SURVIVING DEFERRED
MAINTENANCE:
Take Back Control of Your Facility
Lisa Cooley, LEED AP, Director Federal Solutions at RSMeans from
The Gordian Group
Phil Waier, PE, Principal Engineer Emeritus
CEUs & CFM® Maintenance Points
You are eligible to receive Continuing Education Units and Certified Facility Manager® maintenance points for
attending sessions at IFMA’s World Workplace.
To receive CEU points, you must add the US$15 processing fee to your registration. (Full Event PLUS!
registration includes the CEU processing fee.)
To Receive 20 CFM Maintenance Points
Record your attendance for the three-day conference on your CFM Recertification Form in CAMP.
At re-certification time, submit your completed CFM Recertification Form.
Managing CEUs:
• Log into the Attendee Service Center. http://tinyurl.com/p6y4fxb
Your log-in information was sent to you when you registered for the conference.
• Click “Start CEU Process” on the left-hand side.
• Click “Start” next to the session you attended.
• Complete the session evaluation.
• Click “Start Test” next to the session.
After passing the test, your certificate will be available for download.
**If you wish to receive CEUs or LUs from other organizations, you must contact those organizations for
instructions on reporting credit hours.
TITLE (MAIN)
Title (sub)
Your Feedback is Valued!
Please take the time to Evaluate
Sessions
Log into the Attendee Service Center
http://tinyurl.com/p6y4fxb
TITLE (MAIN)
Title (sub)
Meet Our Presenters:
Lisa Cooley, LEED AP
Director of Federal Solutions at The Gordian Group
Phil Waier, PE, LEED AP
Principal Engineer Emeritus
Review Session Learning Objectives
LEARNING OBJECTIVE 1
Attendees will learn about the factors that contribute to
deferred maintenance.
LEARNING OBJECTIVE 2
Attendees will hear how data can impact deferred maintenance
throughout the construction process.
LEARNING OBJECTIVE 3
Attendees will identify the appropriate data for particular stages
in the construction process.
LEARNING OBJECTIVE 4
Attendees will learn how applying this data can alleviate and
prevent deferred maintenance.
DEFERRED MAINTENANCE
• The practice of postponing maintenance activities such as
repairs on both real property (i.e. infrastructure) and
personal property (i.e. machinery) in order to save costs,
meet budget funding levels, or realign available budget
monies.
• The failure to perform needed repairs could lead to asset
deterioration and ultimately asset impairment.
• Generally, a policy of continued deferred maintenance may
result in higher costs, asset failure, and in some cases, health
and safety implications.
• Deferred maintenance is defined as any repair that does not
occur at the scheduled time.
NEVER PUT OFF UNTIL
TOMORROW WHAT YOU CAN
ACCOMPLISH…
…today.
- Lord Chesterfield
NEVER PUT OFF UNTIL
TOMORROW WHAT YOU CAN
ACCOMPLISH…
…the day after tomorrow.
- Mark Twain
IMPACTS TO BUILDING AND
EQUIPMENT
1/3
COST IMPACT OF DEFERRED
MAINTENANCE
Geaslin’s Inverse-Square Rule for Deferred
Maintenance
THE COST OF DEFERRING
MAINTENANCE
15x
CAUSES OF DEFERRED
MAINTENANCE
MORE ASSET MANAGEMENT
DEFINITIONS
• Capital Renewal
• CRV (Current Replacement Value)
• FCI (Facility Condition Index)
• FCI is used to:
– Inform resource allocation decisions
– Calculate catch-up costs
– Establish KPIs
– Track condition drift over time.
FCI = DM
CRV
ONGOING FACILITY
INVESTMENTS AFTER INITIAL
CONSTRUCTION
Preventative
Maintenance
Repair Maintenance Cyclical Component
Replacement
Capital Renewal
Any of these can be deferred
APPROACHES TO
QUANTIFYING DEFERRED
MAINTENANCE
Condition Assessment
Deficiency-specific
Thorough but labor intensive and
expensive
Parametric Approaches
Facilitates asset management with
fewer resources
Relies on models and owner
understanding of building assets
