Design of Baggage Handling
Systems
Overview
Presentation Overview
1. Considerations when designing a
Baggage Handling System (BHS)
2. Departure Systems
3. Arrivals Systems
4. Specifying a System
5. Typical Project Timeframes and Team
6. Lifetime, Maintenance and through life
costs
7. BHS Controls
8. Case Studies
1
Considerations when designing a
Baggage Handling System (BHS)?
Why have a Baggage Handling System (BHS)
Why have a baggage handling system?
2 (Two) simple reasons
1. On Passenger departure
To take bags from passengers at check in, comply with
security regulations and transfer all bags to the correct
Aircraft in a quick and efficient manner.
2. On Passenger Arrival
To quickly reunite the passenger with all their bags
So what size of BHS does an Airport need?
The size and type of Baggage handling system is
determined by the following:
A. The Passenger numbers (existing and future)
B. Frequency and nature of Flights
C. The type of Terminal i.e.
Domestic and / or International.
D. Security requirements domestic and
International.
E. The project type i.e. A new or expanded or
redeveloped Airport
A. Passenger Numbers and Bag Size
Key to determining the BHS size is.
• The peak number of passengers now and in the
future.
• The nature and type of travel
• The anticipated number of bags per passenger.
• Typical size of bags (Standard Gauge bag)
Airport Size Definition
BHS Terminal / Airport Size broad definition
• Small less than 2million passengers per annum
• Medium between 2 to 15 million passengers per annum
• Large Greater than 15 million passengers per annum
Bag Sizes
As defined in IATA Airport development reference manual (9th edition)
Standard Gauge baggage
Length 450 - 900mm
Width 150 - 300mm
Height 400 - 750mm
Mass 10 - 60 kg
Oversize Baggage (OB)
Length 901 - 2500mm
Width 301 - 600mm
Height 751 - 1500mm
Mass 10 - 70 kg
B. Number and types of Flights
Domestic Flights
•Generally smaller planes
•Higher frequency
•Shorter check In times required
•Less tolerance for delays both at check in and arrivals
•Generally less checked in baggage
International Flights
•Larger Planes
•Less frequent
•Check in process starts earlier
•Greater number and generally larger checked in bags
C. Type of Terminal
Domestic Terminals
•Tend to be simpler in design and concept
•Require less dwell time for passengers
•Less retail space
•The passenger has less tolerance for waiting.
•Generally less security requirements
International Terminals
•Tend to have more complex in design and concept
•By nature international travel requires more time for passenger check
in and processing.
•More retail space and complicated terminal facilities
•The passenger has more tolerance for waiting.
•More security requirements
D. Security Requirements
Baggage Security needs to consider the following:
Terror protection, contraband prevention, general security and law
enforcement
•Local Laws and security
•National Laws and Regulations
•International laws
•The laws applicable to the final destination of the flight
E. The Project Type
There are different considerations depending on the type of BHS project.
New Terminal (Green Field)
•Opportunity to start design on a “clean sheet” of paper
•Opportunity to use the best and latest BHS technologies.
•Opportunity to save money through less staff and labour
•Opportunity to change work processes and become more efficient
•Easier Installation and commissioning of the BHS
Existing Terminal (Brown Field)
•Normally a requirement to use or modify either existing baggage system.
•Opportunity to improve the existing BHS
•With good design there is the opportunity to save costs
•More difficult Installation and commissioning of the BHS
2.
Departure Systems
Process Overview
Check in Security
Screening
Sortation
Flight
Make-up
Model System
View in 3D with Deep View
Free at
www.righthemisphere.com/dv
Model System
The Bag Departure Process
Typical Bag Departure Process
The steps…….
•Step 1 Passenger Check In
– Bags Weighed
– Bags Tagged
•Step 2 Bags Transported
•Step 2A Bags Tracked
•Step 3 Bags Security Screened
•Step 4 Bags transported and Sorted to Flights
Departure Systems
Step 1 Passenger Check In.
Departure Systems: Styles of Check In.
Inline Style.
•Simple and Typical for most airports
•Economic use of space for small to medium size airports.
•Most commercially economic
•Picture Here
Departure Systems: Styles of Check In.
Island Style
•Generally used in large Airports for high passenger numbers
•More expensive but is used to stop a terminal elongating.
•Requires a large check In hall space
Passenger Check In Conveyors
Types of Check In Conveyors
Static Scale.
Picture Here
Cost Low
Space Low
Labour High
Ergonomics Bad
Terminal Suitability Small
Passenger Check In Conveyors
Single Check In Conveyor
Picture
Cost Medium
Space Low
Labour Low
Ergonomics Good
Terminal Suitability Small to Medium
Passenger Check In Conveyors
Double Check In Conveyor
Picture
Cost Medium
Space Medium
Labour Low
Ergonomics Good
Terminal Suitability Medium to Large
Passenger Check In Conveyors
Triple Check In Conveyor
Cost High
Space High
Labour Low
Ergonomics Good
Terminal Suitability Large to Hub
Passenger Check In
Collector Conveyor
Check In: Architectural Interfaces
Issues to consider in the check In area.
•There will be a need for Scale readouts on desks.
•Power to the scale.
•Control panels on desks (Stop/start switches etc.)
•Gap between desks
•Clearances between scales and desks
Check In: Architectural Interfaces
Check In: Architectural Interfaces
Departure System
Step 2 Bags Transported
Baggage Transport From Check In to Airside
Baggage handling providers should be able to provide the full range of
baggage Handling transport conveyors.
Key Criteria for Mechanical Equipment:
•Simple slider bed Construction
•Well Proven track record within the Airport Baggage environment
•Reliable
•Modular and Compatible across the range
•Able to be expanded and modified in the future
•Use Airport standard conveyor fire rated belting
Baggage Handling Equipment
¾ Industry Averages for Baggage conveyor throughput
¾ Check In conveyors “rule of thumb” 1 bag per check In per minute
