Project Manual – Gamble-Boyer Residence




       PROJECT MANUAL
                                   For


       Gamble-Boyer Residence
          5310 Lovall Valley Rd
                  Sonoma, CA




                     March 05, 2007
                          FOR BID




                          Prepared by:

                CCS Architecture, Inc.
                       44 McLea Court
               San Francisco CA 94103




                                     1
Project Manual – Gamble-Boyer Residence




                                                                                Table of Contents

PROJECT SPECIFICATIONS

division 1:      general requirements
    01010        summary of work
    01025        measurement and payment
    01036        change orders
    01040        procedures & controls
    01045        cutting and patching
    01200        project meetings
    01300        submittals
    01500        construction facilities and temporary controls
    01630        substitutions
    01700        contract close out
    01710        cleaning

division 2:      site work
    02000        general

division 3:      concrete
    03300        cast in place concrete

division 4:      masonry
    04200        unit masonry

division 5:      metals
    05100        structural steel
    05500        metal fabrications
    05586        architectural metalwork

division 6:      wood
    06062        lumber
    06100        composite wood panels
    06150        wood decking
    06200        finish carpentry
    06400        architectural woodwork
    06420        wood paneling

division 7:      thermal and moisture protection
    07100        damproofing and waterproofing
    07210        building insulation
    07260        vapor retarders
    07460        exterior siding
    07500        membrane roofing



                                                                                               2
Project Manual – Gamble-Boyer Residence




    07610      metal roofing
    07620      sheet metal flashing and trim
    07915      sealants

division 8:    doors and windows
    08200      wood doors
    08266      glazed wood doors
    08350      folding doors
    08500      windows
    08620      unit skylights
    08710      door hardware
    08800      glazing



division 9:    finishes
    09300      tile
    09640      wood strip flooring
    09910      painting and transparent finishes

division 10:   specialties
    10300      fireplaces + stoves
    10800      toilet + bath accessories
    10826      bathroom mirrors
    10900      closet specialties

division 11:   equipment
    11452      residential appliance schedule

division 12:   furnishings
    12492      blinds

division 15    mechanical
    15000      mechanical general provisions
    15410      plumbing fixture schedule
    15480      domestic water heaters
    15700      heating + air-conditioning equipment
    15852      registers grills and diffusers

division 16:   electrical
    16000      electrical general provisions
    16140      wiring devices
    16501      light fixture schedule
    16850      television equipment




                                                                                           3
Project Manual – Gamble-Boyer Residence




DIVISION 1:             GENERAL REQUIREMENTS


01010 summary of work

1.01   SUMMARY

   A. The General Conditions, Supplementary Conditions, and Division 1, General Requirements,
      applies to the Work of all Sections.

1.02   WORK COVERED BY CONTRACT DOCUMENTS


   Contractor to provide all demolition services, including debris removal.

   All temporary measures, including pedestrian protection to be by the Contractor.

   A separate phone line for use during construction shall be the responsibility of the Contractor.

1.03   WORK NOT COVERED BY CONTRACT DOCUMENTS

   A. Primary building permit to be secured by the Architect. All other permits to be secured by the
      Contractor.

1.04   USE OF PREMISES

   Contractor to provide all temporary facilities necessary for construction.


01025 measurement and payment

1.01   Applications for Payment:

   A. Submit Applications for Payment to the Architect in accordance with the schedule established by
      the General Conditions and the Agreement between the Owner and the Contractor.

   B. Submit itemized applications typed on AIA Document G702, "Application and Certificate for
      Payment," and continuation Sheet G703.


01036 change orders

1.01   SUMMARY

   A. Requirements included:

       1.      Promptly implement change order procedures.
               a.     Provide full written data required to evaluate changes.
               b.     Maintain detailed records of work done on a time-and-material/force account
                      basis or other basis as may be agreed upon between Owner and Contractor.
               c.     Provide full documentation to Owner and Architect on request.




                                                                                                        4
Project Manual – Gamble-Boyer Residence




       2.       Designate in writing the member of Contractor’s organization:
                a.     Who is authorized to accept or direct changes in the Work.
                b.     Who is responsible for informing others in the Contractor’s employ of the
                       authorized changes in the Work.

       3.      Owner will designate in writing the person(s) who are authorized to execute Change
       Orders.

   B. Related Documents and Sections:

       1.       General Conditions:
                a.     Methods of determining cost or credit to Owner resulting from changes in Work
                       made on a time-and-material/force basis.
                b.     Contractor’s claims for additional costs.

       2.       Submittals: Section 01300.

       3.       Product Options and Substitutions: Section 01630

       4.       Contract Closeout: Section 01700

1.02   DEFINITIONS

   A. Change Order: See general Conditions.

   B. Proposal Request: AIA Document G709 signed by the Owner, or Architect which describes a
      proposed change in the Work or the Contract Documents which requests the Contractor to
      submit an itemized quotation for changes in the Contract Sum and/or time incidental to the
      proposed change in the Work or modification to the Contract Documents.

   C. Change Request: Contractor-initiated document containing an itemized quotation for change in
      the Contract Sum and/or Contract Time incidental to the proposed change in the Work or
      modification to the Contract Document referenced therein, for inclusion in a subsequent Change
      Order, if signed by the Owner and Architect.

   D. Construction Change Directive: AIA Document G714; see the General Conditions.

PRELIMINARY PROCEDURES

   A. All forms shall be reviewed by all parties to the Contract and approved by mutual agreement prior
      to commencement of construction.

   B. Owner, through Architect, may initiate changes by submitting a Proposal Request to Contractor.

       1.       Request will include:
                a.     Detailed description of the change, products, and location of the change in the
                       Project.
                b.     Supplementary or revised Drawings and Specifications.
                c.     The projected time span for making the change, and a specific statement as to
                       whether overtime work is or is not authorized.
                d.     A specific period of time during which the requested price will be considered
       valid.




                                                                                                       5
Project Manual – Gamble-Boyer Residence




               e.      Such request is for information only and is not an instruction to execute the
                       changes nor to stop Work in progress.

   C. Contractor may initiate changes by submitting a written notice to the Owner through the Architect.

       1.      Notice shall include:
               a.      Description of the proposed changes.
               b.      Statement of the reason for making the changes.
               c.      Statement of the effect on the Contract Sum and the Contract Time.
               d.      Statement of the effect on the work of separate contractors.
               e.      Documentation supporting any change in Contract Sum or Contract Time, as
                       appropriate.
               f.      Such request is not an authorization to execute the changes nor to stop Work in
                       progress.

1.04   CONSTRUCTION CHANGE DIRECTIVE

   A. In lieu of Proposal Request or Change Request, Owner may issue Construction Change Directive
      for Contractor to proceed with a change for subsequent inclusion in a Change Order.

   B. Construction Change Directive will describe changes in the Work, both additions and deletions,
      with attachments of revised Contract Documents to define details of the change.

   C. Owner and Architect will sign and date the Construction Change Directive as authorization for the
      Contractor to proceed with the changes.

   D. Contractor may sign and date the Construction Change Directive to indicate agreement with the
      terms therein.

1.05   DOCUMENTATION OF PROPOSALS AND CLAIMS

   A. All change request quotations shall be in direct response to and correspondence with specific
      Proposal Request, Construction Change Directive, or Contractor-initiated change and shall be a
      complete and full response to that Change Request.

       1.      No partial quotations or quotations which combine various Changes Requests or portions
               of Changes Requests will be accepted.

   B. Support each quotation for a lump-sum proposal and for each unit price that has not previously
      been established with sufficient substantiating data to allow Owner and Architect to evaluate the
      quotation.

   C. Substantiating data to support time and cost computations shall consist of the following, as
      applicable:

       1.      Labor required.

       2.      Equipment required.

       3.      Products required.
               a.     Recommended source of purchase and unit cost.
               b.     Quantities required.




                                                                                                       6
Project Manual – Gamble-Boyer Residence




       4.     Taxes, insurance, and bonds.

       5.     Credit for work deleted from Contract, similarly documented.

       6.     Overhead and profit.
              Mark-ups on all pricing (labor, materials, and the like) shall be established at the
                 beginning of the Work and shall not be altered.

       7.     Justification for any change in Contract Time.

   D. A period of 1 week (5 working days) will be allowed in which the Contractor shall respond to
      Proposal Requests and Construction Change Directives as described above.

   E. Support each claim for additional costs and for work done on a time-and-material/force account
      basis with documentation as required for a lump-sum proposal, plus additional information:

       1.     Name of the Owner-authorized person who ordered the work and date of the order.

       2.     Dates and times work was performed and by whom.

       3.     Time record, summary of hours worked, and hourly rates paid.

       4.     Receipts and invoices for the following:
              a.     Equipment used, listing dates and times used.
              b.     Products used, listing quantities.
              c.     Subcontractors.

   F. Document requests for substitutions for products as specified in Section 01630, “Product Options
      and Substitutions.”

1.06   PREPARATION OF CHANGE ORDER

   A. Contractor shall prepare each Change Order for a signature by Owner, Architect, and Contractor
      on a form acceptable to all parties.

   B. Change Order will describe changes in the Work, both additions and deletions, with attachments,
      if applicable, of revised Contract Documents to define details of the change.

   C. Change Order will provide an accounting of the adjustment in the Contract Sum and in the
      Contract Time.

1.07   LUMP-SUM/FIXED PRICE CHANGE ORDER

   A. Content of Change Orders will be based on either:

       1.     Contractor’s Change Request as mutually agreed between Owner and Contractor.

       2.     Owner’s Construction Change Authorization.

   B. Owner and Architect will sign and date the Change Order as authorized by a change in the work
      or change in the Contract Sum and/or Time.

   C. Contractor shall sign and date the Change Order to indicate agreement with terms herein.



                                                                                                    7
Project Manual – Gamble-Boyer Residence




1.08   CORRELATION WITH CONTRACTOR’S SUBMITTALS

   A. Periodically revise Schedule of Values and Request for Payment Forms to record each change
      as a separate item of Work and to record the adjusted Contract Sum.

   B. Periodically revise the construction schedule to reflect each change in Contact Time.

       1.      Revise sub schedules to show changes for other items of work affected by the changes.

   C. Upon completion of work under a Change Order, enter pertinent changes in Record Documents.


01040 procedures and controls

RELATED DOCUMENTS:

   A. Drawings and general provisions of the Contract, including General and Supplementary
      Conditions and other Division 1 Specification Sections, apply to the work of this section.

ADMINISTRATION AND SUPERVISION

   A. Coordinate various elements of the work and entities engaged to perform the work. Coordinate
      the work with existing facilities and conditions, and with work by separate contractors and by the
      Owner. Coordination includes but is not limited to:

       1.      Construction material storage with Owner.

       2.      Salvaged material storage with Owner.

       3.      Pre-purchased materials with Owner’s vendor.

   B. The Contractor shall maintain a full time Job Superintendent on premise at all times to coordinate
      the work. Do not delegate the responsibility for coordination to a Subcontractor.

RECORDING

   A. Working from boundaries established through the documents, establish and maintain dependable
      markers for the lines of the work area.

   B. Calculate dimensions and measure for layout of work. DO NOT SCALE DRAWINGS. Record
      deviations if any from drawings and specification information regarding existing and new
      conditions and review with Architect at time of discovery.

INSPECTIONS AND TESTING

   A. If determined to become required, Owner to retain and pay for services of Independent Testing
      Laboratory to perform specified testing and investigation services. Contractor to coordinate
      special inspections and testing requirements with the work as indicated in specific portions of the
      specifications. Special testing and inspection may include but is not necessarily limited to the
      following:

       1.      Testing of soils and hazardous waste.



                                                                                                       8
Project Manual – Gamble-Boyer Residence




        2.      Testing of existing building components for asbestos.

        3.      Field welding of structural steel components.

    B. Promptly notify Architect or Engineer of irregularities or deficiencies of work, which are observed
       during the performance of services.

    C. Contractor to notify Architect and Owner of the progress of the Work and recommend appropriate
       timeframes for the performance of special testing and inspection services.

    D. Installer Inspections: Require installer of each major unit of work to inspect substrate and
       conditions for installation and to report in writing unsatisfactory or ambiguous conditions which
       affect their work before proceeding.

    E. Inspect each product or assembly before installation and do not install damaged or defective
       products, materials, or equipment.

INSTALLATION

    A. Comply with manufacturer’s installation instructions and recommendations.

    B. Install work during time and under conditions, which will insure best possible results.

    C. Anchor units securely in place, properly located by measured line and level.


01045 cutting and patching

    PART 1 – GENERAL

Cutting and patching includes cutting into existing construction to provide for the installation or
        performance of other work and subsequent fitting and patching required to restore surfaces to
        their original condition.

Patching shall achieve security, and weather protection, shall preserve continuity of existing fire ratings,
       and shall successfully duplicate adjacent finishes, colors, textures, and profiles.

    PART 2 – PRODUCTS

Materials for patching shall be identical to existing materials. If identical materials are not available, use
        materials that visually match existing adjacent surfaces.

    PART 3 – EXECUTION

Provide temporary support of work to be cut where required.

Protect other Work during cutting and patching to prevent damage, including protection from exposure to
        the weather.

Cut the Work using methods least likely to damage Work to be retained or adjoining work. Use hand or
        small power tools designed for sawing or grinding.




                                                                                                            9
Project Manual – Gamble-Boyer Residence




Cut through concrete and masonry using carborundum or diamond blade circular saw or core drill.
        Coordinate all saw cutting of existing concrete panels with Architect before proceeding.

By-pass utility services shown or required to be removed, relocated or abandoned.

Patch with durable and invisible seams. Where required, extend patching into retained adjoining Work to
       eliminate evidence of patching.

Finish or refinish cut and patched surfaces to match adjacent finishes. Paint over complete surface
        plane, unless otherwise indicated. Over patched walls or ceiling surfaces, paint to nearest cutoff
        line for entire surface, such as intersection with adjacent wall or ceiling, beam, pilasters, or to
        nearest opening frame, unless otherwise indicated. Painted surfaces shall not present a spotty,
        touched-up appearance.


01200 project meetings

1.01    Prior to commencement of Work, a pre-construction conference will be held at a site to be
        designated by the Architect to discuss procedures to be followed during the progress of the Work.

1.03    Schedule job meeting with the Architect, Contractor and Owner on a weekly basis.

1.04    Eleven months following date of final acceptance, hold a meeting to review guarantees, bonds,
        and service and maintenance contracts for materials and equipment. Implement repair or
        replacement of defective items, and extend service and maintenance contracts, as desired by
        Owner.


01300 submittals

1.01    Make submittals in advance of scheduled dates of installation to provide time for reviews, for
        securing necessary approvals, for possible revision and re-submittal, and for placing orders and
        securing delivery.

1.02    Submittals shall be complete. All submittals, including shop drawings, shall bear the Contractor's
        stamp of review and approval. No submittal will be reviewed without having been transmitted
        through the Contractor.

1.03    Shop Drawings: submit three black-line or blue-line prints for review by Architect, two shall be
        returned to Contractor.

1.04    Only those Shop Drawings which bear stamps showing final review of the Contractor, Architect,
        and the Architect's consultants, shall be used.

1.05    Required Submittals.

    Submittals during construction will be required throughout, including but not limited to:

        1. Samples of all finish materials (wood, paint, etc.)
        2. Detailed shop drawings of all cabinetry, countertops, metal work, windows, doors. skylights
           and other shop fabricated items
        3. Finish hardware cut sheets and purchase orders, lighting cut sheets, plumbing and appliance
           cut sheets



                                                                                                           10
Project Manual – Gamble-Boyer Residence




1.06   Allow a minimum of 10-working days for processing by the Architect and his Consultants.



01500 construction facilities and temporary controls

1.01   Temporary Utilities

   A. Furnish, install, and maintain temporary utilities as required to perform the Work. Materials,
      installation, and maintenance of temporary utilities shall be in compliance with applicable
      regulatory requirements. Remove temporary utilities, including associated materials and
      equipment when no longer required.

   B. Temporary Electric Power and Lighting to be by the Contractor, if required.

   D. Temporary Water to be by the Contractor, if required.

   E. Temporary Sanitary Facilities to be by the Contractor. Maintain in a neat, sanitary condition,
      adequately supplied.

   F. Temporary Fire Protection: Provide and maintain fire extinguishers, fire hoses, and other
      equipment necessary for proper fire protection during the progress of the Work. Equipment shall
      be designed for fire protection only.



01630 substitutions

1.01   Contractor's Options:

   A. For products specified only by reference standard, select product meeting referenced standard.

   B. For products specified by naming one or more products or manufacturers, select products of any
      named manufacturer meeting Specifications.

   C. For product or manufacturer which is specifically named, a written request will be required for
      substitution.

   D. Where terms "or equal," "or approved equal," or similar references are made, submit request for
      substitutions for product or manufacturer not specifically named in Specifications.


01700 contract close out

1.01   Required Record Documents:

   A. Provide Record Drawings, showing any modifications to the Contract Documents. This can be
      made on a set of prints, and then submitted to the Architect. One set of approved Shop Drawings
      showing changes made during construction shall also be furnished.