HOW COST DATA CAN HELP
1. Quantify deferred maintenance liabilities through
accurate estimates
2. Provide a basis for efficiently modeling Current
Replacement Value
3. Building life cycle costs to allow for accurate
budgeting
4. Guide a program of preventative and repair
maintenance which can avoid deferred maintenance
5. Provide a pricing for efficient execution of deferred
maintenance programs through Job Order
Contracting.
Different cost data types for different purposes!
Information Sources
Unit Prices
Assemblies
Models
STRUCTURE OF RSMEANS DATABASE
Calculate CRVs
Estimate deferred maintenance costs
Detailed project-
specific estimates
FMR
CASE STUDY:
DEPARTMENT OF ENERGY
• Prompted by Executive Order 13327 in 2004, DOE
invested in CAIS (condition assessment information
system) and FIMS (facility information management
system) powered by standard and customized
RSMeans data
• Developed a suite of standard and highly customized
models to efficiently ascertain CRV of 127M SF at 50+
sites
• Applies FMR data to predict life cycle costs and funds
needed to support facility management and report to
congress
• Continuous development of program
COST DATA FOR ASSET
MANAGEMENT
Facilities Maintenance and Repair
• Maintenance & Repair
– Repair maintenance
– Capital Renewal
• Preventive Maintenance
• General Maintenance
REPAIR/REPLACEMENT
MAINTENANCE
CAPITAL RENEWAL
PREVENTATIVE
MAINTENANCE
STOP DEFERRED
MAINTENANCE BEFORE IT
STARTS
• Estimate deferred maintenance costs in the most
effective way possible with accurate cost data
• Create a maintenance schedule with RSMeans Life
Cycle Costing data
• Plan/budget for 5, 10, 20 years with RSMeans data
LIFE CYCLE COSTING (LCC)
ASTM Definition: An economic method of evaluating a
project in which all costs arising from owning, operating,
maintaining and disposing of the project are considered.
These costs are added over the life of the project. All costs
are converted to present values.
OUR LCC DEFINITION
An economic method of evaluating a project’s preventive
maintenance, repair maintenance and capital renewal
costs. These costs are added annually over the life of the
project or a specific time frame.
LIFE CYCLE COSTS
• Life cycle costs are based upon:
– Type of structure
– Building’s equipment
LIFE CYCLE COST DEMO
TACKLE DEFERRED
MAINTENANCE WITH JOC
Job Order Contracting (JOC) is:
• A firm priced, competitively bid, indefinite quantity
procurement process
• Primarily used for repair, alterations and minor new
construction projects
• A fundamentally different construction procurement
relationship
– Contractors are subject to different motivations and
behaviors
– Non-adversarial relationship between owner &
contractor
• Brings a programmatic, data-based tool to deferred
maintenance execution
CONSTRUCTION
TASK CATALOG®
Different than the data used to estimate deferred maintenance
• Actual, local costs of work items needed for deferred maintenance
program
• Customized technical specifications for each task
• Quantity breaks and demolition costs
DEFERRED MAINTENANCE
EXECUTION EFFICIENCY
• Faster procurement – weeks instead of months
• Based on owner-contractor partnership = non-
adversarial relationship
CASE STUDY: HOLBROOK
UNIFIED SCHOOL DISTRICT
• Security/Safety Updates
• Short timeline
• Traditional procurement
process not possible
• With JOC:
– Construction Started
in May
– Construction
Completed Mid-July
Holbrook Junior High School
IN CONCLUSION
• Life Cycle Cost Data can prevent deferred maintenance
before it starts
• Use assemblies and unit Cost Data to estimate deferred
maintenance
• Expedite those repairs with Job Order Contracting
TITLE (MAIN)
Title (sub)
THANK YOU!
Be sure to evaluate the session online
at the Attendee Service Center
http://tinyurl.com/p6y4fxb