¾Typical Average conveyor line operate 1800 bags per hour (30 bags per
minute)
¾ Maximum peak 3600 bags per hour (60 bags per minute)
General Transport: Architectural Interfaces
General Transport: Architectural Interfaces
Key Considerations for BHS
• Maintenance access and space
• Walking Space adjacent to conveyors for un jamming bags.
• Head clearance
• Dolly Clearance
• Clearance from adjacent services
• Ceiling and Floor loads
• Building Structure for hanging platforms and conveyors
General Transport: Architectural Interfaces
General Transport: Architectural Interfaces
General Transport: Architectural Interfaces
General Transport: Architectural Interfaces
General Transport: Architectural Interfaces
Baggage Hall Architectural Interface
Departure System
Step 2A Bag Tracking
Bag Tracking
Why do we need bag Tracking?
•To ensure that security screened bags are in fact verifiably cleared
•So bags can be sorted to their destinations if automated sortation is used
•To Allow for Baggage reconciliation in the baggage make up process.
Types of Bag Tracking.
Simple Bar Code readers 95% read rate
•Very low cost and universally used
Radio Frequency Identification RFID Claimed read rate 99.99%
•High cost per unit (5 cents each)
•Still waiting on industry standard
Bar Code Reader
Manual Encode Station
When using Bar Code tags and read rate of 95% as 5% will not be read then…..
It is necessary to allow for a manual Encode station or
Departure System
Step 3 Baggage Security Screening
Baggage Security: Applicable Type.
There are many types and National codes for baggage security screening.
The applicable security practice for the Country, region or airport must be
used.
Some Examples………
National Security Codes
Level 1 Level 2 Level 3
CT (#1)
automatic
machine
decision
CT (#2)
automatic
machine
decision
make up
carousel
make up
carousel
*ETD
manual
inspection
*ETD : Explosive Trace Detection (Handheld)
make up
carousel
National Security Codes
Level 1 Level 2 Level 3
Multi-view
automatic
machine
decision
make up
carousel
make up
carousel
CT
automatic
machine
decision
make up
carousel
Level 4
make up
carousel
Multi-view
operator
decision
Level 5
make up
carousel
CT
operator
decision
reconcile
with
passenger
National Security Codes
Level 1 Level 2 Level 3
Multi-view
automatic
machine
decision
make up
carousel
make up
carousel
Multi-view
2nd operator
decision
make up
carousel
Level 4
make up
carousel
Multi-view
1st operator
decision
Level 5
make up
carousel
*ETD
manual
inspection
reconcile
with
passenger
*ETD : Explosive Trace Detection (Handheld)
Explosive Detection Devices
Rapiscan 528
Rapiscan Systems
UK Department of
Transport (DfT) Accepted
5,000
750
2,500
990
816
802
1,003
2,003
4,344
1,650
MVXR5000
Rapiscan Systems
HI-SCAN 10080
EDX-2is
Smith Heimann
HI-SCAN 10080
EDtS
Smith Heimann
CTX 5500 DS
GE InVision
TSA certified
7,779
(1)
600
(2)
400
1,400
(1)
760
(2)
1,020
600
1,020
2,223
4,759
2,413
CTX 9400 Dsi
GE InVision
CTX 9000 Dsi
GE InVision
VIS-108
L3 Communications
Optional Algorithm
Turning - TSA centified
800
1,000
MVT-HR
L3 Communications
TSA certified
eXaminer 3DX
L3 Communications
Security Screening
Authority Acceptance
Weight
(kg)
Height
(mm)
Lengt
h
(mm)
Width
(mm)
Belt
RL
(mm)
Height
(mm)
Width
(mm)
Height
(mm)
Lengt
h
(mm)
Width
(mm)
Model
Make
Max. Baggage Size
Tunnel
Geometry
(mm)
Exterior Geometry (excl
maintenance area)
Baggage Security Layouts
Small System Single Line Manual Inspection.
Baggage Security Layouts
Small System Single Line Manual Inspection.
Large Screening Matrix
Drawing Required here
Baggage Security Matrix
Departure System
Step 4 Bags Sorted to Flights
Baggage Hall Architectural Interface
Types of Sort Systems
Types of Sort Systems is dependent on
• Terminal Size
• Number of bags to be sorted
• Number and frequency of flights
So Types of Sortation
1. Small to medium Size Terminal
• Manual from the end of a conveyor or Carousel
2. Medium to Large Size
• Automatic sortation
• Pusher type sortation
• TiltTray Sorter
Manual Sort Examples
End of Conveyor type
Manual Sort Examples
Carousel Sortation
Belt/Pusher Sortation
•Picture Here
•Lower investment cost
•System redundancy potential
•Turning radius is relatively smaller
•Lower power consumption, economy mode
•Common spare parts with main BHS system
•Ease of system expansion or modification
Tilt Tray Sortation
• Expensive
• Single point of failure
• Difficult to expand and modify
• High energy consumptions
Automated Sort Destinations
Laterals
Picture
Automated Sort Destinations
Carousels
Oversize Baggage
It is necessary to allow for oversize baggage.
Key points
• Conveyor is generally wider than standard 1200-1370mm
• The system should be as straight as possible and avoid curves if possible
• It will be necessary to allow for security screening
Transfer Baggage
Can be handled in 2 ways.
1. Small Terminals
•Generally handle Transfer baggage manually
2. Larger Terminals
•Injected bags into the system prior to security screening after manually
encoding
•Manually after security screening bags sent to a Transfer carousel.
Sometimes a dedicated security area on the ground floor.
3
Arrivals System
Arrivals Systems
Key Considerations when designing an Arrivals System
•Number of arriving passengers and size of Aircraft.
•Size of bags typical of destinations
•Peak Arrival Times
•Passenger congestion in the baggage reclaim Area
•Passenger flow in the baggage reclaim area
•Noise
These factors will determine
•The type and size of Carousels
•The layout and configuration of the carousels within the reclaim area
•The carousel feed system
Arrivals Systems
Typical Bag Arrival Process
The steps…….
• Step 1 Passenger Arrives on aircraft
• Step 2 Bags Transported from Aircraft to baggage hall
• Step 2a Bags Security Screened (option)
• Step 3 Bags placed on Arrivals conveyor or reclaim Carousel
• Step 4 Bags picked up by passenger
Arrival System
Step 2a Arrival Baggage Security Screened
Generally very simple.
Generally manual processes
Usually Labour Intensive
So….
Normally consists of an EDS machine sited near reclaim
Carousel.
Arrival System
Step 2a Arrival Baggage Security Screened
