INTRODUCTION
CONCEPTS OF MAINTENANCE MANAGEMENT
Adequate maintenance of an irrigation system/project is a precursor to any
irrigation management. No water management is possible unless the
infrastructure to deliver water is in a reasonably good condition, to retain
its operational efficiency.
Irrigation structures are created through massive investment. The structures
need to be kept in good health for which a well established maintenance
programme needs to be followed. Good health means that design parameters of
canal and related structures are maintained for desired hydraulic operation.
There has been a gradual deterioration of the maintenance standards in various
projects in India partly due to inadequate provision for maintenance expenditure
in annual budget and partly due to the ignorance/negligence of the maintenance
related functions such as hydraulic survey, discharge measurements etc. by
irrigation engineers. Deteriorating irrigation channels and unscientific operating
procedures often preclude any significant improvement in management
practices.
3
MAINTENANCE LEARNING PROCESS
• Strategy for improving existing irrigation systems :
 To evaluate the maintenance deficiencies on any particular system and then correct all
maintenance deficiencies that interfere with the proper operation of the irrigation
channels.
 Improved operations practices should be developed that will provide reliable, predictable
and equitable water deliveries to each outlet structure (tertiary system).
 When operation practices have been improved, then technical assistance should be
provided to the farmers so that they can improve their water management practices in
order to increase crop production.
• A maintenance learning process provides guidelines to
(a) identify problems (diagnostic analysis)
(b) develop and test solutions and
(c) provide field experience & insights into further improvements through
implementation of solutions.
The maintenance learning process is also meant to develop appreciation, create
awareness and equip the senior officers of irrigation department with the back
ground of the maintenance process.
4
MAINTENANCE LEARNING PROCESS
• An irrigation system can be decomposed into four major subsystems
a) water source (s); b) water delivery; c) farm; and d) water removal.
Farm sub-system is the heart of an irrigation system; it performs system's
primary function, that of crop growth.
“Even if all the sub-systems have been properly designed, the lack in
operation of the system in accordance with the design criteria will likely lead
to failure of the system or low agricultural production levels”.
A common problem in irrigation systems is the continued cycle of irrigation
system construction followed by deterioration because of inadequate
maintenance and then rehabilitation (which ends up being major
reconstruction) followed again by deterioration. This recurring cycle usually
precludes timely and equitable distribution of water. Besides resulting in
stagnant growth in agricultural production, the construction phase adds to
cost of project.
5
• Each project area is uniquely different having site specific nature of
irrigated agriculture. Therefore, approach should be process oriented
rather than an approach which emphasizes technology alone or which
is prescriptive (step by stem procedures).
The maintenance learning process emphasizes:
• (a) Maintaining rather than rehabilitating.
• (b) Documenting maintenance needs to improve financial
management and accountability.
• c) Using existing flow control structures for water measurement
• d) Developing physical knowledge about what is occurring within
the system.
• e) Increasing sensitivity about operating the system to meet needs
of farmers &
• f) Documenting the needs and costs for irrigation system
improvements.
6
Some of the activities under the operation phase notably developing discharge ratings and
measuring channel losses are necessary to improve effectiveness of `walk-thru' maintenance
survey. Some of the important activities are briefly described below:
• Maps, Reports, Registers: Compile existing information on history of changes, that have
occurred with time and maintenance activities taken up in past. Inspection reports contain
important information.
• Flow control structures, Discharge Measurement: Identify flow control structures which can
be used for discharge measurement (falls, drops, culverts, regulators, gates at dam, barrage
etc). Develop discharge ratings in the field for all flow control structures. Collect water
measurements and estimate channel losses by inflow-outflow method for the reaches
suspected to have unusual seepage losses.
• Conduct `Walk-thru' Maintenance Survey: This should be preceded by i) hydraulic survey ii)
measuring channel losses, iii) obtaining maintenance information from farmers. `Walk-thru'
rather than `drive-thru' is very important. This helps in understanding physical phenomena
causing the problems. Detailed field notes should be made for (1) reaches requiring
sediment removal, (2) reaches experiencing scour and the causes (3) areas of vegetative
growth, (4) grading of roadway 5) repair or replacement of structure (6) cavities at bridge
abutments and gate structures (7) cavities along concrete lined reaches along with estimate
of cavity volume 8) failed lining panels (9) holes in lining panels.
7
