Assembly Line Balancing
Dr. Venkateswara Rao. Korasiga
What is Line balancing?
 Line and work cell balancing is an effective tool to
improve the throughput of assembly lines and work
cells while reducing manpower requirements and
costs.
 Assembly Line Balancing, or simply Line Balancing
(LB), is the problem of assigning operations to
workstations along an assembly line, in such a way
that the assignment be optimal in some sense.
 Ever since Henry Ford’s introduction of assembly
lines, LB has been an optimization problem of
significant industrial importance:
◦ the efficiency difference between an optimal and a sub-
optimal assignment can yield economies (or waste)
reaching millions of dollars per year.
LB is a classic Operations Research
(OR) optimization problem, having been
tackled by OR over several decades.
we use line balancing technique to achieve:
1. the minimization of the number of
workstations;
2. the minimization of cycle time;
3. the maximization of workload
smoothness;
4. The maximization of work relatedness
Scheduling high volume-low
variety Operations
 The mass consumption patterns of modern industrialized
nations depend on assembly line technology.
 The classic example is Henry Ford’s auto chassis line.
◦ Before the “moving assembly line” was introduced in 1913,
each chassis was assembled by one worker and required
12.5 hours.
◦ Once the new technology was installed, this time was reduced
to 93 minutes.
 Favorable Conditions
◦ Volume adequate for reasonable equipment utilization.
◦ Reasonably stable product demand.
◦ Product standardization
◦ Part interchange-ability.
◦ Continuous supply of material
◦ Not all of the above must be met in every case.
Concepts
 Minimum rational work element
◦ Smallest feasible division of work.
 Flow time = time to complete all stations
 Cycle time
◦ Maximum time spent at any one workstation.
◦ Largest workstation time.
◦ How often a product is completed.
◦ Inverse of the desired hourly output rate = the amount of
time available at each work station to complete all
assigned work.
1 2 3
4 min 5 min 4 min
Flow time = 4 + 5 + 4 = 13
Cycle time = max (4, 5, 4) = 5
 Total work content: Sum of the task
times for all the assembly tasks for the
product.
 Precedence diagram: network
showing order of tasks and restrictions
on their performance
 Measure of efficiency
 Efficiency= sum of task time (T)
Actual number of work stations (N), X Cycle
time (C)
The Problem
 Assign tasks to work stations
observing balancing restrictions so as
to minimize balance delay while
keeping station work content for every
station cycle time.
 Restrictions:
◦ Technological: precedence requirement.
◦ Position restrictions.
Finding a Solution
 Heuristic procedures generally allow for a
broader problem definition, but do not guarantee
optimal solution.
 Optimizing procedures generally have used
more narrowly defined problems, but guarantee
optimal solution.
 Examples of optimizing procedures
◦ Dynamic programming
◦ 0-1 Integer programming
◦ Branch and bound techniques.
 Trend in research has been toward optimizing
procedures due to availability of large-scale
computers.
A simple Algarithm
 Identify tasks whose predecessors have been
assigned to a workstation (available tasks).
 Determine from available tasks, those that fit,
i.e., those whose tasks times time remaining to
be filled at this work station.
 Choose a task that fits by some decision rule
◦ task with largest time
◦ task with most successors
◦ task with greatest sum of task times of its predecessors.
 Continue steps 1 to 3 until no task fits, then go
on to next workstation.
 Continue steps 1 to 4 until all tasks are assigned.
Illustrative Example
 You’ve just been assigned the job a setting
up an electric fan assembly line with the
fowing tasks:
A
C
B
D E F
G
H
2
3.25
1
1.2 .5
1
1.4
1
Task Time (Mins) Description Predecessors
A 2 Assemble frame None
B 1 Mount switch A
C 3.25 Assemble motor housing None
D 1.2 Mount motor housing in frame A, C
E 0.5 Attach blade D
F 1 Assemble and attach safety grill E
G 1 Attach cord B
H 1.4 Test F, G
Example
Max Production =
Production time per day
Bottleneck time
=
420 mins
3.25 mins / unit
=129 units
Required Cycle Time, C =
Production time per period
Required output per period
C =
420 mins / day
100 units / day
= 4.2 mins / unit
Example contd….
Theoretical Min. Number of Workstations, N
N =
Sum of task times (T)
Cycle time (C)
t
t
N =
11.35 mins / unit
4.2 mins / unit
= 2.702, or 3
t
Complications
 Behavioral options
◦ Job enlargement and rotation.
◦ Wages related to task.
◦ Distribution of slack time.
◦ Inventory buffers.
◦ Involving work group in decisions.
◦ Arranging stations to facilitate interaction.
◦ Personnel selection.
 Time to move an item between stations
 Machine-dominated work stations.
 Task times which exceed the cycle time.
 Stochastic task times.
 Mixed model assembly lines.
Finally what is Line Balancing ?
 Here is a simple definition and
example of line balancing :
 Everyone is doing the same amount of
work
 Doing the same amount of work to
customer requirement
 Variation is ‘smoothed’
 No one overburdened
 No one waiting
 Everyone working together in a
BALANCED fashion
THANK
YOU

