RESUME
Instrument Technicians
Name : - Patel Sagarkumar
Mobile :- +91 9558891937
E-Mail :- sagarpatel9106@Gmail.Com
Date Of Birth : 24-05-1992
Marital Status : Unmarried
Nationality : Indian.
Languages Proficiency : English, Hindi & Gujarati.
CONTACT INFORMATION :- Passport Details:-
Address :- Sagarkumar Yogeshbhai Patel
At&Po :- Danti (Jalaram Street),Via :-Maroli
Bazaar, Ta :- Jalalpor
District :- Navsari-396436 , Gujarat(India)
Mobile :- +91 9558891937
E-Mail :- sagarpatel9106@Gmail.Com
Passport :- L 2425660
Place Of Issue :- Surat ( INDIA )
Date Of Issue :- 07-06-2013.
Date Of Expiry :- 06-06-2023
ECNR Status :- Check Not Required
EDUCATION. QUALIFICATION: -
 Secondary School Of Certificate (S.S.C.) Passed. 2007
 Passed ITI in Instrument Technician. At Surat September 2009
OBJECTIVE: -
Always Strive to Accomplish New Innovative Ideas to Solve Problems, Aiming at Achieving Set Target
within Stipulated Period.
Motivation: - To Attain Good Position Obtain Rewarding Career With Job Satisfaction.
COMPUTER KNOWLEDGE :-
1. Ms Word
2. Ms Excel
3. Power Point
BRIEF SUMMARY :-
Offering over 03years of full and comprehensive experience in Instrumentation works that
Includes Installation, Tubing, Cabeling, Calibration, Loop Checking. Also I have experience As a Site
Modification of all Instrument Installation works for Oil & Gas Projects. Maintenance works in Refinery.
Brief experienced in handling Electronic, Pneumatic & Hydraulic Instruments.
1 of 3
EXPERIENCEIN ABROD:-
Company : Qatar National Facility Services (QNFS)
In Ras Gas
Inclusive Dates : 18-09-2015 to 24-10-2015
Position : INSTRUMENT TECHNICIAN.
Project : LNG Train 3 & 4
Responsibilities : Loop checking of all the field instrument like control valves, Transmitter,
Switch of commissioning & Vibration prepare
to start up of plant
Company : Qatar National Facility Services (QNFS)
In Ras Gas
Inclusive Dates : 16-04-2015 to 11-05-2015
Position : INSTRUMENT TECHNICIAN.
Project : LNG Train 3 & 4
Responsibilities : Loop checking of all the field instrument like control valves, Transmitter,
Switch of commissioning & Vibration prepare
to start up of plant
Company : Doha Petroleum Construction Co.Ltd. Doha Qatar
In Qatar Petroleum.
Inclusive Dates : 06-02-2014 to 27-03-2014
Position : INSTRUMENT TECHNICIAN.
Project : NGL-2 .
Responsibilities : Loop checking of all the field instrument like control valves (DVC
6000,FVP110)Transmitters, motor operating valves, BENTLY NAVADA 3500
and DSM vibration system, of HONEYWELL C300 Field Bus Foundation
System Involved in commissioning and Dry Function Test, dynamic function
test, cause and effect
Company : Doha Petroleum Construction Co.Ltd. Doha Qatar In QAFCO.
Inclusive Dates : 27-08-2013 to 10-11-2013.
Position : INSTRUMENT TECHNICIAN.
Project : URYA-AMONIA-2,4
Responsibilities : Calibration, Loop checking on consol & in field, function test, trouble
Shooting of all instrument like Control valve, Transmitters, switch of
ABB Centum 3000 R3 Field Bus Foundation System,
Commissioning, prepare to start up of plant.
EXPERIENCE IN INDIA:-
Company : Technosys Engg & Consultants, Rajasthan.Badmer
Inclusive Dates : 16-03-2013 to 17-08-2013
Position : INSTRUMENT TECHNICIAN.