Baggage Reclaim Carousels
Reclaim Carousels.
Design considerations.
• Number of arriving passengers and size of Aircraft.
• Size of bags typical of destinations
• Peak Arrival Times
• Passenger congestion in the baggage reclaim Area
• Passenger flow in the baggage reclaim area
• Noise
Baggage Reclaim Carousels
Typical Carousel Shapes
Baggage Reclaim Carousels
Baggage Reclaim Carousels
Arrival Systems Reclaim: Carousel Options
Sloped Plate Type. (Inclined Dispenser)
•Suitable for remote feeds.
•Good for large bags
•Good for high density and large number of passengers
•Slightly more expensive than other options
•Can have a bigger footprint compared to other carousels
Arrival Systems Reclaim: Carousel Options
Crescent Plate Type. Pallet Loop
•Robust construction.
•Not generally recommended for remote bag feed
•Good for small to medium size airports
•Slightly more economic than other options
•small footprint compared to Inclined Plate
Arrival Systems Reclaim: Carousel Options
Overlapping Slat Type. Multipath
•Slightly Wider conveying width than pallet loop
•Not generally recommended for remote bag feed
•Good for small to medium size airports
•Slightly more economic than other options
•Small footprint compared to Inclined plate
Baggage Claim Devices vs. Aircraft Seat Capacity
1 feed 30 (9)
65 (20)
1 feed 30 (9)
60 (18)
75 (23)
25 (7.6)
50 (15.2)
100
1 feed 30 (9)
80 (24)
1 feed 30 (9)
75 (23)
105 (32)
35 (10.7)
70 (21.3)
140
1 feed 40 (12)
100 (30.5)
1 feed 40 (12)
90 (27)
120 (37)
40 (12.2)
80 (24.4)
170
1 feed 40 (12)
130 (40)
1 feed 40 (12)
120 (37)
150 (46)
50 (15.2)
100 (30.5)
200
2 feeds 30 (9)
170 (52)
2 feeds 30 (9)
150 (46)
200 (61)
70 (21.3)
130 (39.6)
270
2 feeds 40 (12)
235 (72)
2 feeds 40 (12)
210 (64)
255 (78)
80 (24.4)
175 (53.3)
370
2 feeds 40 (12)
270 (82)
2 feeds 40 (12)
250 (76)
295 (90)
90 (27.4)
205 (62.5)
420
Bag Off loading
length 1 or 2 feeds
Claim length
Pallet loop or
Multipath
Exposure to
Public
Bag off loading
length 1 or 2 feeds
Claim length
Incline
Dispenser
Exposure to
Public
Total
Length
Bag off
Offloading
length
Claim length
Exposure to
Public
Aircraft
Seating
Capacity
Remote Feed ft (m)
Incline Dispenser (Sloped plate)
Direct Feed ft (m)
Pallet Loop or Multipath
Assumptions
85% load factor
75 to 35% Terminations
Baggage ratio 1.3 per passenger
12.5 bags per minute per handler
4
Specifying a System
Specifying a system & BHS Vendors
Q. When is the best time to get a Baggage Handling system supplier
involved in a project?
A. As soon as possible.
Q. Performance based or product based solution?
A. Generally a performance based solution is better however the
disadvantage to the airport is it makes it difficult to compare “apples
with apples”
Q. Should all vendors be pre-qualified?
A. Absolutely, all vendors should be able to demonstrate the completion of
successful projects of similar size to your project.
Specifying a system & BHS Vendors
Q. Should we engage a baggage Handling Consultant?
A. This depends on the size of the project, small to medium size projects
can be handled by a competent BHS provider
Q. What about Larger projects?
A. Again these can be designed by a experience BHS vendor but generally
it is also best to engage a consultant as part of the design team.
Q. Where can I find a BHS consultant?
A. Sadly they a few and far between. The biggest gap in industry knowledge
right now is in the area of security screening
Useful Reference Documents and Books
5
Typical Project Timeframes
Typical Project Times from Start to Finish
Start. Defined as Initial concept design in a designed building
Finished. Defined as handed over to the end user after
commissioning
Typical areas the BHS vendor does not have timeline control over
• Building design and iterations
• Finance for the project
• Staged Installation requirements
Typical Project Times from Start to Finish
So some very broad examples of time frames
¾ For a simple reclaim loop or small check In area
Start to finish time 6-8 months
¾ A small domestic terminal 1 to 2 million passengers per annum
Start to finish time 12-24 months.
¾ Medium size International Airport 5-10 million passengers per annum
Start to finish time 30-48 months
¾ Large International Airport 30 million plus passengers per annum
Start to finish time 36-60 months
6
Lifetime
Maintenance and through life costs
BHS Lifetime
Generally Accepted Lifetime of a BHS is 10 or 15 years
Key to longevity, lower through life costs is:
• A Well designed layout in terms of conveyor/sub system duties
• Keeping BHS component suppliers to a minimum
• The use of variable frequency drives for stop/start conveyors
• The use of Economy mode type functions in large systems
• Well trained and Skilled Operational and Maintenance Staff
• Commonality of parts across the site
• A planned maintenance program
7
Control System
Drive System
Safety Systems
PLCs
Field Bus
BHS Controls
Control Systems
PLC based conveyor control: GlideControl
Human Machine Interface: GlideView SCADA
Flight Sortation & Allocation: GlideSort SAC
Baggage Reconciliation: GlideScan BRS
3. Control Systems
Control System Elements
What is a control system?
What defines it?
What does it do?
Conveyor control
Conveyor drive
Operator control panels
Bag Tracking
HMI panels
Safety Systems
I/f to EDS systems
I/f to GV, GS
GlideControl
Field Devices
Photo Sensor (PE)
Pulse Wheel (PX)
Beacons/Sounders
Push Buttons/Indicators
Motors
Variable Frequency Drive (VFD)
Motor Isolator
Thermal Overload
Distributed or centralised
Conveyor Drive System
Safety Systems
Guaranteed Safe Operation,
Electrical control
Safety Categories
CAT 1 Minor Injury
CAT 2 Minor injury
CAT 3 Chance of serious injury
CAT 4 Injury causing death
Emergency Stop Zoning
Independent Reset function
PLC
Industrial Computer, Very reliable
Compact Size
Designed for modular operation
Centre of the System
Bag Tracking
Head Conveyor A Tail
Photo Eye
Rotary Encoder
Head Conveyor B Tail
Photo Eye
Rotary Encoder
Conveyor B Tracking Model
Conveyor A Tracking Model
1 3 4
2 5
PLC – On the Belt Tracking
Belt Tracking
Bag Identification
Field Bus Systems
DeviceNet
ASi
ProfiBus
Ethernet I/O

