Purpose of Tonight’s Meeting
• To introduce the problem and study approach
• To outline general factors contributing to surface and/or basement
flooding and surface water pollution
• Introduce possible alternative solutions and criteria for evaluating the
alternatives
• Outline the next steps in the study process
• Hear from you! Your input is very important.
Purpose of Our Study
• Examine existing stormwater drainage,
combined and sanitary sewer systems to
identify the potential causes of basement
flooding and/or surface flooding (severe
ponding on streets during extreme storms).
• Assess control measures to improve the
water quality of receiving water bodies as
per the City’s Wet Weather Flow Master
Plan.
• Make recommendations to:
– Reduce the risk of future basement
flooding
– Improve the quality of stormwater runoff
before it is discharged to watercourses
Study Area
• York-Cedarvale
Area
• Generally bounded
by Bathurst, Dufferin,
St Clair and Eglinton
• Study Area is based
on the tributary
drainage areas for
the combined sewer
system.
• The City must meet the requirements of Ontario’s Environmental
Assessment (EA) Act for infrastructure projects.
• This project requires completion of Phases 1 and 2 of the Class EA process
as set out by the Municipal Engineers Association (October 2000, as
amended in 2007, 2011 & 2015), following the Master Planning Process.
We are currently in the late stages of Phase 1.
• The EA process is an opportunity for the public and agencies to provide
input. Consultation is facilitated via two rounds of Public Information
Centres (PICs).
Municipal Class Environmental
Assessment Process
PHASE 1 PHASE 2
Problem Or
Opportunity
Alternative
Solutions
Submit Master
Plan Report for
30 Day Review
Notice of
Completion
We are here
PIC #2
Incorporate
Comments
PIC #1
Many steps are involved in the study before solutions can be recommended.
This work includes:
• Collect and review background data on land use, population, soil conditions, combined
sewer and storm drainage systems, flooding history, and operation/maintenance records;
• Conduct field surveys to inventory the number of roof leaders disconnected, survey
catchbasins, identify low lying areas, inspect combined sewer overflow structures, and
inventory storm sewer outfalls;
• Consult with the public via Questionnaire and 1st Public Information Centre, to explain the
problem, introduce the objectives of the EA Study, and invite comments on resident history
of flooding and feedback on potential alternatives to reduce risk of flooding / pollution;
• Develop computer models to:
– Analyze the causes of flooding and to estimate flows under various weather conditions;
– Assess the impacts of stormwater runoff and combined sewer overflows on water quality
in receiving watercourses;
• Develop, assess and refine alternative solutions; and
• Present recommended alternative (at 2nd Public Information Centre) and finalize the study
recommendations with consideration on input from the public and review agencies.
Investigating Basement Flooding:
The Steps Involved
We
Are
Here
Stormwater Pollution: The Problem
• Urbanization has altered the pathways
through which stormwater finds its way
back to rivers and lakes.
• Stormwater collects oil, dirt, pet waste and
other pollutants and carries them to rivers
and lakes.
• Relief structures in the combined system,
intended to reduce flood risk, can result in
sewer overflow to the environment.
• This results in degraded water quality as
well as:
• Impacts on fisheries and aquatic
habitat
• Reduced recreational use and
aesthetics.
Under normal rainfall events, the storm, combined and sanitary sewer
systems operate as designed. However, during extreme storms, the
following takes place:
• Stormwater flow exceeds the storm sewer capacity and overloads the
system.
• Directly-connected roof drains, especially flat roofs, contribute significant
volumes to the sewer system.
• Water remains on the surface and flows
overland along roads.
• At low lying areas, water accumulates (ponds)
and enters the combined or sanitary sewer system
through manhole covers. This causes sewers to
surcharge and potentially back-up into
basements.
Potential Basement Flooding Factors
During these heavy rainfalls, the ground becomes extremely wet and unwanted
water enters the sanitary/combined system through cracks or broken pipes,
cracked maintenance hole walls and loose joints underground. This contributes
to back-up of the sanitary/combined sewers.
Other factors related to sanitary/combined sewer back-up include:
• Shallow groundwater table intersecting the sewers
• Downspouts connected to the sewer (direct or through weeping tiles)
• Water entering the basement from the surface via window sills and reverse-
slope driveways etc. and then through basement floor drains (connected to
the sewer)
• Interconnections between the road storm and combined sewer systems
• Downstream creek and/or trunk sewer water levels
• Grease build-up and/or blockages.
Potential Basement Flooding Factors
Typical Sewer System Configuration
Case 1 – Combined Sewer
Note: Typical connections shown,