More Related Content

What's hot

SOP ENGINEERING
SOP ENGINEERINGSOP ENGINEERING
SOP ENGINEERING
Raghunath Patil
 
Resume201512111001update
Resume201512111001updateResume201512111001update
Resume201512111001update
Eric Daniels
 
Sop mpcb etp
Sop  mpcb etpSop  mpcb etp
Sop mpcb etp
Water Tech Engineers
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
Dhanesh S
 
Disaster Recovery Plan
Disaster Recovery PlanDisaster Recovery Plan
Disaster Recovery Plan
David Donovan
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET Journal
 
Business Continuity Planning Presentation
Business Continuity Planning PresentationBusiness Continuity Planning Presentation
Business Continuity Planning Presentation
The Chamber For a Greater Chapel Hill-Carrboro
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
Vladimir Nikitin
 
Arrelic Offering | RBI
Arrelic Offering | RBIArrelic Offering | RBI
Arrelic Offering | RBI
Arrelic
 
Pmicos 2011 Ppt Schedule Componentsr Raf Rev
Pmicos 2011 Ppt Schedule Componentsr Raf RevPmicos 2011 Ppt Schedule Componentsr Raf Rev
Pmicos 2011 Ppt Schedule Componentsr Raf Rev
Raphael M Düa - FAICD,FGPC(PC),FAPE,MACS(Snr),CP, GDISC
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity Management
Lusungu Mkandawire CISA,CISM,CGEIT,CPF,PRINCE2
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
sachin kumar sharma
 
Raghunath Patil
Raghunath Patil Raghunath Patil
Raghunath Patil
Raghunath Patil
 
Seminar on cim 02
Seminar on cim 02Seminar on cim 02
Seminar on cim 02
Tushar Aneyrao
 
Curriculam Vitae
Curriculam VitaeCurriculam Vitae
Curriculam Vitae
Rajarathinam Vijayakumar
 
Building blocks for BCM programme
Building blocks for BCM programmeBuilding blocks for BCM programme
Building blocks for BCM programme
Malcolm Van Harte
 
Risk Based Inspection
Risk Based InspectionRisk Based Inspection
Risk Based Inspection
trainingproducerPH
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
zaffar abbasi
 

What's hot (18)

SOP ENGINEERING
SOP ENGINEERINGSOP ENGINEERING
SOP ENGINEERING
 
Resume201512111001update
Resume201512111001updateResume201512111001update
Resume201512111001update
 
Sop mpcb etp
Sop  mpcb etpSop  mpcb etp
Sop mpcb etp
 
Maintenance module1 ppt number 3
Maintenance module1 ppt number 3Maintenance module1 ppt number 3
Maintenance module1 ppt number 3
 
Disaster Recovery Plan
Disaster Recovery PlanDisaster Recovery Plan
Disaster Recovery Plan
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
Business Continuity Planning Presentation
Business Continuity Planning PresentationBusiness Continuity Planning Presentation
Business Continuity Planning Presentation
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
Arrelic Offering | RBI
Arrelic Offering | RBIArrelic Offering | RBI
Arrelic Offering | RBI
 
Pmicos 2011 Ppt Schedule Componentsr Raf Rev
Pmicos 2011 Ppt Schedule Componentsr Raf RevPmicos 2011 Ppt Schedule Componentsr Raf Rev
Pmicos 2011 Ppt Schedule Componentsr Raf Rev
 
Business Continuity Management
Business Continuity ManagementBusiness Continuity Management
Business Continuity Management
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Raghunath Patil
Raghunath Patil Raghunath Patil
Raghunath Patil
 
Seminar on cim 02
Seminar on cim 02Seminar on cim 02
Seminar on cim 02
 
Curriculam Vitae
Curriculam VitaeCurriculam Vitae
Curriculam Vitae
 
Building blocks for BCM programme
Building blocks for BCM programmeBuilding blocks for BCM programme
Building blocks for BCM programme
 
Risk Based Inspection
Risk Based InspectionRisk Based Inspection
Risk Based Inspection
 
Business continuity plan
Business continuity planBusiness continuity plan
Business continuity plan
 

Viewers also liked

Altoona Rs Means Concrete Estimate
Altoona   Rs Means Concrete EstimateAltoona   Rs Means Concrete Estimate
Altoona Rs Means Concrete Estimate
shiraziadam
 