More Related Content

What's hot

Lean logistics and warehousing final
Lean logistics and warehousing finalLean logistics and warehousing final
Lean logistics and warehousing finalCody White
 
Container and Containerization
Container and ContainerizationContainer and Containerization
Container and ContainerizationAugustine Aling
 
Freight transport systems
Freight transport systemsFreight transport systems
Freight transport systemsPeanakyMridha
 
Warehouse design and layouts with case study and examples
Warehouse design and layouts with case study and examplesWarehouse design and layouts with case study and examples
Warehouse design and layouts with case study and examplesTejas
 
Material Handling in Port
Material Handling in PortMaterial Handling in Port
Material Handling in PortRanjan Mohanty
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling EquipmentsAnuj Gandhi
 
Airport terminal planning and design
Airport terminal planning and designAirport terminal planning and design
Airport terminal planning and designJetline Marvel
 
Warehouse management system presentation
Warehouse management system presentationWarehouse management system presentation
Warehouse management system presentationNimish Arora
 
Transport: A freight case study
Transport: A freight case studyTransport: A freight case study
Transport: A freight case studyTristan Wiggill
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)Suraj Soni
 
Warehousing and distribution centers
Warehousing  and distribution centersWarehousing  and distribution centers
Warehousing and distribution centerssubhasini rana
 
Transportation management
Transportation managementTransportation management
Transportation managementSugun Subudhi
 
Private conatiner terminal operator
Private conatiner terminal operatorPrivate conatiner terminal operator
Private conatiner terminal operatorAMAN GOYAL
 

What's hot (20)

Determine your navigation system
Determine your navigation systemDetermine your navigation system
Determine your navigation system
 
Lean logistics and warehousing final
Lean logistics and warehousing finalLean logistics and warehousing final
Lean logistics and warehousing final
 
Container and Containerization
Container and ContainerizationContainer and Containerization
Container and Containerization
 
Freight transport systems
Freight transport systemsFreight transport systems
Freight transport systems
 
Warehouse design and layouts with case study and examples
Warehouse design and layouts with case study and examplesWarehouse design and layouts with case study and examples
Warehouse design and layouts with case study and examples
 
Material Handling in Port
Material Handling in PortMaterial Handling in Port
Material Handling in Port
 
Warehousing VAS
Warehousing VASWarehousing VAS
Warehousing VAS
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling Equipments
 
Airport terminal planning and design
Airport terminal planning and designAirport terminal planning and design
Airport terminal planning and design
 
About rivigo
About rivigoAbout rivigo
About rivigo
 
Warehouse management system presentation
Warehouse management system presentationWarehouse management system presentation
Warehouse management system presentation
 
Air cargo logistics
Air cargo logisticsAir cargo logistics
Air cargo logistics
 
Transport: A freight case study
Transport: A freight case studyTransport: A freight case study
Transport: A freight case study
 
Indian railways traffic control (4)
Indian railways traffic control (4)Indian railways traffic control (4)
Indian railways traffic control (4)
 
Warehousing and distribution centers
Warehousing  and distribution centersWarehousing  and distribution centers
Warehousing and distribution centers
 
Transportation management
Transportation managementTransportation management
Transportation management
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
 
TRANSPORT SUPPLY AND DEMAND
TRANSPORT SUPPLY AND DEMANDTRANSPORT SUPPLY AND DEMAND
TRANSPORT SUPPLY AND DEMAND
 
Private conatiner terminal operator
Private conatiner terminal operatorPrivate conatiner terminal operator
Private conatiner terminal operator
 