Fig. Maintenance phase of the irrigation M&O learning process for earthen channels
8
Fig. Simplified flow chart of Operational Management
9
Types of Maintenance
Routine or normal maintenance
Normal or routine maintenance are synonymous terms referring to the usual (normal) maintenance activities that
are conducted annually for an irrigation system. Normal maintenance involves those activities commonly done
(rather than `should be done') every year for example de-silting, reshaping, clearing (cutting of weeds in the
embankment), etc.
Emergency maintenance
Where unusual conditions occur that jeopardise the safety of the dam, head works, or the irrigation channels, then
the required maintenance is termed emergency maintenance because of the urgent need to take immediate action
for example canal breach, blocked intake, damaged sluice, etc.
Essential structural maintenance
Essential structural maintenance is the required maintenance for flow control structures that will allow the
structures to be used for discharge measurement after calibration, Ex: Repair of control gates, greasing or oiling of
gate gears, etc.
Deferred maintenance
Deferred maintenance is the accumulation of maintenance needs being accrued under the normal or routine
maintenance program; most likely because of shortage of funds, and other reasons for example; removal of
significant silt, repair of heavily eroded embankments etc.
Catch-up maintenance
Catch-up maintenance is a program for taking care of the accumulated deferred maintenance needs in order to
upgrade the hydraulic performance of the system.
Prevention maintenance
Prevention maintenance is a program for taking care of the causes creating the maintenance needs when they are
only a minor problem, rather than allowing such maintenance needs to go unattended until they become a major
problem. In most cases routine maintenance is preventive maintenance.
10
General Priorities for Maintenance Repairs
Sl.
No.
Priority type Comment
1. Diversion weir and
intake
Failure of this structure would have serious
consequences for the operation of the system. The
headwork has to have top priority for maintenance.
2. Leakage, unauthorized
offtakes and
overtopping
Losses of water from the canal system as a result of
leakage through banks, unauthorized off takes and
over topping of the canal embankments are a serious
matter because the loss results in inequitable water
distribution to tertiary outlets.
3. Gates and control
structures
Without gates, or stop logs in cross regulators control
of water is difficult. The system cannot be operated
efficiently without control structures in good condition.
4. Masonry repair Repairing of cracks in masonry is necessary to stop
water getting in behind the masonry and causing
cavities which can lead to ultimate collapse of the
masonry.
5. Embankment
Protection
Protection of canal embankments takes several forms
that is protection from:
- erosion by canal water
- gulling caused by low spots and crab holes
- removal by farmers for cultivation close to, or even
on top of embankments.
- erosion by human and animal traffic across the
canal.
6. Measuring structures Inefficient and incorrect water management will result
from having measuring structures in poor condition.
Measurements will be incorrect, water allocation
planning will be wrong and water distribution will be
inequitable.
7. Silt Removal Silt removal upstream of measuring structures has
very high priority (equal to priority 1 or 2). General silt
removal has a lower priority, except where excessive
silt build up has caused the water level in the canal or
drain to rise leaving inadequate operating freeboard.
8. Vegetation Removal Vegetation removal such as cutting grass on
embankments has a very low priority. Removing
grass from cracks in masonry and removing strong
root in shrubs and trees from the vicinity of structures
is more important.
11
O & M Management
Operational plans are made after clear objectives are established. In annual or seasonal
plans, these objectives are related to long term goals and are re-established prior to the
onset of the year or season.
Objective setting
The objectives of operation and maintenance of an irrigation system have to be clearly
stated so that managers can determine whether the results of their actions are in
accordance with what is intended. At field irrigation level, typical objectives for water
delivery might include equity of water distribution to farmer's fields, matching water
deliveries to field level demand, or delivery of reliable water supplies. Output objectives
would be gross production for particular crops irrigated by the system. Normally these
objectives are long-term but are re-established prior to each season or year. In order to
achieve above stated objectives of water delivery, hydraulic performance of
infrastructure will have to be improved thus giving rise to the maintenance related
objectives such as minimize water loss, maximize carrying capacity etc.
Target development
Targets are normally in terms of specific quantitative values used in short term
implementation. Because they are expressed in numeric terms, it is relatively easy to
determine whether they were achieved, and the level of precision attained. For water
delivery, typical targets include conveyance and supply discharge, maintain water levels
and maintain water delivery schedule at each location in the system, and represent the