                                                                                                        11
Project Manual – Gamble-Boyer Residence




   B. Provide 8"x10" paint cards of all finish paint colors/sheens used, with clearly labeled identification
      tags showing manufacturer's name and code, plus one gallon of each paint – labeled where
      used.

   C. Operating and maintenance manuals shall be required, assembled in a three-ring, plastic binders
      sized for 8-1/2-inch x 11-inch sheets. Include a cover containing the Project name and address
      and the general subject matter in the manual, typewritten index, instructions regarding operation
      and maintenance of the equipment included in the manual, replaceable parts, part numbers, and
      name and address of nearest parts distributor, and copy of each warranty and service contract
      issued for the equipment included in the manual.

   D. Warrantees and service contracts shall be submitted for all items which carry such
      documentation.

   E. "As-Built" Drawings will not be required.

1.02   Provide instruction to the Owner for operation and maintenance of all systems and their
       components.

1.04   Service and Maintenance Contracts: Compile, review, and submit specified service and
       maintenance contracts as specified for warranties and bonds.

1.08   Extra Materials: Where specified, furnish extra materials in the quantities and manner specified.


01710 cleaning

1.01   Clean interior spaces prior to the start of finish painting and the application of other finishes, and
       continue cleaning as required until such Work is completed.

1.02   Remove dust, dirt, grease, stains, fingerprints, labels, spilled and spatters, and other materials
       from interior and exterior surfaces exposed to view. Wash and shine glazing and mirrors. Polish
       glossy surfaces to a clear shine.

1.03   Clean permanent filters and replace disposable filters of units operated during construction.
       Clean ducts, blowers, and coils of units operated during construction.

1.04   Vacuum and wipe insides of electrical panels and cabinetwork.

1.05   Mop clean interior spaces. Broom clean exterior paving. Rake clean ground surfaces.

1.06   Air out project with natural ventilation for at least two weeks between end of construction and
       occupancy.


                                              End of section




                                                                                                            12
Project Manual – Gamble-Boyer Residence




DIVISION 2:            SITE WORK

02000 general

A.     Include demolition of the patio and site wall per the drawings.
B.     Grading and drainage per the drawings.
C.     Contractor to provide excavation and earthwork as required.
D.     Provide all hardscape and retaining walls per the drawings.
E.     Owner to receive separate price for all landscaping and irrigation. Contractor to coordinate
       installation.
F.     Provide sewer system additions per the engineer’s drawings and specifications.
G.     Connect water to existing well.
H.     Gravel path stone type to be determined, provide allowance.
I.     Trellis corrugated roofing:
                 Manufacturer: Enduro Composites
                                1005 Blue Mound Road
                                Fort Worth, TX 76131
                                1.800.667.8664
                 Model:         Tuff Span 2.67x7.8 PFR 400
                 Color:         Trans Clear N2000T


                                            End of section




                                                                                                      13
Project Manual – Gamble-Boyer Residence




DIVISION 3:            CONCRETE


03300 cast-in-place concrete

1.01   Section includes: Concrete structural slabs, footing and stem walls, exterior finish stairs and
       retaining walls, fireplace surround, shower pan and curb

1.02   See structural drawings and soils report for general concrete specifications.

1.03   Provide 2’ x 2’ samples of all concrete finishes with all sealants and waxes applied over half of
       the samples for review per 1300 Submittals

1.04   Exposed Concrete

       A. Poured-in-place with Davis Powder Concentrate color mix for integral color. Refer to
          manufacturer’s instructions for installation.
       B. Use good quality plywood form boards, unless otherwise noted. Do not use form ties that will
          be exposed or will rust.
       C. Finish at exposed foundation walls:
               1. Board form – 2x6 vertical smooth boards against 2x form, very tight, no form ties
               2. Use finishing nails: 2 at 6” below top of wall and 2 at 36” centers to grade
               3. Seal with Davis W-1000 Concrete Cure and Sealer
               4. Color: San Diego Buff
       D. Finish at stairs:
               1. Board-formed riser: 1x6 smooth vertical boards against 2x form, very tight, no form
                   ties
               2. Use finishing nails: 2 at 6” below top of wall and 2 at 6” above grade per board
               3. Broom finish tread and trowel an eased nosing
               4. Color: San Diego Buff
       E. Finish at poolside retaining wall:
              1. Board-formed: 1x6 horizontal, long,smooth boards against 2x form, very tight, no
                  form ties
              2. Use finishing nails: 2 at 36” centers per board
              3. Seal with Davis W-1000 Concrete Cure and Sealer
              4. Color: match existing pise wall
       F. Finish at fireplace surround, hearth and wood storage:
              1. Board-formed: 1x6 horizontal, long,smooth boards against 2x form, very tight, no
                  form ties
              2. Use finishing nails: 2 at 36” centers per board
              3. Seal with Davis W-1000 Concrete Cure and Sealer
              4. Color: match existing pise wall
       G. Finish at shower pan and curb:
              1. Reinforced Portland Cement. Use normal sand aggregate, rinsed clean.
              2. Form with MDO, no board panel joints
              3. Seal with: ?
              4. Color: match concrete tile




                                             End of section




                                                                                                           14
Project Manual – Gamble-Boyer Residence




DIVISION 4:   MASONRY


04200 unit masonry

1.01   Fireplace

       A. Fireplace to be per drawings.

              1. Outside of fireplace to be concrete. See section 03300. Firebox to be yellow fire
                 brick.
              2. Provide double wall flue in stainless steel.
              3. Contractor shall coordinate concrete and fireplace subcontractors to ensure proper
                 installation of each part.



                                          End of section




                                                                                                      15
Project Manual – Gamble-Boyer Residence




DIVISION 5:    METALS


05100 structural steel

1.01   Refer to Structural drawings for specifications


05500 metal fabrications

1.01   Section includes: exterior metal panels

1.02   Panels shall be 10 gauge Corten steel, size per drawings

       Supplier:
       Primary Metals
       Ray Garr
       1699 West Grand Ave
       Oakland, CA
       510.251.0900

       Fabricator:
       Master Metal Products
       Eric
       495 Emory Street
       San Jose, CA 95110
       408.275.1210


05586 architectural metalwork.

1.01   Section includes: countertops, Interior edge metal

1.02   Use Schluter –Scheine stainless edge metal at tile, per drawings.

1.03   Use stainless steel for countertops, per drawings.

       A. Weld stainless steel sink to stainless steel counter and grind smooth.
       B. Provide shop drawings of work.
       C. Recommended Fabricator:

               American Metal Products
               Steve Gardner
               1320 Underwood Avenue
               San Francisco, CA 94124
               415.822.4100




                                            End of Section




                                                                                                   16
Project Manual – Gamble-Boyer Residence




DIVISION 6:      WOOD AND PLASTICS


06062 lumber

1.01   Framing lumber

       A. All framing lumber to be construction grade, FSC certified.
       B. All lumber to be free of chromium and arsenic
       C. See structural drawings for specifications on wood framing.


06100 composite wood panels

1.01   Plywood

       A. All exposed interior plywood to be “underlayment”, FSC certified.
       B. All exposed exterior plywood to be exterior grade phenol-bonded weatherproof type, FSC
          certified.
       C. All concealed plywood to be per structural requirements or drawings.


06150 wood decking

1.01   5/4” X 6” Ipe wood decking with pre-finished clear coat, installed per manufacturer’s instructions.

       Source:
       Beronio Lumber CO
       2525 Marin Street, San Francisco, CA
       (415) 824-4300 (10.31.06)


06200 finish carpentry

PART 1 - GENERAL
1.01   WORK INCLUDED
   Wood casework
   Wood floors


1.02   RELATED SECTIONS
   A. Section 06400 – Architectural Woodwork
   B. Section 09640 – Wood strip Flooring
   C   Section 09910 – Painting and Transparent Finishes




                                                                                                        17
Project Manual – Gamble-Boyer Residence




1.03   WOOD CODING
   Wood is described as species.cut.usage, finish (reference division 09910)




       Example:




   Species are coded as follows:
       WD-1:      White oak
       WD-2:      Red oak
       WD-3:      American walnut
       WD-4:      Black walnut
       WD-5:      Brazilian walnut
       WD-6:      American cherry
       WD-7:      Brazilian cherry
       WD-8:      Honduran mahogany
       WD-9:      Hickory
       WD-10:     Ash
       WD-11:     Maple
       WD-12:     Poplar
       WD-13:     Redwood
       WD-14:     Pine
       WD-15:     Douglas fir
       WD-16:     Zebra wood
       WD-17:     Teak
       WD-18:     Koa
       WD-19:     Bamboo, blond
       WD-20:     Bamboo, carbonized


                                                                                                  18
Project Manual – Gamble-Boyer Residence




        WD-21:     Cork
        WD-22:     Lyptus


   Cut is coded as follows:
        1:       Quarter sawn
        2:       Rift cut
        3:       Select cut
        4:       Paint sliced, or equal


   Wood usage is coded as follows:
        S:       Solid stock
        T:       Tongue and groove
        V:       Veneer over 3/4” plywood
        F:       Finger jointed
        P:       Pre-engineered
        R:       Recycled/reclaimed


06400 architectural woodwork

1.01    SECTION INCLUDES: Kitchenette, Bathroom and Closet cabinets.

   A. Provide shop drawings and finished samples of materials for Architect approval.
   B. European-style cabinets, flush inset panels.
   C. Concealed cabinet interiors: almond melamine.
   D. Drawer and roll-out interiors: pre-finished maple plywood. Dovetailed construction.
   E. Hinges: Blum Clip-top concealed hinges, or equal. See cut sheet.
   F. Glides: Blum Tandem full-extension bottom mounting glides, or equal. Sized for drawer loads. See
      cut sheet.
   G. Adjustable shelving supports: Swedish-type supports, Hafele 282.04.702. See cut sheet.
   H. Recommended millworker:

        Amerian Woodworking
        2856 Aiello Drive
        San Jose, CA 95111
        408.227.5533

        or Glen?

1.02    CABINET HARDWARE + ACCESSORIES

   A. Kitchenette
      1. Pulls: Match existing main house kitchen
      2. Upward opening cabinet hinges: Hafele, Lid Stay, 100N and Hafele, Duomatic hinge, Inset
      mount, 329.17.520. See cut sheet.



                                                                                                   19
Project Manual – Gamble-Boyer Residence




   B. Bathroom
      1. Pulls: Match existing house bathroom

   D. Closet
      1. Pulls: Match existing house closets


06420 wood paneling

1.01   Wood paneling shall be 1x6 T+G clear western red cedar siding, no finish.



                                               End of Section




                                                                                                    20
Project Manual – Gamble-Boyer Residence




DIVISION 7:    THERMAL & MOISTURE PROTECTION


07100 damproofing and waterproofing

1.01   coordinating with structural.


07210 building insulation

PART 1 - GENERAL
1.01   SUMMARY
   A. Section Includes:
       Loose fit cotton fiber insulation
   Related sections:
       1. See Sections 07511, Built-up asphalt bituminous roofing.
1.02   SUBMITTALS
   A. Procedures:       In accordance with Section 01300, "Submittals."
   Product Literature: Literature fully describing the products to be supplied.
1.03   QUALITY ASSURANCE
   A. Applicator shall demonstrate proof of a minimum of five years experience specified process.
      Owner reserves the right to reject a proposed supplier.


PART 2 - PRODUCTS
2.01   MATERIALS
   (getting from energy consultant)
   B. Insulate floor joist w R-30
   C. Insulate all roof/ceiling with R-30 per drawing details
   D. Insulate exterior walls with R-19.

PART 3 - EXECUTION
3.01   Verify all roof deck conditions at site with Architect before installing rigid insulation at roof.
3.02   Carefully cut and fit insulation around pipes, conduit and other obstructions and penetrations.
3.03   Use manufacturer recommended fasteners of appropriate length when securing roof deck
       insulation. DO NOT LET FASTENERS PENETRATE THROUGH UNDERSIDE OF ROOF
       DECK. Contractor shall remove all fasteners that penetrate the underside of the roof deck and
       repair the resulting damage.
3.04   Remove debris from roof surfaces and Project site. Leave surfaces in a condition acceptable to
       roof membrane installer.




                                                                                                            21
Project Manual – Gamble-Boyer Residence




07260 vapor retarders

PART 1 - GENERAL

PART 2 - PRODUCTS

2.01 MATERIALS

   A. Vapor Retarder: Kraft paper sheets laminated together with fiberglass reinforcing and multi-ply
      polyethylene sheet and with a laboratory tested maximum vapor transmission rating of 0.15 perm;
      "Moistop" by Fortifiber Corp., or equal.

   B. Vapor Barrier: 6 mil Visqueen, or equal.

   C. Sand: ASTM C33, uniformly graded, clean sand, free from excessive fines, organic material, and
      other deleterious substances.

   D. Vapor-Retarder Tape:     Minimum 2-inch-wide self-adhering type designed to maintain vapor
      retarder integrity.

   E. Provide bituthene or equal wrap at all exterior door and window openings.


PART 3 - EXECUTION

3.01 EXAMINATION

   A. Check that areas to receive membrane are clean and dry.

   B. Check that pipes, vents, drains, and other penetrations of the membrane are completed.

   C. Where nails, screws, or other penetrations exist, apply heavy beads of caulking compound or
      manufacturer's pressure-sensitive tape.

   D. Do not commence installation of membrane until conditions are satisfactory.

3.02   INSTALLATION UNDER SLAB-ON-GRADE

   A. Install Vapor Barrier membrane over 3-inch sand course. Lap 6 inches, and tape edges. Turn up
      membrane at edges, and secure to foundations or footings with tape.

   B. Seal around all penetrations of membrane with tape to create air-tight seal between penetrating
      objects and membrane.

   C. Repair tears and punctures in membrane immediately before concealment by other work. Cover
      with tape or another layer of membrane.

   D. Provide nominal 2-inch-thick protection cover of sand over membrane. Screed and level before
      reinforcing or concrete is placed. Moisten sand prior to placing concrete.




                                                                                                  22
Project Manual – Gamble-Boyer Residence




07460 exterior siding

1.01   Exterior siding to be 1x6 T+G clear western red cedar with clear finish. All siding to be back-
       stained and blind-nailed with stainless steel fasteners.

1.02   Provide sample for Architect’s review and approval.


07500 membrane roofing

PART 1 - GENERAL

1.01   Installer shall be approved by manufacturer of accepted roofing system, with not less than 5
       years experience in installation of membrane roofing systems similar to those required for this
       Project. Submit certification from roofing materials manufacturer that installer is certified and
       approved to install specified roofing system and that materials and components furnished
       conform to Specification requirements and are compatible with each other, the roof substrate,
       and adjacent related Work.

1.02   Membranes shall be tested and listed by UL for Fire Hazard Classification A.

1.03   Submit manufacturer's specifications and installation instructions.

1.04   Deliver materials requiring fire-hazard classification bearing the UL label on each container and
       roll, or deliver with a UL certification of compliance with the classification specified.

1.05   Handle rolled goods to prevent damage to edges and ends. Store-rolled goods on end on pallets
       or other raised surface in dry, well-ventilated, water-tight place.

1.06   Protect materials, including aggregate, from moisture. Remove wet materials from Project site.
       Protect materials against damage by construction traffic and equipment.

1.07   Apply materials during dry weather when ambient temperature is 40º F or above.

1.08   Protect walks, paving, and building walls adjacent to hoist prior to starting Work. Restore to
       original condition or replace Work and materials damaged due to roofing installation operations.

1.09   Provide temporary roofing if it becomes necessary to make the building weather-tight prior to
       installation of permanent roofing system. Remove from each area prior to installation of
       permanent roofing.

1.10   Drainage must effectively prevent ponding water as defined by NRCA 48-hour testing.

1.11   Prior to final acceptance of Work, furnish written manufacturer’s Labor and Material and Total
       System 20 year warranty covering repairs required to maintain roof, including flashing, in water-
       tight condition. Guarantee shall be limited to ordinary wear and tear by the elements or defect
       due to faulty materials and workmanship.

1.12   Schedule a Pre-Roofing Site Meeting with the Contractor, Architect and all sub-trades involved in
       the roofing installation prior to final ordering of materials.




                                                                                                     23
Project Manual – Gamble-Boyer Residence




PART 2 - PRODUCTS

2.01    Stevens EP Thermoplastic Olefin (TPO) membrane, fully adhered

        A. Size: 60mil, 10 feet wide sheet

        B. Color: White, Energy Star

        C. Substrate: Stevens-approved isocyanurate. Fasten per Stevens instructions.

        D. Roof flashings: use applicable Stevens flashing products


PART 3 - EXECUTION

3.01    Verify all roofing conditions at Pre-Roofing Meeting with Architect and roofing installer.

3.02    Examine substrate surfaces to receive membrane roofing and associated Work and conditions
        under which roofing will be installed. Do not proceed with roofing until unsatisfactory conditions
        have been corrected.

