Facility Renewal Planning Snapshot
QUESTIONS:
• How much should we be spending on facility renewal?
• Are we falling behind what we should be spending?
• Are there significant, Facility Renewal capital expendi-
tures that we have not planned for?
BEST PRACTICES:
The rankings (1-4 with “1” being the simplest and least costly)
show the Facility Renewal planning options available to Facili-
ty Managers:
1. 1-9 Facility Condition Assessment (Quick )
2. Mathematical Model (2% per year or other)
3. ASTM Property Condition Assessment - Used for Financial
Planning— does not include detail engineering assessment. OK
for buildings with “simple” HVAC systems.
4. Detail Survey— Engineering or Architecture study that iden-
tifies replacement cost for each subsystem (i.e. pumps, VAV
CONCEPT:
Buildings wear out over time. It’s a fact. Facility Renewal is not maintenance. Cleaning the carpet, replacing light bulbs and
replacing a $ 78.00 condenser fan motor in a HVAC unit are maintenance expenditures. Replacing the carpet, light fixtures and
HVAC units are capital expenditures because they replace building subsystems. Replacing a light switch, a component (part of a
subsystem) is a maintenance expenditure. Maintenance is an operating expense, while capital expenditures do not hit Facility
Managers operating budget, but are part of the enterprises’ capital expenditures that typically require a year’s notice. Starting
a year after the expenditure, a portion of the capital expenditure “shows up” in the Facility operating budget as depreciation
expense. Deprecation is a financial concept that translates a portion of the capital expenditure into an expense showing a por-
tion of the building being “used up” each year. Depreciation does not necessarily reflect Facility Renewal requirements.
If Facility Renewal expenditures are not planned, they often are misclassified as maintenance expenditures and greatly skew
the maintenance costs per square foot. Buildings in the Private Sector in the U.S. are designed to last 40 years while Public
Buildings typically are generally designed to last 50 years. Building and their subsystems don’t wear out at a steady rate, conse-
quently estimating a 2.5% annual Facility Renewal rate (for corporate facilities) per year over estimates expenditures in the
early years and is inadequate in later years. Each subsystem or component typically has a known Expected Useful Life (EUL)
which can be used to plan future expenditures. In years past, Facility Renewal was often called “Deferred Maintenance” and
Financial staff often refer to these capital expenditures as “Recapitalization.” Facility Managers should have a thorough under-
standing of Facility Renewal so that they can present a case for funding for Facility Renewal planning or expenditures.
Barry Lynch, CFM, SFP, IFMA Fellow, NCARB, MBA, Labarre Associates, Inc. 8385 Rushing Rd. East, Denham Springs, LA 70726
For More Information visit: www.Labarre-inc.com
STRATEGIC INSIGHTS:
• When renovation costs exceed 50% of the replacement value of the building (U.S.) the entire building must be brought up to
the current code. Also consult with your architect regarding the requirement to add sprinklers as a result of a Renewal Pro-
ject. These two items could blow your cost estimates out of the water.
• LEED EB can be use as a format for developing an office renovation master plan—even without a LEED application.
• Look at Computer room loads for all systems. Do a multi-year capital plan for the Computer Room.
• Create a Value Proposition for your Master Facility Renewal Plan— how it supports the Business Plan & Benefits.
NOTES:
Facility Condition Index : FCI = Sum of “Deferred Maintenance” or Facility Renewal divided by the Replacement Value of the
Building. This is useful in ranking buildings within a portfolio of buildings in order to determine priorities.
Functional Obsolescence : Many building subsystems may require an upgrade at the time of replacement. The most common
example is upgrading HVAC controls when the system requires replacement. Don’t forget to write off replaced subsystems!
YOUR PRESENTATION:
• Gather facts, present your best shot given available re-
sources (time and money) - Always give a range
• Are we falling behind what we should be spending?
• Are there significant expected capital expenditures that
are not in the capital budget? (Roof Replacement etc.)

More Related Content

What's hot

Doran Energy Presentation
Doran Energy PresentationDoran Energy Presentation
Doran Energy Presentation
pbdoran
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015
Dr Ezzat Mansour
 
Pms integration and scheduling
Pms integration and schedulingPms integration and scheduling
Pms integration and scheduling
jimpyle
 
Delivering nothing efficiently
Delivering nothing efficientlyDelivering nothing efficiently
Delivering nothing efficiently
Association for Project Management
 
Projects DWDobbs 2016a
Projects DWDobbs 2016aProjects DWDobbs 2016a
Projects DWDobbs 2016a
Dennis Dobbs, P.E., CMRP
 
Thomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPointThomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPoint
JeremyMathews
 
Optimize power and cooling final
Optimize power and cooling finalOptimize power and cooling final
Optimize power and cooling final
Viridity Software
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
WBDC of Florida
 
Integrating Reliability Engineering Concepts
Integrating Reliability Engineering ConceptsIntegrating Reliability Engineering Concepts
Integrating Reliability Engineering Concepts
Dan DeGrendel
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
Anne Patenaude
 