instructions passed down to the field level staff for subsequent implementation. On the
maintenance side, targets include develop discharge rating, remove sediment from a
specific reach, fulfill specific maintenance needs etc.
12
Resource identification
Parallel with the process of setting target is the need to clearly identify what
resources are available. If finance, material, equipment, transportation or field
staffs are insufficient to accomplish a particular O & M task or fulfill a particular
target, then the manager has to revise the target. Effective management does
not include setting targets that are impossible to achieve. Effective use of
resources is necessary to meet the targets and fulfill the objectives.
Implementation
This represents, the scheduling of the activities to be undertaken by the staff of
the agency at different levels throughout the period including the arrangements
necessary for achieving the targets set down earlier. It will involve assessment of
the financial, human and other resources necessary for effective implementation.
Proper method of water delivery or distribution will have to be selected keeping
in view status of irrigation water supply. Major components in implementation of
operation plan are i) planning of water distribution plan, ii) preparatory work at
the beginning of a crop season, iii) operation of irrigation facilities to implement
water distribution plan iv)monitoring of the activities and v)evaluation at the end
of crop season.
13
Monitoring
Managers have to be able to determine whether the plan was implemented as
expected, and that targets were fulfilled. If they were not met, then the
managers need to be able to ensure that the required steps are taken to obtain a
better level of achievement. This set of activities includes monitoring, which is
the process by which information on conditions within the irrigation systems are
collected for use by managers. The information may be used to adjust targets but
within a season, it is impossible to expect to change objectives.
In small irrigation systems, monitoring activities are straight forward, whereby
field staff gather data and relay it to the managers for confirmation of plan or
adjustments. In large systems, semi-automatic devices are used. Remote sensing
facilities can be used to monitor crop areas and water use.
Evaluation
At the end of each irrigation season, the net effects of the management of the
system have to be evaluated. Unlike monitoring, which largely focuses on the
fulfillment of targets and periodic adjustments of those targets in light of
changing conditions within the system during the season, evaluation is concerned
more with whether meeting the set of targets laid down resulted in the
attainment of the wider system objectives. This activity involves measurement or
estimation of indicators of performance based on the stated objectives.
14
Fig. Role of maintenance programs for improving the hydraulic performance of an Irrigation system
15
Planning of Maintenance
Irrigation network is perhaps the most costly element of an irrigation scheme designed to last for a
long time. However, many a time, one finds that even an irrigation system of recent construction bears
little resemblance to the original design after operation for a few years. The system is unable to deliver
the necessary water and distribute it equitably as envisaged originally and the cause would be
attributed to in-efficient or indifferent maintenance.
Maintenance needs/problems and solutions can be grouped into the following broad groups:
• Headwork’s i.e. dam or barrage
• Cross regulators
• Escapes
• Irrigation net work about outlet
• Tertiary irrigation system
• Drainage net-work
• Communication
• Any other important constituent specific to the irrigation scheme.
To formulate a maintenance program the following steps would be necessary:
• Make an inventory of all the works that require maintenance.
• Determine volume of maintenance activities to be undertaken and assess their costs.
• Establish optimum cycle of maintenance for each type of work.
• Determine the machinery and manpower requirements for each type of work.
• Establishing the maintenance periodicities and priorities.
• Ensure provision of the various where withal i.e. funds, materials etc.
16
SUMMARY
• O & M management is the process through which institutions and/or
individuals set objectives for irrigation systems; establish appropriate
conditions and identify, mobilize and use resources, so as to attain these
objectives while ensuring that these activities are performed without causing
adverse effects to the environment.
• Procedures for attaining targets set are usually established. However, these
procedures have to be reflective of the actual or current situation to be
useful in implementing the operational plan. In some cases, they are not
used at all since these were established using unrealistic targets and
unreliable estimate of resources to achieve these targets. Most of these are
outdated and rigid in nature thus preventing their usage in the
implementation of the O & M plan.
• Maintenance learning process provides guidelines to identify problems,
develop solution and implement solutions. Maintenance needs are met or
problems solved through preparation and implementation of different types
of maintenance plans.
17