4.3 assemblies estimating
4.3 assemblies estimating4.3 assemblies estimating
4.3 assemblies estimating
Ali Juma Albahrani
 
Beca modulo1 diplomado
Beca modulo1 diplomadoBeca modulo1 diplomado
Beca modulo1 diplomado
Colégio de las Américas
 
General Paper
General PaperGeneral Paper
General Paper
A Levels General Paper
 
Walk-in interview
Walk-in interviewWalk-in interview
Walk-in interview
Ashokchandani
 
Thesis Defense Presentation
Thesis Defense PresentationThesis Defense Presentation
Thesis Defense Presentation
Calvin Kellendonk
 
Circulação Atmosférica
Circulação AtmosféricaCirculação Atmosférica
Circulação Atmosférica
Amália Beims
 
Decreto supremo nº 007 2015-minedu importante analizarlo
Decreto supremo nº 007  2015-minedu importante analizarloDecreto supremo nº 007  2015-minedu importante analizarlo
Decreto supremo nº 007 2015-minedu importante analizarlo
rogergene
 
Formato AMFE
Formato AMFEFormato AMFE
Formato AMFE
Chino MG
 
GP Tuition
GP TuitionGP Tuition
GP Tuition
GP Tuition
 
Circulação geral atmosférica
Circulação geral atmosféricaCirculação geral atmosférica
Circulação geral atmosférica
Mario Canelas
 
Cervical cancer screening in rural india
Cervical cancer screening in rural indiaCervical cancer screening in rural india
Cervical cancer screening in rural india
CONSULTANT IN OBGYN, ODISHA ,INDIA
 
Narrative text for xi senior high school students
Narrative text for xi senior high school studentsNarrative text for xi senior high school students
Narrative text for xi senior high school students
afreilian
 
Bfhi revised section_3.3
Bfhi revised section_3.3Bfhi revised section_3.3
Bfhi revised section_3.3
ELCA Egypt
 
Project life cycle costing
Project life cycle costing Project life cycle costing
Project life cycle costing
Shashikumar_chari
 
I1803056267
I1803056267I1803056267
I1803056267
IOSR Journals
 

Viewers also liked (16)

Altoona Rs Means Concrete Estimate
Altoona   Rs Means Concrete EstimateAltoona   Rs Means Concrete Estimate
Altoona Rs Means Concrete Estimate
 
4.3 assemblies estimating
4.3 assemblies estimating4.3 assemblies estimating
4.3 assemblies estimating
 
Beca modulo1 diplomado
Beca modulo1 diplomadoBeca modulo1 diplomado
Beca modulo1 diplomado
 
General Paper
General PaperGeneral Paper
General Paper
 
Walk-in interview
Walk-in interviewWalk-in interview
Walk-in interview
 
Thesis Defense Presentation
Thesis Defense PresentationThesis Defense Presentation
Thesis Defense Presentation
 
Circulação Atmosférica
Circulação AtmosféricaCirculação Atmosférica
Circulação Atmosférica
 
Decreto supremo nº 007 2015-minedu importante analizarlo
Decreto supremo nº 007  2015-minedu importante analizarloDecreto supremo nº 007  2015-minedu importante analizarlo
Decreto supremo nº 007 2015-minedu importante analizarlo
 
Formato AMFE
Formato AMFEFormato AMFE
Formato AMFE
 
GP Tuition
GP TuitionGP Tuition
GP Tuition
 
Circulação geral atmosférica
Circulação geral atmosféricaCirculação geral atmosférica
Circulação geral atmosférica
 
Cervical cancer screening in rural india
Cervical cancer screening in rural indiaCervical cancer screening in rural india
Cervical cancer screening in rural india
 
Narrative text for xi senior high school students
Narrative text for xi senior high school studentsNarrative text for xi senior high school students
Narrative text for xi senior high school students
 
Bfhi revised section_3.3
Bfhi revised section_3.3Bfhi revised section_3.3
Bfhi revised section_3.3
 