Crew scheduling
Crew schedulingCrew scheduling
Crew scheduling
 

Similar to Glidepath Design Interfase.pdf

Hold baggage Screening : MIS
Hold baggage Screening : MISHold baggage Screening : MIS
Hold baggage Screening : MISNajam Rao
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH RAMPRASAD KUMAWAT
 
airport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSairport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSBHARATANKURDOGRA
 
Airport terminal design (lecture note)
Airport terminal design (lecture note)Airport terminal design (lecture note)
Airport terminal design (lecture note)Sarah Shuchi
 
Airport planning part 2 -erau webinar
Airport planning part 2 -erau webinarAirport planning part 2 -erau webinar
Airport planning part 2 -erau webinarERAUWebinars
 
UNIT-1 A OPERATIONS PPT.pptx
UNIT-1 A OPERATIONS PPT.pptxUNIT-1 A OPERATIONS PPT.pptx
UNIT-1 A OPERATIONS PPT.pptxReganFernandes2
 
Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Gazi Sanaul Hasan
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION FinalRyan Slimmon
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towertitu11
 
Airport check in process improvement
Airport check in process improvementAirport check in process improvement
Airport check in process improvementHarish Narayanaswamy
 
Flight Line Safety.ppt
Flight Line Safety.pptFlight Line Safety.ppt
Flight Line Safety.pptDeepana
 
Choosing the Right Airport to Call home - Flying Aviation Expo 2014
Choosing the Right Airport to Call home - Flying Aviation Expo 2014Choosing the Right Airport to Call home - Flying Aviation Expo 2014
Choosing the Right Airport to Call home - Flying Aviation Expo 2014Jason Blair
 
SRM- JSM - AIRPORTS-30 0CT 13.pptx
SRM- JSM - AIRPORTS-30 0CT 13.pptxSRM- JSM - AIRPORTS-30 0CT 13.pptx
SRM- JSM - AIRPORTS-30 0CT 13.pptxThirumeni Madavan
 
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...IBAS International Brazil Air Show
 

Similar to Glidepath Design Interfase.pdf (20)

Hold baggage Screening : MIS
Hold baggage Screening : MISHold baggage Screening : MIS
Hold baggage Screening : MIS
 
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
IoT at Airports is Really Taking Off
IoT at Airports is Really Taking OffIoT at Airports is Really Taking Off
IoT at Airports is Really Taking Off
 
Avionics
AvionicsAvionics
Avionics
 
airport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSairport customer services class1_ basics of ACS
airport customer services class1_ basics of ACS
 
Best Practice Airports
Best Practice AirportsBest Practice Airports
Best Practice Airports
 
Airport terminal design (lecture note)
Airport terminal design (lecture note)Airport terminal design (lecture note)
Airport terminal design (lecture note)
 
Airport planning part 2 -erau webinar
Airport planning part 2 -erau webinarAirport planning part 2 -erau webinar
Airport planning part 2 -erau webinar
 
UNIT-1 A OPERATIONS PPT.pptx
UNIT-1 A OPERATIONS PPT.pptxUNIT-1 A OPERATIONS PPT.pptx
UNIT-1 A OPERATIONS PPT.pptx
 
As kumar
As kumarAs kumar
As kumar
 
Presentation cadcam class b
Presentation cadcam class bPresentation cadcam class b
Presentation cadcam class b
 
Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan Smart City/Operation Management -Gazi Sanaul Hasan
Smart City/Operation Management -Gazi Sanaul Hasan
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION Final
 
Lecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+towerLecture+3 air+traffic+control+(atc)+tower
Lecture+3 air+traffic+control+(atc)+tower
 
Airport check in process improvement
Airport check in process improvementAirport check in process improvement
Airport check in process improvement
 
Flight Line Safety.ppt
Flight Line Safety.pptFlight Line Safety.ppt
Flight Line Safety.ppt
 
Choosing the Right Airport to Call home - Flying Aviation Expo 2014
Choosing the Right Airport to Call home - Flying Aviation Expo 2014Choosing the Right Airport to Call home - Flying Aviation Expo 2014
Choosing the Right Airport to Call home - Flying Aviation Expo 2014
 
SRM- JSM - AIRPORTS-30 0CT 13.pptx
SRM- JSM - AIRPORTS-30 0CT 13.pptxSRM- JSM - AIRPORTS-30 0CT 13.pptx
SRM- JSM - AIRPORTS-30 0CT 13.pptx
 
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...
Danilo Dias - SAFETY & SECURITY WORKSHOP - PANEL 3: Passenger processing inte...
 
Avionics sai
Avionics saiAvionics sai
Avionics sai
 

Recently uploaded

Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailDesigntroIntroducing
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full NightCall Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
Call Girls Bapu Nagar 7397865700 Ridhima Hire Me Full Night
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detail
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 

