder_2016
Christopher_Reder_2016
 
Gopi Krishna Resume_Cards
Gopi Krishna Resume_CardsGopi Krishna Resume_Cards
Gopi Krishna Resume_Cards
 
Ravi-apr30
Ravi-apr30Ravi-apr30
Ravi-apr30
 
Network Service Benchmarking
Network Service BenchmarkingNetwork Service Benchmarking
Network Service Benchmarking
 
Ken Naumann925
Ken Naumann925Ken Naumann925
Ken Naumann925
 
Profile_Sugumar_N
Profile_Sugumar_NProfile_Sugumar_N
Profile_Sugumar_N
 
Ranjana biswas resume
Ranjana biswas resumeRanjana biswas resume
Ranjana biswas resume
 
Murali Resume
Murali ResumeMurali Resume
Murali Resume
 
Implementing vCPE with OpenStack and Software Defined Networks
Implementing vCPE with OpenStack and Software Defined NetworksImplementing vCPE with OpenStack and Software Defined Networks
Implementing vCPE with OpenStack and Software Defined Networks
 
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...
PLNOG14: Evolved Programmable Network, architektura dla sieci operatorskich -...
 
Vinay Singh
Vinay SinghVinay Singh
Vinay Singh
 
Maniteja_Professional_Resume
Maniteja_Professional_ResumeManiteja_Professional_Resume
Maniteja_Professional_Resume
 
Meganathan_Profile
Meganathan_ProfileMeganathan_Profile
Meganathan_Profile
 
Resume_RamVerma
Resume_RamVermaResume_RamVerma
Resume_RamVerma
 
Abhay-Resume
Abhay-ResumeAbhay-Resume
Abhay-Resume
 
An Approach to Overcome Modeling Inaccuracies for Performance Simulation Sig...
An Approach to Overcome Modeling  Inaccuracies for Performance Simulation Sig...An Approach to Overcome Modeling  Inaccuracies for Performance Simulation Sig...
An Approach to Overcome Modeling Inaccuracies for Performance Simulation Sig...
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 

Similar to Resume_Satheesh Kumar K R

Similar to Resume_Satheesh Kumar K R (20)

Resume_Vinayak_Mahajan
Resume_Vinayak_MahajanResume_Vinayak_Mahajan
Resume_Vinayak_Mahajan
 
Mallikarjuna_Resume
Mallikarjuna_ResumeMallikarjuna_Resume
Mallikarjuna_Resume
 
Mohammed Rashid CV
Mohammed Rashid  CVMohammed Rashid  CV
Mohammed Rashid CV
 
Resume-Unus
Resume-UnusResume-Unus
Resume-Unus
 
Test Lead at WIPRO Technologies
Test Lead at WIPRO TechnologiesTest Lead at WIPRO Technologies
Test Lead at WIPRO Technologies
 
Simon-CV-April-2015
Simon-CV-April-2015Simon-CV-April-2015
Simon-CV-April-2015
 
Resume_PitambarDas
Resume_PitambarDasResume_PitambarDas
Resume_PitambarDas
 
kundan_resume
kundan_resumekundan_resume
kundan_resume
 
Arpit resume new
Arpit resume newArpit resume new
Arpit resume new
 
Resume Maumita Biswas
Resume Maumita BiswasResume Maumita Biswas
Resume Maumita Biswas
 
Puneet
PuneetPuneet
Puneet
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
Waleed Abdel Wahab
Waleed Abdel WahabWaleed Abdel Wahab
Waleed Abdel Wahab
 
resume-latest 14022016
resume-latest 14022016resume-latest 14022016
resume-latest 14022016
 
Yousri Mesbah CV
Yousri Mesbah CV Yousri Mesbah CV
Yousri Mesbah CV
 
Vinay Singh
Vinay SinghVinay Singh
Vinay Singh
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
 