3.03    Install roofing for compliance with UL Fire Classification A and Class 60 wind uplift resistance.

3.04    Coordinate the installation of insulation, roofing sheets, flashings, stripping, coatings and
        surfacings, so that insulation and felts are not exposed overnight or to precipitation.

3.05    Roof Membrane Installation per manufacturer's printed instructions.

3.06    Avoid heavy traffic on completed roofing when ambient temperature is above 80° F. Equipment
        that requires more than two persons to carry it across the roof and put in place shall be lifted and
        placed by crane.


07610 metal roofing


Part I – General

1.01    Quality Assurance

        A. Before Fabrication: Contractor shall take field measurements of the structure and substrates
        indicated and specified to ensure that panel lengths and brakeformed flashings are dimensioned
        accurately to facilitate easy installation. Fabrication shall not begin until all field conditions have
        been verified. Allow for sufficient trimming of panel units at eaves, valleys and gables prior to
        fabrication

1.02    Submittals

        A. Submit shop drawings, indicating extent of work to be performed. Include sections of roof and
        fascia for each condition, detailing flashing and trim for different conditions, such as eaves,
        outside/inside corners, skylights, terminations, etc, showing a full and complete installation.



                                                                                                            24
Project Manual – Gamble-Boyer Residence




        Show securement of panels and dips, spacing, type and number of fasteners, as recommended
        by the Manufacturer.

        B. Submit 2’-0” long sample panel indicating the metal, gauge, color, texture and finish proposed.

        C. Submit Manufacturer’s warranty covering the substrate (metal) against rupture, perforation,
        and structural failure due to normal atmospheric corrosion for (25) years.

        D. Submit Manufacturer’s (35) year warranty on paint finish against cracking, peeling, blistering,
        chalk, and color change.


Part II – Product

2.01    Manufacturer

        Englert, Inc
        1200 Amboy Ave
        Perth Amboy, NJ 08861
        732.826.8614

2.02    Panel system shall be Series A1300, 1-1/2” high, 24” wide panel, Standing Seam System, with
        ribs, 180º seam.

2.03    Finish shall be Galvalume Plus


Part III – Execution

3.01    Install per manufacturer’s instructions.




                                                                                                       25
Project Manual – Gamble-Boyer Residence




07620 sheet metal flashing and trim



All sheet metal work to be done by a highly qualified sheet metal subcontractor, not the
        roofer.



1.01   All exterior sills and thresholds to have sheet metal pan-on-bituthene flashing, riveted,
       soldered and turned up at ends. See Drawings.

1.02   Exterior metal Flashing/coping to be galvalume. All joints to be riveted and inter-lapped with
       sealant. All copings to be cleated per the drawings.

1.03   Contractor, Architect and sub-contractor shall have a pre-construction meeting to review flashing
       work.

1.04   All reglets to be Fry stainless steel finish or accepted equal, see details.

1.05   Plumbing vent flashing

   A. Pitch Pans are not to be used in lieu of any other penetration flashing in these specifications and
   will require special approval by Architect to be used for unusual conditions.
   B. If required, fabricate pitch pan by forming a hemmed 3 inch high side and a 4 inch flashing flange.
      Provide minimum 2 inch clearance from penetration. Shop or field solder radial corners and
      vertical seam.
   C. Fabrication of two piece flashings for connected pipes, conduits and other round penetrations.
   D. Form semi-cylindrical tubular flashing sleeves 9 inches high and minimum 1/4 inch clearance
      from penetration and tightly seamed to fit snugly.

   E. Form square flashing plate 7 inch larger than penetration. Punch hole and extrude metal upward
      1/4 inch, providing a continuous vertical flange. Split flashing plate and shop solder flashing
      sleeves. Cut radius corners on flashing plate.

   F. Form a conical sealant cover with an inside diameter equal to penetration and an outside
      diameter 1 to 2 inches larger.

   G. The above describes Model VTREXVP with sealant cover as manufactured by SBC Industries,
       North Miami, FL. / 800-228-2580.




                                                                                                        26
Project Manual – Gamble-Boyer Residence




07915 sealants

PART 1 - GENERAL
1.01    RELATED DOCUMENTS
   Drawings and general provisions of Contract, including General and Supplementary Conditions and
      Division-1 Specification sections, apply to work of this section.


1.02    DESCRIPTION OF WORK
   A. The extent of each form and type of joint sealer is indicated on drawings and by provisions of this
      section an where required to provide a finished appearance to the building.
   B. The applications for joint sealers as work of this section include but are not limited to the
   following;
        Where required for water tightness
        Concrete construction joints.
        Floor joints (interior new to existing).
        Interior wall & wall/ceiling joints where required for sound control of rooms.
        Flashing and coping joints.
        Gasketing of assemblies.
        Behind any surface-mounted signs or equipment
        Roof accessories
        Around windows, doors and storefronts.
   C. Refer to Division 8 sections for glazing requirements – not as work of this section.
   D. Refer to sections of Divisions 15 and 16 for joint sealers in mechanical and electrical work - not
      as work of this section.
   E. General Performance: Except as otherwise indicated, joint sealers are required to establish and
      maintain airtight and waterproof continuous seals on a permanent basis, within recognized
      limitations of wear and aging as indicated for each applications. Failures of installed sealers to
      comply with this requirement will be recognized as failures of materials and workmanship.
        ASTM References listed herein shall apply unless updated ASTM References exist; wherein
           Architect shall be immediately notified in writing as to the alternate standard for Architect’s
           verification of applicability.


1.03    SUBMITTALS
   A. Product Data: Submit manufacturer’s product specifications, handling/ installation/ curing
      instructions, and performance tested data sheets for each elastomeric product required.


1.04    JOB CONDITIONS
   A.     Weather Conditions: Do not proceed with installation of liquid sealants under unfavorable
        weather conditions. Install elastomeric sealants when temperature is in lower third of
        temperature range recommended by manufacturer for installation.


                                                                                                       27
Project Manual – Gamble-Boyer Residence




PART 2 - PRODUCTS


2.01    ACCEPTABLE MANUFACTURERS
   A.   General: Manufacturers listed in this article include those known to produce the indicated
        category of prime joint sealer material, either as a nominally pure generic product of as an
        equivalent performance modification thereof or proprietary product.
   B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering
      products which may be incorporated in the work include, but are not limited to the following:
        Manufacturers of Elastomeric Sealants (Liquid):
                American Poly-Therm Co.; Sacramento, CA
                Dow Corning Corp.; Midland, MI
                Pecora Corp.; Harleysville, PA
                Sonneborn/Contech, Inc.; Minneapolis MN
                Standard Dry Wall Products Co.; Miami, FL
        Mfrs. Of Non-Elastomeric Sealants/Calks (Liquid/Tape):
                Parr, Inc.; Cleveland, OH
                Pecora Corp.; Harleysville, PA
                Protetive Treatments, Inc.; Dayton, OH
                Sonneborn/Contech, Inc.; Minneapolis, MN
                Standard Dry Wall Products Co.; Miami, FL
        Mfrs. Of Rubber and Polymeric Gaskets (Solid/Cellular):
                Acme Highway Products Corp.; Amherst, NY
                Norton Co.; Granville, NY
                Rubatex Corps.; Bedford, VA
                Standard Products Co.; Port Clinton, OH
                Williams Products, Inc.; Troy, MI
        Mfrs. Of Joint Fillers/ Sealant Backers;
                Backer Rod Mfr & Supply Co.; Denver, CO
                Dow Chemical Co.; Midland, MI
                Hercules, Inc.; Middletown, DE
                J&P Petroleum Products, Inc.; Dallas, TX
                Sonneborn/ Contech, Inc.; Minneapolis, MN


2.02    MATERIALS




                                                                                                      28
Project Manual – Gamble-Boyer Residence




A.     General Sealer Requirements: Provide colors indicated or, clear, or if not otherwise indicated,
       as selected by Architect from manufacturer’s standard colors or clear where available. Select
       materials for compatibility with joint surfaces and other indicated exposures, and except as
       otherwise indicated select modulus of elasticity and hardness or grade recommended by
       manufacturer for each application indicated. Where exposed to foot traffic, select non-tracking
       materials of sufficient strength and hardness to withstand stiletto hell traffic without damage or
       deterioration of sealer system.
B.     Single Component Polyurethane Sealant (1Pu-S): Except as otherwise indicated, provide
       manufacturer’s standard non-modified, one-art, polyurethane-based, air-curing, elastomeric
       sealant; complying with either ASRM C 920 Type S Class 25, or FS RR-S-00230C Class A or
       equal standard; self-leveling grade/type where used in joints of surfaces subject to traffic
       otherwise non-sag grade/type.
     Bituminous Modification (-Bit): Where joint surfaces contain or are contaminated with bituminous
           materials,, provide manufacturer’s modified type sealant which is compatible with joint
           surfaces (modified with coal tar or asphalt as required).
C. Single-Component Silicon Rubber Sealant (12SR-S): Except as otherwise indicated, provide
   manufacturer’s standard, non-modified, one-part, silicone-rubber-based, air-curing, non-sag,
   elastomeric sealant; complying with either ASTM C 920 Type S Class 25 Grade NS, or FS TT-S-
   001553A Class A Type Non-sag or equal standard.
D. Acrylic-Emulsion Sealant (AcEm-S): Provide acrylic-emulsion or latex-rubber-modified acrylic-
   emulsion sealant compound, permanently flexible, non-staining and non-bleeding; recommended
   by manufacturer for protected exterior exposure and general interior exposure.
E. Butyl Rubber Sealant (BuR-S): Provide polymerized Butyl rubber and inert fillers (pigments),
   solvent-based with minimum 75% solids, non-sag consistency, tack-free time of 24 hours or less,
   paintable, non-staining; complying with FS TT-S-001657 or equal standard.
F. Preformed Butyl Rubber Sealant (PbuR-S): Provide preformed ribbon or tape (coiled with
   release paper) of vulcanized Butyl rubber of Butyl/polyisobutylene and inert fillers (pigments);
   solvent-based with minimum 95% solids, non-sag consistency, tack-free time of 24 hours or less,
   paintable, non-staining, either with or without reinforcement thread or fabric to prevent stretch (as
   required by Installer to facilitate proper application).
G. Polyisobutylene Mastic Sealant (PibM-S): Provide either liquid or performed ribbon (coiled with
   release paper) of polyisobutylene- based mastic; nondrying, non-skimming, non-hardening, non-
   migrating, heavy-bodied as recommended by manufacturer for large joints subject to shear
   movement but not subject to normal joint movement; grade as recommended by manufacturer for
   exposures as indicated.
H. Bituminous Calking Compound (Btm-CkC):                 Provide manufacturer’s standard one-part
   bituminous, general-purpose crack filler or calking compound, containing asphalt or coal tar (as
   required for compatibility), Butyl rubber, mineral fiber, and other modifiers or fillers.
I.   Joint Fillers, Pavement Types:
     Bituminous and Fiber Joint Filler (BtmF-JF): Provide resilient and non-extruding type premolded
         bituminous impregnated fiber-board units complying with ASRM D 1751; FS JJ-F-341, Type I
         or equal standard; or AASHTO M 213.
J.   Other compatible compounds shall be at the option of the Contractor and as approved by the
     Architect.
K. Miscellaneous Materials:




                                                                                                      29
Project Manual – Gamble-Boyer Residence




       Joint Primer/ Sealer: Provide type of joint primer/ sealer recommended by sealant manufacturer
            for joint surfaces to be primed or sealed.
       L.   Bond Breaker Tape (BB-Tp):           Provide polyethylene tape or other plastic tape as
            recommended by sealant manufacturer, to be applied to sealant-contact surfaces where
            bond to substrate or joint filler must be avoided for proper performance of sealant. Provide
            self-adhesive tape where applicable.
       M.   Sealant Backer Rod (S-BR): Provide compressible rod stock of polyethylene foam,
            polyurethane foam, polyethylene jacketed polyurethane foam, Butyl rubber foam, neoprene
            foam or other flexible, permanent, durable non-absorptive material as recommended by
            sealant manufacturer for back-up of and compatibility with sealant. Where used with hot-
            applied sealant, provide heat-resistant type which will not be deteriorated by sealant
            application temperature as indicated.


PART 3 - EXECUTION
3.01    INSPECTION
  A.   Installer must examine substrates, (joint surfaces) and conditions under which joint sealer work is
       to be performed, and must notify contractor in writing of unsatisfactory conditions. Do not
       proceed with joint sealer work until unsatisfactory conditions have been corrected in a manner
       acceptable to Installer.


3.02   JOINT PREPARATION
  A.   Clean joint surfaces immediately before installation of gaskets, sealants or calking compounds.
       Remove dirt, insecure coatings, moisture and other substances which could interfere with seal of
       gasket or bond of sealant or calking compound. Etch concrete and masonry joint surfaces as
       recommended by sealant manufacturer. Roughen vitreous and glazed joint surfaces as
       recommended by sealant manufacturer.
   B. Prime or seal joint surfaces where indicate, and where recommended by sealant manufacturer.
      Confine primer/sealer to areas of sealant bond; do not allow spillage or migration onto adjoining
      surfaces.


3.03    INSTALLATION
  A.   Comply with manufacturer’s printed instructions except where more stringent requirements are
       shown or specified, and except where manufacturer’s technical representative directs otherwise.
  B.   Set joint filler units at depth or position in joint as indicated to coordinate with other work,
       including installation of bond breakers, backer rods and sealants. Do not leave voids or gaps
       between ends of joint filler units.
  C.   Install sealant backer rod for liquid-applied sealants, except where shown to be omitt4ed or
       recommended to be omitted by sealant manufacturer for application indicated.
  D. Install bond breaker tape where indicated and where required by manufacturer’s recommendations
       to ensure that liquid-applied sealants will perform as intended.
  E.   Employ only proven installation techniques, which will ensure that sealants are deposited in
       uniform, continuous ribbons without gaps or air pockets, with complete “wetting” of joint bond
       surfaces equally on opposite sides. Except as otherwise indicated, fill sealant rabbet to a slightly
       concave surface, slightly below adjoining surfaces. Where horizontal joints are between a



                                                                                                        30
Project Manual – Gamble-Boyer Residence




        horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap
        moisture and dirt.
   F.   Install liquid-applied sealant to depths as shown or if not shown, as recommended by sealant
        manufacturer but within the following general limitations, measured at center (thin) section of
        beads; (not applicable to sealants in lapped joints).
        1. For sidewalks, pavements and similar joints sealed with elastomeric sealants and subject to
           traffic and other abrasion and indentation exposures, fill joints to a depth equal to 75% of joint
           width, but neither more than 5/8” deep nor less than 3/8” deep.
        2. For normal moving joints sealed with elastomeric sealants but not subject to traffic, fill joints
           to a depth equal to 50% of joint width, but neither more than ½” deep nor less than ¼” deep.
        3. For joints sealed with non-elastomeric sealants and calking compounds, fill joints to a depth
           in range of 75% to 125% of joint width.
   G.   Spillage: Do not allow sealants or compounds to overflow from confines of joints, or to spill onto
        adjoining work, or to migrate into void of exposed finishes. Clean adjoining surfaces by whatever
        means may be necessary to eliminate evidence of spillage.
   H.   Recess exposed edges of gaskets and exposed joint fillers slightly behind adjoining surfaces,
        unless otherwise shown, so that compressed units will not protrude from joints.
   I.   Bond ends of gaskets together with adhesive or “weld” by other means as recommended by
        manufacturer to ensure continuous watertight and airtight performance. Miter-cut and bond ends
        at corners unless molded corner units are provided.


3.04    CURE AND PROTECTION

         A.      Cure sealants and caulking compounds in compliance with manufacturer’s instructions
and recommendations, to obtain high early bond strength, internal cohesive strength and surface
durability. Advise Contractor of procedures required for cure and protection of joint sealers during
construction period, so that they will be without deterioration or damage (other than normal wear and
weathering) at time of substantial completion. Cure and protect sealants in a manner which will minimize
increases in modulus of elasticity and other accelerated aging effects. Replace or restore sealants which
are damaged or deteriorated during construction period.




                                              End of Section




                                                                                                           31
Project Manual – Gamble-Boyer Residence




DIVISION 8:    DOORS & WINDOWS


08200 wood doors

1.01   Finish hardware to be per Section 08710.

1.02   Interior doors and jambs: solid core, size and material per drawings.


08266 glazed wood doors

1.01   Manufacturer to be Duratherm

1.02   Provide hardware submittal

08350 folding doors

1.02   Manufacturer to be Duratherm

1.02   Provide hardware submittal

08500 windows

1.01   Provide shop drawings of all systems for review.

1.02   Hardware options: to be specified from manufacture’s standard range.

1.03   All windows to be aluminum-frame Blomberg 450 Series, Class II clear anodized finish, dual
       glazed, low-e.


08610 wood skylights


1.01   Skylight manufacturer to provide all skylight related flashings, including flashing between
       operable skylights.

