Definition of assembly lines
 Assembly line is a sequence of work stations performing a specified
repeated tasks on a product units moving along the line at constant speed.
 Each unit of the product spends the same amount of time in every station,
this time is called cycle time.
 The sequence, in which operations must be performed, follow certain
constraints called precedence relations.
Assembly line balancing (ALB)
 It is the procedure concerning the assignment of tasks to work stations so
that:
• Precedence relations are respected.
• Workstation time do not exceed the cycl time.
• Minimize the total idle time.
Important relations
 Cycle time (C) =
𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑤𝑜𝑟𝑘𝑖𝑛𝑔 𝑡𝑖𝑚𝑒
𝐶𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝑑𝑒𝑚𝑎𝑛𝑑 𝑜𝑟 𝑡ℎ𝑒 𝑑𝑒𝑠𝑖𝑟𝑒𝑑 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛
 Theoretical number of work stations (N)=
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒
 Theoretical line efficiency =
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑁∗𝐶
%
 Balance delay (BD) =1-Efficiency.
 Smoothing index (SI)= (𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 − 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒)
2
 SI is preferred to be small and near zero. This indicates a perfect workload
balance.
Goals of ALB
 The ALB problem can be classified to different types according to the
objective as the following:
• Type-1: minimizing the total number of stations.
• Type-2: minimize the number of work stations.
• Type-3: maximize the work load balance.
• Type-E: this type is concerned with maximizing the efficiency of assembly
line by minimizing cycle time and number of stations.
Example
 The example below shows the tasks required for assembly of electric fan
and the time of each task and the precedence relations between tasks.
Code task time
A Assemble frame 3
B Mount switch 1
C Assemble motor housing 3.25
D Mount motor housing in frame 1.2
E Attach blade 0.5
F Assemble and attach safety grill 1
G Attach cord 1
H Test 1.4
A
C
B
D E F
G
H
2
3.25
1
1.2 .5
1
1.4
1
 Daily demand 100 units per day and the available working time is 420
minutes daily.
 Required cycle time (C) =
420
100
= 4.2 minutes/ unit
 Theoretical number of work stations =
𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠
𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒
=
11.35
4.2
=
2.702. (round up to nearest integer number = 3).
Station no. Task Description Predecessors Assigned
time (min)
Remaining
time
1 A
B
G
Assemble Frame
Mount Switch
Attach Cord
-
A
B
2
1
1
2.2
1.2
0.2
2 C Assemble Motor Housing - 3.25 0.95
3 D
E
F
H
Mount motor housing in
frame
Attach Blade
Assemble and attach safety
grill
Test
A,C
D
E
F,G
1.2
0.5
1
1.4
3
2.5
1.5
0.1
Performance criteria of the line
 Actual cycle time (realized cycle time) =4.1
 Line efficiency =
11.35
4.1∗3
= 92.27 %
 SI= 0.98
Thank you

More Related Content

What's hot (20)

79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Line balancing ppt By Wakil Kumar
Line balancing ppt By Wakil KumarLine balancing ppt By Wakil Kumar
Line balancing ppt By Wakil Kumar
 
Assembly Line Balancing
Assembly Line BalancingAssembly Line Balancing
Assembly Line Balancing
 
Line balancing example
Line balancing exampleLine balancing example
Line balancing example
 
Assembly Line Balancing | Case Study
Assembly Line Balancing | Case StudyAssembly Line Balancing | Case Study
Assembly Line Balancing | Case Study
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | Management
 
Method study
Method studyMethod study
Method study
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Line balancing
Line balancingLine balancing
Line balancing
 
Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)Assembly line balancing using Rank positional weight (RPW)
Assembly line balancing using Rank positional weight (RPW)
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work Study
Work Study Work Study
Work Study
 
Final line balancing ppt 4
Final line balancing ppt 4Final line balancing ppt 4
Final line balancing ppt 4
 
Line balance
Line balanceLine balance
Line balance
 
Line balancing and heuristics
Line balancing and heuristicsLine balancing and heuristics
Line balancing and heuristics
 
Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 

Similar to Assembly line balancing

04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancingSonali Guha
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222harkesh singh
 
CIM report - final
CIM report - finalCIM report - final
CIM report - finalPraveen S R
 
22d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp0222d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp02Mostafa Kamal
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production managementJoshua Miranda
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEyosefhadiwibowo
 