Project life cycle costing
Project life cycle costing Project life cycle costing
Project life cycle costing
 
I1803056267
I1803056267I1803056267
I1803056267
 

Similar to Final RSMeans from TGG Cooley Waire presentation prep edits Autosaved

Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
James Fitzgerald
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
FirasAlhilu
 
Streamlining Environmental Management in Public Sector (Webinar Slides)
Streamlining Environmental Management in Public Sector (Webinar Slides)Streamlining Environmental Management in Public Sector (Webinar Slides)
Streamlining Environmental Management in Public Sector (Webinar Slides)
Intelex
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
Ketan Parekh
 
Decq llc final
Decq llc finalDecq llc final
Decq llc final
joyousone1104
 
Software engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharmaSoftware engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharma
Vishnu Sharma
 
T1 01 MajorChemCompJourneyToReliability_v2.pptx
T1 01 MajorChemCompJourneyToReliability_v2.pptxT1 01 MajorChemCompJourneyToReliability_v2.pptx
T1 01 MajorChemCompJourneyToReliability_v2.pptx
ssuser29ffba
 
ITSM Policies Presention and details for implementation
ITSM Policies Presention and details for implementationITSM Policies Presention and details for implementation
ITSM Policies Presention and details for implementation
ssuser01634e
 
Business continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysisBusiness continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysis
moranjustin
 
Unit5.pptx
Unit5.pptxUnit5.pptx
Unit5.pptx
Anish874317
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5
Mohammad Faizan
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptx
saru92sarathsivadas
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
Zuzi Evangelista
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
Michelle Kleiber-Viglione
 
Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013
SchoolDude
 
document (1).pdf
document (1).pdfdocument (1).pdf
document (1).pdf
ReneJancoChoquecallo1
 
Solution Lifecycle Briefing & Risk Matrix
Solution Lifecycle Briefing & Risk MatrixSolution Lifecycle Briefing & Risk Matrix
Solution Lifecycle Briefing & Risk Matrix
Johanne Gauthier
 
Revelwood Managed Services Offerings - IBM.pptx
Revelwood Managed Services Offerings - IBM.pptxRevelwood Managed Services Offerings - IBM.pptx
Revelwood Managed Services Offerings - IBM.pptx
tkerans
 
Jump Start your PM Program
Jump Start your PM ProgramJump Start your PM Program
Jump Start your PM Program
SchoolDude
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
Olivia Wilson
 

Similar to Final RSMeans from TGG Cooley Waire presentation prep edits Autosaved (20)

Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Streamlining Environmental Management in Public Sector (Webinar Slides)
Streamlining Environmental Management in Public Sector (Webinar Slides)Streamlining Environmental Management in Public Sector (Webinar Slides)
Streamlining Environmental Management in Public Sector (Webinar Slides)
 
Practical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management systemPractical tips for implementing corporate performance management system
Practical tips for implementing corporate performance management system
 
Decq llc final
Decq llc finalDecq llc final
Decq llc final
 
Software engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharmaSoftware engineering by Dr. vishnu sharma
Software engineering by Dr. vishnu sharma
 
T1 01 MajorChemCompJourneyToReliability_v2.pptx
T1 01 MajorChemCompJourneyToReliability_v2.pptxT1 01 MajorChemCompJourneyToReliability_v2.pptx
T1 01 MajorChemCompJourneyToReliability_v2.pptx
 
ITSM Policies Presention and details for implementation
ITSM Policies Presention and details for implementationITSM Policies Presention and details for implementation
ITSM Policies Presention and details for implementation
 
Business continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysisBusiness continuity - 5 key steps to effective business impact analysis
Business continuity - 5 key steps to effective business impact analysis
 
Unit5.pptx
Unit5.pptxUnit5.pptx
Unit5.pptx
 
Software maintenance Unit5
Software maintenance  Unit5Software maintenance  Unit5
Software maintenance Unit5
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptx
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013Developing A Facilities Vision - California Savings Summit 2013
Developing A Facilities Vision - California Savings Summit 2013
 
document (1).pdf
document (1).pdfdocument (1).pdf
document (1).pdf
 
Solution Lifecycle Briefing & Risk Matrix
Solution Lifecycle Briefing & Risk MatrixSolution Lifecycle Briefing & Risk Matrix
Solution Lifecycle Briefing & Risk Matrix
 