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
energytrustor
 
motograde
motogrademotograde
Energy efficiency services by Greenleaf
Energy efficiency services by GreenleafEnergy efficiency services by Greenleaf
Energy efficiency services by Greenleaf
Mathews Vincent
 
Contract savings job overview
Contract savings job overviewContract savings job overview
Contract savings job overview
sivaprasanth rentala
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16
Eric Bostwick
 
How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)
Glen Alleman
 

What's hot (16)

Doran Energy Presentation
Doran Energy PresentationDoran Energy Presentation
Doran Energy Presentation
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015
 
Pms integration and scheduling
Pms integration and schedulingPms integration and scheduling
Pms integration and scheduling
 
Delivering nothing efficiently
Delivering nothing efficientlyDelivering nothing efficiently
Delivering nothing efficiently
 
Projects DWDobbs 2016a
Projects DWDobbs 2016aProjects DWDobbs 2016a
Projects DWDobbs 2016a
 
Thomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPointThomas & betts LinkedIn PowerPoint
Thomas & betts LinkedIn PowerPoint
 
Optimize power and cooling final
Optimize power and cooling finalOptimize power and cooling final
Optimize power and cooling final
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 
Integrating Reliability Engineering Concepts
Integrating Reliability Engineering ConceptsIntegrating Reliability Engineering Concepts
Integrating Reliability Engineering Concepts
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
 
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
Energy Modeling of Dedicated Outdoor Air System, DOAS, for a Small Commercial...
 
motograde
motogrademotograde
motograde
 
Energy efficiency services by Greenleaf
Energy efficiency services by GreenleafEnergy efficiency services by Greenleaf
Energy efficiency services by Greenleaf
 
Contract savings job overview
Contract savings job overviewContract savings job overview
Contract savings job overview
 
Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16Eric Bostwick's resume 5-10-16
Eric Bostwick's resume 5-10-16
 
How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)How to build a credible performance measurement baseline (v5)
How to build a credible performance measurement baseline (v5)
 

Similar to 1 page facility renewal snapshot

Condition Asessment.ppt
Condition Asessment.pptCondition Asessment.ppt
Condition Asessment.ppt
Bhaskar Jalan
 
Lcca
LccaLcca
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
Rakhi Ghosh
 
Cli Grp
Cli GrpCli Grp
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy Efficiency
Divya Kothari
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
LongBun1
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
Robb Dods
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
Vincent Bui
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
Olivia Wilson
 
Existing Building Commissioning
Existing Building CommissioningExisting Building Commissioning
Existing Building Commissioning
Fishbeck, Thompson, Carr & Huber, Inc.
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
Illinois ASHRAE
 
Capital Assets - Idenitification & Compilatio
Capital Assets - Idenitification & CompilatioCapital Assets - Idenitification & Compilatio
Capital Assets - Idenitification & Compilatio
Rea & Associates
 
Construction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during TurnoverConstruction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during Turnover
Harry George
 
FP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdfFP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdf
amrahmed683029
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
Asa Chan
 
Unit5.pptx
Unit5.pptxUnit5.pptx
Unit5.pptx
Anish874317
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5
Mohammad Faizan
 
Smart Building Automation Summit 2016 - Interview IoannisSpanos
Smart Building Automation Summit 2016 - Interview IoannisSpanosSmart Building Automation Summit 2016 - Interview IoannisSpanos
Smart Building Automation Summit 2016 - Interview IoannisSpanos
Ioannis (Yianni) Spanos
 
Project Summer Internship
Project Summer InternshipProject Summer Internship
Project Summer Internship
Shivam Mishra
 
Building tune ups for commercial buildings
Building tune ups for commercial buildingsBuilding tune ups for commercial buildings
Building tune ups for commercial buildings
BetterBricks
 

Similar to 1 page facility renewal snapshot (20)

Condition Asessment.ppt
Condition Asessment.pptCondition Asessment.ppt
Condition Asessment.ppt
 
Lcca
LccaLcca
Lcca
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
Retrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy EfficiencyRetrofitting Buildings to Achieve Energy Efficiency
Retrofitting Buildings to Achieve Energy Efficiency
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
 
Beyond the bca
Beyond the bcaBeyond the bca
Beyond the bca
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 
Existing Building Commissioning
Existing Building CommissioningExisting Building Commissioning
Existing Building Commissioning
 
Creating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable BuildingCreating a High-Performance and Environmentally Sustainable Building
Creating a High-Performance and Environmentally Sustainable Building
 
Capital Assets - Idenitification & Compilatio
Capital Assets - Idenitification & CompilatioCapital Assets - Idenitification & Compilatio
Capital Assets - Idenitification & Compilatio
 
Construction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during TurnoverConstruction Commissioning Best Practices during Turnover
Construction Commissioning Best Practices during Turnover
 
FP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdfFP - Spring 2021 - Lecture 1 - Introduction.pdf
FP - Spring 2021 - Lecture 1 - Introduction.pdf
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Unit5.pptx
Unit5.pptxUnit5.pptx
Unit5.pptx
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5
 
