Data-Driven Decision Making Using Microsoft Excel
This assignment must be completed and submitted using a Microsoft Excel spreadsheet (.xls). Provide a source for each equation you use. Sources must be listed at the bottom of the spreadsheet. No title page or additional formatting is required.
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Bus 611 week 4 assignment integrated project management
1. BUS 611 Week 4 Assignment Integrated Project
Management
To purchase this material link
http://www.assignmentcloud.com/BUS-611/BUS-611-Week-4-Assignment-Integrated-Project-
Management
Integrated Project Management Tools. Choose a project where you were a team member or Project
Manager that lasted more than three months. Write a three page paper that identifies the importance of
integrated project management tools. The introduction should describe the industry involved, high level
deliverables of the project, and the number of resources assigned to the project. The body of the paper
needs to describe at least three of the following tools that were used for building an integrated project
management system, and if these tools were effective or not.
a. Generic WBS
b. Scheduling System
c. Work Authorization System
d. Decision making process
e. Integrated cost or scheduling system
f. Project Status Reports
Your conclusion should be a summary of your essay and should repeat the main ideas. In academic
writing, a conclusion serves to remind the reader of what the paper is about and allows you to make a
final point without introducing new information.
For more courses visit our website
http://www.assignmentcloud.com/