More Related Content

What's hot (20)

Hydrological cycle
Hydrological cycleHydrological cycle
Hydrological cycle
 
Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01Waterdistributionsystem 120411061916-phpapp01
Waterdistributionsystem 120411061916-phpapp01
 
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 10
 
11 air pollution dispersion
11 air pollution dispersion11 air pollution dispersion
11 air pollution dispersion
 
Submersible pump
Submersible pumpSubmersible pump
Submersible pump
 
Regulating structure for canal flow
Regulating structure for canal flowRegulating structure for canal flow
Regulating structure for canal flow
 
Baseflow
BaseflowBaseflow
Baseflow
 
Measurement of rainfall
Measurement of rainfallMeasurement of rainfall
Measurement of rainfall
 
RO & NF chemical cleaning
RO & NF chemical cleaningRO & NF chemical cleaning
RO & NF chemical cleaning
 
Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
 
Presentation on water treatment plant
Presentation on water treatment plantPresentation on water treatment plant
Presentation on water treatment plant
 
Training process manual for wtp narmada
Training  process manual for wtp narmadaTraining  process manual for wtp narmada
Training process manual for wtp narmada
 
STP Operation Presentation
STP Operation PresentationSTP Operation Presentation
STP Operation Presentation
 
Advanced hydrology
Advanced hydrologyAdvanced hydrology
Advanced hydrology
 
L5 infiltration
L5 infiltrationL5 infiltration
L5 infiltration
 
L 25 and 26 final
L 25 and 26  finalL 25 and 26  final
L 25 and 26 final
 
Surface water runoff
Surface water runoffSurface water runoff
Surface water runoff
 
AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15
 
Component of Hydro Power Plant
Component of Hydro Power PlantComponent of Hydro Power Plant
Component of Hydro Power Plant
 
Infiltration and runoff
Infiltration and runoffInfiltration and runoff
Infiltration and runoff
 

Similar to IIT Roorkee Principles O&M Management

Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviiihydrologyproject001
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Managementharoldtaylor1113
 
Water Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxWater Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxBalakrishnaBedudoori
 
Water loss detection and management
Water loss detection and management Water loss detection and management
Water loss detection and management Yogesh SN
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivsIouri Vaisman
 
Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34WBB34
 
Presentation_O_M.ppt
Presentation_O_M.pptPresentation_O_M.ppt
Presentation_O_M.pptsree886554
 
Presentation_O&M ppt.ppt
Presentation_O&M ppt.pptPresentation_O&M ppt.ppt
Presentation_O&M ppt.pptsanjayeducation
 
Presentation_O&M.ppt
Presentation_O&M.pptPresentation_O&M.ppt
Presentation_O&M.pptKrischaEver
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesignSiam Kak
 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET Journal
 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET Journal
 
IRJET- Study of Conventional Drainage System
IRJET- Study of Conventional Drainage SystemIRJET- Study of Conventional Drainage System
IRJET- Study of Conventional Drainage SystemIRJET Journal
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvestingrahul_5587
 

Similar to IIT Roorkee Principles O&M Management (20)

Rehab modernization
Rehab modernizationRehab modernization
Rehab modernization
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviii
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
 
Water Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptxWater Audit, Water accounting presentation.pptx
Water Audit, Water accounting presentation.pptx
 
Water loss detection and management
Water loss detection and management Water loss detection and management
Water loss detection and management
 
Ground water o&m_norms
Ground water o&m_normsGround water o&m_norms
Ground water o&m_norms
 
Presentation at wr conference may 13 draft 1 ivs
Presentation at wr conference may 13  draft 1 ivsPresentation at wr conference may 13  draft 1 ivs
Presentation at wr conference may 13 draft 1 ivs
 
Water use efficiency
Water use efficiency Water use efficiency
Water use efficiency
 
Area 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panelsArea 21 & 23 Pic1 display panels
Area 21 & 23 Pic1 display panels
 
Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34
 
Presentation_O_M.ppt
Presentation_O_M.pptPresentation_O_M.ppt
Presentation_O_M.ppt
 
Presentation_O&M ppt.ppt
Presentation_O&M ppt.pptPresentation_O&M ppt.ppt
Presentation_O&M ppt.ppt
 
Presentation_O&M.ppt
Presentation_O&M.pptPresentation_O&M.ppt
Presentation_O&M.ppt
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesign
 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil Erosion
 
Area36 final pic1 boards
Area36 final pic1 boardsArea36 final pic1 boards
Area36 final pic1 boards
 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling Methods
 
City of Toronto Basement Flooding Area 37 Display Boards
City of Toronto Basement Flooding Area 37 Display Boards City of Toronto Basement Flooding Area 37 Display Boards
City of Toronto Basement Flooding Area 37 Display Boards
 