Glidepath Design Interfase.pdf

  • 1. Design of Baggage Handling Systems Overview
  • 2. Presentation Overview 1. Considerations when designing a Baggage Handling System (BHS) 2. Departure Systems 3. Arrivals Systems 4. Specifying a System 5. Typical Project Timeframes and Team 6. Lifetime, Maintenance and through life costs 7. BHS Controls 8. Case Studies
  • 3. 1 Considerations when designing a Baggage Handling System (BHS)?
  • 4. Why have a Baggage Handling System (BHS) Why have a baggage handling system? 2 (Two) simple reasons 1. On Passenger departure To take bags from passengers at check in, comply with security regulations and transfer all bags to the correct Aircraft in a quick and efficient manner. 2. On Passenger Arrival To quickly reunite the passenger with all their bags
  • 5. So what size of BHS does an Airport need? The size and type of Baggage handling system is determined by the following: A. The Passenger numbers (existing and future) B. Frequency and nature of Flights C. The type of Terminal i.e. Domestic and / or International. D. Security requirements domestic and International. E. The project type i.e. A new or expanded or redeveloped Airport
  • 6. A. Passenger Numbers and Bag Size Key to determining the BHS size is. • The peak number of passengers now and in the future. • The nature and type of travel • The anticipated number of bags per passenger. • Typical size of bags (Standard Gauge bag)
  • 7. Airport Size Definition BHS Terminal / Airport Size broad definition • Small less than 2million passengers per annum • Medium between 2 to 15 million passengers per annum • Large Greater than 15 million passengers per annum
  • 8. Bag Sizes As defined in IATA Airport development reference manual (9th edition) Standard Gauge baggage Length 450 - 900mm Width 150 - 300mm Height 400 - 750mm Mass 10 - 60 kg Oversize Baggage (OB) Length 901 - 2500mm Width 301 - 600mm Height 751 - 1500mm Mass 10 - 70 kg
  • 9. B. Number and types of Flights Domestic Flights •Generally smaller planes •Higher frequency •Shorter check In times required •Less tolerance for delays both at check in and arrivals •Generally less checked in baggage International Flights •Larger Planes •Less frequent •Check in process starts earlier •Greater number and generally larger checked in bags
  • 10. C. Type of Terminal Domestic Terminals •Tend to be simpler in design and concept •Require less dwell time for passengers •Less retail space •The passenger has less tolerance for waiting. •Generally less security requirements International Terminals •Tend to have more complex in design and concept •By nature international travel requires more time for passenger check in and processing. •More retail space and complicated terminal facilities •The passenger has more tolerance for waiting. •More security requirements
  • 11. D. Security Requirements Baggage Security needs to consider the following: Terror protection, contraband prevention, general security and law enforcement •Local Laws and security •National Laws and Regulations •International laws •The laws applicable to the final destination of the flight
  • 12. E. The Project Type There are different considerations depending on the type of BHS project. New Terminal (Green Field) •Opportunity to start design on a “clean sheet” of paper •Opportunity to use the best and latest BHS technologies. •Opportunity to save money through less staff and labour •Opportunity to change work processes and become more efficient •Easier Installation and commissioning of the BHS Existing Terminal (Brown Field) •Normally a requirement to use or modify either existing baggage system. •Opportunity to improve the existing BHS •With good design there is the opportunity to save costs •More difficult Installation and commissioning of the BHS
  • 14. Process Overview Check in Security Screening Sortation Flight Make-up
  • 15. Model System View in 3D with Deep View Free at www.righthemisphere.com/dv
  • 17. The Bag Departure Process Typical Bag Departure Process The steps……. •Step 1 Passenger Check In – Bags Weighed – Bags Tagged •Step 2 Bags Transported •Step 2A Bags Tracked •Step 3 Bags Security Screened •Step 4 Bags transported and Sorted to Flights
  • 18. Departure Systems Step 1 Passenger Check In.
  • 19. Departure Systems: Styles of Check In. Inline Style. •Simple and Typical for most airports •Economic use of space for small to medium size airports. •Most commercially economic •Picture Here
  • 20. Departure Systems: Styles of Check In. Island Style •Generally used in large Airports for high passenger numbers •More expensive but is used to stop a terminal elongating. •Requires a large check In hall space
  • 21. Passenger Check In Conveyors Types of Check In Conveyors Static Scale. Picture Here Cost Low Space Low Labour High Ergonomics Bad Terminal Suitability Small
  • 22. Passenger Check In Conveyors Single Check In Conveyor Picture Cost Medium Space Low Labour Low Ergonomics Good Terminal Suitability Small to Medium
  • 23. Passenger Check In Conveyors Double Check In Conveyor Picture Cost Medium Space Medium Labour Low Ergonomics Good Terminal Suitability Medium to Large
  • 24. Passenger Check In Conveyors Triple Check In Conveyor Cost High Space High Labour Low Ergonomics Good Terminal Suitability Large to Hub
  • 26. Check In: Architectural Interfaces Issues to consider in the check In area. •There will be a need for Scale readouts on desks. •Power to the scale. •Control panels on desks (Stop/start switches etc.) •Gap between desks •Clearances between scales and desks
  • 29. Departure System Step 2 Bags Transported
  • 30. Baggage Transport From Check In to Airside Baggage handling providers should be able to provide the full range of baggage Handling transport conveyors. Key Criteria for Mechanical Equipment: •Simple slider bed Construction •Well Proven track record within the Airport Baggage environment •Reliable •Modular and Compatible across the range •Able to be expanded and modified in the future •Use Airport standard conveyor fire rated belting