however, private drainage systems
can be more complex and each one
is unique. For example, there could
be other combinations of
connections shown.
Typical Sewer System Configuration
Case 2 – Partially Separated Sewer
Note: Typical connections shown,
however, private drainage systems
can be more complex and each one
is unique. For example, there could
be interconnection between the
combined/sanitary and storm systems
or other combinations of connections
shown.
Typical Sewer System Configuration
Case 3 – Separated Sewer – Isolated System
Note: Typical connections shown,
however, private drainage systems
can be more complex and each one
is unique. For example, there could
be interconnection between the
sanitary and storm systems or other
combinations of connections shown.
Methods for Reducing Basement Flooding
and Improving Water Quality
Source control measures involve managing stormwater where it
originates (roofs, roads, driveways), before it enters the City’s
sewer pipes.
Source Controls
Conveyance Controls
End-of-Pipe Controls
Conveyance control measures help to control stormwater as it
travels along the drainage system (in pipes or along the road).
End-of-pipe control measures control stormwater just before it is
discharged to a watercourse (stream, river, or lake), or control
combined sewer overflow discharge so that it can be treated or
re-released back into the combined sewer system for treatment
at the wastewater plant.
Potential Solutions
SOURCE CONTROLS
Rain Barrels Rain Gardens Tree Planting
Residents can help reduce runoff – the water that flows from hard surfaces into the sewer system.
Naturalizing your property lowers the risk of basement flooding and contributes to improving
stormwater runoff quality.
Downspout
Disconnection
Reduce ToxinsPermeable Paving
• Eliminate pesticide/fertilizer use
• Do not let household
chemicals such as paint, oil,
grease, salt, soap, etc. wash to
the storm sewer
• Pick-up pet waste
Soakaway Pits Green Roofs
Potential Solutions
SOURCE CONTROLS
Replace Perforated
Maintenance Hole Covers
Additional source control options:
• Sewer Maintenance and Rehabilitation
Involves:
• CCTV, smoke/dye tests, sewer cleaning, relining, and repair
• Street sweeping, seasonal leaf pick-up, catchbasin vacuum cleanouts
Surface Flow Path
Diversion
Pervious
Pavement
These measures can also help reduce the amount of runoff entering the sewer system.
Sealing Maintenance
Hole Covers
Potential Solutions
CONVEYANCE CONTROLS
Description
• At existing combined sewer overflow locations, either to a
storm sewer or the natural environment, adjust or remove the
structure to reduce discharge during extreme events
What Does it Involve?
• Redesign of underground structures such as interconnecting
pipes and weirs, to reduce or eliminate overflow
Description
• An engineered pipe system that encourages everyday
rainfall to be infiltrated back into the groundwater table
before running down the storm sewer pipe
What Does it Involve?
• Used where a storm sewer is already being replaced for
flood protection, an additional underground gravel trench
and perforated piping system is connected to encourage
infiltration
Exfiltration/Pervious Pipe Systems
(Improve Stormwater Runoff Quality)
Combined Sewer Overflow
Modifications
(Improve Water Quality)
http://www.hkywater.org/departments/wastewater/combined-sewer-system
http://www.civil.ryerson.ca/urban/techno/stormwater/source/10-2-8/index.html
Potential Solutions
CONVEYANCE CONTROLS
Description
• A vegetated depression and underground trench designed
to filter stormwater runoff to remove pollutants and promote
infiltration/evapotranspiration
What Does it Involve?
• Diversion of small overland or piped drainage areas for small
storm events
• Excavation of a trench with specific soil mixture, surface
plantings and underdrain within an open area such as a
boulevard or park
Description
• In place of concrete curb and gutter, replace with grassed
ditches and a series of culverts which slows surface water
down and encourages infiltration/filtration
What Does it Involve?
• Removal of curb and gutter (if existing) and reconstruction
of roadway and boulevard
• Installation of shallow culvert pipes
Alternate Road Cross-Sections (Ditches)
(Improve Stormwater Runoff Quality)
Local Bioretention Filters
(Improve Stormwater Runoff Quality)
Potential Solutions
CONVEYANCE CONTROLS
Increase Number of Catchbasins
(Controls Basement Flooding)
Overland (Major System) Control
(Controls Basement Flooding)
Description
• The diversion of surface drainage away from low lying
areas that have no direct outlet to reduce surface
ponding depths
What Does it Involve?
• Addition of “speed bump” or “curb cut” to redirect
overland flow to strategic locations
• Interception of road or boulevard flows to dedicated
major system sewer with large inlet grate or “curb
drain”
Description
• Where the storm sewer has existing capacity, add
more catchbasins to capture more flow from the
surface
What Does it Involve?
• Minor street excavation for installation of new
catchbasin(s) and connection to storm sewer