1.02   Skylights:      Velux VSE Electric venting deck-mounted
                       Flashing: ECB
                       Bug screen: yes
                       Size: 106
                       Glazing: Comfort Plus Glass
                       Shade: Exterior Heatblock Awning on interior skylights only (5)
                       Keypad: WLI 160 (2), combi-link connectors (4)

1.03   Build curbs for mounting per manufacturer’s recommendations.


08710 finish hardware and hardware groups

1.01   Provide a complete hardware submittal of all systems for review.




                                                                                                     32
Project Manual – Gamble-Boyer Residence




1.02   See cut sheets.

1.03   MATERIALS



   A. Hinges:
      1. Type: five knuckle, Baldwin 1030, 1035, 1040 or 1045 as required (or McKinney). Dull
          Chrome finish.
      2. Quantity: Furnish two hinges for doors up to 5 feet high and one additional hinge for each
          2'-6" of height or fraction thereof over 5 feet.
      4. Width: Provide widths sufficient to clear trim projection when door swings 180 degrees.

   B. Door Stops:
      1. All doors to receive a door stop unless otherwise specified. See Hardware Groups.
      2. Coordinate in field with Architect exact type at each location.

   C. Finishes:
      1. Stainless steel or satin nickel finish throughout.


2.01   HARDWARE GROUPS

   Manufacturer Abbreviations
              Baldwin         BAL
              Cool Lines      COL



  Hardware Group 1 = [Dr #x]                                                          Interior Door

            Item                Description                                       Manufacturer
            Latchset            TBD, passage
            Stop


  Hardware Group 2 = [Dr #x]                                                          Interior Door

            Item                Description                                       Manufacturer
            Latchset            TBD, privacy
            Stop




                                                                                                      33
Project Manual – Gamble-Boyer Residence




08800 glazing

1.01   GLAZING TYPES


   Glazing is specified as GL, followed by codes for its characteristics
       Example:




   Characteristics are coded as follows
       1: Single Glazing
       2: Double Glazing
       A: Acrylic
       C: Color, to be selected by architect
       E: Low E
       F: Floor glass
       G: Annealed float glass - ASTM C1036, Type I, Class 1, Quality q3 or better.
       L: Laminated safety glass
       M: Mirrored float glass with, with all exposed edges polished smooth.
       N: Tinted, color to be selected by architect
       P: Patterned glass, to be selected by architect
       R: Wire safety glass
       S: Sandblasted
       T: Tempered safety glass - Shall meet ANSI Z97.1 test requirements.
       V: Vision glass - Switch Lite #SWC 10, tempered glass. See cut sheet.
       U: Translucent
       W: White


                                                 End of Section




                                                                                                     34
Project Manual – Gamble-Boyer Residence




DIVISION 9:      FINISHES


09300 tile

1.01   General

   A. Layout: align joints to give straight, uniform grout lines, parallel to walls. Field verify all layouts with
       Architect.
   B. Glass tile to be installed per the manufacturer specifications.
   C. Architect to approve from sample(s) all tile prior to material purchase and installation. Samples to
       be submitted from the actual stock from which material will be purchased and represent the
       range found within the material.
   D. Architect to approve sample of grout color in actual tile sample prior to grouting on site
   E. Shower Pan membrane: Cloraloy or equal sheet membrane, no seams.
   F. Mortar bed at wet walls. Provide waterproof backing membrane with bituthene or equal behind
       mortar at areas exposed to direct moisture. Provide water resistant membrane behind mortar at
       all other locations.

1.02   Tile Schedule:
   T-1: Bath –shower walls
        MFR: Solus Decor
        Color: Mousse
        Size: 6” x 36” x 3/4”thick
        Grout: Hydroment, color TBD

         Source: Solus Décor, 877.255.3146

   T-2: Bath – floor
        MFR: Solus Decor
        Color: Mousse
        Size: 18” x 36” x 1/2”thick
        Grout: Hydroment, color TBD

         Source:         Solus Décor
                         1445 Powell Street
                         Vancouver, BC
                         Canada V5L 1G8
                         877.255.3146


09640 wood strip flooring

1.01   Wood Floor: 3” plank, long boards.
1.02   For wood type and finish, refer to 06200 – finish carpentry and 09910 – painting and transparent
       finishes
       Source:           Flooring Alternative
                         758 Gilman Street
                         Berkeley, CA 94710
                         510.550.4449
1.03   Provide sample for Architect’s approval


                                                                                                               35
Project Manual – Gamble-Boyer Residence




09910 painting and transparent finishes

1.01     SUBMITTALS

     A. Procedure per Section 01300 Submittals.
     B. Submit 24" square hardboard samples of all colors, one for each color and type of paint to be
        used.
     C. Submit stock colors on manufacturer's standard large size chips.
     D. Prepare wood samples on type and quality of wood to be used.

1.02     QUALITY ASSURANCE

     A. As much as possible, select a single manufacturer to provide all materials for the work of this
        section, especially where systems call for primer coats or bond coats.
     B. Applicator shall demonstrate 5 years experience with similar projects.
     C. Finish paint 4ft square on wall each color and review with Architect before completing the
        application.
     D. Ensure proper project conditions before painting.
     E. All painted surfaces to be warranted for one year.

1.03     MAINTENANCE

     A. Provide Owner with one gallon of each color and type of paint used in tightly sealed, clearly
        labeled cans. Label manufacturer, color mix and phone number on each can.

MATERIALS

     A. FINISH CODING
     Finishes are described as finishing system.color, example:




C.       Finishing systems are coded as follows:
         PT-1    Flat Finish on Gypsum Board, Interior (typical finish for ceilings except as otherwise
                 noted)
                 1 coat     PVA Pigmented Sealer
                 1 coat     Latex undercoat
                 1 coat     Acrylic Latex, a second coat if first does not cover

         PT-2    Satin finish on Gypsum Board, Interior (typical finish for walls)
                 1 coat     PVA Pigmented Sealer
                 1 coat     Latex undercoat



                                                                                                          36
Project Manual – Gamble-Boyer Residence




          1 coat    Acrylic Latex, a second coat if first does not cover

   PT-3   Semigloss Finish on Wood Cabinets & Casework, Interior
          1 coat   Primer
          3 coats Lacquer, Satin Sheen

   PT-4   Semigloss Finish on Wood Trim, Interior
          1 coat   Interior wood primer
          2 coat   Semi-gloss enamel

   PT-10 Semigloss Finish on Wood, Exterior
         1 coat   Exterior wood primer
         2 coats Semi-gloss enamel

   PT-11 Flat Finish on Wood, Exterior
         1 coat     Exterior wood primer
         2 coats Acrylic Latex

   ST-1   Natural Clear Finish on Wood, Interior
          1 coat    Sanding sealer, if required
          3 coats Satin Conversion Varnish or equal

   ST-2   Stained Clear Finish on Wood, Interior
          1 coat   Stain, custom colors
          1 coat   Sanding sealer, if required
          3 coats Satin Conversion Varnish or equal

   ST-10 Natural Clear Finish on Wood, Exterior
         1 coat    Sanding sealer, if required
         3 coats Satin Conversion Varnish or equal

   ST-11 Stained Finish on Wood, Exterior
         1 coat    Stain, custom colors
         1 coat    Sanding sealer, if required
         3 coats Satin Conversion Varnish or equal


D. PAINT SCHEDULE:

          A:       MFR: Safecoat Enamal (bath shower window interior)
                   Color: TBD
                   Number: TBD

          B:       MFR: Safecoat Exterior Satin Enamal (window exterior)
                   Color: TBD
                   Number: TBD

          C:       MFR: Timber Pro UV (exterior siding)
                   Color: TBD
                   Number: TBD

          D:       MFR: TBD (wood flooring)
                   Color: TBD


                                                                                               37
Project Manual – Gamble-Boyer Residence




                        Number: TBD

                E:      MFR: TBD (wood decking)
                        Color: TBD
                        Number: TBD

                F:      MFR: Tnemec (steel)
                        Primer: Enviro-Prime Series 18
                        Color: 18-1092 Gray
                        Topcoat: Enviro-Crete Series 156
                        Color: TBD


3.01   GENERAL EXECUTION

   A. Final coat of paint, or stains on wood shall not be applied to any surface until colors have been
      accepted by the Architect.

3.02   PREPARATION

   A. Examine all surfaces for conditions that will adversely affect finishes.

   B. Broom clean rooms and spaces before commencement of work.

   C. Protect all surfaces not to be painted.

3.03   APPLICATION

   A. Comply with manufacturer's recommendations for drying time between coats.

   B. Finish coats shall be smooth and free of brush marks, streaks, laps or pileup of paints, skipped or
      missed areas.

   C. Paint visible surfaces behind vents, registers, or grilles flat black.

   D. Surfaces Not to Be Painted:

       1.   Pre-finished or integral color wall, ceiling or floor coverings.
       2.   Items with factory-applied final finish, unless noted otherwise.
       3.   Concealed ducts, pipes and conduits.
       4.   Cabinetry, unless noted otherwise
       5.   Other items listed as not painted on Drawings.


                                              End of Section




                                                                                                          38
Project Manual – Gamble-Boyer Residence




DIVISION 10:   SPECIALTIES


10300 fireplaces and stoves

1.01   Living Room stove: Rais Classic 106, glass doors, top vent. See cut sheet

1.02   Poolside fireplace per drawings. Provide shop drawings for Architect’s approval.


10800 toilet + bath accessories

1.01   Match existing house accessories

1.02   Shower curtain rod: 1-1/4” stainless steel pipe w/ stainless steel flanges screwed to wall at ends


10826 bathroom mirrors

1.01   1/4" tempered glass mirror


10900 closet specialties

1.01   Closet Poles:                    1-1/4” wood

1.02   Pole Flanges:                    Wood rosettes

1.03   Closet Curtain rod:              TBD




                                            End of Section




                                                                                                       39
Project Manual – Gamble-Boyer Residence




DIVISION 11:        EQUIPMENT


11452 residential appliance schedule (see cut sheets)

(reviewing with client for final approval)

    Item                Manuf.          Model                 Remarks
    Refrigerator        U-Line          2175RF                Full overlay, left hinge
    Cooktop             Miele           KM421                 24” Electric, stainless frame
    Oven                Miele           H4680B                24” stainless finish,
    Dishwasher          Miele           Slimline G832Sci      18” Full overlay
    Exhaust Fan         Broan           335, 1200cfm          Remote fan, roof-mounted
    (Kitchen)
    Washer              Asko            W6461                 Electric
    Dryer                                                     Electric
                        Asko            W6441
    Outdoor grill       Capital
                                        CCE32XCH2BI
    Grill ignitor                       Propane Ignition
                        Grill Lover’s
                                        system

                                             End of Section




                                                                                                  40
Project Manual – Gamble-Boyer Residence




DIVISION 12:   FURNISHINGS


12492 blinds

1.01   Roller shades to be manual roll Mecho Shades

   A. Recommended supplier:Cutting Edge Drapery, 15 Dorman Ave, San Francisco, CA
415.824.6000




                                          End of Section




                                                                                               41
Project Manual – Gamble-Boyer Residence




DIVISION 15: MECHANICAL

15000 mechanical general provisions

   See electrical/mechanical plans for additional information.


15410 plumbing fixture schedule

1.01     Kitchen


   Item            Room          Manuf.        Model                     Remarks

   Faucet          Kitchen       Chicago       540-LD372NHF              Brushed nickel
                                               317-PRJKNHF handles
   Sink            Kitchen       Elkay         ELU211510                 integral stainless steel sink


   Sink Disposal   Kitchen       Insinkerato   Evolution Excel and       Satin nickel air switch and drain;
                                 r                                       Verify need for power cord kit and
                                               Sink Top Switch
                                                                         dishwasher connector kit
   Soap            Kitchen       Grohe         28 751 SDO                Deluxe XL soap/lotion dispenser
   Dispenser
                                               Stainless Steel




1.02 Bath


   Item            Room          Manuf.          Model                   Remarks

   Sink            Bath          Elkay           EWMA4820                Two-station wall-mounted sink
                                                 LK18B drain             Verify hole drilling config
   Faucets         Bath          Chicago         540-LD372NHF            Brushed nickel
   (2)                                           317-PRJKNHF
                                                 handles
   Toilet          Bath          Toto            Carlyle                 Chrome trip lever
                                                 MS874114SG
   Shower          Bath          Grohe           Europlus II             Chrome combination trim
                                                 35233 OOO




                                                                                                         42
Project Manual – Gamble-Boyer Residence




15480 domestic water heater

1.01 Heater: to be coordinated with installation by solar thermal contractor. Contractor to provide
     adequate amp service for tank back-up electric heater.


15700 heating + air-conditioning equipment

1.01 Heat Pump: Carrier Comfort Series 5KW 38YSA with back-up electric fan coil and matching
     “Thermidistat” thermostats.


15852 registers grilles and diffusers

1.01 Exhaust fans at all bathrooms and laundry: Panasonic FV11VF1

1.02 Ducts to be 8” spiral. Provide submitall.

1.03 Supply Vent: Seiho NT 8. See cut sheet.

1.04 Return air grille: TBD, provide allowance.




                                             End of Section




                                                                                                      43
Project Manual – Gamble-Boyer Residence




DIVISION 16:     ELECTRICAL


16000 electrical general provisions

1.01    Contractor to provide power, lighting, switching, dimming, and fixtures per the plans.

    B. Provide telephone service and all house pre-wiring and jacks per drawings. Provide two CAT5-E
       communication/phone wires to each phone jack with 2 jack plate. Use TCI/ATT cable for all TV
       wiring home runs.

    C. Audio Visual equipment by Owner, General Contractor to accommodate and coordinate as
       required. General Contractor to do all AV wiring and terminations.

    D. Verify existing 400-amp service and provide new 200-amp subpanel at Guest Cottage.


16140 wiring devices

Cover plates for all switches, receptacles, jacks, etc., are to be a matching style. Contractor to furnish
       submittals of the following:

    A. Typical on/off lighting switches: Lutron Diva Satin, match existing house color.

    B. Typical dimmer switches:           Lutron Diva Satin, match existing house color.

    C. Typical receptacles:               Lutron Diva Satin, match existing house color.

    D. Typical Jacks:                     Lutron Diva Satin, match existing house color.

    E. Typical coverplates:               Lutron Diva Satin, match existing house color.

    F. AT KITCHENETTE STAINLESS STEEL WALLS:
          A. Receptacles/switches to be Diva Black.
          B. Coverplates to be Claro stainless steel, brushed finish

    G. Plugmold: Wiremold 2000 series, stainless steel.

    H. Smoke detectors: provide submittal.




                                                                                                             44
Project Manual – Gamble-Boyer Residence




16501 light fixture schedule

1.01    Provide submittal for all fixtures for Architect review.

1.02    At kitchen and bathrooms where fluorescent fixtures are required for code, provide any type of
        fluorescent, code complying fixture and install for final inspections. Following inspections, replace
        with fixtures scheduled.

1.03    Lighting Schedule (see cut sheets)

 Type    Description        Manufacturer          Lamp                    Quantity    Remarks

 F1      Wall mount         RAB                   LQ150                       9       Paint?
                            QF300
 F2      Under cabinet      WAC                   13W T5                      8       white
                            BA-BF-13
 F3      Wall mount         Stonco                100w incandescent           7       Prismatic globe
                            VK1K                                                      NO CAST GUARD
                            VGP100
 F4      Recessed           TBD                                               4
         ceiling
 F5      Wall mount         Artemide              100W incandescent           2
                            Tolomeo Wall
                            Spot
 F6      Wall mount         Stonco                100w incandescent           4       Prismatic globe
                            VW1K                                                      NO CAST GUARD
                            VGP100
 F7      Ceiling Fan        Boffi                 Minimal Air                 2       400mm length
                            Boffi Los Angeles
                            310.458.9300



16850 television equipment

1.01    Flat panel television and bracket provided by owner. Contractor to install.



                                                End of Section




                                                                                                          45

More Related Content

What's hot

FHA Streamline 203[k] Wholesale
FHA Streamline 203[k] WholesaleFHA Streamline 203[k] Wholesale
FHA Streamline 203[k] Wholesaleafrmarketing
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-1205061978
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12Osmar Gomes Pinto
 
Bedingfield Assessment Report, blank
Bedingfield Assessment Report, blankBedingfield Assessment Report, blank
Bedingfield Assessment Report, blankWally Dutcher
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...Angeline KH
 
Borg Warner Presentation
Borg Warner PresentationBorg Warner Presentation
Borg Warner Presentationbtharp
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairFairfax County
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairSharon Rae North
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESwendyteosy
 

What's hot (12)

FHA Streamline 203[k] Wholesale
FHA Streamline 203[k] WholesaleFHA Streamline 203[k] Wholesale
FHA Streamline 203[k] Wholesale
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
 
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-122.5.3 3 3-steel-storage-tanks-effective-12-19-12
2.5.3 3 3-steel-storage-tanks-effective-12-19-12
 
Bedingfield Assessment Report, blank
Bedingfield Assessment Report, blankBedingfield Assessment Report, blank
Bedingfield Assessment Report, blank
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
ARC 3612 PROJECT MANAGEMENT- PROJECT 1- DEFINING AND DOCUMENTING A RESIDENTIA...
 
