JUNE 14, 2017
AGENDA
2
1. INTRODUCTION
NEW ATTENDEES
3
Olaf de Kruijff MSc student UT at Fokker Services
Nina Rooijakkers BSc student TU/e at Defense
1. Nils:
 Second paper completed and submitted (consolidation)
 Third paper completed and submitted (dual sourcing)
 Research on fourth paper just started (extensions of dual
sourcing)
2. Laura
 Two conference papers finished, now extend to journal
papers
3. Bram:
 First paper completed and submitted
 Second paper almost completed
 First thoughts on third research topic
2. ACTIVITIES IN THE PAST HALF YEAR
RESEARCH ACTIVITIES (FURTHER UPDATES BY NILS, LAURA AND BRAM,)
4
1. MSc project on life cycle costs with AM at Thales (Michel
Reimert, UT): completed, on the agenda today
2. MSc project at Fokker Services on obsolescence problems
in the end-of-life phase (Jorn Jansman, TU/e): completed
3. MSc project at Fokker Services on AM for production tools
(Olaf de Kruijf, UT): started
4. MSc project at NLR on correlation between external
conditions in AM and final product quality (Fabian Plura,
UT): in progress
5. BSc projects on AM at MinDef (Defauwes & Hoek, NLDA),
on the agenda today
6. BSc project at Army on selecting parts for on-site additive
manufacturing, Nina Rooijakkers (TU/e)
2. ACTIVITIES IN THE PAST HALF YEAR
STUDENT ACTIVITIES
5
1. Presentation at Maintenance day, February 2017 (Knofius)
2. Presentation at Maintenance day, February 2017 (Westerweel)
3. Presentation at University of Twente - EWI, March 2017 (Basten)
4. Presentation at Young SLF, April 2017 (Westerweel)
5. Presentation at POM Conference, May 2017 (Basten)
6. Research period at Universidad Carlos III de Madrid, Spain, March
– June 2017 (Cordova)
7. Presentation at “VI Congreso Nacional de Pulvimetalurgia y I
Congreso Iberoamericano de Pulvimetalurgia” in Ciudad Real,
Spain, June 2017 (Cordova)
2. ACTIVITIES IN THE PAST HALF YEAR
EXTERNAL MEETINGS / PRESENTATIONS (1)
6
7
 Selection of parts to be printed
 New student projects
 Input of industry in project meetings (project partners,
external organizations)
ORGANIZATIONAL ISSUES
8
 In kind contribution by NLR covers 60 SLM machine
hours for printing samples; capacity for small samples
in WP-1: 20-30 hours
 Suggested way of working:
 Companies request cases to be printed, with motivation
 NLR assesses technological feasibility, resource usage
 Working group (Tiedo, Rob, Matthieu) gives an advice,
companies may object within some period (2-3 weeks?)
 Suggested criteria:
 Useful for research of at least WP1, and preferably also
WP2 and/or WP3
 Useful for at least 2 other participants (e.g. NLR + user)
 Indication of positive business case (rough LCC analysis)
SELECTION OF SAMPLES TO BE PRINTED
DISCUSSION LAST MEETING (NOVEMBER 2016):
9
 Single request received
 Printing part (which one?) for Scania trucks, provided that
Scania gives permission
 Printing capacity required is not clear yet
 Usefulness for the work packages and other participants
is not clear yet
 Other needs by other companies?
SELECTION OF SAMPLES TO BE PRINTED
UPDATE
10
 Opportunities for additional (BSc, MSc) projects
FOLLOW-UP (1)
11
Partner Student project Researcher
Thales No follow-up project yet -
Fokker Services MSc project (Olaf de Kruijff),
ongoing
Nils
Defense, Army MSc at OU (Jelmar de Boer,
autumn 2017)
??
Defense, Air Force /
Navy / Army
BSc (possibly, jan-mar 2018) Tiedo
NLR TBD Laura
 How to find other interesting business cases?
 What kind of model support is needed?
 User input in the plenary meetings, e.g.:
 Company presentations on their ongoing and planned
activities in the field of AM?
 Invitation of external companies (Dimanex, Norwegian
Defense, …)?
FOLLOW-UP (2)
12
 Ongoing activities in the field of AM at:
 Fokker Services
 Thales
 Defense
 Additive Industries
 NLR
 UT: Opening of Rapid Prototyping Lab today, see
https://www.utwente.nl/en/rpl/#welcome-to-the-rplab
(part of TEAM: Twente centre of Excellence in Additive
Manufacturing)
BRIEF UPDATE OF PROJECT PARTNERS
13
 Timing: November 2017?
 Location: ?? (UT? Dinalog?)
NEXT MEETING
14
ANY OTHER MATTER?
15
AND NOW…
INFORMAL DINNER
16
TU/e
K.08