• Curb replacement and road restoration
Potential Solutions
CONVEYANCE CONTROLS
Parking Lot Retrofit for Surface Storage
(Controls Basement Flooding)
Catchbasin Inlet Controls
(Controls Basement Flooding)
Description
• Installation of inlet control devices (ICDs) on
catchbasins to limit release into the storm sewer
system to control back-up (surcharge)
What Does it Involve?
• A plastic or metal plate / device installed inside the
catchbasin outlet (not visible from surface)
• Minimal effort and time to install
• Keeps more water on the surface
Description
• Installation of ICDs in parking lots to store stormwater
on surface
• Installation of roof drain controls to store stormwater
on large flat roof areas
What Does it Involve?
• Retrofit of City-Owned property (where physically
possible)
Potential Solutions
CONVEYANCE CONTROLS
Adding New Sewers (Twinning)
(Controls Basement Flooding)
Replacement of Existing Storm,
Combined and/or Sanitary
Sewers
(Controls Basement Flooding)
Description
• Increase the size of the sewer pipe by replacing the old sewer with
a larger pipe
What Does it Involve?
• Road excavation within City limits
• Removal of old sewer and structures (manholes & catchbasins)
and disconnection of sewer service line(s)
• Placement of new sewer, reconnection of sewer service line(s) and
restoration of road and boulevard
Description
• Increase the capacity of the sewer system by adding another
sewer pipe in addition to the existing pipe
What Does it Involve?
• Road excavation within City limits
• Replacement of old structures (manholes & catchbasins) and
reconnection of sewer service line(s), if necessary
• Placement of new sewer, reconnection of sewer service line(s) and
restoration of road and boulevard
Potential Solutions
END-OF-PIPE CONTROLS
Wet Pond/Wetland
(Controls Basement Flooding and Can
Improve Runoff Quality)
Dry Pond
(Controls Basement Flooding)
Description
• An engineered surface depression that controls the quantity of
inflowing stormwater through storage and slow release to the
receiving system
• Typically fills with water during extreme storm events and drains
within 24 to 48 hours or less
What Does it Involve?
• Excavation and shaping of a suitable open space
• Addition of inlet/outlet structures
• Restoration and landscaping; signage
Description
• An engineered pond or wetland with a permanent water surface
that controls the quantity and quality of inflowing stormwater
through storage and slow release to the receiving system
What Does it Involve?
• Excavation and shaping of a suitable open space
• Addition of inlet/outlet structures
• Restoration and landscaping (aquatic and side-slope)
• Infrequent maintenance (sediment removal)
Potential Solutions
END-OF-PIPE CONTROLS
Oil & Grit Separator
(Improves Stormwater Runoff Quality)
Underground Storage Tank
(Controls Basement Flooding & Can Improve
Water Quality)
Description
• An underground tank or pipe that controls the rate of
inflowing sanitary or stormwater through temporary
detention and slow release to the receiving sewer,
reducing the potential for flooding
What Does it Involve?
• Excavation and construction of tank or pipe, including
inlet and outlet structures
• Infrequent maintenance (monitoring, clean-out)
Description
• An underground separation tank that takes the place of a
conventional manhole and provides a measure of
treatment for small drainage areas
What Does it Involve?
• Similar to a manhole, minor street excavation for
installation of structure
• Road restoration
• Annual maintenance (vacuum clean-out)
The following criteria are suggested for evaluating each of the options and
identifying the recommended solutions:
Evaluation of Solutions
Natural Environment
• Potential Impact on
Terrestrial Systems
(Vegetation, Trees,
Wildlife)
• Potential Impact on
Aquatic Systems
(Aquatic Life and
Vegetation, Surface
Water Quality,
Groundwater,
Receiving
Watercourses)
• Soil and Geology
Socio-Cultural
• Effect on Urban
Greenspace (Parks,
Ravines, Open Spaces)
• Disruption to Existing
Community During
Construction (Traffic,
Noise)
• Disruption to Existing
Community Post
Construction (Visual
Impact, Odour, Safety)
• Archaeology and First
Nations
Technical
• Feasibility of Control
Measure (Available
Space, Accessibility,
Constructability)
• Ability to Improve Water
Quality
• Impact on Upstream,
Downstream and
Surrounding Areas
• Operations &
Maintenance
Requirements
• Basement Flooding
Prevention Effectiveness
Economic
• Capital Cost
• Operating and
Maintenance Cost
Thank You for Attending
We welcome your feedback. Please fill out the comment sheet provided.
Following this PIC, the study team will review and consider your comments in the
evaluation of alternative solutions.
The next PIC is expected to be held in late 2016 to present the recommended solutions.
Contact Information
For more information on this study, to provide your comments, or to be placed on the
project mailing list, please contact:
Mae Lee, Public Consultation Unit
55 John Street, Metro Hall, 19th Floor, Toronto, ON M5V 3C6
Phone: 416-392-8210, E-mail: rmlee@toronto.ca
Website: http://www.toronto.ca/bfea

