1. Exercise 1.
Performing Simulation
with Enterprise BPMN collaboration diagram
Purpose
• Learning how to prepare the process model to be simulated in the
Enterprise BPMN
• You are comparing the possibilities of process simulation between BPMN
2.0, Enterprise BPMN, and EPC in the aspect of costs, time database
maintenance.
NOTE
• Risk Simulation is not possible in BPMN 2.0, Enterprise BPMN
• Database maintaince costs are very high.
2. Step 1. Create Model - Enterprise BPMN collaboration diagram
4. Step 2a. Assign Avrage Times (in Attributes)
Other options are available – using minimum or maximum time
could be chosen; functions – constant, equal, normal log, normal
distribution could create a more statistically relevant simulations.