Borg Warner Presentation
Borg Warner PresentationBorg Warner Presentation
Borg Warner Presentation
 
Project list
Project listProject list
Project list
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer Repair
 
Burke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer RepairBurke View Court Emergency Sewer Repair
Burke View Court Emergency Sewer Repair
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
 

Similar to 070305 gamble-project-manual

Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
Item # 8 Sewer Rehab Contract - Ogden
Item # 8   Sewer Rehab Contract - OgdenItem # 8   Sewer Rehab Contract - Ogden
Item # 8 Sewer Rehab Contract - Ogdenahcitycouncil
 
PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation Jaey Chai
 
Session-02 17-09-2011
Session-02 17-09-2011Session-02 17-09-2011
Session-02 17-09-2011Tahir B Mirza
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsYee Len Wan
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val repIndependentgroup
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Making Changes on the Construction Project
 Making Changes on the Construction Project Making Changes on the Construction Project
Making Changes on the Construction ProjectMelissa Brumback
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7Farah Sham
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction projectMarvin M Gamboa
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanJames Zhang (Chi, Zhang)
 
Locksmith modified MTA hardware specs
Locksmith modified MTA hardware specsLocksmith modified MTA hardware specs
Locksmith modified MTA hardware specsAShestopalov
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
A Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptxA Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptxMahSobeh
 

Similar to 070305 gamble-project-manual (20)

Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
Item # 8 Sewer Rehab Contract - Ogden
Item # 8   Sewer Rehab Contract - OgdenItem # 8   Sewer Rehab Contract - Ogden
Item # 8 Sewer Rehab Contract - Ogden
 
PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation
 
Session-02 17-09-2011
Session-02 17-09-2011Session-02 17-09-2011
Session-02 17-09-2011
 
Construction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual ClaimsConstruction Law - Presentation - Construction Contractual Claims
Construction Law - Presentation - Construction Contractual Claims
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val rep
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Making Changes on the Construction Project
 Making Changes on the Construction Project Making Changes on the Construction Project
Making Changes on the Construction Project
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
TOPIC7.pdf
TOPIC7.pdfTOPIC7.pdf
TOPIC7.pdf
 
Cl report final
Cl report finalCl report final
Cl report final
 
35 days bid procedure for construction project
35 days bid procedure for construction project35 days bid procedure for construction project
35 days bid procedure for construction project
 
Attachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution PlanAttachement 3 61T01411 - Construction Execution Plan
Attachement 3 61T01411 - Construction Execution Plan
 
Locksmith modified MTA hardware specs
Locksmith modified MTA hardware specsLocksmith modified MTA hardware specs
Locksmith modified MTA hardware specs
 
Cl presentation
Cl presentationCl presentation
Cl presentation
 
Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
A Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptxA Claim submitted by the contractor during for slides.pptx
A Claim submitted by the contractor during for slides.pptx
 
Br pdf ad_p_2010
Br pdf ad_p_2010Br pdf ad_p_2010
Br pdf ad_p_2010
 

More from laneycollege

Review of green building march 2011
Review of green building march 2011Review of green building march 2011
Review of green building march 2011laneycollege
 
Presentation ieq and health
Presentation ieq and healthPresentation ieq and health
Presentation ieq and healthlaneycollege
 
Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010laneycollege
 
From cob to prefab and beyond
From cob to prefab and beyondFrom cob to prefab and beyond
From cob to prefab and beyondlaneycollege
 
Green point rated and green materials
Green point rated and green materialsGreen point rated and green materials
Green point rated and green materialslaneycollege
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laneylaneycollege
 
Volunteer orientation -grid alternatives
Volunteer orientation -grid alternativesVolunteer orientation -grid alternatives
Volunteer orientation -grid alternativeslaneycollege
 
Passive house slide show
Passive house slide showPassive house slide show
Passive house slide showlaneycollege
 
Blue2 posters 100704c w nyt
  Blue2 posters 100704c w nyt  Blue2 posters 100704c w nyt
Blue2 posters 100704c w nytlaneycollege
 
John loyldsolarssu
John loyldsolarssuJohn loyldsolarssu
John loyldsolarssulaneycollege
 
Ebd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopeEbd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopelaneycollege
 
Laney lighting pec
Laney lighting pecLaney lighting pec
Laney lighting peclaneycollege
 
Cavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finalCavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finallaneycollege
 
Green building codes, programs & rating systems
Green building codes, programs & rating systemsGreen building codes, programs & rating systems
Green building codes, programs & rating systemslaneycollege
 
Climate change and the sustainable built environment
Climate change and the sustainable built environmentClimate change and the sustainable built environment
Climate change and the sustainable built environmentlaneycollege
 
John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting laneycollege
 
Passive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightingPassive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightinglaneycollege
 
Energy the carbon imperative - shorter version revised 3-17-11
Energy  the carbon imperative - shorter version revised 3-17-11Energy  the carbon imperative - shorter version revised 3-17-11
Energy the carbon imperative - shorter version revised 3-17-11laneycollege
 

More from laneycollege (20)

Review of green building march 2011
Review of green building march 2011Review of green building march 2011
Review of green building march 2011
 
Presentation ieq and health
Presentation ieq and healthPresentation ieq and health
Presentation ieq and health
 
Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010
 
From cob to prefab and beyond
From cob to prefab and beyondFrom cob to prefab and beyond
From cob to prefab and beyond
 
Green point rated and green materials
Green point rated and green materialsGreen point rated and green materials
Green point rated and green materials
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laney
 
Volunteer orientation -grid alternatives
Volunteer orientation -grid alternativesVolunteer orientation -grid alternatives
Volunteer orientation -grid alternatives
 
Passive house slide show
Passive house slide showPassive house slide show
Passive house slide show
 
Blue2 posters 100704c w nyt
  Blue2 posters 100704c w nyt  Blue2 posters 100704c w nyt
Blue2 posters 100704c w nyt
 
John loyldsolarssu
John loyldsolarssuJohn loyldsolarssu
John loyldsolarssu
 
Ebd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopeEbd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scope
 
Laney lighting pec
Laney lighting pecLaney lighting pec
Laney lighting pec
 
Building science
Building scienceBuilding science
Building science
 
Cavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finalCavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 final
 
Leed for-homes
Leed for-homesLeed for-homes
Leed for-homes
 
Green building codes, programs & rating systems
Green building codes, programs & rating systemsGreen building codes, programs & rating systems
Green building codes, programs & rating systems
 
Climate change and the sustainable built environment
Climate change and the sustainable built environmentClimate change and the sustainable built environment
Climate change and the sustainable built environment
 
John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting
 
Passive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightingPassive solar, passive cooling and daylighting
Passive solar, passive cooling and daylighting
 
Energy the carbon imperative - shorter version revised 3-17-11
Energy  the carbon imperative - shorter version revised 3-17-11Energy  the carbon imperative - shorter version revised 3-17-11
Energy the carbon imperative - shorter version revised 3-17-11
 

Recently uploaded

MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 

Recently uploaded (20)

MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 

070305 gamble-project-manual

  • 1. Project Manual – Gamble-Boyer Residence PROJECT MANUAL For Gamble-Boyer Residence 5310 Lovall Valley Rd Sonoma, CA March 05, 2007 FOR BID Prepared by: CCS Architecture, Inc. 44 McLea Court San Francisco CA 94103 1
  • 2. Project Manual – Gamble-Boyer Residence Table of Contents PROJECT SPECIFICATIONS division 1: general requirements 01010 summary of work 01025 measurement and payment 01036 change orders 01040 procedures & controls 01045 cutting and patching 01200 project meetings 01300 submittals 01500 construction facilities and temporary controls 01630 substitutions 01700 contract close out 01710 cleaning division 2: site work 02000 general division 3: concrete 03300 cast in place concrete division 4: masonry 04200 unit masonry division 5: metals 05100 structural steel 05500 metal fabrications 05586 architectural metalwork division 6: wood 06062 lumber 06100 composite wood panels 06150 wood decking 06200 finish carpentry 06400 architectural woodwork 06420 wood paneling division 7: thermal and moisture protection 07100 damproofing and waterproofing 07210 building insulation 07260 vapor retarders 07460 exterior siding 07500 membrane roofing 2
  • 3. Project Manual – Gamble-Boyer Residence 07610 metal roofing 07620 sheet metal flashing and trim 07915 sealants division 8: doors and windows 08200 wood doors 08266 glazed wood doors 08350 folding doors 08500 windows 08620 unit skylights 08710 door hardware 08800 glazing division 9: finishes 09300 tile 09640 wood strip flooring 09910 painting and transparent finishes division 10: specialties 10300 fireplaces + stoves 10800 toilet + bath accessories 10826 bathroom mirrors 10900 closet specialties division 11: equipment 11452 residential appliance schedule division 12: furnishings 12492 blinds division 15 mechanical 15000 mechanical general provisions 15410 plumbing fixture schedule 15480 domestic water heaters 15700 heating + air-conditioning equipment 15852 registers grills and diffusers division 16: electrical 16000 electrical general provisions 16140 wiring devices 16501 light fixture schedule 16850 television equipment 3
  • 4. Project Manual – Gamble-Boyer Residence DIVISION 1: GENERAL REQUIREMENTS 01010 summary of work 1.01 SUMMARY A. The General Conditions, Supplementary Conditions, and Division 1, General Requirements, applies to the Work of all Sections. 1.02 WORK COVERED BY CONTRACT DOCUMENTS Contractor to provide all demolition services, including debris removal. All temporary measures, including pedestrian protection to be by the Contractor. A separate phone line for use during construction shall be the responsibility of the Contractor. 1.03 WORK NOT COVERED BY CONTRACT DOCUMENTS A. Primary building permit to be secured by the Architect. All other permits to be secured by the Contractor. 1.04 USE OF PREMISES Contractor to provide all temporary facilities necessary for construction. 01025 measurement and payment 1.01 Applications for Payment: A. Submit Applications for Payment to the Architect in accordance with the schedule established by the General Conditions and the Agreement between the Owner and the Contractor. B. Submit itemized applications typed on AIA Document G702, "Application and Certificate for Payment," and continuation Sheet G703. 01036 change orders 1.01 SUMMARY A. Requirements included: 1. Promptly implement change order procedures. a. Provide full written data required to evaluate changes. b. Maintain detailed records of work done on a time-and-material/force account basis or other basis as may be agreed upon between Owner and Contractor. c. Provide full documentation to Owner and Architect on request. 4
  • 5. Project Manual – Gamble-Boyer Residence 2. Designate in writing the member of Contractor’s organization: a. Who is authorized to accept or direct changes in the Work. b. Who is responsible for informing others in the Contractor’s employ of the authorized changes in the Work. 3. Owner will designate in writing the person(s) who are authorized to execute Change Orders. B. Related Documents and Sections: 1. General Conditions: a. Methods of determining cost or credit to Owner resulting from changes in Work made on a time-and-material/force basis. b. Contractor’s claims for additional costs. 2. Submittals: Section 01300. 3. Product Options and Substitutions: Section 01630 4. Contract Closeout: Section 01700 1.02 DEFINITIONS A. Change Order: See general Conditions. B. Proposal Request: AIA Document G709 signed by the Owner, or Architect which describes a proposed change in the Work or the Contract Documents which requests the Contractor to submit an itemized quotation for changes in the Contract Sum and/or time incidental to the proposed change in the Work or modification to the Contract Documents. C. Change Request: Contractor-initiated document containing an itemized quotation for change in the Contract Sum and/or Contract Time incidental to the proposed change in the Work or modification to the Contract Document referenced therein, for inclusion in a subsequent Change Order, if signed by the Owner and Architect. D. Construction Change Directive: AIA Document G714; see the General Conditions. PRELIMINARY PROCEDURES A. All forms shall be reviewed by all parties to the Contract and approved by mutual agreement prior to commencement of construction. B. Owner, through Architect, may initiate changes by submitting a Proposal Request to Contractor. 1. Request will include: a. Detailed description of the change, products, and location of the change in the Project. b. Supplementary or revised Drawings and Specifications. c. The projected time span for making the change, and a specific statement as to whether overtime work is or is not authorized. d. A specific period of time during which the requested price will be considered valid. 5
  • 6. Project Manual – Gamble-Boyer Residence e. Such request is for information only and is not an instruction to execute the changes nor to stop Work in progress. C. Contractor may initiate changes by submitting a written notice to the Owner through the Architect. 1. Notice shall include: a. Description of the proposed changes. b. Statement of the reason for making the changes. c. Statement of the effect on the Contract Sum and the Contract Time. d. Statement of the effect on the work of separate contractors. e. Documentation supporting any change in Contract Sum or Contract Time, as appropriate. f. Such request is not an authorization to execute the changes nor to stop Work in progress. 1.04 CONSTRUCTION CHANGE DIRECTIVE A. In lieu of Proposal Request or Change Request, Owner may issue Construction Change Directive for Contractor to proceed with a change for subsequent inclusion in a Change Order. B. Construction Change Directive will describe changes in the Work, both additions and deletions, with attachments of revised Contract Documents to define details of the change. C. Owner and Architect will sign and date the Construction Change Directive as authorization for the Contractor to proceed with the changes. D. Contractor may sign and date the Construction Change Directive to indicate agreement with the terms therein. 1.05 DOCUMENTATION OF PROPOSALS AND CLAIMS A. All change request quotations shall be in direct response to and correspondence with specific Proposal Request, Construction Change Directive, or Contractor-initiated change and shall be a complete and full response to that Change Request. 1. No partial quotations or quotations which combine various Changes Requests or portions of Changes Requests will be accepted. B. Support each quotation for a lump-sum proposal and for each unit price that has not previously been established with sufficient substantiating data to allow Owner and Architect to evaluate the quotation. C. Substantiating data to support time and cost computations shall consist of the following, as applicable: 1. Labor required. 2. Equipment required. 3. Products required. a. Recommended source of purchase and unit cost. b. Quantities required. 6
  • 7. Project Manual – Gamble-Boyer Residence 4. Taxes, insurance, and bonds. 5. Credit for work deleted from Contract, similarly documented. 6. Overhead and profit. Mark-ups on all pricing (labor, materials, and the like) shall be established at the beginning of the Work and shall not be altered. 7. Justification for any change in Contract Time. D. A period of 1 week (5 working days) will be allowed in which the Contractor shall respond to Proposal Requests and Construction Change Directives as described above. E. Support each claim for additional costs and for work done on a time-and-material/force account basis with documentation as required for a lump-sum proposal, plus additional information: 1. Name of the Owner-authorized person who ordered the work and date of the order. 2. Dates and times work was performed and by whom. 3. Time record, summary of hours worked, and hourly rates paid. 4. Receipts and invoices for the following: a. Equipment used, listing dates and times used. b. Products used, listing quantities. c. Subcontractors. F. Document requests for substitutions for products as specified in Section 01630, “Product Options and Substitutions.” 1.06 PREPARATION OF CHANGE ORDER A. Contractor shall prepare each Change Order for a signature by Owner, Architect, and Contractor on a form acceptable to all parties. B. Change Order will describe changes in the Work, both additions and deletions, with attachments, if applicable, of revised Contract Documents to define details of the change. C. Change Order will provide an accounting of the adjustment in the Contract Sum and in the Contract Time. 1.07 LUMP-SUM/FIXED PRICE CHANGE ORDER A. Content of Change Orders will be based on either: 1. Contractor’s Change Request as mutually agreed between Owner and Contractor. 2. Owner’s Construction Change Authorization. B. Owner and Architect will sign and date the Change Order as authorized by a change in the work or change in the Contract Sum and/or Time. C. Contractor shall sign and date the Change Order to indicate agreement with terms herein. 7
  • 8. Project Manual – Gamble-Boyer Residence 1.08 CORRELATION WITH CONTRACTOR’S SUBMITTALS A. Periodically revise Schedule of Values and Request for Payment Forms to record each change as a separate item of Work and to record the adjusted Contract Sum. B. Periodically revise the construction schedule to reflect each change in Contact Time. 1. Revise sub schedules to show changes for other items of work affected by the changes. C. Upon completion of work under a Change Order, enter pertinent changes in Record Documents. 01040 procedures and controls RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to the work of this section. ADMINISTRATION AND SUPERVISION A. Coordinate various elements of the work and entities engaged to perform the work. Coordinate the work with existing facilities and conditions, and with work by separate contractors and by the Owner. Coordination includes but is not limited to: 1. Construction material storage with Owner. 2. Salvaged material storage with Owner. 3. Pre-purchased materials with Owner’s vendor. B. The Contractor shall maintain a full time Job Superintendent on premise at all times to coordinate the work. Do not delegate the responsibility for coordination to a Subcontractor. RECORDING A. Working from boundaries established through the documents, establish and maintain dependable markers for the lines of the work area. B. Calculate dimensions and measure for layout of work. DO NOT SCALE DRAWINGS. Record deviations if any from drawings and specification information regarding existing and new conditions and review with Architect at time of discovery. INSPECTIONS AND TESTING A. If determined to become required, Owner to retain and pay for services of Independent Testing Laboratory to perform specified testing and investigation services. Contractor to coordinate special inspections and testing requirements with the work as indicated in specific portions of the specifications. Special testing and inspection may include but is not necessarily limited to the following: 1. Testing of soils and hazardous waste. 8
  • 9. Project Manual – Gamble-Boyer Residence 2. Testing of existing building components for asbestos. 3. Field welding of structural steel components. B. Promptly notify Architect or Engineer of irregularities or deficiencies of work, which are observed during the performance of services. C. Contractor to notify Architect and Owner of the progress of the Work and recommend appropriate timeframes for the performance of special testing and inspection services. D. Installer Inspections: Require installer of each major unit of work to inspect substrate and conditions for installation and to report in writing unsatisfactory or ambiguous conditions which affect their work before proceeding. E. Inspect each product or assembly before installation and do not install damaged or defective products, materials, or equipment. INSTALLATION A. Comply with manufacturer’s installation instructions and recommendations. B. Install work during time and under conditions, which will insure best possible results. C. Anchor units securely in place, properly located by measured line and level. 01045 cutting and patching PART 1 – GENERAL Cutting and patching includes cutting into existing construction to provide for the installation or performance of other work and subsequent fitting and patching required to restore surfaces to their original condition. Patching shall achieve security, and weather protection, shall preserve continuity of existing fire ratings, and shall successfully duplicate adjacent finishes, colors, textures, and profiles. PART 2 – PRODUCTS Materials for patching shall be identical to existing materials. If identical materials are not available, use materials that visually match existing adjacent surfaces. PART 3 – EXECUTION Provide temporary support of work to be cut where required. Protect other Work during cutting and patching to prevent damage, including protection from exposure to the weather. Cut the Work using methods least likely to damage Work to be retained or adjoining work. Use hand or small power tools designed for sawing or grinding. 9
  • 10. Project Manual – Gamble-Boyer Residence Cut through concrete and masonry using carborundum or diamond blade circular saw or core drill. Coordinate all saw cutting of existing concrete panels with Architect before proceeding. By-pass utility services shown or required to be removed, relocated or abandoned. Patch with durable and invisible seams. Where required, extend patching into retained adjoining Work to eliminate evidence of patching. Finish or refinish cut and patched surfaces to match adjacent finishes. Paint over complete surface plane, unless otherwise indicated. Over patched walls or ceiling surfaces, paint to nearest cutoff line for entire surface, such as intersection with adjacent wall or ceiling, beam, pilasters, or to nearest opening frame, unless otherwise indicated. Painted surfaces shall not present a spotty, touched-up appearance. 01200 project meetings 1.01 Prior to commencement of Work, a pre-construction conference will be held at a site to be designated by the Architect to discuss procedures to be followed during the progress of the Work. 1.03 Schedule job meeting with the Architect, Contractor and Owner on a weekly basis. 1.04 Eleven months following date of final acceptance, hold a meeting to review guarantees, bonds, and service and maintenance contracts for materials and equipment. Implement repair or replacement of defective items, and extend service and maintenance contracts, as desired by Owner. 01300 submittals 1.01 Make submittals in advance of scheduled dates of installation to provide time for reviews, for securing necessary approvals, for possible revision and re-submittal, and for placing orders and securing delivery. 1.02 Submittals shall be complete. All submittals, including shop drawings, shall bear the Contractor's stamp of review and approval. No submittal will be reviewed without having been transmitted through the Contractor. 1.03 Shop Drawings: submit three black-line or blue-line prints for review by Architect, two shall be returned to Contractor. 1.04 Only those Shop Drawings which bear stamps showing final review of the Contractor, Architect, and the Architect's consultants, shall be used. 1.05 Required Submittals. Submittals during construction will be required throughout, including but not limited to: 1. Samples of all finish materials (wood, paint, etc.) 2. Detailed shop drawings of all cabinetry, countertops, metal work, windows, doors. skylights and other shop fabricated items 3. Finish hardware cut sheets and purchase orders, lighting cut sheets, plumbing and appliance cut sheets 10
  • 11. Project Manual – Gamble-Boyer Residence 1.06 Allow a minimum of 10-working days for processing by the Architect and his Consultants. 01500 construction facilities and temporary controls 1.01 Temporary Utilities A. Furnish, install, and maintain temporary utilities as required to perform the Work. Materials, installation, and maintenance of temporary utilities shall be in compliance with applicable regulatory requirements. Remove temporary utilities, including associated materials and equipment when no longer required. B. Temporary Electric Power and Lighting to be by the Contractor, if required. D. Temporary Water to be by the Contractor, if required. E. Temporary Sanitary Facilities to be by the Contractor. Maintain in a neat, sanitary condition, adequately supplied. F. Temporary Fire Protection: Provide and maintain fire extinguishers, fire hoses, and other equipment necessary for proper fire protection during the progress of the Work. Equipment shall be designed for fire protection only. 01630 substitutions 1.01 Contractor's Options: A. For products specified only by reference standard, select product meeting referenced standard. B. For products specified by naming one or more products or manufacturers, select products of any named manufacturer meeting Specifications. C. For product or manufacturer which is specifically named, a written request will be required for substitution. D. Where terms "or equal," "or approved equal," or similar references are made, submit request for substitutions for product or manufacturer not specifically named in Specifications. 01700 contract close out 1.01 Required Record Documents: A. Provide Record Drawings, showing any modifications to the Contract Documents. This can be made on a set of prints, and then submitted to the Architect. One set of approved Shop Drawings showing changes made during construction shall also be furnished. 11
  • 12. Project Manual – Gamble-Boyer Residence B. Provide 8"x10" paint cards of all finish paint colors/sheens used, with clearly labeled identification tags showing manufacturer's name and code, plus one gallon of each paint – labeled where used. C. Operating and maintenance manuals shall be required, assembled in a three-ring, plastic binders sized for 8-1/2-inch x 11-inch sheets. Include a cover containing the Project name and address and the general subject matter in the manual, typewritten index, instructions regarding operation and maintenance of the equipment included in the manual, replaceable parts, part numbers, and name and address of nearest parts distributor, and copy of each warranty and service contract issued for the equipment included in the manual. D. Warrantees and service contracts shall be submitted for all items which carry such documentation. E. "As-Built" Drawings will not be required. 1.02 Provide instruction to the Owner for operation and maintenance of all systems and their components. 1.04 Service and Maintenance Contracts: Compile, review, and submit specified service and maintenance contracts as specified for warranties and bonds. 1.08 Extra Materials: Where specified, furnish extra materials in the quantities and manner specified. 01710 cleaning 1.01 Clean interior spaces prior to the start of finish painting and the application of other finishes, and continue cleaning as required until such Work is completed. 1.02 Remove dust, dirt, grease, stains, fingerprints, labels, spilled and spatters, and other materials from interior and exterior surfaces exposed to view. Wash and shine glazing and mirrors. Polish glossy surfaces to a clear shine. 1.03 Clean permanent filters and replace disposable filters of units operated during construction. Clean ducts, blowers, and coils of units operated during construction. 1.04 Vacuum and wipe insides of electrical panels and cabinetwork. 1.05 Mop clean interior spaces. Broom clean exterior paving. Rake clean ground surfaces. 1.06 Air out project with natural ventilation for at least two weeks between end of construction and occupancy. End of section 12
  • 13. Project Manual – Gamble-Boyer Residence DIVISION 2: SITE WORK 02000 general A. Include demolition of the patio and site wall per the drawings. B. Grading and drainage per the drawings. C. Contractor to provide excavation and earthwork as required. D. Provide all hardscape and retaining walls per the drawings. E. Owner to receive separate price for all landscaping and irrigation. Contractor to coordinate installation. F. Provide sewer system additions per the engineer’s drawings and specifications. G. Connect water to existing well. H. Gravel path stone type to be determined, provide allowance. I. Trellis corrugated roofing: Manufacturer: Enduro Composites 1005 Blue Mound Road Fort Worth, TX 76131 1.800.667.8664 Model: Tuff Span 2.67x7.8 PFR 400 Color: Trans Clear N2000T End of section 13