More Related Content

What's hot

16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology
Environmental Protection Agency, Ireland
 

What's hot (20)

Black Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display BoardsBlack Creek Drainage Improvement Study Display Boards
Black Creek Drainage Improvement Study Display Boards
 
Areas2123 pic2boards
Areas2123 pic2boardsAreas2123 pic2boards
Areas2123 pic2boards
 
Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016Contractor Awareness Training Above Ground Facilities Part 2 2016
Contractor Awareness Training Above Ground Facilities Part 2 2016
 
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
Tucker Avenue Neighborhood Stormwater Project Community Meeting Sept 19, 2019
 
Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016Contractor Awareness Training Vegetative Practices 2016
Contractor Awareness Training Vegetative Practices 2016
 
Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016Contractor Awareness Training Below Ground Facilities 2016
Contractor Awareness Training Below Ground Facilities 2016
 
16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology16. Abstractions/Hydromorphology
16. Abstractions/Hydromorphology
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solution
 
Checkdam
CheckdamCheckdam
Checkdam
 
Presentation to AAAEA Technical conference
Presentation to AAAEA Technical conferencePresentation to AAAEA Technical conference
Presentation to AAAEA Technical conference
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater Management
 
Wetlands and Stormwater Management
Wetlands and Stormwater ManagementWetlands and Stormwater Management
Wetlands and Stormwater Management
 
#13 - Comp Plan - Trends & Implications -continued
#13 - Comp Plan - Trends & Implications -continued#13 - Comp Plan - Trends & Implications -continued
#13 - Comp Plan - Trends & Implications -continued
 
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept PlanDead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
Dead Run Stream Restoration Project Segments 2/3 – Final Concept Plan
 
Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014Dead Run Stream Restoration May 2014
Dead Run Stream Restoration May 2014
 
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
Stormwater Maintenance Awareness Training, Part I: Overview, October 6, 2015
 