IRJET- Study of Conventional Drainage System
IRJET- Study of Conventional Drainage SystemIRJET- Study of Conventional Drainage System
IRJET- Study of Conventional Drainage System
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 

Recently uploaded

(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Recently uploaded (20)

(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

IIT Roorkee Principles O&M Management

  • 1. INDIAN INSTITUTE OF TECHNOLOGY ROORKEE PRINCIPLES OF O & M MANAGEMENT by DR. ASHISH PANDEY Associate Professor Department of Water Resources Development and Management IIT Roorkee-247 667 (UK), India E-mail: ashisfwt@gmail.com
  • 2. 2 INTRODUCTION CONCEPTS OF MAINTENANCE MANAGEMENT Adequate maintenance of an irrigation system/project is a precursor to any irrigation management. No water management is possible unless the infrastructure to deliver water is in a reasonably good condition, to retain its operational efficiency. Irrigation structures are created through massive investment. The structures need to be kept in good health for which a well established maintenance programme needs to be followed. Good health means that design parameters of canal and related structures are maintained for desired hydraulic operation. There has been a gradual deterioration of the maintenance standards in various projects in India partly due to inadequate provision for maintenance expenditure in annual budget and partly due to the ignorance/negligence of the maintenance related functions such as hydraulic survey, discharge measurements etc. by irrigation engineers. Deteriorating irrigation channels and unscientific operating procedures often preclude any significant improvement in management practices.
  • 3. 3 MAINTENANCE LEARNING PROCESS • Strategy for improving existing irrigation systems :  To evaluate the maintenance deficiencies on any particular system and then correct all maintenance deficiencies that interfere with the proper operation of the irrigation channels.  Improved operations practices should be developed that will provide reliable, predictable and equitable water deliveries to each outlet structure (tertiary system).  When operation practices have been improved, then technical assistance should be provided to the farmers so that they can improve their water management practices in order to increase crop production. • A maintenance learning process provides guidelines to (a) identify problems (diagnostic analysis) (b) develop and test solutions and (c) provide field experience & insights into further improvements through implementation of solutions. The maintenance learning process is also meant to develop appreciation, create awareness and equip the senior officers of irrigation department with the back ground of the maintenance process.
  • 4. 4 MAINTENANCE LEARNING PROCESS • An irrigation system can be decomposed into four major subsystems a) water source (s); b) water delivery; c) farm; and d) water removal. Farm sub-system is the heart of an irrigation system; it performs system's primary function, that of crop growth. “Even if all the sub-systems have been properly designed, the lack in operation of the system in accordance with the design criteria will likely lead to failure of the system or low agricultural production levels”. A common problem in irrigation systems is the continued cycle of irrigation system construction followed by deterioration because of inadequate maintenance and then rehabilitation (which ends up being major reconstruction) followed again by deterioration. This recurring cycle usually precludes timely and equitable distribution of water. Besides resulting in stagnant growth in agricultural production, the construction phase adds to cost of project.
  • 5. 5 • Each project area is uniquely different having site specific nature of irrigated agriculture. Therefore, approach should be process oriented rather than an approach which emphasizes technology alone or which is prescriptive (step by stem procedures). The maintenance learning process emphasizes: • (a) Maintaining rather than rehabilitating. • (b) Documenting maintenance needs to improve financial management and accountability. • c) Using existing flow control structures for water measurement • d) Developing physical knowledge about what is occurring within the system. • e) Increasing sensitivity about operating the system to meet needs of farmers & • f) Documenting the needs and costs for irrigation system improvements.
  • 6. 6 Some of the activities under the operation phase notably developing discharge ratings and measuring channel losses are necessary to improve effectiveness of `walk-thru' maintenance survey. Some of the important activities are briefly described below: • Maps, Reports, Registers: Compile existing information on history of changes, that have occurred with time and maintenance activities taken up in past. Inspection reports contain important information. • Flow control structures, Discharge Measurement: Identify flow control structures which can be used for discharge measurement (falls, drops, culverts, regulators, gates at dam, barrage etc). Develop discharge ratings in the field for all flow control structures. Collect water measurements and estimate channel losses by inflow-outflow method for the reaches suspected to have unusual seepage losses. • Conduct `Walk-thru' Maintenance Survey: This should be preceded by i) hydraulic survey ii) measuring channel losses, iii) obtaining maintenance information from farmers. `Walk-thru' rather than `drive-thru' is very important. This helps in understanding physical phenomena causing the problems. Detailed field notes should be made for (1) reaches requiring sediment removal, (2) reaches experiencing scour and the causes (3) areas of vegetative growth, (4) grading of roadway 5) repair or replacement of structure (6) cavities at bridge abutments and gate structures (7) cavities along concrete lined reaches along with estimate of cavity volume 8) failed lining panels (9) holes in lining panels.
