Copyright © Siemens AG 2008. All rights reserved.
Copyright © Siemens AG 2008. All rights reserved.
Siemens Power Academy TD
Using numerical machine and motor protection
Paralleling Devices
7VE61 & 7VE63
Overview, Features, connections
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 2
Damaged
stator
winding
Wrong synchronisation leads to large damages
Why the High Reliability Requirements?
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 3
M
M
G
Start
Stop
Parameter
group
selection
.
.
.
Paralleling device
7VE6
System
u1 f1
u2 f2
ON command
Balancing commands
Speed
higher-lower
Voltage
higher-lower
Synchronisation of Generators
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 4
Synchro-
check
Paralleling
principle CLOSE
CLOSE
Both measuring principle in one device
The CLOSE command results of a
2 out of 2 decision
Paralleling
principle 1
Paralleling
principle 2
Release CLOSE
CLOSE 1 CLOSE 2
High Reliability through dual channel design
7VE 61
7VE 63
11/2-channel
2-channel
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 5
Paralleling connection 1 Paralleling connection 2
U = U2 - U1
+
-
f = f2 - f1
 = 2-1
Note:
At the synchronoscope is
the rotation vice versa
+
-
CB
&
U
f
=LB
&
U
f
t=tCB
Para1  Para2
CLOSE
tCB
Para1  Para2
Dual- channel design
Close command forming of the 7VE63 at asynchronous networks
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 6
Dual Channel Design and Additional Supervision
Functions Offers a High Safety
ADC 1
U1
U2
U1(2-3)
ADC 2
U1
U2
U2(2-3)
channel 1
channel 2
U1
U2
G
Measuring
principle 1
Measuring
principle 2
control 1
control 2
C
C
CLOSE 1
CLOSE 2
Input circuit
supervision
- Sampling values
- data continuity
- phase rotation
CLOSE
supervision
Running time
between
Close 1 and 2
EIN1 und EIN2
Supervision of
the CLOSE
command
Supervision
transistors
+ relay coil
CB-Coil
+
-
C
C
(Side 1)
(Side 2)
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 7
Switching of asynchronous power systems
Check of U, f, 
ON command under consideration of CB-closing time
Switching of synchronous power systems
Check of U, f,  (f  0)
ON command, if all conditions are fulfilled over the adjusted time
Synchrocheck
Release, if U, f,  are fulfilled
Switching at dead bus or dead line
Supervision of voltages U1 and U2
High security at three phase connection
(Multiple supervision)
Function Overview 7VE6
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 8
Influence of the voltage and frequency balancing can be clear seen
The Regulation Behaviour can be optimized with RMS
Fault Record
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 9
Ua
7VE6
L1 L2 L3
Q1
Q2
Q3
Q4
Q5
Q6
Q7
Q8
Q9
Q10
Q11
Q12
Ub
Uc
Ud
Ue
Uf
Side 1 (U1)
Side 2 (U2)
Standard Connection (3phase VT)
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 10
Connection Example for a Medium Sized Generator
with 7VE61
Ua
7VE61
L1 L2 L3
Q1
Q2
Q3
Q4
Q5
Q6
Q7
Q8
Q9
Q10
Q11
Q12
Ub
Uc
Ud
Ue
Uf
U1
U2
BI 6
BI 5
BI 4
BI 3
BI 2
BI 1
F 5
F 6
F 7
F 8
F 9
F 10
R 17
R 18
R 1
R 2
R 3
R 4
R 1
R 2
R 3
R 4
R 7
R 6
R 9
R 8
Live-
contact
R5
F 3
R 5
F 4
R 6
R 7
R 8
R 9
R 10
R 11
R 12
R 13
R 14
R 15
R 16
Voltage m.c.b.
-
+
Start
Stop
Selection Sync-group 1
Paralleling decice failure
Synchronisation is running
Synchronisation is blocked
Synchronisation ON-command
Balancing command for voltage regulator
Voltage higher
Voltage lower
Balancing command frequenz-(speed)
reglulator
Frequency higher
Frequency lower
+
-
Release U1< U2>
+
-
U2
U1
Setting in the matrix
"L" (Low active)
Energy Sector
Copyright
©
Siemens
AG
2008.
All
rights
reserved.
Siemens Power Academy TD
15 Numerical paralleling device 7VE6
Using numerical machine and motor protection
Version: C 3_Page 11
 High reliability of the CLOSE command forming through the TWO out
of TWO decision
 11/2- channel design at the 7VE61 (Sync-check + Paralleling
function)
 2-channel design at the 7VE63 (two different paralleling
principles)
 The reliability will be increased with additional supervision principles
 Input channel supervision (samples, jumps, phase rotation)
 Internal synchronous supervision of the two different principles
provide a high security against 2 different devices
 Two channel supervision of the Close relays
Quality Characteristics

15_C_3_Numerical paralleling device_7VE6.ppt

  • 1.