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public MeetingDead Run Segments 2/3 Stream Restoration Project Public Meeting
Dead Run Segments 2/3 Stream Restoration Project Public Meeting
 
Stormwater Roundtable Presenation 01/10
Stormwater  Roundtable Presenation 01/10Stormwater  Roundtable Presenation 01/10
Stormwater Roundtable Presenation 01/10
 
Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 

Similar to City of Toronto Basement Flooding Area 37 Display Boards

Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
Martin Preene
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
glennmcgillivray
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
AsnelTiffa
 
Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
Yashna Garg
 

Similar to City of Toronto Basement Flooding Area 37 Display Boards (20)

Areas2123 pic2boards
Areas2123 pic2boardsAreas2123 pic2boards
Areas2123 pic2boards
 
Environmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and DewateringEnvironmental Impacts of Groundwater Control and Dewatering
Environmental Impacts of Groundwater Control and Dewatering
 
Impacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areasImpacts from groundwater comtrol in urban areas
Impacts from groundwater comtrol in urban areas
 
Case Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater ManagementCase Study No. 9-Philippines’ Integrated Stormwater Management
Case Study No. 9-Philippines’ Integrated Stormwater Management
 
Water loss detection and management
Water loss detection and management Water loss detection and management
Water loss detection and management
 
Environmental Engineering II M2.pptx
Environmental Engineering II M2.pptxEnvironmental Engineering II M2.pptx
Environmental Engineering II M2.pptx
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
 
Ee 2
Ee 2Ee 2
Ee 2
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
 
Srorm water management
Srorm water managementSrorm water management
Srorm water management
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Hydropower water conveyance systam
Hydropower water conveyance systamHydropower water conveyance systam
Hydropower water conveyance systam
 
hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system
 
Sustainable urban drainage
Sustainable urban drainageSustainable urban drainage
Sustainable urban drainage
 
UNIT I 1.pptx
UNIT I 1.pptxUNIT I 1.pptx
UNIT I 1.pptx
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 

More from Toronto Public Consultation Unit

More from Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 

Recently uploaded

VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Chandigarh Call girls 9053900678 Call girls in Chandigarh
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
nehasharma67844
 

Recently uploaded (20)

Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakurbest call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
best call girls in Pune - 450+ Call Girl Cash Payment 8005736733 Neha Thakur
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Chakan ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Chakan ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 