Revelwood Managed Services Offerings - IBM.pptx
Revelwood Managed Services Offerings - IBM.pptxRevelwood Managed Services Offerings - IBM.pptx
Revelwood Managed Services Offerings - IBM.pptx
 
Jump Start your PM Program
Jump Start your PM ProgramJump Start your PM Program
Jump Start your PM Program
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 

Final RSMeans from TGG Cooley Waire presentation prep edits Autosaved

  • 1. TITLE (MAIN) Title (sub) SURVIVING DEFERRED MAINTENANCE: Take Back Control of Your Facility Lisa Cooley, LEED AP, Director Federal Solutions at RSMeans from The Gordian Group Phil Waier, PE, Principal Engineer Emeritus
  • 2. CEUs & CFM® Maintenance Points You are eligible to receive Continuing Education Units and Certified Facility Manager® maintenance points for attending sessions at IFMA’s World Workplace. To receive CEU points, you must add the US$15 processing fee to your registration. (Full Event PLUS! registration includes the CEU processing fee.) To Receive 20 CFM Maintenance Points Record your attendance for the three-day conference on your CFM Recertification Form in CAMP. At re-certification time, submit your completed CFM Recertification Form. Managing CEUs: • Log into the Attendee Service Center. http://tinyurl.com/p6y4fxb Your log-in information was sent to you when you registered for the conference. • Click “Start CEU Process” on the left-hand side. • Click “Start” next to the session you attended. • Complete the session evaluation. • Click “Start Test” next to the session. After passing the test, your certificate will be available for download. **If you wish to receive CEUs or LUs from other organizations, you must contact those organizations for instructions on reporting credit hours.
  • 3. TITLE (MAIN) Title (sub) Your Feedback is Valued! Please take the time to Evaluate Sessions Log into the Attendee Service Center http://tinyurl.com/p6y4fxb
  • 4. TITLE (MAIN) Title (sub) Meet Our Presenters: Lisa Cooley, LEED AP Director of Federal Solutions at The Gordian Group Phil Waier, PE, LEED AP Principal Engineer Emeritus
  • 5. Review Session Learning Objectives LEARNING OBJECTIVE 1 Attendees will learn about the factors that contribute to deferred maintenance. LEARNING OBJECTIVE 2 Attendees will hear how data can impact deferred maintenance throughout the construction process. LEARNING OBJECTIVE 3 Attendees will identify the appropriate data for particular stages in the construction process. LEARNING OBJECTIVE 4 Attendees will learn how applying this data can alleviate and prevent deferred maintenance.
  • 6. DEFERRED MAINTENANCE • The practice of postponing maintenance activities such as repairs on both real property (i.e. infrastructure) and personal property (i.e. machinery) in order to save costs, meet budget funding levels, or realign available budget monies. • The failure to perform needed repairs could lead to asset deterioration and ultimately asset impairment. • Generally, a policy of continued deferred maintenance may result in higher costs, asset failure, and in some cases, health and safety implications. • Deferred maintenance is defined as any repair that does not occur at the scheduled time.
  • 7. NEVER PUT OFF UNTIL TOMORROW WHAT YOU CAN ACCOMPLISH… …today. - Lord Chesterfield
  • 8. NEVER PUT OFF UNTIL TOMORROW WHAT YOU CAN ACCOMPLISH… …the day after tomorrow. - Mark Twain
  • 9. IMPACTS TO BUILDING AND EQUIPMENT 1/3
  • 10. COST IMPACT OF DEFERRED MAINTENANCE Geaslin’s Inverse-Square Rule for Deferred Maintenance
  • 11. THE COST OF DEFERRING MAINTENANCE 15x
  • 13. MORE ASSET MANAGEMENT DEFINITIONS • Capital Renewal • CRV (Current Replacement Value) • FCI (Facility Condition Index) • FCI is used to: – Inform resource allocation decisions – Calculate catch-up costs – Establish KPIs – Track condition drift over time. FCI = DM CRV
  • 14. ONGOING FACILITY INVESTMENTS AFTER INITIAL CONSTRUCTION Preventative Maintenance Repair Maintenance Cyclical Component Replacement Capital Renewal Any of these can be deferred