Responsibilities : Involved in Calibration & Installation of All Field Instruments.
Company : Essar Steel Limited Co.( Surat )
Inclusive Dates : 14-08- 2012 to 15-02- 2013
Position : INSTRUMENT TECHNICIAN.
Company : Reliance Industries Pvt Ltd. In ICB Ltd. ( Haziar - Surat)
Inclusive Dates : 01-08-2011 to 31-07-2012
Position : INSTRUMENT TECHNICIAN.
Company : Gujarat Instruments ONGC.(Hazira - Surat )
Inclusive Dates : 15-03-2010 to 27-06-2011
Position : INSTRUMENT TECHNICIAN.
Company : Navin Fluorine International Ltd. .(Bhestan - Surat )
Inclusive Dates : 25-09-2009 to 10-02-2010
Position : ASST. INSTRUMENT TECHNICIAN.
FIELD EXPERIENCE : -
2. VALVES: On-Off Valves, Control Valves with Digital (HART) Valve Positioner of Fisher
Rosemount DVC 6010, 6020 & 6030, Siemens, Adamas, Neles Jamesbury ND-800/900, Valtake,
Antisurge Control Valves
3. TRANSMITTERS: Pressure, Flow, Level, Temperature. SMART Transmitters (foundation field
bus) Of Foxboro with HHT, Rosemount, Yokogawa Endress + Hausser Druck, H&B with Hart
Communicator 475, Elsag Bailey with STT-04E, Honey Well, ABB with SFC, Vortex Flow Meters,
Electromagnetic Flow Meters, and Turbine Meters. Commissioning Of Wet Leg Type Level
Transmitter (D/P) With Filling Sealing Liquid. Ultr
4. LEVEL TROLL :( Displacement Transmitters) Of Magnetrol, Masonelian, Foxboro Eckardt.
5. SWITCHES: Pressure, Temperature, Level of Asco, Ashcroft, ITT Barton, Sor, Switzer, Magnetrol,
Spirax Sarco.
2 of 3
USE EQUIPMENTS:-
1. HART Communicator 475 (Foundation Fieldbus).
2. DRUCK-Digital pressure indicator.Model (605, 601, 610)
3. Hydraulic Pressure Pump (Druck)
4. Multimeter (fluke)
5. Loop calibrator, MA source (fluke)
6. Decade Box
7. Temperature Bath (Jofra)
8. MV simulator (fluke)
JOB DESCRIPTION :-
1. Carry out general day to day Preventive Maintenance Job, Break down Job, Condition Based Jobs
shut down jobs and pre-commissioning & Start up activities.
2. Understand and Interpret approved for Construction drawings of consultant for field installation of
Instruments, Impulse tubing, Cable Junction boxes, Support etc.
3. Carryout calibration of Instruments and prepare test certificate.
4. Carryout Meager and continuity test of instrument/electrical cables.
5. Lay and Terminate Instrument and power cables in field and control room.
6. Carryout cross-wing and inter panel wiring in the control room panels for signal marshalling, Relay
logic, Fire & Gas Panels, Operator Control Desk etc.
7. Gained Experience in Calibration of smart Transmitter for Pressure, Differential pressure,
Temperature, Level Measurement of reputable manufacturers such as Rosemount (Model 3051 C),
Yokogawa (EJA Series), Honeywell (300 Series). Familiar with use and application of
communicators using HART protocol (475)
8. Gained experience in calibration of Bentley Nevada Vibration 3000 Series system. Basic set up of
3300 Series Monitor & familiar with 3500 series.
9. P&ID, Instrument Location And General Operating Floor Plant Prepares Turn-Over Packages
Documents For Mechanical Completion That Consists Of All Engineering And Construction
Disciplines Such As As-Built, Test Reports, Punch Lists. Vendor Drawing & Other Related
Documents.