More Related Content

Similar to 170614 Project Progress Update (Matthieu van der Heijden)

UK Foresight - a view from 2005
UK Foresight - a view from 2005UK Foresight - a view from 2005
UK Foresight - a view from 2005Ian Miles
 
Research Infrastructures Draft Work Programme 2016-2017
Research Infrastructures Draft Work Programme 2016-2017Research Infrastructures Draft Work Programme 2016-2017
Research Infrastructures Draft Work Programme 2016-2017Innovate UK
 
Chamada cn pq_snsf_29_2018_anexo_1
Chamada cn pq_snsf_29_2018_anexo_1Chamada cn pq_snsf_29_2018_anexo_1
Chamada cn pq_snsf_29_2018_anexo_1Paula Rafahela Silva
 
Preparation material clue expert workshop
Preparation material clue expert workshopPreparation material clue expert workshop
Preparation material clue expert workshopOlena Tatarchenko
 
UKOLN activities on research information management
UKOLN activities on research information managementUKOLN activities on research information management
UKOLN activities on research information managementMichael Day
 
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...SSHOC
 
4th Technical Meeting - WP8
4th Technical Meeting - WP84th Technical Meeting - WP8
4th Technical Meeting - WP8SLOPE Project
 
Introducing the UGC Networking Resource Centre for Materials (NRC-M)
Introducing the UGC Networking Resource Centre for Materials (NRC-M)Introducing the UGC Networking Resource Centre for Materials (NRC-M)
Introducing the UGC Networking Resource Centre for Materials (NRC-M)T.A. Abinandanan
 
3rd Technical Meeting - WP8
3rd Technical Meeting - WP83rd Technical Meeting - WP8
3rd Technical Meeting - WP8SLOPE Project
 
Sifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_finalSifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_finalJoao Bosco Jares
 
Exploiting the Added Value of Climate Services - From Climate Service Concept...
Exploiting the Added Value of Climate Services - From Climate Service Concept...Exploiting the Added Value of Climate Services - From Climate Service Concept...
Exploiting the Added Value of Climate Services - From Climate Service Concept...Environmental Protection Agency, Ireland
 
E-book of LSSGB Project History
E-book of LSSGB Project HistoryE-book of LSSGB Project History
E-book of LSSGB Project HistoryESTIEM
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0Mandar Trivedi
 
SMARCOS Newsletter 2nd Issue
SMARCOS Newsletter 2nd IssueSMARCOS Newsletter 2nd Issue
SMARCOS Newsletter 2nd IssueSmarcos Eu
 

Similar to 170614 Project Progress Update (Matthieu van der Heijden) (20)

UK Foresight - a view from 2005
UK Foresight - a view from 2005UK Foresight - a view from 2005
UK Foresight - a view from 2005
 
Faculty science ngameni
Faculty science ngameniFaculty science ngameni
Faculty science ngameni
 
Research Infrastructures Draft Work Programme 2016-2017
Research Infrastructures Draft Work Programme 2016-2017Research Infrastructures Draft Work Programme 2016-2017
Research Infrastructures Draft Work Programme 2016-2017
 
Chamada cn pq_snsf_29_2018_anexo_1
Chamada cn pq_snsf_29_2018_anexo_1Chamada cn pq_snsf_29_2018_anexo_1
Chamada cn pq_snsf_29_2018_anexo_1
 
Preparation material clue expert workshop
Preparation material clue expert workshopPreparation material clue expert workshop
Preparation material clue expert workshop
 
Still ispim 2017
Still ispim 2017Still ispim 2017
Still ispim 2017
 
Sonex 2nd DL.org workshop ECDL2010
Sonex 2nd DL.org workshop ECDL2010Sonex 2nd DL.org workshop ECDL2010
Sonex 2nd DL.org workshop ECDL2010
 
UKOLN activities on research information management
UKOLN activities on research information managementUKOLN activities on research information management
UKOLN activities on research information management
 
Project Overview
Project OverviewProject Overview
Project Overview
 
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...
Sshoc Kick off meeting - Work Package 2 presentation - Communication, dissemi...
 