More Related Content

Similar to Line Balancing (2).pptx

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)Shadina Shah
 
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- Performance
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- PerformanceLec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- Performance
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- PerformanceHsien-Hsin Sean Lee, Ph.D.
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEyosefhadiwibowo
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 EstimationLawrence Bernstein
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip BasicsA B Shinde
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancingRohit Goutam
 
performance uploading.pptx
performance uploading.pptxperformance uploading.pptx
performance uploading.pptxSanthiS10
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line BalancingRohan Bharaj
 
5275401 (2).ppt
5275401 (2).ppt5275401 (2).ppt
5275401 (2).pptCaldwell4
 
Parallel Computing - Lec 6
Parallel Computing - Lec 6Parallel Computing - Lec 6
Parallel Computing - Lec 6Shah Zaib
 
productivity improvement using work studt tools.pptx
productivity improvement using work studt tools.pptxproductivity improvement using work studt tools.pptx
productivity improvement using work studt tools.pptxNeerajSaini430412
 

Similar to Line Balancing (2).pptx (20)

vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Line balancing
Line balancing Line balancing
Line balancing
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)
 
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- Performance
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- PerformanceLec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- Performance
Lec3 Computer Architecture by Hsien-Hsin Sean Lee Georgia Tech -- Performance
 
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGEOPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
OPERATIONS MANAGEMENT FOR COMPETITIVE ADVANTAGE
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 Estimation
 
Line balancing
Line balancingLine balancing
Line balancing
 
SOC Chip Basics
SOC Chip BasicsSOC Chip Basics
SOC Chip Basics
 
Line balancing
Line balancingLine balancing
Line balancing
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
performance uploading.pptx
performance uploading.pptxperformance uploading.pptx
performance uploading.pptx
 
Ch05
Ch05Ch05
Ch05
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
5275401 (2).ppt
5275401 (2).ppt5275401 (2).ppt
5275401 (2).ppt
 
Parallel Computing - Lec 6
Parallel Computing - Lec 6Parallel Computing - Lec 6
Parallel Computing - Lec 6
 
productivity improvement using work studt tools.pptx
productivity improvement using work studt tools.pptxproductivity improvement using work studt tools.pptx
productivity improvement using work studt tools.pptx
 
Work measurement
Work measurementWork measurement
Work measurement
 
Iq2515441549
Iq2515441549Iq2515441549
Iq2515441549
 

Recently uploaded

Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130Suhani Kapoor
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...ThinkInnovation
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一fhwihughh
 

Recently uploaded (20)

Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
Decoding Loan Approval: Predictive Modeling in Action
Decoding Loan Approval: Predictive Modeling in ActionDecoding Loan Approval: Predictive Modeling in Action
Decoding Loan Approval: Predictive Modeling in Action
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
VIP Call Girls Service Miyapur Hyderabad Call +91-8250192130
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
办理学位证纽约大学毕业证(NYU毕业证书)原版一比一
 