ThankinYou
Yours Faithfully
PATEL SAGARKUMAR
3 of 3

1.sagar instru cv (1)

  • 1.
    RESUME Instrument Technicians Name :- Patel Sagarkumar Mobile :- +91 9558891937 E-Mail :- sagarpatel9106@Gmail.Com Date Of Birth : 24-05-1992 Marital Status : Unmarried Nationality : Indian. Languages Proficiency : English, Hindi & Gujarati. CONTACT INFORMATION :- Passport Details:- Address :- Sagarkumar Yogeshbhai Patel At&Po :- Danti (Jalaram Street),Via :-Maroli Bazaar, Ta :- Jalalpor District :- Navsari-396436 , Gujarat(India) Mobile :- +91 9558891937 E-Mail :- sagarpatel9106@Gmail.Com Passport :- L 2425660 Place Of Issue :- Surat ( INDIA ) Date Of Issue :- 07-06-2013. Date Of Expiry :- 06-06-2023 ECNR Status :- Check Not Required EDUCATION. QUALIFICATION: -  Secondary School Of Certificate (S.S.C.) Passed. 2007  Passed ITI in Instrument Technician. At Surat September 2009 OBJECTIVE: - Always Strive to Accomplish New Innovative Ideas to Solve Problems, Aiming at Achieving Set Target within Stipulated Period. Motivation: - To Attain Good Position Obtain Rewarding Career With Job Satisfaction. COMPUTER KNOWLEDGE :- 1. Ms Word 2. Ms Excel 3. Power Point BRIEF SUMMARY :- Offering over 03years of full and comprehensive experience in Instrumentation works that Includes Installation, Tubing, Cabeling, Calibration, Loop Checking. Also I have experience As a Site Modification of all Instrument Installation works for Oil & Gas Projects. Maintenance works in Refinery. Brief experienced in handling Electronic, Pneumatic & Hydraulic Instruments. 1 of 3
  • 2.
    EXPERIENCEIN ABROD:- Company :Qatar National Facility Services (QNFS) In Ras Gas Inclusive Dates : 18-09-2015 to 24-10-2015 Position : INSTRUMENT TECHNICIAN. Project : LNG Train 3 & 4 Responsibilities : Loop checking of all the field instrument like control valves, Transmitter, Switch of commissioning & Vibration prepare to start up of plant Company : Qatar National Facility Services (QNFS) In Ras Gas Inclusive Dates : 16-04-2015 to 11-05-2015 Position : INSTRUMENT TECHNICIAN. Project : LNG Train 3 & 4 Responsibilities : Loop checking of all the field instrument like control valves, Transmitter, Switch of commissioning & Vibration prepare to start up of plant Company : Doha Petroleum Construction Co.Ltd. Doha Qatar In Qatar Petroleum. Inclusive Dates : 06-02-2014 to 27-03-2014 Position : INSTRUMENT TECHNICIAN. Project : NGL-2 . Responsibilities : Loop checking of all the field instrument like control valves (DVC 6000,FVP110)Transmitters, motor operating valves, BENTLY NAVADA 3500 and DSM vibration system, of HONEYWELL C300 Field Bus Foundation System Involved in commissioning and Dry Function Test, dynamic function test, cause and effect Company : Doha Petroleum Construction Co.Ltd. Doha Qatar In QAFCO. Inclusive Dates : 27-08-2013 to 10-11-2013. Position : INSTRUMENT TECHNICIAN. Project : URYA-AMONIA-2,4 Responsibilities : Calibration, Loop checking on consol & in field, function test, trouble Shooting of all instrument like Control valve, Transmitters, switch of ABB Centum 3000 R3 Field Bus Foundation System, Commissioning, prepare to start up of plant. EXPERIENCE IN INDIA:- Company : Technosys Engg & Consultants, Rajasthan.Badmer Inclusive Dates : 16-03-2013 to 17-08-2013 Position : INSTRUMENT TECHNICIAN. Responsibilities : Involved in Calibration & Installation of All Field Instruments. Company : Essar Steel Limited Co.( Surat ) Inclusive Dates : 14-08- 2012 to 15-02- 2013 Position : INSTRUMENT TECHNICIAN. Company : Reliance Industries Pvt Ltd. In ICB Ltd. ( Haziar - Surat) Inclusive Dates : 01-08-2011 to 31-07-2012 Position : INSTRUMENT TECHNICIAN.