City of Toronto Basement Flooding Area 37 Display Boards

  • 1. Welcome Basement Flooding Remediation and Water Quality Improvement Master Plan Environmental Assessment Study Area 37 Public Information Centre #1 View displays and discuss the study with project staff Feel free to ask questions and fill out a comment sheet
  • 2. Purpose of Tonight’s Meeting • To introduce the problem and study approach • To outline general factors contributing to surface and/or basement flooding and surface water pollution • Introduce possible alternative solutions and criteria for evaluating the alternatives • Outline the next steps in the study process • Hear from you! Your input is very important.
  • 3. Purpose of Our Study • Examine existing stormwater drainage, combined and sanitary sewer systems to identify the potential causes of basement flooding and/or surface flooding (severe ponding on streets during extreme storms). • Assess control measures to improve the water quality of receiving water bodies as per the City’s Wet Weather Flow Master Plan. • Make recommendations to: – Reduce the risk of future basement flooding – Improve the quality of stormwater runoff before it is discharged to watercourses
  • 4. Study Area • York-Cedarvale Area • Generally bounded by Bathurst, Dufferin, St Clair and Eglinton • Study Area is based on the tributary drainage areas for the combined sewer system.
  • 5. • The City must meet the requirements of Ontario’s Environmental Assessment (EA) Act for infrastructure projects. • This project requires completion of Phases 1 and 2 of the Class EA process as set out by the Municipal Engineers Association (October 2000, as amended in 2007, 2011 & 2015), following the Master Planning Process. We are currently in the late stages of Phase 1. • The EA process is an opportunity for the public and agencies to provide input. Consultation is facilitated via two rounds of Public Information Centres (PICs). Municipal Class Environmental Assessment Process PHASE 1 PHASE 2 Problem Or Opportunity Alternative Solutions Submit Master Plan Report for 30 Day Review Notice of Completion We are here PIC #2 Incorporate Comments PIC #1
  • 6. Many steps are involved in the study before solutions can be recommended. This work includes: • Collect and review background data on land use, population, soil conditions, combined sewer and storm drainage systems, flooding history, and operation/maintenance records; • Conduct field surveys to inventory the number of roof leaders disconnected, survey catchbasins, identify low lying areas, inspect combined sewer overflow structures, and inventory storm sewer outfalls; • Consult with the public via Questionnaire and 1st Public Information Centre, to explain the problem, introduce the objectives of the EA Study, and invite comments on resident history of flooding and feedback on potential alternatives to reduce risk of flooding / pollution; • Develop computer models to: – Analyze the causes of flooding and to estimate flows under various weather conditions; – Assess the impacts of stormwater runoff and combined sewer overflows on water quality in receiving watercourses; • Develop, assess and refine alternative solutions; and • Present recommended alternative (at 2nd Public Information Centre) and finalize the study recommendations with consideration on input from the public and review agencies. Investigating Basement Flooding: The Steps Involved We Are Here
  • 7. Stormwater Pollution: The Problem • Urbanization has altered the pathways through which stormwater finds its way back to rivers and lakes. • Stormwater collects oil, dirt, pet waste and other pollutants and carries them to rivers and lakes. • Relief structures in the combined system, intended to reduce flood risk, can result in sewer overflow to the environment. • This results in degraded water quality as well as: • Impacts on fisheries and aquatic habitat • Reduced recreational use and aesthetics.
  • 8. Under normal rainfall events, the storm, combined and sanitary sewer systems operate as designed. However, during extreme storms, the following takes place: • Stormwater flow exceeds the storm sewer capacity and overloads the system. • Directly-connected roof drains, especially flat roofs, contribute significant volumes to the sewer system. • Water remains on the surface and flows overland along roads. • At low lying areas, water accumulates (ponds) and enters the combined or sanitary sewer system through manhole covers. This causes sewers to surcharge and potentially back-up into basements. Potential Basement Flooding Factors
  • 9. During these heavy rainfalls, the ground becomes extremely wet and unwanted water enters the sanitary/combined system through cracks or broken pipes, cracked maintenance hole walls and loose joints underground. This contributes to back-up of the sanitary/combined sewers. Other factors related to sanitary/combined sewer back-up include: • Shallow groundwater table intersecting the sewers • Downspouts connected to the sewer (direct or through weeping tiles) • Water entering the basement from the surface via window sills and reverse- slope driveways etc. and then through basement floor drains (connected to the sewer) • Interconnections between the road storm and combined sewer systems • Downstream creek and/or trunk sewer water levels • Grease build-up and/or blockages. Potential Basement Flooding Factors