  • 15. APPROACHES TO QUANTIFYING DEFERRED MAINTENANCE Condition Assessment Deficiency-specific Thorough but labor intensive and expensive Parametric Approaches Facilitates asset management with fewer resources Relies on models and owner understanding of building assets
  • 16. HOW COST DATA CAN HELP 1. Quantify deferred maintenance liabilities through accurate estimates 2. Provide a basis for efficiently modeling Current Replacement Value 3. Building life cycle costs to allow for accurate budgeting 4. Guide a program of preventative and repair maintenance which can avoid deferred maintenance 5. Provide a pricing for efficient execution of deferred maintenance programs through Job Order Contracting. Different cost data types for different purposes!
  • 17. Information Sources Unit Prices Assemblies Models STRUCTURE OF RSMEANS DATABASE Calculate CRVs Estimate deferred maintenance costs Detailed project- specific estimates FMR
  • 18. CASE STUDY: DEPARTMENT OF ENERGY • Prompted by Executive Order 13327 in 2004, DOE invested in CAIS (condition assessment information system) and FIMS (facility information management system) powered by standard and customized RSMeans data • Developed a suite of standard and highly customized models to efficiently ascertain CRV of 127M SF at 50+ sites • Applies FMR data to predict life cycle costs and funds needed to support facility management and report to congress • Continuous development of program
  • 19. COST DATA FOR ASSET MANAGEMENT Facilities Maintenance and Repair • Maintenance & Repair – Repair maintenance – Capital Renewal • Preventive Maintenance • General Maintenance
  • 23. STOP DEFERRED MAINTENANCE BEFORE IT STARTS • Estimate deferred maintenance costs in the most effective way possible with accurate cost data • Create a maintenance schedule with RSMeans Life Cycle Costing data • Plan/budget for 5, 10, 20 years with RSMeans data
  • 24. LIFE CYCLE COSTING (LCC) ASTM Definition: An economic method of evaluating a project in which all costs arising from owning, operating, maintaining and disposing of the project are considered. These costs are added over the life of the project. All costs are converted to present values.
  • 25. OUR LCC DEFINITION An economic method of evaluating a project’s preventive maintenance, repair maintenance and capital renewal costs. These costs are added annually over the life of the project or a specific time frame.
  • 26. LIFE CYCLE COSTS • Life cycle costs are based upon: – Type of structure – Building’s equipment
  • 27.
  • 29. TACKLE DEFERRED MAINTENANCE WITH JOC Job Order Contracting (JOC) is: • A firm priced, competitively bid, indefinite quantity procurement process • Primarily used for repair, alterations and minor new construction projects • A fundamentally different construction procurement relationship – Contractors are subject to different motivations and behaviors – Non-adversarial relationship between owner & contractor • Brings a programmatic, data-based tool to deferred maintenance execution
  • 30. CONSTRUCTION TASK CATALOG® Different than the data used to estimate deferred maintenance • Actual, local costs of work items needed for deferred maintenance program • Customized technical specifications for each task • Quantity breaks and demolition costs
  • 31. DEFERRED MAINTENANCE EXECUTION EFFICIENCY • Faster procurement – weeks instead of months • Based on owner-contractor partnership = non- adversarial relationship
  • 32. CASE STUDY: HOLBROOK UNIFIED SCHOOL DISTRICT • Security/Safety Updates • Short timeline • Traditional procurement process not possible • With JOC: – Construction Started in May – Construction Completed Mid-July Holbrook Junior High School
  • 33. IN CONCLUSION • Life Cycle Cost Data can prevent deferred maintenance before it starts • Use assemblies and unit Cost Data to estimate deferred maintenance • Expedite those repairs with Job Order Contracting