  • 3.
    Company : GujaratInstruments ONGC.(Hazira - Surat ) Inclusive Dates : 15-03-2010 to 27-06-2011 Position : INSTRUMENT TECHNICIAN. Company : Navin Fluorine International Ltd. .(Bhestan - Surat ) Inclusive Dates : 25-09-2009 to 10-02-2010 Position : ASST. INSTRUMENT TECHNICIAN. FIELD EXPERIENCE : - 2. VALVES: On-Off Valves, Control Valves with Digital (HART) Valve Positioner of Fisher Rosemount DVC 6010, 6020 & 6030, Siemens, Adamas, Neles Jamesbury ND-800/900, Valtake, Antisurge Control Valves 3. TRANSMITTERS: Pressure, Flow, Level, Temperature. SMART Transmitters (foundation field bus) Of Foxboro with HHT, Rosemount, Yokogawa Endress + Hausser Druck, H&B with Hart Communicator 475, Elsag Bailey with STT-04E, Honey Well, ABB with SFC, Vortex Flow Meters, Electromagnetic Flow Meters, and Turbine Meters. Commissioning Of Wet Leg Type Level Transmitter (D/P) With Filling Sealing Liquid. Ultr 4. LEVEL TROLL :( Displacement Transmitters) Of Magnetrol, Masonelian, Foxboro Eckardt. 5. SWITCHES: Pressure, Temperature, Level of Asco, Ashcroft, ITT Barton, Sor, Switzer, Magnetrol, Spirax Sarco. 2 of 3 USE EQUIPMENTS:- 1. HART Communicator 475 (Foundation Fieldbus). 2. DRUCK-Digital pressure indicator.Model (605, 601, 610) 3. Hydraulic Pressure Pump (Druck) 4. Multimeter (fluke) 5. Loop calibrator, MA source (fluke) 6. Decade Box 7. Temperature Bath (Jofra) 8. MV simulator (fluke) JOB DESCRIPTION :- 1. Carry out general day to day Preventive Maintenance Job, Break down Job, Condition Based Jobs shut down jobs and pre-commissioning & Start up activities. 2. Understand and Interpret approved for Construction drawings of consultant for field installation of Instruments, Impulse tubing, Cable Junction boxes, Support etc. 3. Carryout calibration of Instruments and prepare test certificate. 4. Carryout Meager and continuity test of instrument/electrical cables. 5. Lay and Terminate Instrument and power cables in field and control room. 6. Carryout cross-wing and inter panel wiring in the control room panels for signal marshalling, Relay logic, Fire & Gas Panels, Operator Control Desk etc. 7. Gained Experience in Calibration of smart Transmitter for Pressure, Differential pressure, Temperature, Level Measurement of reputable manufacturers such as Rosemount (Model 3051 C), Yokogawa (EJA Series), Honeywell (300 Series). Familiar with use and application of communicators using HART protocol (475) 8. Gained experience in calibration of Bentley Nevada Vibration 3000 Series system. Basic set up of 3300 Series Monitor & familiar with 3500 series.
  • 4.
    9. P&ID, InstrumentLocation And General Operating Floor Plant Prepares Turn-Over Packages Documents For Mechanical Completion That Consists Of All Engineering And Construction Disciplines Such As As-Built, Test Reports, Punch Lists. Vendor Drawing & Other Related Documents. ThankinYou Yours Faithfully PATEL SAGARKUMAR 3 of 3