Smart Building Automation Summit 2016 - Interview IoannisSpanos
Smart Building Automation Summit 2016 - Interview IoannisSpanosSmart Building Automation Summit 2016 - Interview IoannisSpanos
Smart Building Automation Summit 2016 - Interview IoannisSpanos
 
Project Summer Internship
Project Summer InternshipProject Summer Internship
Project Summer Internship
 
Building tune ups for commercial buildings
Building tune ups for commercial buildingsBuilding tune ups for commercial buildings
Building tune ups for commercial buildings
 

Recently uploaded

BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
knox groups real estate
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
Shivgan Infratech
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
olgashriki
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
shuilykhatunnil
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 

Recently uploaded (11)

BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
BEST FARMLAND FOR SALE | FARM PLOTS NEAR BANGALORE | KANAKAPURA | CHICKKABALP...
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Dholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdfDholera Smart City Latest Development Status 2024.pdf
Dholera Smart City Latest Development Status 2024.pdf
 
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
Deed 3754 S Honeysuckle Mesa AZ 85212 owner Shawn Freeman - Pamela Brown Nota...
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!Stark Builders: Where Quality Meets Craftsmanship!
Stark Builders: Where Quality Meets Craftsmanship!
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 

1 page facility renewal snapshot

  • 1. Facility Renewal Planning Snapshot QUESTIONS: • How much should we be spending on facility renewal? • Are we falling behind what we should be spending? • Are there significant, Facility Renewal capital expendi- tures that we have not planned for? BEST PRACTICES: The rankings (1-4 with “1” being the simplest and least costly) show the Facility Renewal planning options available to Facili- ty Managers: 1. 1-9 Facility Condition Assessment (Quick ) 2. Mathematical Model (2% per year or other) 3. ASTM Property Condition Assessment - Used for Financial Planning— does not include detail engineering assessment. OK for buildings with “simple” HVAC systems. 4. Detail Survey— Engineering or Architecture study that iden- tifies replacement cost for each subsystem (i.e. pumps, VAV CONCEPT: Buildings wear out over time. It’s a fact. Facility Renewal is not maintenance. Cleaning the carpet, replacing light bulbs and replacing a $ 78.00 condenser fan motor in a HVAC unit are maintenance expenditures. Replacing the carpet, light fixtures and HVAC units are capital expenditures because they replace building subsystems. Replacing a light switch, a component (part of a subsystem) is a maintenance expenditure. Maintenance is an operating expense, while capital expenditures do not hit Facility Managers operating budget, but are part of the enterprises’ capital expenditures that typically require a year’s notice. Starting a year after the expenditure, a portion of the capital expenditure “shows up” in the Facility operating budget as depreciation expense. Deprecation is a financial concept that translates a portion of the capital expenditure into an expense showing a por- tion of the building being “used up” each year. Depreciation does not necessarily reflect Facility Renewal requirements. If Facility Renewal expenditures are not planned, they often are misclassified as maintenance expenditures and greatly skew the maintenance costs per square foot. Buildings in the Private Sector in the U.S. are designed to last 40 years while Public Buildings typically are generally designed to last 50 years. Building and their subsystems don’t wear out at a steady rate, conse- quently estimating a 2.5% annual Facility Renewal rate (for corporate facilities) per year over estimates expenditures in the early years and is inadequate in later years. Each subsystem or component typically has a known Expected Useful Life (EUL) which can be used to plan future expenditures. In years past, Facility Renewal was often called “Deferred Maintenance” and Financial staff often refer to these capital expenditures as “Recapitalization.” Facility Managers should have a thorough under- standing of Facility Renewal so that they can present a case for funding for Facility Renewal planning or expenditures. Barry Lynch, CFM, SFP, IFMA Fellow, NCARB, MBA, Labarre Associates, Inc. 8385 Rushing Rd. East, Denham Springs, LA 70726 For More Information visit: www.Labarre-inc.com STRATEGIC INSIGHTS: • When renovation costs exceed 50% of the replacement value of the building (U.S.) the entire building must be brought up to the current code. Also consult with your architect regarding the requirement to add sprinklers as a result of a Renewal Pro- ject. These two items could blow your cost estimates out of the water. • LEED EB can be use as a format for developing an office renovation master plan—even without a LEED application. • Look at Computer room loads for all systems. Do a multi-year capital plan for the Computer Room. • Create a Value Proposition for your Master Facility Renewal Plan— how it supports the Business Plan & Benefits. NOTES: Facility Condition Index : FCI = Sum of “Deferred Maintenance” or Facility Renewal divided by the Replacement Value of the Building. This is useful in ranking buildings within a portfolio of buildings in order to determine priorities. Functional Obsolescence : Many building subsystems may require an upgrade at the time of replacement. The most common example is upgrading HVAC controls when the system requires replacement. Don’t forget to write off replaced subsystems! YOUR PRESENTATION: • Gather facts, present your best shot given available re- sources (time and money) - Always give a range • Are we falling behind what we should be spending? • Are there significant expected capital expenditures that are not in the capital budget? (Roof Replacement etc.)