  • 7. 7 Fig. Maintenance phase of the irrigation M&O learning process for earthen channels
  • 8. 8 Fig. Simplified flow chart of Operational Management
  • 9. 9 Types of Maintenance Routine or normal maintenance Normal or routine maintenance are synonymous terms referring to the usual (normal) maintenance activities that are conducted annually for an irrigation system. Normal maintenance involves those activities commonly done (rather than `should be done') every year for example de-silting, reshaping, clearing (cutting of weeds in the embankment), etc. Emergency maintenance Where unusual conditions occur that jeopardise the safety of the dam, head works, or the irrigation channels, then the required maintenance is termed emergency maintenance because of the urgent need to take immediate action for example canal breach, blocked intake, damaged sluice, etc. Essential structural maintenance Essential structural maintenance is the required maintenance for flow control structures that will allow the structures to be used for discharge measurement after calibration, Ex: Repair of control gates, greasing or oiling of gate gears, etc. Deferred maintenance Deferred maintenance is the accumulation of maintenance needs being accrued under the normal or routine maintenance program; most likely because of shortage of funds, and other reasons for example; removal of significant silt, repair of heavily eroded embankments etc. Catch-up maintenance Catch-up maintenance is a program for taking care of the accumulated deferred maintenance needs in order to upgrade the hydraulic performance of the system. Prevention maintenance Prevention maintenance is a program for taking care of the causes creating the maintenance needs when they are only a minor problem, rather than allowing such maintenance needs to go unattended until they become a major problem. In most cases routine maintenance is preventive maintenance.
  • 10. 10 General Priorities for Maintenance Repairs Sl. No. Priority type Comment 1. Diversion weir and intake Failure of this structure would have serious consequences for the operation of the system. The headwork has to have top priority for maintenance. 2. Leakage, unauthorized offtakes and overtopping Losses of water from the canal system as a result of leakage through banks, unauthorized off takes and over topping of the canal embankments are a serious matter because the loss results in inequitable water distribution to tertiary outlets. 3. Gates and control structures Without gates, or stop logs in cross regulators control of water is difficult. The system cannot be operated efficiently without control structures in good condition. 4. Masonry repair Repairing of cracks in masonry is necessary to stop water getting in behind the masonry and causing cavities which can lead to ultimate collapse of the masonry. 5. Embankment Protection Protection of canal embankments takes several forms that is protection from: - erosion by canal water - gulling caused by low spots and crab holes - removal by farmers for cultivation close to, or even on top of embankments. - erosion by human and animal traffic across the canal. 6. Measuring structures Inefficient and incorrect water management will result from having measuring structures in poor condition. Measurements will be incorrect, water allocation planning will be wrong and water distribution will be inequitable. 7. Silt Removal Silt removal upstream of measuring structures has very high priority (equal to priority 1 or 2). General silt removal has a lower priority, except where excessive silt build up has caused the water level in the canal or drain to rise leaving inadequate operating freeboard. 8. Vegetation Removal Vegetation removal such as cutting grass on embankments has a very low priority. Removing grass from cracks in masonry and removing strong root in shrubs and trees from the vicinity of structures is more important.
  • 11. 11 O & M Management Operational plans are made after clear objectives are established. In annual or seasonal plans, these objectives are related to long term goals and are re-established prior to the onset of the year or season. Objective setting The objectives of operation and maintenance of an irrigation system have to be clearly stated so that managers can determine whether the results of their actions are in accordance with what is intended. At field irrigation level, typical objectives for water delivery might include equity of water distribution to farmer's fields, matching water deliveries to field level demand, or delivery of reliable water supplies. Output objectives would be gross production for particular crops irrigated by the system. Normally these objectives are long-term but are re-established prior to each season or year. In order to achieve above stated objectives of water delivery, hydraulic performance of infrastructure will have to be improved thus giving rise to the maintenance related objectives such as minimize water loss, maximize carrying capacity etc. Target development Targets are normally in terms of specific quantitative values used in short term implementation. Because they are expressed in numeric terms, it is relatively easy to determine whether they were achieved, and the level of precision attained. For water delivery, typical targets include conveyance and supply discharge, maintain water levels and maintain water delivery schedule at each location in the system, and represent the instructions passed down to the field level staff for subsequent implementation. On the maintenance side, targets include develop discharge rating, remove sediment from a specific reach, fulfill specific maintenance needs etc.