Sasmita Biswal_OSS_ORDER MANAGEMENT
Sasmita Biswal_OSS_ORDER MANAGEMENTSasmita Biswal_OSS_ORDER MANAGEMENT
Sasmita Biswal_OSS_ORDER MANAGEMENT
 
sunil CV _2016
sunil CV _2016sunil CV _2016
sunil CV _2016
 
SenthilkumarR
SenthilkumarRSenthilkumarR
SenthilkumarR
 

Resume_Satheesh Kumar K R

  • 1. Resume of KR SATHEESH KUMAR (Senior solution integrator - Ericsson) Personal Detail: Total years of Telecom experience : 9+ Years Passport status : Valid Passport Expiry Date : 31-12-2017 Address : 3/26, Nithyanand sagar apartment, Block-B, Madhavaram high road,Permabur,Chennai-600011 Telephone : +918056111751 Date of Birth : 06-05-1986 Passport Number : G6931131 Professional Detail: Seeking challenging assignment on all conversions (Integration/Expansion/Up gradation) of Ericsson Charging System Access Nodes. • Having 9+ years of professional experience in Telecom IN and CORE network on both implementation and operational support. • Presently working as Senior Solution Integrator - Data charging domain with EGI. • Have good knowledge about Policy services (Gx[Legacy/Proxy], Sy, Esy, DTR, Ro, INAP, CS1+, CAP and SCAPv1/v2 protocols. • Hands on experience in performing SS7/CIP-IP configuration on Charging System-Access node integration. Languages: Mother Tongue: Tamil Fluent In: Tamil and English
  • 2. Selection of Assignments: Ericsson Assignment: Assignment Title: Installation and Integration of OCC nodes for America Movil - Claro Peru CBIO16 project. Client: AMX Claro, Peru (RLAM) Task: From 15-04-2016 to 25-09-2016. • Started with installing Test bed OCCs for this Green field project on 2 Sites in a 2 node Cluster Setup. • Successfully completed the First DATA and SCAPv2 service demonstrated to customer on Test OCC as a part of initial milestone of CBIO16 Migration project. • Provided onsite support for installing 18 production OCC nodes in 2 Sites in a 3 node cluster setup. • Installed 22 OCCs (HP ProLiant Gen9) in total on HOT standby setup with software level ICP1601 +EP03A (OCC3.0.3 version) onsite. • Integrated OCC with DRA (Huawei) node on Gy traffic and with OLM/CMS for SCAPv2 traffic. • Integrated OCC with SDP (SCAPv2_CIP-IP, CIP_IP) and AF nodes. • Integrated OCC with Spectrum OSS for Fault management (ALARMS). • Integrated OCC with ENIQ OSS for Performance management (Statistical report generation). • Configured backup server and integrated OCC nodes on NFS backup type for backup storage. • Support extended for performing both Functional and Hardware UAT cases for OCC nodes along with Customer for the Drop1 nodes. • Prepared Installation report document based on the installation, integration and configuration logs available for the OCC nodes. Assignment Title: Installation and Integration of OCC nodes for Digicel WIFI calling project. Client: Digicel, JAMAICA (RLAM) Task: From 27-09-2015 to 15-04-2016.
  • 3. • Successfully performed First call with customer for OCC voice(Ro) over WIFI. • Successfully completed the Customer Functional ATP for OCC nodes after first VoWifi call test and sign-off obtained from the customer thereby. • Involved in final solution design and integration for OCC voice(Ro) over WIFI project and initial solution discussion for SMS over WIFI services. • Installed 2 OCC (HP ProLiant Gen9) on cold standby setup with software level ICP1504 (OCC2.8.3 version) onsite. • Integrated OCC with MTAS (IMS) node on Ro interface. • Integrated OCC with SDP(Ro_CIP-IP)nodes. • Prepared Charging system LLD based on the installation and integration input performed on the OCC nodes. Assignment Title: Support for OCC Volte service Integration. Client: Ooredoo, KUWAIT Task: From 01-08-2015 to 15-09-2015. • Project outline obtained from the region team for VOLTE service integration in existing OCC servers. • Solution Design analysis done for understanding the SOW. Assignment Title: CCN LSV – NFNT Tester. Client: BUSS DU T&V CCN LSV, Ericsson INDIA Task: From 17th Nov 2013 to 31-07-2015. • Job role - NFNT Tester, verify CCN and OCC ICP release on LSV suite(Regression Testing). • Provided testing support for TSP EP/TLM verification on customer raised TR thereby co-ordinate with TSP to conclude on issues. • Tested Policy services (Sy,Esy,Gx) behavior on new ICP builds. • Customer CCN PCs(Product Customization) Functional Testing Document verification review. Provide feedback to PC team to add/delete Call Test Cases based on the requirement. • Performed OCC upgrade both by System Replacement and Update by patching on LSV suite based on ICP/PCP release requirement.