  • 14. Project Manual – Gamble-Boyer Residence DIVISION 3: CONCRETE 03300 cast-in-place concrete 1.01 Section includes: Concrete structural slabs, footing and stem walls, exterior finish stairs and retaining walls, fireplace surround, shower pan and curb 1.02 See structural drawings and soils report for general concrete specifications. 1.03 Provide 2’ x 2’ samples of all concrete finishes with all sealants and waxes applied over half of the samples for review per 1300 Submittals 1.04 Exposed Concrete A. Poured-in-place with Davis Powder Concentrate color mix for integral color. Refer to manufacturer’s instructions for installation. B. Use good quality plywood form boards, unless otherwise noted. Do not use form ties that will be exposed or will rust. C. Finish at exposed foundation walls: 1. Board form – 2x6 vertical smooth boards against 2x form, very tight, no form ties 2. Use finishing nails: 2 at 6” below top of wall and 2 at 36” centers to grade 3. Seal with Davis W-1000 Concrete Cure and Sealer 4. Color: San Diego Buff D. Finish at stairs: 1. Board-formed riser: 1x6 smooth vertical boards against 2x form, very tight, no form ties 2. Use finishing nails: 2 at 6” below top of wall and 2 at 6” above grade per board 3. Broom finish tread and trowel an eased nosing 4. Color: San Diego Buff E. Finish at poolside retaining wall: 1. Board-formed: 1x6 horizontal, long,smooth boards against 2x form, very tight, no form ties 2. Use finishing nails: 2 at 36” centers per board 3. Seal with Davis W-1000 Concrete Cure and Sealer 4. Color: match existing pise wall F. Finish at fireplace surround, hearth and wood storage: 1. Board-formed: 1x6 horizontal, long,smooth boards against 2x form, very tight, no form ties 2. Use finishing nails: 2 at 36” centers per board 3. Seal with Davis W-1000 Concrete Cure and Sealer 4. Color: match existing pise wall G. Finish at shower pan and curb: 1. Reinforced Portland Cement. Use normal sand aggregate, rinsed clean. 2. Form with MDO, no board panel joints 3. Seal with: ? 4. Color: match concrete tile End of section 14
  • 15. Project Manual – Gamble-Boyer Residence DIVISION 4: MASONRY 04200 unit masonry 1.01 Fireplace A. Fireplace to be per drawings. 1. Outside of fireplace to be concrete. See section 03300. Firebox to be yellow fire brick. 2. Provide double wall flue in stainless steel. 3. Contractor shall coordinate concrete and fireplace subcontractors to ensure proper installation of each part. End of section 15
  • 16. Project Manual – Gamble-Boyer Residence DIVISION 5: METALS 05100 structural steel 1.01 Refer to Structural drawings for specifications 05500 metal fabrications 1.01 Section includes: exterior metal panels 1.02 Panels shall be 10 gauge Corten steel, size per drawings Supplier: Primary Metals Ray Garr 1699 West Grand Ave Oakland, CA 510.251.0900 Fabricator: Master Metal Products Eric 495 Emory Street San Jose, CA 95110 408.275.1210 05586 architectural metalwork. 1.01 Section includes: countertops, Interior edge metal 1.02 Use Schluter –Scheine stainless edge metal at tile, per drawings. 1.03 Use stainless steel for countertops, per drawings. A. Weld stainless steel sink to stainless steel counter and grind smooth. B. Provide shop drawings of work. C. Recommended Fabricator: American Metal Products Steve Gardner 1320 Underwood Avenue San Francisco, CA 94124 415.822.4100 End of Section 16
  • 17. Project Manual – Gamble-Boyer Residence DIVISION 6: WOOD AND PLASTICS 06062 lumber 1.01 Framing lumber A. All framing lumber to be construction grade, FSC certified. B. All lumber to be free of chromium and arsenic C. See structural drawings for specifications on wood framing. 06100 composite wood panels 1.01 Plywood A. All exposed interior plywood to be “underlayment”, FSC certified. B. All exposed exterior plywood to be exterior grade phenol-bonded weatherproof type, FSC certified. C. All concealed plywood to be per structural requirements or drawings. 06150 wood decking 1.01 5/4” X 6” Ipe wood decking with pre-finished clear coat, installed per manufacturer’s instructions. Source: Beronio Lumber CO 2525 Marin Street, San Francisco, CA (415) 824-4300 (10.31.06) 06200 finish carpentry PART 1 - GENERAL 1.01 WORK INCLUDED Wood casework Wood floors 1.02 RELATED SECTIONS A. Section 06400 – Architectural Woodwork B. Section 09640 – Wood strip Flooring C Section 09910 – Painting and Transparent Finishes 17
  • 18. Project Manual – Gamble-Boyer Residence 1.03 WOOD CODING Wood is described as species.cut.usage, finish (reference division 09910) Example: Species are coded as follows: WD-1: White oak WD-2: Red oak WD-3: American walnut WD-4: Black walnut WD-5: Brazilian walnut WD-6: American cherry WD-7: Brazilian cherry WD-8: Honduran mahogany WD-9: Hickory WD-10: Ash WD-11: Maple WD-12: Poplar WD-13: Redwood WD-14: Pine WD-15: Douglas fir WD-16: Zebra wood WD-17: Teak WD-18: Koa WD-19: Bamboo, blond WD-20: Bamboo, carbonized 18
  • 19. Project Manual – Gamble-Boyer Residence WD-21: Cork WD-22: Lyptus Cut is coded as follows: 1: Quarter sawn 2: Rift cut 3: Select cut 4: Paint sliced, or equal Wood usage is coded as follows: S: Solid stock T: Tongue and groove V: Veneer over 3/4” plywood F: Finger jointed P: Pre-engineered R: Recycled/reclaimed 06400 architectural woodwork 1.01 SECTION INCLUDES: Kitchenette, Bathroom and Closet cabinets. A. Provide shop drawings and finished samples of materials for Architect approval. B. European-style cabinets, flush inset panels. C. Concealed cabinet interiors: almond melamine. D. Drawer and roll-out interiors: pre-finished maple plywood. Dovetailed construction. E. Hinges: Blum Clip-top concealed hinges, or equal. See cut sheet. F. Glides: Blum Tandem full-extension bottom mounting glides, or equal. Sized for drawer loads. See cut sheet. G. Adjustable shelving supports: Swedish-type supports, Hafele 282.04.702. See cut sheet. H. Recommended millworker: Amerian Woodworking 2856 Aiello Drive San Jose, CA 95111 408.227.5533 or Glen? 1.02 CABINET HARDWARE + ACCESSORIES A. Kitchenette 1. Pulls: Match existing main house kitchen 2. Upward opening cabinet hinges: Hafele, Lid Stay, 100N and Hafele, Duomatic hinge, Inset mount, 329.17.520. See cut sheet. 19
  • 20. Project Manual – Gamble-Boyer Residence B. Bathroom 1. Pulls: Match existing house bathroom D. Closet 1. Pulls: Match existing house closets 06420 wood paneling 1.01 Wood paneling shall be 1x6 T+G clear western red cedar siding, no finish. End of Section 20
  • 21. Project Manual – Gamble-Boyer Residence DIVISION 7: THERMAL & MOISTURE PROTECTION 07100 damproofing and waterproofing 1.01 coordinating with structural. 07210 building insulation PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Loose fit cotton fiber insulation Related sections: 1. See Sections 07511, Built-up asphalt bituminous roofing. 1.02 SUBMITTALS A. Procedures: In accordance with Section 01300, "Submittals." Product Literature: Literature fully describing the products to be supplied. 1.03 QUALITY ASSURANCE A. Applicator shall demonstrate proof of a minimum of five years experience specified process. Owner reserves the right to reject a proposed supplier. PART 2 - PRODUCTS 2.01 MATERIALS (getting from energy consultant) B. Insulate floor joist w R-30 C. Insulate all roof/ceiling with R-30 per drawing details D. Insulate exterior walls with R-19. PART 3 - EXECUTION 3.01 Verify all roof deck conditions at site with Architect before installing rigid insulation at roof. 3.02 Carefully cut and fit insulation around pipes, conduit and other obstructions and penetrations. 3.03 Use manufacturer recommended fasteners of appropriate length when securing roof deck insulation. DO NOT LET FASTENERS PENETRATE THROUGH UNDERSIDE OF ROOF DECK. Contractor shall remove all fasteners that penetrate the underside of the roof deck and repair the resulting damage. 3.04 Remove debris from roof surfaces and Project site. Leave surfaces in a condition acceptable to roof membrane installer. 21
  • 22. Project Manual – Gamble-Boyer Residence 07260 vapor retarders PART 1 - GENERAL PART 2 - PRODUCTS 2.01 MATERIALS A. Vapor Retarder: Kraft paper sheets laminated together with fiberglass reinforcing and multi-ply polyethylene sheet and with a laboratory tested maximum vapor transmission rating of 0.15 perm; "Moistop" by Fortifiber Corp., or equal. B. Vapor Barrier: 6 mil Visqueen, or equal. C. Sand: ASTM C33, uniformly graded, clean sand, free from excessive fines, organic material, and other deleterious substances. D. Vapor-Retarder Tape: Minimum 2-inch-wide self-adhering type designed to maintain vapor retarder integrity. E. Provide bituthene or equal wrap at all exterior door and window openings. PART 3 - EXECUTION 3.01 EXAMINATION A. Check that areas to receive membrane are clean and dry. B. Check that pipes, vents, drains, and other penetrations of the membrane are completed. C. Where nails, screws, or other penetrations exist, apply heavy beads of caulking compound or manufacturer's pressure-sensitive tape. D. Do not commence installation of membrane until conditions are satisfactory. 3.02 INSTALLATION UNDER SLAB-ON-GRADE A. Install Vapor Barrier membrane over 3-inch sand course. Lap 6 inches, and tape edges. Turn up membrane at edges, and secure to foundations or footings with tape. B. Seal around all penetrations of membrane with tape to create air-tight seal between penetrating objects and membrane. C. Repair tears and punctures in membrane immediately before concealment by other work. Cover with tape or another layer of membrane. D. Provide nominal 2-inch-thick protection cover of sand over membrane. Screed and level before reinforcing or concrete is placed. Moisten sand prior to placing concrete. 22
  • 23. Project Manual – Gamble-Boyer Residence 07460 exterior siding 1.01 Exterior siding to be 1x6 T+G clear western red cedar with clear finish. All siding to be back- stained and blind-nailed with stainless steel fasteners. 1.02 Provide sample for Architect’s review and approval. 07500 membrane roofing PART 1 - GENERAL 1.01 Installer shall be approved by manufacturer of accepted roofing system, with not less than 5 years experience in installation of membrane roofing systems similar to those required for this Project. Submit certification from roofing materials manufacturer that installer is certified and approved to install specified roofing system and that materials and components furnished conform to Specification requirements and are compatible with each other, the roof substrate, and adjacent related Work. 1.02 Membranes shall be tested and listed by UL for Fire Hazard Classification A. 1.03 Submit manufacturer's specifications and installation instructions. 1.04 Deliver materials requiring fire-hazard classification bearing the UL label on each container and roll, or deliver with a UL certification of compliance with the classification specified. 1.05 Handle rolled goods to prevent damage to edges and ends. Store-rolled goods on end on pallets or other raised surface in dry, well-ventilated, water-tight place. 1.06 Protect materials, including aggregate, from moisture. Remove wet materials from Project site. Protect materials against damage by construction traffic and equipment. 1.07 Apply materials during dry weather when ambient temperature is 40º F or above. 1.08 Protect walks, paving, and building walls adjacent to hoist prior to starting Work. Restore to original condition or replace Work and materials damaged due to roofing installation operations. 1.09 Provide temporary roofing if it becomes necessary to make the building weather-tight prior to installation of permanent roofing system. Remove from each area prior to installation of permanent roofing. 1.10 Drainage must effectively prevent ponding water as defined by NRCA 48-hour testing. 1.11 Prior to final acceptance of Work, furnish written manufacturer’s Labor and Material and Total System 20 year warranty covering repairs required to maintain roof, including flashing, in water- tight condition. Guarantee shall be limited to ordinary wear and tear by the elements or defect due to faulty materials and workmanship. 1.12 Schedule a Pre-Roofing Site Meeting with the Contractor, Architect and all sub-trades involved in the roofing installation prior to final ordering of materials. 23
  • 24. Project Manual – Gamble-Boyer Residence PART 2 - PRODUCTS 2.01 Stevens EP Thermoplastic Olefin (TPO) membrane, fully adhered A. Size: 60mil, 10 feet wide sheet B. Color: White, Energy Star C. Substrate: Stevens-approved isocyanurate. Fasten per Stevens instructions. D. Roof flashings: use applicable Stevens flashing products PART 3 - EXECUTION 3.01 Verify all roofing conditions at Pre-Roofing Meeting with Architect and roofing installer. 3.02 Examine substrate surfaces to receive membrane roofing and associated Work and conditions under which roofing will be installed. Do not proceed with roofing until unsatisfactory conditions have been corrected. 3.03 Install roofing for compliance with UL Fire Classification A and Class 60 wind uplift resistance. 3.04 Coordinate the installation of insulation, roofing sheets, flashings, stripping, coatings and surfacings, so that insulation and felts are not exposed overnight or to precipitation. 3.05 Roof Membrane Installation per manufacturer's printed instructions. 3.06 Avoid heavy traffic on completed roofing when ambient temperature is above 80° F. Equipment that requires more than two persons to carry it across the roof and put in place shall be lifted and placed by crane. 07610 metal roofing Part I – General 1.01 Quality Assurance A. Before Fabrication: Contractor shall take field measurements of the structure and substrates indicated and specified to ensure that panel lengths and brakeformed flashings are dimensioned accurately to facilitate easy installation. Fabrication shall not begin until all field conditions have been verified. Allow for sufficient trimming of panel units at eaves, valleys and gables prior to fabrication 1.02 Submittals A. Submit shop drawings, indicating extent of work to be performed. Include sections of roof and fascia for each condition, detailing flashing and trim for different conditions, such as eaves, outside/inside corners, skylights, terminations, etc, showing a full and complete installation. 24
  • 25. Project Manual – Gamble-Boyer Residence Show securement of panels and dips, spacing, type and number of fasteners, as recommended by the Manufacturer. B. Submit 2’-0” long sample panel indicating the metal, gauge, color, texture and finish proposed. C. Submit Manufacturer’s warranty covering the substrate (metal) against rupture, perforation, and structural failure due to normal atmospheric corrosion for (25) years. D. Submit Manufacturer’s (35) year warranty on paint finish against cracking, peeling, blistering, chalk, and color change. Part II – Product 2.01 Manufacturer Englert, Inc 1200 Amboy Ave Perth Amboy, NJ 08861 732.826.8614 2.02 Panel system shall be Series A1300, 1-1/2” high, 24” wide panel, Standing Seam System, with ribs, 180º seam. 2.03 Finish shall be Galvalume Plus Part III – Execution 3.01 Install per manufacturer’s instructions. 25
  • 26. Project Manual – Gamble-Boyer Residence 07620 sheet metal flashing and trim All sheet metal work to be done by a highly qualified sheet metal subcontractor, not the roofer. 1.01 All exterior sills and thresholds to have sheet metal pan-on-bituthene flashing, riveted, soldered and turned up at ends. See Drawings. 1.02 Exterior metal Flashing/coping to be galvalume. All joints to be riveted and inter-lapped with sealant. All copings to be cleated per the drawings. 1.03 Contractor, Architect and sub-contractor shall have a pre-construction meeting to review flashing work. 1.04 All reglets to be Fry stainless steel finish or accepted equal, see details. 1.05 Plumbing vent flashing A. Pitch Pans are not to be used in lieu of any other penetration flashing in these specifications and will require special approval by Architect to be used for unusual conditions. B. If required, fabricate pitch pan by forming a hemmed 3 inch high side and a 4 inch flashing flange. Provide minimum 2 inch clearance from penetration. Shop or field solder radial corners and vertical seam. C. Fabrication of two piece flashings for connected pipes, conduits and other round penetrations. D. Form semi-cylindrical tubular flashing sleeves 9 inches high and minimum 1/4 inch clearance from penetration and tightly seamed to fit snugly. E. Form square flashing plate 7 inch larger than penetration. Punch hole and extrude metal upward 1/4 inch, providing a continuous vertical flange. Split flashing plate and shop solder flashing sleeves. Cut radius corners on flashing plate. F. Form a conical sealant cover with an inside diameter equal to penetration and an outside diameter 1 to 2 inches larger. G. The above describes Model VTREXVP with sealant cover as manufactured by SBC Industries, North Miami, FL. / 800-228-2580. 26
  • 27. Project Manual – Gamble-Boyer Residence 07915 sealants PART 1 - GENERAL 1.01 RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. 1.02 DESCRIPTION OF WORK A. The extent of each form and type of joint sealer is indicated on drawings and by provisions of this section an where required to provide a finished appearance to the building. B. The applications for joint sealers as work of this section include but are not limited to the following; Where required for water tightness Concrete construction joints. Floor joints (interior new to existing). Interior wall & wall/ceiling joints where required for sound control of rooms. Flashing and coping joints. Gasketing of assemblies. Behind any surface-mounted signs or equipment Roof accessories Around windows, doors and storefronts. C. Refer to Division 8 sections for glazing requirements – not as work of this section. D. Refer to sections of Divisions 15 and 16 for joint sealers in mechanical and electrical work - not as work of this section. E. General Performance: Except as otherwise indicated, joint sealers are required to establish and maintain airtight and waterproof continuous seals on a permanent basis, within recognized limitations of wear and aging as indicated for each applications. Failures of installed sealers to comply with this requirement will be recognized as failures of materials and workmanship. ASTM References listed herein shall apply unless updated ASTM References exist; wherein Architect shall be immediately notified in writing as to the alternate standard for Architect’s verification of applicability. 1.03 SUBMITTALS A. Product Data: Submit manufacturer’s product specifications, handling/ installation/ curing instructions, and performance tested data sheets for each elastomeric product required. 1.04 JOB CONDITIONS A. Weather Conditions: Do not proceed with installation of liquid sealants under unfavorable weather conditions. Install elastomeric sealants when temperature is in lower third of temperature range recommended by manufacturer for installation. 27
  • 28. Project Manual – Gamble-Boyer Residence PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. General: Manufacturers listed in this article include those known to produce the indicated category of prime joint sealer material, either as a nominally pure generic product of as an equivalent performance modification thereof or proprietary product. B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include, but are not limited to the following: Manufacturers of Elastomeric Sealants (Liquid): American Poly-Therm Co.; Sacramento, CA Dow Corning Corp.; Midland, MI Pecora Corp.; Harleysville, PA Sonneborn/Contech, Inc.; Minneapolis MN Standard Dry Wall Products Co.; Miami, FL Mfrs. Of Non-Elastomeric Sealants/Calks (Liquid/Tape): Parr, Inc.; Cleveland, OH Pecora Corp.; Harleysville, PA Protetive Treatments, Inc.; Dayton, OH Sonneborn/Contech, Inc.; Minneapolis, MN Standard Dry Wall Products Co.; Miami, FL Mfrs. Of Rubber and Polymeric Gaskets (Solid/Cellular): Acme Highway Products Corp.; Amherst, NY Norton Co.; Granville, NY Rubatex Corps.; Bedford, VA Standard Products Co.; Port Clinton, OH Williams Products, Inc.; Troy, MI Mfrs. Of Joint Fillers/ Sealant Backers; Backer Rod Mfr & Supply Co.; Denver, CO Dow Chemical Co.; Midland, MI Hercules, Inc.; Middletown, DE J&P Petroleum Products, Inc.; Dallas, TX Sonneborn/ Contech, Inc.; Minneapolis, MN 2.02 MATERIALS 28
