GROUND FLOOR PLAN
02-03-2015
1 : 100
STARTING DATE
DATE
SCALE
DRAWN BY
CHECKED BY
MEASURED BY
DRAWING NO. SHEET NO.PROJECT TITLE
19-01-2015
KOH JING HAO & SANJEH KUMAR RAMAN
PENANG GROUP
PENANG GROUP
DRAWING TITLE
LHCO. 003
3
40
LEGENDS :
1 PAVEMENT
2 FIVE FOOT WALKWAY
3 HALL 1
4 AIR WELL 1
5 HALL 2
6 AIR WELL 2
7 TOILET 1
8 HALL 3
9 HALL 4
10 AIR WELL 3
11 INACCESSIBLE STAIRCASE
12 UTILITIES ROOM
13 STOREROOM
14 TOILET 2
15 INACCESSIBLE ROOM
ARC1215
METHODS OF DOCUMENTATION AND
MEASURED DRAWINGS
LIAN HUAT COMPANY, 140 LEBUH
CARNARVON, GEORGETOWN
PENANG
LIAN HUAT COMPANY
A1
1
1
FFL : 0.000
SPACE NO.
FINISH FLOOR LEVEL
TIMBER
DRAWING SHEET NO.
DRAWING NAME
TILES FINISHING
TD1
40

3 finalised ground & first floor plans ready plot first floor plan

  • 1.
    GROUND FLOOR PLAN 02-03-2015 1: 100 STARTING DATE DATE SCALE DRAWN BY CHECKED BY MEASURED BY DRAWING NO. SHEET NO.PROJECT TITLE 19-01-2015 KOH JING HAO & SANJEH KUMAR RAMAN PENANG GROUP PENANG GROUP DRAWING TITLE LHCO. 003 3 40 LEGENDS : 1 PAVEMENT 2 FIVE FOOT WALKWAY 3 HALL 1 4 AIR WELL 1 5 HALL 2 6 AIR WELL 2 7 TOILET 1 8 HALL 3 9 HALL 4 10 AIR WELL 3 11 INACCESSIBLE STAIRCASE 12 UTILITIES ROOM 13 STOREROOM 14 TOILET 2 15 INACCESSIBLE ROOM ARC1215 METHODS OF DOCUMENTATION AND MEASURED DRAWINGS LIAN HUAT COMPANY, 140 LEBUH CARNARVON, GEORGETOWN PENANG LIAN HUAT COMPANY A1 1 1 FFL : 0.000 SPACE NO. FINISH FLOOR LEVEL TIMBER DRAWING SHEET NO. DRAWING NAME TILES FINISHING TD1 40