  • 10. Typical Sewer System Configuration Case 1 – Combined Sewer Note: Typical connections shown, however, private drainage systems can be more complex and each one is unique. For example, there could be other combinations of connections shown.
  • 11. Typical Sewer System Configuration Case 2 – Partially Separated Sewer Note: Typical connections shown, however, private drainage systems can be more complex and each one is unique. For example, there could be interconnection between the combined/sanitary and storm systems or other combinations of connections shown.
  • 12. Typical Sewer System Configuration Case 3 – Separated Sewer – Isolated System Note: Typical connections shown, however, private drainage systems can be more complex and each one is unique. For example, there could be interconnection between the sanitary and storm systems or other combinations of connections shown.
  • 13. Methods for Reducing Basement Flooding and Improving Water Quality Source control measures involve managing stormwater where it originates (roofs, roads, driveways), before it enters the City’s sewer pipes. Source Controls Conveyance Controls End-of-Pipe Controls Conveyance control measures help to control stormwater as it travels along the drainage system (in pipes or along the road). End-of-pipe control measures control stormwater just before it is discharged to a watercourse (stream, river, or lake), or control combined sewer overflow discharge so that it can be treated or re-released back into the combined sewer system for treatment at the wastewater plant.
  • 14. Potential Solutions SOURCE CONTROLS Rain Barrels Rain Gardens Tree Planting Residents can help reduce runoff – the water that flows from hard surfaces into the sewer system. Naturalizing your property lowers the risk of basement flooding and contributes to improving stormwater runoff quality. Downspout Disconnection Reduce ToxinsPermeable Paving • Eliminate pesticide/fertilizer use • Do not let household chemicals such as paint, oil, grease, salt, soap, etc. wash to the storm sewer • Pick-up pet waste Soakaway Pits Green Roofs
  • 15. Potential Solutions SOURCE CONTROLS Replace Perforated Maintenance Hole Covers Additional source control options: • Sewer Maintenance and Rehabilitation Involves: • CCTV, smoke/dye tests, sewer cleaning, relining, and repair • Street sweeping, seasonal leaf pick-up, catchbasin vacuum cleanouts Surface Flow Path Diversion Pervious Pavement These measures can also help reduce the amount of runoff entering the sewer system. Sealing Maintenance Hole Covers
  • 16. Potential Solutions CONVEYANCE CONTROLS Description • At existing combined sewer overflow locations, either to a storm sewer or the natural environment, adjust or remove the structure to reduce discharge during extreme events What Does it Involve? • Redesign of underground structures such as interconnecting pipes and weirs, to reduce or eliminate overflow Description • An engineered pipe system that encourages everyday rainfall to be infiltrated back into the groundwater table before running down the storm sewer pipe What Does it Involve? • Used where a storm sewer is already being replaced for flood protection, an additional underground gravel trench and perforated piping system is connected to encourage infiltration Exfiltration/Pervious Pipe Systems (Improve Stormwater Runoff Quality) Combined Sewer Overflow Modifications (Improve Water Quality) http://www.hkywater.org/departments/wastewater/combined-sewer-system http://www.civil.ryerson.ca/urban/techno/stormwater/source/10-2-8/index.html
  • 17. Potential Solutions CONVEYANCE CONTROLS Description • A vegetated depression and underground trench designed to filter stormwater runoff to remove pollutants and promote infiltration/evapotranspiration What Does it Involve? • Diversion of small overland or piped drainage areas for small storm events • Excavation of a trench with specific soil mixture, surface plantings and underdrain within an open area such as a boulevard or park Description • In place of concrete curb and gutter, replace with grassed ditches and a series of culverts which slows surface water down and encourages infiltration/filtration What Does it Involve? • Removal of curb and gutter (if existing) and reconstruction of roadway and boulevard • Installation of shallow culvert pipes Alternate Road Cross-Sections (Ditches) (Improve Stormwater Runoff Quality) Local Bioretention Filters (Improve Stormwater Runoff Quality)
  • 18. Potential Solutions CONVEYANCE CONTROLS Increase Number of Catchbasins (Controls Basement Flooding) Overland (Major System) Control (Controls Basement Flooding) Description • The diversion of surface drainage away from low lying areas that have no direct outlet to reduce surface ponding depths What Does it Involve? • Addition of “speed bump” or “curb cut” to redirect overland flow to strategic locations • Interception of road or boulevard flows to dedicated major system sewer with large inlet grate or “curb drain” Description • Where the storm sewer has existing capacity, add more catchbasins to capture more flow from the surface What Does it Involve? • Minor street excavation for installation of new catchbasin(s) and connection to storm sewer • Curb replacement and road restoration