  • 4. • Maiden installation performed on CCN (NSP5, NSP6 nodes) and OCC (Single, Session Fail Over, Manager Fail Over). Assignment Title: New SDPs integration with Live CCN for MTN Congo. Job Role: Senior Solution Integrator. Client: MTN, Lintel DRC Task: From 28th Oct 2013 to 15th Nov 2013. • Project outline obtained from the region team for the integration of 2 new SDP platforms with the Live existing CCN. • Solution Design analysis done for understanding further on the SOW. Assignment Title: Corrupt CCN CDR Analysis support for Africell Congo. Job Role: Senior Solution Integrator. Client: Africel, Lintel DRC Task: From 7th Oct 2013 to 25th Oct 2013 • Provided detailed analysis on the issue raised by the customer for corrupt CCN CDR’s post analyzing the CCN Alarm log from the node. • CCN support may be extended for the activity at EMM end for fixing some indexing issue on CCN CDR, waiting for the communication from the region for the same. Assignment Title: CCN NSP6.0 Maiden installation in Test Lab. • Worked on maiden installation of CCN NSP 6.0 in Ericsson Lab setup. Previous Assignments: Organization: Nokia Solutions and Networks (Formerly, Nokia Siemens Networks) Position: CS Core Specialist Project Scope: 2nd level NSS product line support Nokia R4 MSS and MGW. Customer: Viettel Country: Vietnam Duration: 12th Feb 2013 to 12th Jul 2013
  • 5. Assignment Title: Tier-2 NSS product line support Nokia R4 MSS and MGW for Viettel Vietnam customer. • Extended Tier-2 support to Viettel VMN customer for handling CS Core Technical query and Trouble Resolution raised cases. • Have closed cases with proper resolution, post customer acceptance within the agreed SLA. • Positive customer satisfaction feedback obtained on closure of each case. • Recognized by the CPM for the support provided to customer during project handover. Organization: Plintron Global Technologies Private limited, Chennai. Job Role: Senior Engineer - Projects Project Scope: Integration and Implementation of Plintron IN and VAS products Customer: Lycamobile Country: United Kingdom Duration: March 2011 to Feb 2013 Assignment Title: Srilanka Family and Friends bundle minutes for Lycamobile UK customers Job Role: Senior Engineer, Projects. Client: Lycamobile Task: From Nov 2012 to Jan 2013 • Successfully launched Srilanka Bundle Minute for Lycamobile UK subscribers having partnered with Global Acquirers for handling the bundle minutes subscription/call monitoring. • Involved in preparation of Solution Design Document based on the scope of the project. • Charging and subscription API testing performed on integrating Lycamobile SCP with Global Acquirers.
  • 6. • User acceptance test performed with the customer based on the feature implemented. Assignment Title: ASTRO SMS and CRBT with Comviva using BUY Solution. Job Role: Senior Engineer, Projects Client: Lycamobile Task: AUG 2012 - Feb 2013 • Business solution proposal partnering Comviva as Content provider presented to customer to meet their requirement on Astro SMS and CRBT. • Involved in Solution Design documentation based on the provided SOW. • Demonstrated the solutions developed by Plintron RnD on test bed and initial signoff acquired with the customer. Assignment Title: Lycamobile MVNO Launch in Portugal with Vodafone PT Job Role: Senior Engineer, Projects Client : Lycamobile Task: Jun 2012 - Aug 2012 • Installation of Plintron MVNO platform on Solaris Servers for Portugal and perform the UAT cases with Base MNO and other national operators. • Installed and Integrated the IN Hardware / SS7 Stack configuration . • Tested varies features ( GPRS / MNP / VOICE / SMS /USSD ). • Analysis and trouble-shooting-solving of CS related problems. • Installing customer specific product customizations in Tariff. Assignment Title: MNP Service launch for Lycamobile Ireland Job Role: Senior Engineer,Projects Client: LycaMobile Task: Nov 2011 – June 2012