  • 31. Baggage Handling Equipment ¾ Industry Averages for Baggage conveyor throughput ¾ Check In conveyors “rule of thumb” 1 bag per check In per minute ¾Typical Average conveyor line operate 1800 bags per hour (30 bags per minute) ¾ Maximum peak 3600 bags per hour (60 bags per minute)
  • 33. General Transport: Architectural Interfaces Key Considerations for BHS • Maintenance access and space • Walking Space adjacent to conveyors for un jamming bags. • Head clearance • Dolly Clearance • Clearance from adjacent services • Ceiling and Floor loads • Building Structure for hanging platforms and conveyors
  • 40. Departure System Step 2A Bag Tracking
  • 41. Bag Tracking Why do we need bag Tracking? •To ensure that security screened bags are in fact verifiably cleared •So bags can be sorted to their destinations if automated sortation is used •To Allow for Baggage reconciliation in the baggage make up process. Types of Bag Tracking. Simple Bar Code readers 95% read rate •Very low cost and universally used Radio Frequency Identification RFID Claimed read rate 99.99% •High cost per unit (5 cents each) •Still waiting on industry standard
  • 43. Manual Encode Station When using Bar Code tags and read rate of 95% as 5% will not be read then….. It is necessary to allow for a manual Encode station or
  • 44. Departure System Step 3 Baggage Security Screening
  • 45. Baggage Security: Applicable Type. There are many types and National codes for baggage security screening. The applicable security practice for the Country, region or airport must be used. Some Examples………
  • 46. National Security Codes Level 1 Level 2 Level 3 CT (#1) automatic machine decision CT (#2) automatic machine decision make up carousel make up carousel *ETD manual inspection *ETD : Explosive Trace Detection (Handheld) make up carousel
  • 47. National Security Codes Level 1 Level 2 Level 3 Multi-view automatic machine decision make up carousel make up carousel CT automatic machine decision make up carousel Level 4 make up carousel Multi-view operator decision Level 5 make up carousel CT operator decision reconcile with passenger
  • 48. National Security Codes Level 1 Level 2 Level 3 Multi-view automatic machine decision make up carousel make up carousel Multi-view 2nd operator decision make up carousel Level 4 make up carousel Multi-view 1st operator decision Level 5 make up carousel *ETD manual inspection reconcile with passenger *ETD : Explosive Trace Detection (Handheld)
  • 49. Explosive Detection Devices Rapiscan 528 Rapiscan Systems UK Department of Transport (DfT) Accepted 5,000 750 2,500 990 816 802 1,003 2,003 4,344 1,650 MVXR5000 Rapiscan Systems HI-SCAN 10080 EDX-2is Smith Heimann HI-SCAN 10080 EDtS Smith Heimann CTX 5500 DS GE InVision TSA certified 7,779 (1) 600 (2) 400 1,400 (1) 760 (2) 1,020 600 1,020 2,223 4,759 2,413 CTX 9400 Dsi GE InVision CTX 9000 Dsi GE InVision VIS-108 L3 Communications Optional Algorithm Turning - TSA centified 800 1,000 MVT-HR L3 Communications TSA certified eXaminer 3DX L3 Communications Security Screening Authority Acceptance Weight (kg) Height (mm) Lengt h (mm) Width (mm) Belt RL (mm) Height (mm) Width (mm) Height (mm) Lengt h (mm) Width (mm) Model Make Max. Baggage Size Tunnel Geometry (mm) Exterior Geometry (excl maintenance area)
  • 50. Baggage Security Layouts Small System Single Line Manual Inspection.
  • 51. Baggage Security Layouts Small System Single Line Manual Inspection.
  • 54. Departure System Step 4 Bags Sorted to Flights
  • 56. Types of Sort Systems Types of Sort Systems is dependent on • Terminal Size • Number of bags to be sorted • Number and frequency of flights So Types of Sortation 1. Small to medium Size Terminal • Manual from the end of a conveyor or Carousel 2. Medium to Large Size • Automatic sortation • Pusher type sortation • TiltTray Sorter
  • 57. Manual Sort Examples End of Conveyor type
  • 59. Belt/Pusher Sortation •Picture Here •Lower investment cost •System redundancy potential •Turning radius is relatively smaller •Lower power consumption, economy mode •Common spare parts with main BHS system •Ease of system expansion or modification
  • 60. Tilt Tray Sortation • Expensive • Single point of failure • Difficult to expand and modify • High energy consumptions
  • 63. Oversize Baggage It is necessary to allow for oversize baggage. Key points • Conveyor is generally wider than standard 1200-1370mm • The system should be as straight as possible and avoid curves if possible • It will be necessary to allow for security screening
  • 64. Transfer Baggage Can be handled in 2 ways. 1. Small Terminals •Generally handle Transfer baggage manually 2. Larger Terminals •Injected bags into the system prior to security screening after manually encoding •Manually after security screening bags sent to a Transfer carousel. Sometimes a dedicated security area on the ground floor.
  • 66. Arrivals Systems Key Considerations when designing an Arrivals System •Number of arriving passengers and size of Aircraft. •Size of bags typical of destinations •Peak Arrival Times •Passenger congestion in the baggage reclaim Area •Passenger flow in the baggage reclaim area •Noise These factors will determine •The type and size of Carousels •The layout and configuration of the carousels within the reclaim area •The carousel feed system
  • 67. Arrivals Systems Typical Bag Arrival Process The steps……. • Step 1 Passenger Arrives on aircraft • Step 2 Bags Transported from Aircraft to baggage hall • Step 2a Bags Security Screened (option) • Step 3 Bags placed on Arrivals conveyor or reclaim Carousel • Step 4 Bags picked up by passenger
  • 68. Arrival System Step 2a Arrival Baggage Security Screened Generally very simple. Generally manual processes Usually Labour Intensive So…. Normally consists of an EDS machine sited near reclaim Carousel.