4th Technical Meeting - WP8
4th Technical Meeting - WP84th Technical Meeting - WP8
4th Technical Meeting - WP8
 
Design_Learn_26112010
Design_Learn_26112010Design_Learn_26112010
Design_Learn_26112010
 
VALS WP7 – Dissemina1on Status at Bolton meeting
VALS WP7 – Dissemina1on Status at Bolton meetingVALS WP7 – Dissemina1on Status at Bolton meeting
VALS WP7 – Dissemina1on Status at Bolton meeting
 
Introducing the UGC Networking Resource Centre for Materials (NRC-M)
Introducing the UGC Networking Resource Centre for Materials (NRC-M)Introducing the UGC Networking Resource Centre for Materials (NRC-M)
Introducing the UGC Networking Resource Centre for Materials (NRC-M)
 
3rd Technical Meeting - WP8
3rd Technical Meeting - WP83rd Technical Meeting - WP8
3rd Technical Meeting - WP8
 
Sifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_finalSifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_final
 
Exploiting the Added Value of Climate Services - From Climate Service Concept...
Exploiting the Added Value of Climate Services - From Climate Service Concept...Exploiting the Added Value of Climate Services - From Climate Service Concept...
Exploiting the Added Value of Climate Services - From Climate Service Concept...
 
E-book of LSSGB Project History
E-book of LSSGB Project HistoryE-book of LSSGB Project History
E-book of LSSGB Project History
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 
SMARCOS Newsletter 2nd Issue
SMARCOS Newsletter 2nd IssueSMARCOS Newsletter 2nd Issue
SMARCOS Newsletter 2nd Issue
 

More from SINTAS

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D PrintingSINTAS
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AMSINTAS
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote LocationsSINTAS
 
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service LogisticsSINTAS
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussionSINTAS
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)SINTAS
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)SINTAS
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)SINTAS
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)SINTAS
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)SINTAS
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)SINTAS
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)SINTAS
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)SINTAS
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)SINTAS
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)SINTAS
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)SINTAS
 
161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)SINTAS
 
161130 Progress Update WP1 (Laura Cordova Gonzalez)
161130 Progress Update WP1 (Laura Cordova Gonzalez)161130 Progress Update WP1 (Laura Cordova Gonzalez)
161130 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 

More from SINTAS (20)

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
 
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussion
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)
 
161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)
 
161130 Progress Update WP1 (Laura Cordova Gonzalez)
161130 Progress Update WP1 (Laura Cordova Gonzalez)161130 Progress Update WP1 (Laura Cordova Gonzalez)
161130 Progress Update WP1 (Laura Cordova Gonzalez)
 

Recently uploaded

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Product School
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesBhaskar Mitra
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsVlad Stirbu
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsPaul Groth
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...Product School
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...Product School
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsDorra BARTAGUIZ
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backElena Simperl
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform EngineeringJemma Hussein Allen
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaRTTS
 
КАТЕРИНА АБЗЯТОВА «Ефективне планування тестування ключові аспекти та практ...
КАТЕРИНА АБЗЯТОВА  «Ефективне планування тестування  ключові аспекти та практ...КАТЕРИНА АБЗЯТОВА  «Ефективне планування тестування  ключові аспекти та практ...
КАТЕРИНА АБЗЯТОВА «Ефективне планування тестування ключові аспекти та практ...QADay
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...Product School
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Product School
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlPeter Udo Diehl
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...Sri Ambati
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...Product School
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Search and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical FuturesSearch and Society: Reimagining Information Access for Radical Futures
Search and Society: Reimagining Information Access for Radical Futures
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
 
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
From Siloed Products to Connected Ecosystem: Building a Sustainable and Scala...
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
КАТЕРИНА АБЗЯТОВА «Ефективне планування тестування ключові аспекти та практ...
КАТЕРИНА АБЗЯТОВА  «Ефективне планування тестування  ключові аспекти та практ...КАТЕРИНА АБЗЯТОВА  «Ефективне планування тестування  ключові аспекти та практ...
КАТЕРИНА АБЗЯТОВА «Ефективне планування тестування ключові аспекти та практ...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...Mission to Decommission: Importance of Decommissioning Products to Increase E...
Mission to Decommission: Importance of Decommissioning Products to Increase E...
 