  • 19. Potential Solutions CONVEYANCE CONTROLS Parking Lot Retrofit for Surface Storage (Controls Basement Flooding) Catchbasin Inlet Controls (Controls Basement Flooding) Description • Installation of inlet control devices (ICDs) on catchbasins to limit release into the storm sewer system to control back-up (surcharge) What Does it Involve? • A plastic or metal plate / device installed inside the catchbasin outlet (not visible from surface) • Minimal effort and time to install • Keeps more water on the surface Description • Installation of ICDs in parking lots to store stormwater on surface • Installation of roof drain controls to store stormwater on large flat roof areas What Does it Involve? • Retrofit of City-Owned property (where physically possible)
  • 20. Potential Solutions CONVEYANCE CONTROLS Adding New Sewers (Twinning) (Controls Basement Flooding) Replacement of Existing Storm, Combined and/or Sanitary Sewers (Controls Basement Flooding) Description • Increase the size of the sewer pipe by replacing the old sewer with a larger pipe What Does it Involve? • Road excavation within City limits • Removal of old sewer and structures (manholes & catchbasins) and disconnection of sewer service line(s) • Placement of new sewer, reconnection of sewer service line(s) and restoration of road and boulevard Description • Increase the capacity of the sewer system by adding another sewer pipe in addition to the existing pipe What Does it Involve? • Road excavation within City limits • Replacement of old structures (manholes & catchbasins) and reconnection of sewer service line(s), if necessary • Placement of new sewer, reconnection of sewer service line(s) and restoration of road and boulevard
  • 21. Potential Solutions END-OF-PIPE CONTROLS Wet Pond/Wetland (Controls Basement Flooding and Can Improve Runoff Quality) Dry Pond (Controls Basement Flooding) Description • An engineered surface depression that controls the quantity of inflowing stormwater through storage and slow release to the receiving system • Typically fills with water during extreme storm events and drains within 24 to 48 hours or less What Does it Involve? • Excavation and shaping of a suitable open space • Addition of inlet/outlet structures • Restoration and landscaping; signage Description • An engineered pond or wetland with a permanent water surface that controls the quantity and quality of inflowing stormwater through storage and slow release to the receiving system What Does it Involve? • Excavation and shaping of a suitable open space • Addition of inlet/outlet structures • Restoration and landscaping (aquatic and side-slope) • Infrequent maintenance (sediment removal)
  • 22. Potential Solutions END-OF-PIPE CONTROLS Oil & Grit Separator (Improves Stormwater Runoff Quality) Underground Storage Tank (Controls Basement Flooding & Can Improve Water Quality) Description • An underground tank or pipe that controls the rate of inflowing sanitary or stormwater through temporary detention and slow release to the receiving sewer, reducing the potential for flooding What Does it Involve? • Excavation and construction of tank or pipe, including inlet and outlet structures • Infrequent maintenance (monitoring, clean-out) Description • An underground separation tank that takes the place of a conventional manhole and provides a measure of treatment for small drainage areas What Does it Involve? • Similar to a manhole, minor street excavation for installation of structure • Road restoration • Annual maintenance (vacuum clean-out)
  • 23. The following criteria are suggested for evaluating each of the options and identifying the recommended solutions: Evaluation of Solutions Natural Environment • Potential Impact on Terrestrial Systems (Vegetation, Trees, Wildlife) • Potential Impact on Aquatic Systems (Aquatic Life and Vegetation, Surface Water Quality, Groundwater, Receiving Watercourses) • Soil and Geology Socio-Cultural • Effect on Urban Greenspace (Parks, Ravines, Open Spaces) • Disruption to Existing Community During Construction (Traffic, Noise) • Disruption to Existing Community Post Construction (Visual Impact, Odour, Safety) • Archaeology and First Nations Technical • Feasibility of Control Measure (Available Space, Accessibility, Constructability) • Ability to Improve Water Quality • Impact on Upstream, Downstream and Surrounding Areas • Operations & Maintenance Requirements • Basement Flooding Prevention Effectiveness Economic • Capital Cost • Operating and Maintenance Cost
  • 24. Thank You for Attending We welcome your feedback. Please fill out the comment sheet provided. Following this PIC, the study team will review and consider your comments in the evaluation of alternative solutions. The next PIC is expected to be held in late 2016 to present the recommended solutions. Contact Information For more information on this study, to provide your comments, or to be placed on the project mailing list, please contact: Mae Lee, Public Consultation Unit 55 John Street, Metro Hall, 19th Floor, Toronto, ON M5V 3C6 Phone: 416-392-8210, E-mail: rmlee@toronto.ca Website: http://www.toronto.ca/bfea