Integrated fuzzy logic controller for a Brushless DC Servomotor system
Integrated fuzzylogic controller for a Brushless DC Servomotor systemIntegrated fuzzylogic controller for a Brushless DC Servomotor system
Integrated fuzzy logic controller for a Brushless DC Servomotor systemEhab Al hamayel
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.pptxicohos114
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&AMahmoud Eltaweel
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeIAEME Publication
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip BasicsA B Shinde
 

Similar to Assembly line balancing (20)

Line Balancing (2).pptx
Line Balancing (2).pptxLine Balancing (2).pptx
Line Balancing (2).pptx
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
04 assemblylinebalancing
04 assemblylinebalancing04 assemblylinebalancing
04 assemblylinebalancing
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
22d2 optimal assembly line balancing222
22d2 optimal assembly line balancing22222d2 optimal assembly line balancing222
22d2 optimal assembly line balancing222
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM report - final
CIM report - finalCIM report - final
CIM report - final
 
CIM Report
CIM ReportCIM Report
CIM Report
 
22d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp0222d2optimalassemblylinebalancing222 110829065724-phpapp02
22d2optimalassemblylinebalancing222 110829065724-phpapp02
 
Facility Layout in production management
Facility Layout in production managementFacility Layout in production management
Facility Layout in production management
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
 
Integrated fuzzy logic controller for a Brushless DC Servomotor system
Integrated fuzzylogic controller for a Brushless DC Servomotor systemIntegrated fuzzylogic controller for a Brushless DC Servomotor system
Integrated fuzzy logic controller for a Brushless DC Servomotor system
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
 
Assembly line balancing Q&A
Assembly line balancing Q&AAssembly line balancing Q&A
Assembly line balancing Q&A
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and time
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip Basics
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptxrouholahahmadi9876
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 

Assembly line balancing

  • 2. Definition of assembly lines  Assembly line is a sequence of work stations performing a specified repeated tasks on a product units moving along the line at constant speed.  Each unit of the product spends the same amount of time in every station, this time is called cycle time.  The sequence, in which operations must be performed, follow certain constraints called precedence relations.
  • 3. Assembly line balancing (ALB)  It is the procedure concerning the assignment of tasks to work stations so that: • Precedence relations are respected. • Workstation time do not exceed the cycl time. • Minimize the total idle time.
  • 4. Important relations  Cycle time (C) = 𝐴𝑣𝑎𝑖𝑙𝑎𝑏𝑙𝑒 𝑤𝑜𝑟𝑘𝑖𝑛𝑔 𝑡𝑖𝑚𝑒 𝐶𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝑑𝑒𝑚𝑎𝑛𝑑 𝑜𝑟 𝑡ℎ𝑒 𝑑𝑒𝑠𝑖𝑟𝑒𝑑 𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛  Theoretical number of work stations (N)= 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒  Theoretical line efficiency = 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑁∗𝐶 %  Balance delay (BD) =1-Efficiency.  Smoothing index (SI)= (𝑀𝑎𝑥𝑖𝑚𝑢𝑚 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒 − 𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝑡𝑖𝑚𝑒) 2  SI is preferred to be small and near zero. This indicates a perfect workload balance.
  • 5. Goals of ALB  The ALB problem can be classified to different types according to the objective as the following: • Type-1: minimizing the total number of stations. • Type-2: minimize the number of work stations. • Type-3: maximize the work load balance. • Type-E: this type is concerned with maximizing the efficiency of assembly line by minimizing cycle time and number of stations.
  • 6. Example  The example below shows the tasks required for assembly of electric fan and the time of each task and the precedence relations between tasks. Code task time A Assemble frame 3 B Mount switch 1 C Assemble motor housing 3.25 D Mount motor housing in frame 1.2 E Attach blade 0.5 F Assemble and attach safety grill 1 G Attach cord 1 H Test 1.4 A C B D E F G H 2 3.25 1 1.2 .5 1 1.4 1
  • 7.  Daily demand 100 units per day and the available working time is 420 minutes daily.  Required cycle time (C) = 420 100 = 4.2 minutes/ unit  Theoretical number of work stations = 𝑆𝑢𝑚𝑚𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑡𝑎𝑠𝑘 𝑡𝑖𝑚𝑒𝑠 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 = 11.35 4.2 = 2.702. (round up to nearest integer number = 3).
  • 8. Station no. Task Description Predecessors Assigned time (min) Remaining time 1 A B G Assemble Frame Mount Switch Attach Cord - A B 2 1 1 2.2 1.2 0.2 2 C Assemble Motor Housing - 3.25 0.95 3 D E F H Mount motor housing in frame Attach Blade Assemble and attach safety grill Test A,C D E F,G 1.2 0.5 1 1.4 3 2.5 1.5 0.1