  • 29. Project Manual – Gamble-Boyer Residence A. General Sealer Requirements: Provide colors indicated or, clear, or if not otherwise indicated, as selected by Architect from manufacturer’s standard colors or clear where available. Select materials for compatibility with joint surfaces and other indicated exposures, and except as otherwise indicated select modulus of elasticity and hardness or grade recommended by manufacturer for each application indicated. Where exposed to foot traffic, select non-tracking materials of sufficient strength and hardness to withstand stiletto hell traffic without damage or deterioration of sealer system. B. Single Component Polyurethane Sealant (1Pu-S): Except as otherwise indicated, provide manufacturer’s standard non-modified, one-art, polyurethane-based, air-curing, elastomeric sealant; complying with either ASRM C 920 Type S Class 25, or FS RR-S-00230C Class A or equal standard; self-leveling grade/type where used in joints of surfaces subject to traffic otherwise non-sag grade/type. Bituminous Modification (-Bit): Where joint surfaces contain or are contaminated with bituminous materials,, provide manufacturer’s modified type sealant which is compatible with joint surfaces (modified with coal tar or asphalt as required). C. Single-Component Silicon Rubber Sealant (12SR-S): Except as otherwise indicated, provide manufacturer’s standard, non-modified, one-part, silicone-rubber-based, air-curing, non-sag, elastomeric sealant; complying with either ASTM C 920 Type S Class 25 Grade NS, or FS TT-S- 001553A Class A Type Non-sag or equal standard. D. Acrylic-Emulsion Sealant (AcEm-S): Provide acrylic-emulsion or latex-rubber-modified acrylic- emulsion sealant compound, permanently flexible, non-staining and non-bleeding; recommended by manufacturer for protected exterior exposure and general interior exposure. E. Butyl Rubber Sealant (BuR-S): Provide polymerized Butyl rubber and inert fillers (pigments), solvent-based with minimum 75% solids, non-sag consistency, tack-free time of 24 hours or less, paintable, non-staining; complying with FS TT-S-001657 or equal standard. F. Preformed Butyl Rubber Sealant (PbuR-S): Provide preformed ribbon or tape (coiled with release paper) of vulcanized Butyl rubber of Butyl/polyisobutylene and inert fillers (pigments); solvent-based with minimum 95% solids, non-sag consistency, tack-free time of 24 hours or less, paintable, non-staining, either with or without reinforcement thread or fabric to prevent stretch (as required by Installer to facilitate proper application). G. Polyisobutylene Mastic Sealant (PibM-S): Provide either liquid or performed ribbon (coiled with release paper) of polyisobutylene- based mastic; nondrying, non-skimming, non-hardening, non- migrating, heavy-bodied as recommended by manufacturer for large joints subject to shear movement but not subject to normal joint movement; grade as recommended by manufacturer for exposures as indicated. H. Bituminous Calking Compound (Btm-CkC): Provide manufacturer’s standard one-part bituminous, general-purpose crack filler or calking compound, containing asphalt or coal tar (as required for compatibility), Butyl rubber, mineral fiber, and other modifiers or fillers. I. Joint Fillers, Pavement Types: Bituminous and Fiber Joint Filler (BtmF-JF): Provide resilient and non-extruding type premolded bituminous impregnated fiber-board units complying with ASRM D 1751; FS JJ-F-341, Type I or equal standard; or AASHTO M 213. J. Other compatible compounds shall be at the option of the Contractor and as approved by the Architect. K. Miscellaneous Materials: 29
  • 30. Project Manual – Gamble-Boyer Residence Joint Primer/ Sealer: Provide type of joint primer/ sealer recommended by sealant manufacturer for joint surfaces to be primed or sealed. L. Bond Breaker Tape (BB-Tp): Provide polyethylene tape or other plastic tape as recommended by sealant manufacturer, to be applied to sealant-contact surfaces where bond to substrate or joint filler must be avoided for proper performance of sealant. Provide self-adhesive tape where applicable. M. Sealant Backer Rod (S-BR): Provide compressible rod stock of polyethylene foam, polyurethane foam, polyethylene jacketed polyurethane foam, Butyl rubber foam, neoprene foam or other flexible, permanent, durable non-absorptive material as recommended by sealant manufacturer for back-up of and compatibility with sealant. Where used with hot- applied sealant, provide heat-resistant type which will not be deteriorated by sealant application temperature as indicated. PART 3 - EXECUTION 3.01 INSPECTION A. Installer must examine substrates, (joint surfaces) and conditions under which joint sealer work is to be performed, and must notify contractor in writing of unsatisfactory conditions. Do not proceed with joint sealer work until unsatisfactory conditions have been corrected in a manner acceptable to Installer. 3.02 JOINT PREPARATION A. Clean joint surfaces immediately before installation of gaskets, sealants or calking compounds. Remove dirt, insecure coatings, moisture and other substances which could interfere with seal of gasket or bond of sealant or calking compound. Etch concrete and masonry joint surfaces as recommended by sealant manufacturer. Roughen vitreous and glazed joint surfaces as recommended by sealant manufacturer. B. Prime or seal joint surfaces where indicate, and where recommended by sealant manufacturer. Confine primer/sealer to areas of sealant bond; do not allow spillage or migration onto adjoining surfaces. 3.03 INSTALLATION A. Comply with manufacturer’s printed instructions except where more stringent requirements are shown or specified, and except where manufacturer’s technical representative directs otherwise. B. Set joint filler units at depth or position in joint as indicated to coordinate with other work, including installation of bond breakers, backer rods and sealants. Do not leave voids or gaps between ends of joint filler units. C. Install sealant backer rod for liquid-applied sealants, except where shown to be omitt4ed or recommended to be omitted by sealant manufacturer for application indicated. D. Install bond breaker tape where indicated and where required by manufacturer’s recommendations to ensure that liquid-applied sealants will perform as intended. E. Employ only proven installation techniques, which will ensure that sealants are deposited in uniform, continuous ribbons without gaps or air pockets, with complete “wetting” of joint bond surfaces equally on opposite sides. Except as otherwise indicated, fill sealant rabbet to a slightly concave surface, slightly below adjoining surfaces. Where horizontal joints are between a 30
  • 31. Project Manual – Gamble-Boyer Residence horizontal surface and vertical surface, fill joint to form a slight cove, so that joint will not trap moisture and dirt. F. Install liquid-applied sealant to depths as shown or if not shown, as recommended by sealant manufacturer but within the following general limitations, measured at center (thin) section of beads; (not applicable to sealants in lapped joints). 1. For sidewalks, pavements and similar joints sealed with elastomeric sealants and subject to traffic and other abrasion and indentation exposures, fill joints to a depth equal to 75% of joint width, but neither more than 5/8” deep nor less than 3/8” deep. 2. For normal moving joints sealed with elastomeric sealants but not subject to traffic, fill joints to a depth equal to 50% of joint width, but neither more than ½” deep nor less than ¼” deep. 3. For joints sealed with non-elastomeric sealants and calking compounds, fill joints to a depth in range of 75% to 125% of joint width. G. Spillage: Do not allow sealants or compounds to overflow from confines of joints, or to spill onto adjoining work, or to migrate into void of exposed finishes. Clean adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage. H. Recess exposed edges of gaskets and exposed joint fillers slightly behind adjoining surfaces, unless otherwise shown, so that compressed units will not protrude from joints. I. Bond ends of gaskets together with adhesive or “weld” by other means as recommended by manufacturer to ensure continuous watertight and airtight performance. Miter-cut and bond ends at corners unless molded corner units are provided. 3.04 CURE AND PROTECTION A. Cure sealants and caulking compounds in compliance with manufacturer’s instructions and recommendations, to obtain high early bond strength, internal cohesive strength and surface durability. Advise Contractor of procedures required for cure and protection of joint sealers during construction period, so that they will be without deterioration or damage (other than normal wear and weathering) at time of substantial completion. Cure and protect sealants in a manner which will minimize increases in modulus of elasticity and other accelerated aging effects. Replace or restore sealants which are damaged or deteriorated during construction period. End of Section 31
  • 32. Project Manual – Gamble-Boyer Residence DIVISION 8: DOORS & WINDOWS 08200 wood doors 1.01 Finish hardware to be per Section 08710. 1.02 Interior doors and jambs: solid core, size and material per drawings. 08266 glazed wood doors 1.01 Manufacturer to be Duratherm 1.02 Provide hardware submittal 08350 folding doors 1.02 Manufacturer to be Duratherm 1.02 Provide hardware submittal 08500 windows 1.01 Provide shop drawings of all systems for review. 1.02 Hardware options: to be specified from manufacture’s standard range. 1.03 All windows to be aluminum-frame Blomberg 450 Series, Class II clear anodized finish, dual glazed, low-e. 08610 wood skylights 1.01 Skylight manufacturer to provide all skylight related flashings, including flashing between operable skylights. 1.02 Skylights: Velux VSE Electric venting deck-mounted Flashing: ECB Bug screen: yes Size: 106 Glazing: Comfort Plus Glass Shade: Exterior Heatblock Awning on interior skylights only (5) Keypad: WLI 160 (2), combi-link connectors (4) 1.03 Build curbs for mounting per manufacturer’s recommendations. 08710 finish hardware and hardware groups 1.01 Provide a complete hardware submittal of all systems for review. 32
  • 33. Project Manual – Gamble-Boyer Residence 1.02 See cut sheets. 1.03 MATERIALS A. Hinges: 1. Type: five knuckle, Baldwin 1030, 1035, 1040 or 1045 as required (or McKinney). Dull Chrome finish. 2. Quantity: Furnish two hinges for doors up to 5 feet high and one additional hinge for each 2'-6" of height or fraction thereof over 5 feet. 4. Width: Provide widths sufficient to clear trim projection when door swings 180 degrees. B. Door Stops: 1. All doors to receive a door stop unless otherwise specified. See Hardware Groups. 2. Coordinate in field with Architect exact type at each location. C. Finishes: 1. Stainless steel or satin nickel finish throughout. 2.01 HARDWARE GROUPS Manufacturer Abbreviations Baldwin BAL Cool Lines COL Hardware Group 1 = [Dr #x] Interior Door Item Description Manufacturer Latchset TBD, passage Stop Hardware Group 2 = [Dr #x] Interior Door Item Description Manufacturer Latchset TBD, privacy Stop 33
  • 34. Project Manual – Gamble-Boyer Residence 08800 glazing 1.01 GLAZING TYPES Glazing is specified as GL, followed by codes for its characteristics Example: Characteristics are coded as follows 1: Single Glazing 2: Double Glazing A: Acrylic C: Color, to be selected by architect E: Low E F: Floor glass G: Annealed float glass - ASTM C1036, Type I, Class 1, Quality q3 or better. L: Laminated safety glass M: Mirrored float glass with, with all exposed edges polished smooth. N: Tinted, color to be selected by architect P: Patterned glass, to be selected by architect R: Wire safety glass S: Sandblasted T: Tempered safety glass - Shall meet ANSI Z97.1 test requirements. V: Vision glass - Switch Lite #SWC 10, tempered glass. See cut sheet. U: Translucent W: White End of Section 34
  • 35. Project Manual – Gamble-Boyer Residence DIVISION 9: FINISHES 09300 tile 1.01 General A. Layout: align joints to give straight, uniform grout lines, parallel to walls. Field verify all layouts with Architect. B. Glass tile to be installed per the manufacturer specifications. C. Architect to approve from sample(s) all tile prior to material purchase and installation. Samples to be submitted from the actual stock from which material will be purchased and represent the range found within the material. D. Architect to approve sample of grout color in actual tile sample prior to grouting on site E. Shower Pan membrane: Cloraloy or equal sheet membrane, no seams. F. Mortar bed at wet walls. Provide waterproof backing membrane with bituthene or equal behind mortar at areas exposed to direct moisture. Provide water resistant membrane behind mortar at all other locations. 1.02 Tile Schedule: T-1: Bath –shower walls MFR: Solus Decor Color: Mousse Size: 6” x 36” x 3/4”thick Grout: Hydroment, color TBD Source: Solus Décor, 877.255.3146 T-2: Bath – floor MFR: Solus Decor Color: Mousse Size: 18” x 36” x 1/2”thick Grout: Hydroment, color TBD Source: Solus Décor 1445 Powell Street Vancouver, BC Canada V5L 1G8 877.255.3146 09640 wood strip flooring 1.01 Wood Floor: 3” plank, long boards. 1.02 For wood type and finish, refer to 06200 – finish carpentry and 09910 – painting and transparent finishes Source: Flooring Alternative 758 Gilman Street Berkeley, CA 94710 510.550.4449 1.03 Provide sample for Architect’s approval 35
  • 36. Project Manual – Gamble-Boyer Residence 09910 painting and transparent finishes 1.01 SUBMITTALS A. Procedure per Section 01300 Submittals. B. Submit 24" square hardboard samples of all colors, one for each color and type of paint to be used. C. Submit stock colors on manufacturer's standard large size chips. D. Prepare wood samples on type and quality of wood to be used. 1.02 QUALITY ASSURANCE A. As much as possible, select a single manufacturer to provide all materials for the work of this section, especially where systems call for primer coats or bond coats. B. Applicator shall demonstrate 5 years experience with similar projects. C. Finish paint 4ft square on wall each color and review with Architect before completing the application. D. Ensure proper project conditions before painting. E. All painted surfaces to be warranted for one year. 1.03 MAINTENANCE A. Provide Owner with one gallon of each color and type of paint used in tightly sealed, clearly labeled cans. Label manufacturer, color mix and phone number on each can. MATERIALS A. FINISH CODING Finishes are described as finishing system.color, example: C. Finishing systems are coded as follows: PT-1 Flat Finish on Gypsum Board, Interior (typical finish for ceilings except as otherwise noted) 1 coat PVA Pigmented Sealer 1 coat Latex undercoat 1 coat Acrylic Latex, a second coat if first does not cover PT-2 Satin finish on Gypsum Board, Interior (typical finish for walls) 1 coat PVA Pigmented Sealer 1 coat Latex undercoat 36
  • 37. Project Manual – Gamble-Boyer Residence 1 coat Acrylic Latex, a second coat if first does not cover PT-3 Semigloss Finish on Wood Cabinets & Casework, Interior 1 coat Primer 3 coats Lacquer, Satin Sheen PT-4 Semigloss Finish on Wood Trim, Interior 1 coat Interior wood primer 2 coat Semi-gloss enamel PT-10 Semigloss Finish on Wood, Exterior 1 coat Exterior wood primer 2 coats Semi-gloss enamel PT-11 Flat Finish on Wood, Exterior 1 coat Exterior wood primer 2 coats Acrylic Latex ST-1 Natural Clear Finish on Wood, Interior 1 coat Sanding sealer, if required 3 coats Satin Conversion Varnish or equal ST-2 Stained Clear Finish on Wood, Interior 1 coat Stain, custom colors 1 coat Sanding sealer, if required 3 coats Satin Conversion Varnish or equal ST-10 Natural Clear Finish on Wood, Exterior 1 coat Sanding sealer, if required 3 coats Satin Conversion Varnish or equal ST-11 Stained Finish on Wood, Exterior 1 coat Stain, custom colors 1 coat Sanding sealer, if required 3 coats Satin Conversion Varnish or equal D. PAINT SCHEDULE: A: MFR: Safecoat Enamal (bath shower window interior) Color: TBD Number: TBD B: MFR: Safecoat Exterior Satin Enamal (window exterior) Color: TBD Number: TBD C: MFR: Timber Pro UV (exterior siding) Color: TBD Number: TBD D: MFR: TBD (wood flooring) Color: TBD 37
  • 38. Project Manual – Gamble-Boyer Residence Number: TBD E: MFR: TBD (wood decking) Color: TBD Number: TBD F: MFR: Tnemec (steel) Primer: Enviro-Prime Series 18 Color: 18-1092 Gray Topcoat: Enviro-Crete Series 156 Color: TBD 3.01 GENERAL EXECUTION A. Final coat of paint, or stains on wood shall not be applied to any surface until colors have been accepted by the Architect. 3.02 PREPARATION A. Examine all surfaces for conditions that will adversely affect finishes. B. Broom clean rooms and spaces before commencement of work. C. Protect all surfaces not to be painted. 3.03 APPLICATION A. Comply with manufacturer's recommendations for drying time between coats. B. Finish coats shall be smooth and free of brush marks, streaks, laps or pileup of paints, skipped or missed areas. C. Paint visible surfaces behind vents, registers, or grilles flat black. D. Surfaces Not to Be Painted: 1. Pre-finished or integral color wall, ceiling or floor coverings. 2. Items with factory-applied final finish, unless noted otherwise. 3. Concealed ducts, pipes and conduits. 4. Cabinetry, unless noted otherwise 5. Other items listed as not painted on Drawings. End of Section 38
  • 39. Project Manual – Gamble-Boyer Residence DIVISION 10: SPECIALTIES 10300 fireplaces and stoves 1.01 Living Room stove: Rais Classic 106, glass doors, top vent. See cut sheet 1.02 Poolside fireplace per drawings. Provide shop drawings for Architect’s approval. 10800 toilet + bath accessories 1.01 Match existing house accessories 1.02 Shower curtain rod: 1-1/4” stainless steel pipe w/ stainless steel flanges screwed to wall at ends 10826 bathroom mirrors 1.01 1/4" tempered glass mirror 10900 closet specialties 1.01 Closet Poles: 1-1/4” wood 1.02 Pole Flanges: Wood rosettes 1.03 Closet Curtain rod: TBD End of Section 39
  • 40. Project Manual – Gamble-Boyer Residence DIVISION 11: EQUIPMENT 11452 residential appliance schedule (see cut sheets) (reviewing with client for final approval) Item Manuf. Model Remarks Refrigerator U-Line 2175RF Full overlay, left hinge Cooktop Miele KM421 24” Electric, stainless frame Oven Miele H4680B 24” stainless finish, Dishwasher Miele Slimline G832Sci 18” Full overlay Exhaust Fan Broan 335, 1200cfm Remote fan, roof-mounted (Kitchen) Washer Asko W6461 Electric Dryer Electric Asko W6441 Outdoor grill Capital CCE32XCH2BI Grill ignitor Propane Ignition Grill Lover’s system End of Section 40
  • 41. Project Manual – Gamble-Boyer Residence DIVISION 12: FURNISHINGS 12492 blinds 1.01 Roller shades to be manual roll Mecho Shades A. Recommended supplier:Cutting Edge Drapery, 15 Dorman Ave, San Francisco, CA 415.824.6000 End of Section 41
  • 42. Project Manual – Gamble-Boyer Residence DIVISION 15: MECHANICAL 15000 mechanical general provisions See electrical/mechanical plans for additional information. 15410 plumbing fixture schedule 1.01 Kitchen Item Room Manuf. Model Remarks Faucet Kitchen Chicago 540-LD372NHF Brushed nickel 317-PRJKNHF handles Sink Kitchen Elkay ELU211510 integral stainless steel sink Sink Disposal Kitchen Insinkerato Evolution Excel and Satin nickel air switch and drain; r Verify need for power cord kit and Sink Top Switch dishwasher connector kit Soap Kitchen Grohe 28 751 SDO Deluxe XL soap/lotion dispenser Dispenser Stainless Steel 1.02 Bath Item Room Manuf. Model Remarks Sink Bath Elkay EWMA4820 Two-station wall-mounted sink LK18B drain Verify hole drilling config Faucets Bath Chicago 540-LD372NHF Brushed nickel (2) 317-PRJKNHF handles Toilet Bath Toto Carlyle Chrome trip lever MS874114SG Shower Bath Grohe Europlus II Chrome combination trim 35233 OOO 42
  • 43. Project Manual – Gamble-Boyer Residence 15480 domestic water heater 1.01 Heater: to be coordinated with installation by solar thermal contractor. Contractor to provide adequate amp service for tank back-up electric heater. 15700 heating + air-conditioning equipment 1.01 Heat Pump: Carrier Comfort Series 5KW 38YSA with back-up electric fan coil and matching “Thermidistat” thermostats. 15852 registers grilles and diffusers 1.01 Exhaust fans at all bathrooms and laundry: Panasonic FV11VF1 1.02 Ducts to be 8” spiral. Provide submitall. 1.03 Supply Vent: Seiho NT 8. See cut sheet. 1.04 Return air grille: TBD, provide allowance. End of Section 43
  • 44. Project Manual – Gamble-Boyer Residence DIVISION 16: ELECTRICAL 16000 electrical general provisions 1.01 Contractor to provide power, lighting, switching, dimming, and fixtures per the plans. B. Provide telephone service and all house pre-wiring and jacks per drawings. Provide two CAT5-E communication/phone wires to each phone jack with 2 jack plate. Use TCI/ATT cable for all TV wiring home runs. C. Audio Visual equipment by Owner, General Contractor to accommodate and coordinate as required. General Contractor to do all AV wiring and terminations. D. Verify existing 400-amp service and provide new 200-amp subpanel at Guest Cottage. 16140 wiring devices Cover plates for all switches, receptacles, jacks, etc., are to be a matching style. Contractor to furnish submittals of the following: A. Typical on/off lighting switches: Lutron Diva Satin, match existing house color. B. Typical dimmer switches: Lutron Diva Satin, match existing house color. C. Typical receptacles: Lutron Diva Satin, match existing house color. D. Typical Jacks: Lutron Diva Satin, match existing house color. E. Typical coverplates: Lutron Diva Satin, match existing house color. F. AT KITCHENETTE STAINLESS STEEL WALLS: A. Receptacles/switches to be Diva Black. B. Coverplates to be Claro stainless steel, brushed finish G. Plugmold: Wiremold 2000 series, stainless steel. H. Smoke detectors: provide submittal. 44
  • 45. Project Manual – Gamble-Boyer Residence 16501 light fixture schedule 1.01 Provide submittal for all fixtures for Architect review. 1.02 At kitchen and bathrooms where fluorescent fixtures are required for code, provide any type of fluorescent, code complying fixture and install for final inspections. Following inspections, replace with fixtures scheduled. 1.03 Lighting Schedule (see cut sheets) Type Description Manufacturer Lamp Quantity Remarks F1 Wall mount RAB LQ150 9 Paint? QF300 F2 Under cabinet WAC 13W T5 8 white BA-BF-13 F3 Wall mount Stonco 100w incandescent 7 Prismatic globe VK1K NO CAST GUARD VGP100 F4 Recessed TBD 4 ceiling F5 Wall mount Artemide 100W incandescent 2 Tolomeo Wall Spot F6 Wall mount Stonco 100w incandescent 4 Prismatic globe VW1K NO CAST GUARD VGP100 F7 Ceiling Fan Boffi Minimal Air 2 400mm length Boffi Los Angeles 310.458.9300 16850 television equipment 1.01 Flat panel television and bracket provided by owner. Contractor to install. End of Section 45