    Copyright © SiemensAG 2008. All rights reserved. Copyright © Siemens AG 2008. All rights reserved. Siemens Power Academy TD Using numerical machine and motor protection Paralleling Devices 7VE61 & 7VE63 Overview, Features, connections
  • 2.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 2 Damaged stator winding Wrong synchronisation leads to large damages Why the High Reliability Requirements?
  • 3.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 3 M M G Start Stop Parameter group selection . . . Paralleling device 7VE6 System u1 f1 u2 f2 ON command Balancing commands Speed higher-lower Voltage higher-lower Synchronisation of Generators
  • 4.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 4 Synchro- check Paralleling principle CLOSE CLOSE Both measuring principle in one device The CLOSE command results of a 2 out of 2 decision Paralleling principle 1 Paralleling principle 2 Release CLOSE CLOSE 1 CLOSE 2 High Reliability through dual channel design 7VE 61 7VE 63 11/2-channel 2-channel
  • 5.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 5 Paralleling connection 1 Paralleling connection 2 U = U2 - U1 + - f = f2 - f1  = 2-1 Note: At the synchronoscope is the rotation vice versa + - CB & U f =LB & U f t=tCB Para1  Para2 CLOSE tCB Para1  Para2 Dual- channel design Close command forming of the 7VE63 at asynchronous networks
  • 6.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 6 Dual Channel Design and Additional Supervision Functions Offers a High Safety ADC 1 U1 U2 U1(2-3) ADC 2 U1 U2 U2(2-3) channel 1 channel 2 U1 U2 G Measuring principle 1 Measuring principle 2 control 1 control 2 C C CLOSE 1 CLOSE 2 Input circuit supervision - Sampling values - data continuity - phase rotation CLOSE supervision Running time between Close 1 and 2 EIN1 und EIN2 Supervision of the CLOSE command Supervision transistors + relay coil CB-Coil + - C C (Side 1) (Side 2)
  • 7.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 7 Switching of asynchronous power systems Check of U, f,  ON command under consideration of CB-closing time Switching of synchronous power systems Check of U, f,  (f  0) ON command, if all conditions are fulfilled over the adjusted time Synchrocheck Release, if U, f,  are fulfilled Switching at dead bus or dead line Supervision of voltages U1 and U2 High security at three phase connection (Multiple supervision) Function Overview 7VE6
  • 8.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 8 Influence of the voltage and frequency balancing can be clear seen The Regulation Behaviour can be optimized with RMS Fault Record
  • 9.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 9 Ua 7VE6 L1 L2 L3 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Ub Uc Ud Ue Uf Side 1 (U1) Side 2 (U2) Standard Connection (3phase VT)
  • 10.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 10 Connection Example for a Medium Sized Generator with 7VE61 Ua 7VE61 L1 L2 L3 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Ub Uc Ud Ue Uf U1 U2 BI 6 BI 5 BI 4 BI 3 BI 2 BI 1 F 5 F 6 F 7 F 8 F 9 F 10 R 17 R 18 R 1 R 2 R 3 R 4 R 1 R 2 R 3 R 4 R 7 R 6 R 9 R 8 Live- contact R5 F 3 R 5 F 4 R 6 R 7 R 8 R 9 R 10 R 11 R 12 R 13 R 14 R 15 R 16 Voltage m.c.b. - + Start Stop Selection Sync-group 1 Paralleling decice failure Synchronisation is running Synchronisation is blocked Synchronisation ON-command Balancing command for voltage regulator Voltage higher Voltage lower Balancing command frequenz-(speed) reglulator Frequency higher Frequency lower + - Release U1< U2> + - U2 U1 Setting in the matrix "L" (Low active)
  • 11.
    Energy Sector Copyright © Siemens AG 2008. All rights reserved. Siemens PowerAcademy TD 15 Numerical paralleling device 7VE6 Using numerical machine and motor protection Version: C 3_Page 11  High reliability of the CLOSE command forming through the TWO out of TWO decision  11/2- channel design at the 7VE61 (Sync-check + Paralleling function)  2-channel design at the 7VE63 (two different paralleling principles)  The reliability will be increased with additional supervision principles  Input channel supervision (samples, jumps, phase rotation)  Internal synchronous supervision of the two different principles provide a high security against 2 different devices  Two channel supervision of the Close relays Quality Characteristics