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo DiehlFuture Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
Future Visions: Predictions to Guide and Time Tech Innovation, Peter Udo Diehl
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 

170614 Project Progress Update (Matthieu van der Heijden)

  • 1. SUSTAINABILITY IMPACT OF NEW TECHNOLOGY ON AFTER-SALES SERVICE SUPPLY CHAINS (SINTAS) JUNE 14, 2017
  • 3. 1. INTRODUCTION NEW ATTENDEES 3 Olaf de Kruijff MSc student UT at Fokker Services Nina Rooijakkers BSc student TU/e at Defense
  • 4. 1. Nils:  Second paper completed and submitted (consolidation)  Third paper completed and submitted (dual sourcing)  Research on fourth paper just started (extensions of dual sourcing) 2. Laura  Two conference papers finished, now extend to journal papers 3. Bram:  First paper completed and submitted  Second paper almost completed  First thoughts on third research topic 2. ACTIVITIES IN THE PAST HALF YEAR RESEARCH ACTIVITIES (FURTHER UPDATES BY NILS, LAURA AND BRAM,) 4
  • 5. 1. MSc project on life cycle costs with AM at Thales (Michel Reimert, UT): completed, on the agenda today 2. MSc project at Fokker Services on obsolescence problems in the end-of-life phase (Jorn Jansman, TU/e): completed 3. MSc project at Fokker Services on AM for production tools (Olaf de Kruijf, UT): started 4. MSc project at NLR on correlation between external conditions in AM and final product quality (Fabian Plura, UT): in progress 5. BSc projects on AM at MinDef (Defauwes & Hoek, NLDA), on the agenda today 6. BSc project at Army on selecting parts for on-site additive manufacturing, Nina Rooijakkers (TU/e) 2. ACTIVITIES IN THE PAST HALF YEAR STUDENT ACTIVITIES 5
  • 6. 1. Presentation at Maintenance day, February 2017 (Knofius) 2. Presentation at Maintenance day, February 2017 (Westerweel) 3. Presentation at University of Twente - EWI, March 2017 (Basten) 4. Presentation at Young SLF, April 2017 (Westerweel) 5. Presentation at POM Conference, May 2017 (Basten) 6. Research period at Universidad Carlos III de Madrid, Spain, March – June 2017 (Cordova) 7. Presentation at “VI Congreso Nacional de Pulvimetalurgia y I Congreso Iberoamericano de Pulvimetalurgia” in Ciudad Real, Spain, June 2017 (Cordova) 2. ACTIVITIES IN THE PAST HALF YEAR EXTERNAL MEETINGS / PRESENTATIONS (1) 6
  • 7. 7
  • 8.  Selection of parts to be printed  New student projects  Input of industry in project meetings (project partners, external organizations) ORGANIZATIONAL ISSUES 8
  • 9.  In kind contribution by NLR covers 60 SLM machine hours for printing samples; capacity for small samples in WP-1: 20-30 hours  Suggested way of working:  Companies request cases to be printed, with motivation  NLR assesses technological feasibility, resource usage  Working group (Tiedo, Rob, Matthieu) gives an advice, companies may object within some period (2-3 weeks?)  Suggested criteria:  Useful for research of at least WP1, and preferably also WP2 and/or WP3  Useful for at least 2 other participants (e.g. NLR + user)  Indication of positive business case (rough LCC analysis) SELECTION OF SAMPLES TO BE PRINTED DISCUSSION LAST MEETING (NOVEMBER 2016): 9
  • 10.  Single request received  Printing part (which one?) for Scania trucks, provided that Scania gives permission  Printing capacity required is not clear yet  Usefulness for the work packages and other participants is not clear yet  Other needs by other companies? SELECTION OF SAMPLES TO BE PRINTED UPDATE 10
  • 11.  Opportunities for additional (BSc, MSc) projects FOLLOW-UP (1) 11 Partner Student project Researcher Thales No follow-up project yet - Fokker Services MSc project (Olaf de Kruijff), ongoing Nils Defense, Army MSc at OU (Jelmar de Boer, autumn 2017) ?? Defense, Air Force / Navy / Army BSc (possibly, jan-mar 2018) Tiedo NLR TBD Laura
  • 12.  How to find other interesting business cases?  What kind of model support is needed?  User input in the plenary meetings, e.g.:  Company presentations on their ongoing and planned activities in the field of AM?  Invitation of external companies (Dimanex, Norwegian Defense, …)? FOLLOW-UP (2) 12
  • 13.  Ongoing activities in the field of AM at:  Fokker Services  Thales  Defense  Additive Industries  NLR  UT: Opening of Rapid Prototyping Lab today, see https://www.utwente.nl/en/rpl/#welcome-to-the-rplab (part of TEAM: Twente centre of Excellence in Additive Manufacturing) BRIEF UPDATE OF PROJECT PARTNERS 13
  • 14.  Timing: November 2017?  Location: ?? (UT? Dinalog?) NEXT MEETING 14