  • 7. • Played a significant role in understanding MNP structure in Ireland and involved in the project E2E from scrap till launch of service. • Attended MNP meeting with COMREG (Regulatory for MNP service in Ireland) representing Lycamobile and discussed on the roadmap for MNP service launch). • Involved in various discussions and meeting with Plintron Research and Development team for their concerns while developing the MNP solution. • Performed 2 Phase of MNP Buisness and Network testing with the Plintron MNP solution with Base MNO (Vodafone PT) • Appreciated by the customer for a quick roll out of MNP service, which held the key for Lycamobile to launch mobile FMVNO service in Ireland. Assignment Title: Lycamobile MVNO Launch in Germany with Vodafone Job Role: Senior Engineer, Projects Client: Lycamobile Task: From Mar 2011 to Nov 2011 • Interacted with vendors on Platform deliveries and implementations. Negotiating the plans with different internal, external teams/ vendors & project stakeholders. • Installed and Integrated the SCP / SMSC /USSD / IVR / HLR Nodes into the Network Elements-including SS7/SIGTRAN configurations • Tested Plintron features and performed AT with customer. • Analysis and trouble-shooting-solving of CS related problems. • Installing customer specific product customizations in Database. Organization: Huawei Telecommunications Private limited, Chennai. Position: Core Engineer - Projects Project Scope: Integration and Implementation of Huawei MSS, MGW Customer: Etisalat DB Telecom Pvt ltd, BSNL 3G, Country: India Duration: April 2010 to Mar 2011 Assignment Title: Huawei Telecommunications Pvt Ltd
  • 8. Job Role: Core Engineer-Projects Client: Etisalat DB Pvt Ltd, Chennai, India Task: From April 2010 to March 2011 • Worked as a Core Network Integrator, during this period Installed Core ( MSC / MGW / IGWB ) and Billing real time charging services for Voice, data, SMS, IVR and USSD call functionalities. • Involved in MNP core implementation For Etisalat DB Telecom, South Region. • Provided Interim Core Network implementation support for BSNL 3G project in Chennai. • SS7 Links creation / BICC / TDM routes creations in ATCA MSS. • New POI integration with other networks based on demand. • ATP & RA clearance from customers for installed nodes. Organization: Nokia Siemens Networks Private limited, Chennai. Position: Core Engineer - Services Project Scope: Operation and Maintenance support for Nokia Core Network Elements. Customer: Vodafone Essar South Private Ltd. Country: India Duration: Oct 2007 to Apr 2010 Assignment Title: Nokia Siemens Networks Pvt Ltd Job Role: Core Engineer Client: Vodafone Essar South Ltd, Chennai, India Task: From Oct 2007 to Apr 2010 • Involved in implementation and maintenance of various functional applications in Nokia CS Core node(Rel 99 and R4 nodes). • Provided Level2 support for troubleshooting FM related issue. • Responsible for POI augmentations. • SS7 link configurations and AT testing. • Successfully involved in MNP Data Base Loading and testing on a Pilot MSC for Vodafone Chennai.
  • 9. • Extensive experience in Routing Calls in Nokia MSS, MSC Based on the routing Matrix requested by the Corporate. • Involved in various IR/CAP tests with National/International operators for roaming ATs. • Ensured smooth and efficient resolution of customer incidents (Outage and planned downtime). • Coordinated with Drive test team for various Call Quality testing. • Responsible for the Net Act handling HLR, MSC, MSS, MGW & taking various actions for the alarms reporting on it. • Involved in participation of an on-call rotation supporting 24x7 critical production applications. • Hands on experience on taking Subscriber dumps from the HLR for reconciliation purpose. • General maintenance of Switch activities database, taking care of regular NE backups (MOD and Sytem) and routine activities. • SPOC for Level-2 Trouble shooting for any FM Related issues in Nokia MSS. Education: • 2007 – Electronics and Communication Engineering, SRM University, Kattangulatur, Tamil Nadu. Training: • Nokia R4 MSS and MGW O&M training, Gurgaon. • IP training, (NSN)Chennai. • Huawei ATCA MSS training, Kolkatta. • Ireland MNP workshop, Plintron, Chennai. Professional Background: From To Designation Organisation Location
  • 10. Oct 2007 Apr 2010 Core Engineer Nokia Siemens Networks Pvt Ltd. Chennai, India Apr 2010 Mar 2011 Core Engineer - Projects Huawei Telecommunicati ons Pvt ltd. Chennai, India Mar 2011 Feb 2013 Senior engineer - Projects Plintron Global Technologies Pvt Ltd. Chennai, India Feb 2013 July 2013 CS Core Specialist Nokia Siemens Networks Pvt Ltd. Chennai, India Aug 2013 Till Date Senior Solution Integrator Ericsson Global Services India Pvt Ltd. Chennai, India Contact Information: Name: Satheesh Kumar K R Mobile: +91 8056111751 Mail Id: k.r.satheesh.kumar@ericsson.com