  • 12. 12 Resource identification Parallel with the process of setting target is the need to clearly identify what resources are available. If finance, material, equipment, transportation or field staffs are insufficient to accomplish a particular O & M task or fulfill a particular target, then the manager has to revise the target. Effective management does not include setting targets that are impossible to achieve. Effective use of resources is necessary to meet the targets and fulfill the objectives. Implementation This represents, the scheduling of the activities to be undertaken by the staff of the agency at different levels throughout the period including the arrangements necessary for achieving the targets set down earlier. It will involve assessment of the financial, human and other resources necessary for effective implementation. Proper method of water delivery or distribution will have to be selected keeping in view status of irrigation water supply. Major components in implementation of operation plan are i) planning of water distribution plan, ii) preparatory work at the beginning of a crop season, iii) operation of irrigation facilities to implement water distribution plan iv)monitoring of the activities and v)evaluation at the end of crop season.
  • 13. 13 Monitoring Managers have to be able to determine whether the plan was implemented as expected, and that targets were fulfilled. If they were not met, then the managers need to be able to ensure that the required steps are taken to obtain a better level of achievement. This set of activities includes monitoring, which is the process by which information on conditions within the irrigation systems are collected for use by managers. The information may be used to adjust targets but within a season, it is impossible to expect to change objectives. In small irrigation systems, monitoring activities are straight forward, whereby field staff gather data and relay it to the managers for confirmation of plan or adjustments. In large systems, semi-automatic devices are used. Remote sensing facilities can be used to monitor crop areas and water use. Evaluation At the end of each irrigation season, the net effects of the management of the system have to be evaluated. Unlike monitoring, which largely focuses on the fulfillment of targets and periodic adjustments of those targets in light of changing conditions within the system during the season, evaluation is concerned more with whether meeting the set of targets laid down resulted in the attainment of the wider system objectives. This activity involves measurement or estimation of indicators of performance based on the stated objectives.
  • 14. 14 Fig. Role of maintenance programs for improving the hydraulic performance of an Irrigation system
  • 15. 15 Planning of Maintenance Irrigation network is perhaps the most costly element of an irrigation scheme designed to last for a long time. However, many a time, one finds that even an irrigation system of recent construction bears little resemblance to the original design after operation for a few years. The system is unable to deliver the necessary water and distribute it equitably as envisaged originally and the cause would be attributed to in-efficient or indifferent maintenance. Maintenance needs/problems and solutions can be grouped into the following broad groups: • Headwork’s i.e. dam or barrage • Cross regulators • Escapes • Irrigation net work about outlet • Tertiary irrigation system • Drainage net-work • Communication • Any other important constituent specific to the irrigation scheme. To formulate a maintenance program the following steps would be necessary: • Make an inventory of all the works that require maintenance. • Determine volume of maintenance activities to be undertaken and assess their costs. • Establish optimum cycle of maintenance for each type of work. • Determine the machinery and manpower requirements for each type of work. • Establishing the maintenance periodicities and priorities. • Ensure provision of the various where withal i.e. funds, materials etc.
  • 16. 16 SUMMARY • O & M management is the process through which institutions and/or individuals set objectives for irrigation systems; establish appropriate conditions and identify, mobilize and use resources, so as to attain these objectives while ensuring that these activities are performed without causing adverse effects to the environment. • Procedures for attaining targets set are usually established. However, these procedures have to be reflective of the actual or current situation to be useful in implementing the operational plan. In some cases, they are not used at all since these were established using unrealistic targets and unreliable estimate of resources to achieve these targets. Most of these are outdated and rigid in nature thus preventing their usage in the implementation of the O & M plan. • Maintenance learning process provides guidelines to identify problems, develop solution and implement solutions. Maintenance needs are met or problems solved through preparation and implementation of different types of maintenance plans.