  • 69. Arrival System Step 2a Arrival Baggage Security Screened
  • 70. Baggage Reclaim Carousels Reclaim Carousels. Design considerations. • Number of arriving passengers and size of Aircraft. • Size of bags typical of destinations • Peak Arrival Times • Passenger congestion in the baggage reclaim Area • Passenger flow in the baggage reclaim area • Noise
  • 74. Arrival Systems Reclaim: Carousel Options Sloped Plate Type. (Inclined Dispenser) •Suitable for remote feeds. •Good for large bags •Good for high density and large number of passengers •Slightly more expensive than other options •Can have a bigger footprint compared to other carousels
  • 75. Arrival Systems Reclaim: Carousel Options Crescent Plate Type. Pallet Loop •Robust construction. •Not generally recommended for remote bag feed •Good for small to medium size airports •Slightly more economic than other options •small footprint compared to Inclined Plate
  • 76. Arrival Systems Reclaim: Carousel Options Overlapping Slat Type. Multipath •Slightly Wider conveying width than pallet loop •Not generally recommended for remote bag feed •Good for small to medium size airports •Slightly more economic than other options •Small footprint compared to Inclined plate
  • 77. Baggage Claim Devices vs. Aircraft Seat Capacity 1 feed 30 (9) 65 (20) 1 feed 30 (9) 60 (18) 75 (23) 25 (7.6) 50 (15.2) 100 1 feed 30 (9) 80 (24) 1 feed 30 (9) 75 (23) 105 (32) 35 (10.7) 70 (21.3) 140 1 feed 40 (12) 100 (30.5) 1 feed 40 (12) 90 (27) 120 (37) 40 (12.2) 80 (24.4) 170 1 feed 40 (12) 130 (40) 1 feed 40 (12) 120 (37) 150 (46) 50 (15.2) 100 (30.5) 200 2 feeds 30 (9) 170 (52) 2 feeds 30 (9) 150 (46) 200 (61) 70 (21.3) 130 (39.6) 270 2 feeds 40 (12) 235 (72) 2 feeds 40 (12) 210 (64) 255 (78) 80 (24.4) 175 (53.3) 370 2 feeds 40 (12) 270 (82) 2 feeds 40 (12) 250 (76) 295 (90) 90 (27.4) 205 (62.5) 420 Bag Off loading length 1 or 2 feeds Claim length Pallet loop or Multipath Exposure to Public Bag off loading length 1 or 2 feeds Claim length Incline Dispenser Exposure to Public Total Length Bag off Offloading length Claim length Exposure to Public Aircraft Seating Capacity Remote Feed ft (m) Incline Dispenser (Sloped plate) Direct Feed ft (m) Pallet Loop or Multipath Assumptions 85% load factor 75 to 35% Terminations Baggage ratio 1.3 per passenger 12.5 bags per minute per handler
  • 79. Specifying a system & BHS Vendors Q. When is the best time to get a Baggage Handling system supplier involved in a project? A. As soon as possible. Q. Performance based or product based solution? A. Generally a performance based solution is better however the disadvantage to the airport is it makes it difficult to compare “apples with apples” Q. Should all vendors be pre-qualified? A. Absolutely, all vendors should be able to demonstrate the completion of successful projects of similar size to your project.
  • 80. Specifying a system & BHS Vendors Q. Should we engage a baggage Handling Consultant? A. This depends on the size of the project, small to medium size projects can be handled by a competent BHS provider Q. What about Larger projects? A. Again these can be designed by a experience BHS vendor but generally it is also best to engage a consultant as part of the design team. Q. Where can I find a BHS consultant? A. Sadly they a few and far between. The biggest gap in industry knowledge right now is in the area of security screening
  • 83. Typical Project Times from Start to Finish Start. Defined as Initial concept design in a designed building Finished. Defined as handed over to the end user after commissioning Typical areas the BHS vendor does not have timeline control over • Building design and iterations • Finance for the project • Staged Installation requirements
  • 84. Typical Project Times from Start to Finish So some very broad examples of time frames ¾ For a simple reclaim loop or small check In area Start to finish time 6-8 months ¾ A small domestic terminal 1 to 2 million passengers per annum Start to finish time 12-24 months. ¾ Medium size International Airport 5-10 million passengers per annum Start to finish time 30-48 months ¾ Large International Airport 30 million plus passengers per annum Start to finish time 36-60 months
  • 86. BHS Lifetime Generally Accepted Lifetime of a BHS is 10 or 15 years Key to longevity, lower through life costs is: • A Well designed layout in terms of conveyor/sub system duties • Keeping BHS component suppliers to a minimum • The use of variable frequency drives for stop/start conveyors • The use of Economy mode type functions in large systems • Well trained and Skilled Operational and Maintenance Staff • Commonality of parts across the site • A planned maintenance program
  • 87. 7 Control System Drive System Safety Systems PLCs Field Bus BHS Controls
  • 88. Control Systems PLC based conveyor control: GlideControl Human Machine Interface: GlideView SCADA Flight Sortation & Allocation: GlideSort SAC Baggage Reconciliation: GlideScan BRS
  • 90. Control System Elements What is a control system? What defines it? What does it do? Conveyor control Conveyor drive Operator control panels Bag Tracking HMI panels Safety Systems I/f to EDS systems I/f to GV, GS
  • 92. Field Devices Photo Sensor (PE) Pulse Wheel (PX) Beacons/Sounders Push Buttons/Indicators
  • 93. Motors Variable Frequency Drive (VFD) Motor Isolator Thermal Overload Distributed or centralised Conveyor Drive System
  • 94. Safety Systems Guaranteed Safe Operation, Electrical control Safety Categories CAT 1 Minor Injury CAT 2 Minor injury CAT 3 Chance of serious injury CAT 4 Injury causing death Emergency Stop Zoning Independent Reset function
  • 95. PLC Industrial Computer, Very reliable Compact Size Designed for modular operation Centre of the System
  • 96. Bag Tracking Head Conveyor A Tail Photo Eye Rotary Encoder Head Conveyor B Tail Photo Eye Rotary Encoder Conveyor B Tracking Model Conveyor A Tracking Model 1 3 4 2 5 PLC – On the Belt Tracking Belt Tracking Bag Identification