Severity Evaluation Criteria
Page 1 of 1
Effect Criteria : Severity of Effect on Product
(Customer Effect)
Rank Effect
Criteria : Severity of Effect on Process
(Manufacturing/Assembly Effect)
Failure to
Meet Safety
and/or
Regulatory
Requirements
Potential failure mode affects safe vehicle operation
and/or involves noncompliance with government
regulation without warning.
10
Failure to
Meet Safety
and/or
Regulatory
Requirements
May endanger operator (machine or assembly)
without warning.
Potential failure mode affects safe vehicle operation
and/or involves noncompliance with government
regulation with warning.
9
May endanger operator (machine or assembly) with
warning.
Loss or
Degradation
of Primary
Function
Loss of primary function (vehicle operable, does not
affect safe vehicle operation).
8
Major
Disruption
100% of product may have to be scrapped. Line
shutdown or stop ship.
Degradation of primary function (vehicle operable, but
at reduced level of performance). 7
Significant
Disruption
A portion of the production run may have to be
scrapped. Deviation from primary process including
decreased line speed or added manpower.
Loss or
Degradation
of Secondary
Function
Loss of primary function (vehicle operable, but
comfort / convenience functions inoperable).
6
Moderate
Disruption
100% of production run may have to be reworked off
line and accepted.
Degradation of secondary function (vehicle operable,
but comfort / convenience functions at reduced level of
performance).
5
A portion of the production run may have to be
reworked off line and accepted.
Annoyance
Appearance or Audible Noise, Vehicle operable, items
does not confirm and noticed by most customers ( <
75%)
4
Moderate
Disruption
100% of production run may have to be reworked in-
station before it is processed.
Appearance or Audible Noise, Vehicle operable, items
does not confirm and noticed by many customers ( <
50%)
3
A portion of the production run may have to be
reworked in-station before it is processed.
Appearance or Audible Noise, Vehicle operable, items
does not confirm and noticed by discriminating
customers ( < 25 %)
2
Minor
Disruption
Slight inconvenience to process, operation, or
operator
No effect No discernible effect. 1 No effect No discernible effect.
PD/F05/R1 Issue date: 19/01/09
18

More Related Content

Similar to 04 severity_evaluation_criteria_r1_

Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
BhaveshShukla15
 
Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systems
Kamal Vora
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
Sushil Anand
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCE
Zubair Ali ali
 
IRPS rev 3-19-2012
IRPS rev 3-19-2012IRPS rev 3-19-2012
IRPS rev 3-19-2012
Abe Salloum
 

Similar to 04 severity_evaluation_criteria_r1_ (20)

Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
 
16 Major production losses.pdf
16 Major production losses.pdf16 Major production losses.pdf
16 Major production losses.pdf
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Process fmea work_instructions
Process fmea work_instructionsProcess fmea work_instructions
Process fmea work_instructions
 
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
16_Major_Losses_in_Production_Complete_Presentation_1662385512.pdf
 
Dfmea for engine systems
Dfmea for engine systemsDfmea for engine systems
Dfmea for engine systems
 
Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Opportunity Assessment and Advanced Control
Opportunity Assessment and Advanced ControlOpportunity Assessment and Advanced Control
Opportunity Assessment and Advanced Control
 
RCM
RCMRCM
RCM
 
18 Jul 2018 - FMEA and Risk Management in Practice
18 Jul 2018 - FMEA and Risk Management in Practice 18 Jul 2018 - FMEA and Risk Management in Practice
18 Jul 2018 - FMEA and Risk Management in Practice
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Fmea
FmeaFmea
Fmea
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCE
 
IRPS rev 3-19-2012
IRPS rev 3-19-2012IRPS rev 3-19-2012
IRPS rev 3-19-2012
 
Failure mode
Failure modeFailure mode
Failure mode
 
Design fmea
Design fmeaDesign fmea
Design fmea
 
SSCG Automotive Insight - Vehicle Quality Engineering Optimisation through Ea...
SSCG Automotive Insight - Vehicle Quality Engineering Optimisation through Ea...SSCG Automotive Insight - Vehicle Quality Engineering Optimisation through Ea...
SSCG Automotive Insight - Vehicle Quality Engineering Optimisation through Ea...
 
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLCReliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
Reliability Centered Maintenenance Intro by Carl Byington - PHM Design, LLC
 

Recently uploaded

21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
AshwaniAnuragi1
 

Recently uploaded (20)

Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
History of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & ModernizationHistory of Indian Railways - the story of Growth & Modernization
History of Indian Railways - the story of Growth & Modernization
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 

04 severity_evaluation_criteria_r1_

  • 1. Severity Evaluation Criteria Page 1 of 1 Effect Criteria : Severity of Effect on Product (Customer Effect) Rank Effect Criteria : Severity of Effect on Process (Manufacturing/Assembly Effect) Failure to Meet Safety and/or Regulatory Requirements Potential failure mode affects safe vehicle operation and/or involves noncompliance with government regulation without warning. 10 Failure to Meet Safety and/or Regulatory Requirements May endanger operator (machine or assembly) without warning. Potential failure mode affects safe vehicle operation and/or involves noncompliance with government regulation with warning. 9 May endanger operator (machine or assembly) with warning. Loss or Degradation of Primary Function Loss of primary function (vehicle operable, does not affect safe vehicle operation). 8 Major Disruption 100% of product may have to be scrapped. Line shutdown or stop ship. Degradation of primary function (vehicle operable, but at reduced level of performance). 7 Significant Disruption A portion of the production run may have to be scrapped. Deviation from primary process including decreased line speed or added manpower. Loss or Degradation of Secondary Function Loss of primary function (vehicle operable, but comfort / convenience functions inoperable). 6 Moderate Disruption 100% of production run may have to be reworked off line and accepted. Degradation of secondary function (vehicle operable, but comfort / convenience functions at reduced level of performance). 5 A portion of the production run may have to be reworked off line and accepted. Annoyance Appearance or Audible Noise, Vehicle operable, items does not confirm and noticed by most customers ( < 75%) 4 Moderate Disruption 100% of production run may have to be reworked in- station before it is processed. Appearance or Audible Noise, Vehicle operable, items does not confirm and noticed by many customers ( < 50%) 3 A portion of the production run may have to be reworked in-station before it is processed. Appearance or Audible Noise, Vehicle operable, items does not confirm and noticed by discriminating customers ( < 25 %) 2 Minor Disruption Slight inconvenience to process, operation, or operator No effect No discernible effect. 1 No effect No discernible effect. PD/F05/R1 Issue date: 19/01/09 18