Line Balancing (2).pptx

  • 1. Assembly Line Balancing Dr. Venkateswara Rao. Korasiga
  • 2. What is Line balancing?  Line and work cell balancing is an effective tool to improve the throughput of assembly lines and work cells while reducing manpower requirements and costs.  Assembly Line Balancing, or simply Line Balancing (LB), is the problem of assigning operations to workstations along an assembly line, in such a way that the assignment be optimal in some sense.  Ever since Henry Ford’s introduction of assembly lines, LB has been an optimization problem of significant industrial importance: ◦ the efficiency difference between an optimal and a sub- optimal assignment can yield economies (or waste) reaching millions of dollars per year.
  • 3. LB is a classic Operations Research (OR) optimization problem, having been tackled by OR over several decades. we use line balancing technique to achieve: 1. the minimization of the number of workstations; 2. the minimization of cycle time; 3. the maximization of workload smoothness; 4. The maximization of work relatedness
  • 4. Scheduling high volume-low variety Operations  The mass consumption patterns of modern industrialized nations depend on assembly line technology.  The classic example is Henry Ford’s auto chassis line. ◦ Before the “moving assembly line” was introduced in 1913, each chassis was assembled by one worker and required 12.5 hours. ◦ Once the new technology was installed, this time was reduced to 93 minutes.  Favorable Conditions ◦ Volume adequate for reasonable equipment utilization. ◦ Reasonably stable product demand. ◦ Product standardization ◦ Part interchange-ability. ◦ Continuous supply of material ◦ Not all of the above must be met in every case.
  • 5. Concepts  Minimum rational work element ◦ Smallest feasible division of work.  Flow time = time to complete all stations  Cycle time ◦ Maximum time spent at any one workstation. ◦ Largest workstation time. ◦ How often a product is completed. ◦ Inverse of the desired hourly output rate = the amount of time available at each work station to complete all assigned work. 1 2 3 4 min 5 min 4 min Flow time = 4 + 5 + 4 = 13 Cycle time = max (4, 5, 4) = 5
  • 6.  Total work content: Sum of the task times for all the assembly tasks for the product.  Precedence diagram: network showing order of tasks and restrictions on their performance  Measure of efficiency  Efficiency= sum of task time (T) Actual number of work stations (N), X Cycle time (C)
  • 7. The Problem  Assign tasks to work stations observing balancing restrictions so as to minimize balance delay while keeping station work content for every station cycle time.  Restrictions: ◦ Technological: precedence requirement. ◦ Position restrictions.
  • 8. Finding a Solution  Heuristic procedures generally allow for a broader problem definition, but do not guarantee optimal solution.  Optimizing procedures generally have used more narrowly defined problems, but guarantee optimal solution.  Examples of optimizing procedures ◦ Dynamic programming ◦ 0-1 Integer programming ◦ Branch and bound techniques.  Trend in research has been toward optimizing procedures due to availability of large-scale computers.
  • 9. A simple Algarithm  Identify tasks whose predecessors have been assigned to a workstation (available tasks).  Determine from available tasks, those that fit, i.e., those whose tasks times time remaining to be filled at this work station.  Choose a task that fits by some decision rule ◦ task with largest time ◦ task with most successors ◦ task with greatest sum of task times of its predecessors.  Continue steps 1 to 3 until no task fits, then go on to next workstation.  Continue steps 1 to 4 until all tasks are assigned.
  • 10. Illustrative Example  You’ve just been assigned the job a setting up an electric fan assembly line with the fowing tasks: A C B D E F G H 2 3.25 1 1.2 .5 1 1.4 1 Task Time (Mins) Description Predecessors A 2 Assemble frame None B 1 Mount switch A C 3.25 Assemble motor housing None D 1.2 Mount motor housing in frame A, C E 0.5 Attach blade D F 1 Assemble and attach safety grill E G 1 Attach cord B H 1.4 Test F, G
  • 11. Example Max Production = Production time per day Bottleneck time = 420 mins 3.25 mins / unit =129 units Required Cycle Time, C = Production time per period Required output per period C = 420 mins / day 100 units / day = 4.2 mins / unit
  • 12. Example contd…. Theoretical Min. Number of Workstations, N N = Sum of task times (T) Cycle time (C) t t N = 11.35 mins / unit 4.2 mins / unit = 2.702, or 3 t
  • 13. Complications  Behavioral options ◦ Job enlargement and rotation. ◦ Wages related to task. ◦ Distribution of slack time. ◦ Inventory buffers. ◦ Involving work group in decisions. ◦ Arranging stations to facilitate interaction. ◦ Personnel selection.  Time to move an item between stations  Machine-dominated work stations.  Task times which exceed the cycle time.  Stochastic task times.  Mixed model assembly lines.
  • 14. Finally what is Line Balancing ?  Here is a simple definition and example of line balancing :  Everyone is doing the same amount of work  Doing the same amount of work to customer requirement  Variation is ‘smoothed’  No one overburdened  No one waiting  Everyone working together in a BALANCED fashion
  • 15.