World-Class, Lean Performance Tutorials and Case Studies - Tutorial 05
scrap yard operations - scrap cans processing
THE PRESENT STATUS:
A Scrap Yard Business collects and processes scrap cool-drinks-cans for subsequent export.
The scrap cans collection/processing operations consist of the following:
o Scrap cans are actually delivered to the Scrap Yard by a number of "suppliers", including
restaurants, hotels, fast-food outlets, small grocery shops and kiosks, as well as "professional"
scrap items collectors - they come regularly to the yard by their own means to deliver scrap
items.
o Scrap Cans Suppliers are classified into two main groups: the "clean scrap" suppliers and the
"dirty scrap" suppliers.
o "Clean scrap" suppliers include restaurants, hotels and fast-food outlets. They are classified as
"clean" because their scrap cans are "clean" (from straws - and not mixed with glass and plastic
bottles and other non-metal items). This kind of suppliers actually does a "sorting" and
separation operation in their premises, and their supplies consist only of cans. For this reason
they are paid a premium price per Kg for their supplies.
o "Dirty scrap" suppliers include small supermarkets and kiosks and scrap street collectors (these
last suppliers do actually earn their living by collecting cans from street refusal bins). They are
classified as "dirty" because their supplies are generally "unsorted" (contents include other
objects that must be removed in the scrap yard before processing). These suppliers are paid the
ongoing market price for scrap cans.
o "Clean suppliers" generally supply their goods in large refusal bags. "Dirty suppliers" supply their
goods in any type of bags (generally small, supermarket-size) and even in cardboard box type of
containers.
o Suppliers arrive at the scrap yard at any random time, and their goods are received and paid-for
immediately: they drive their vans or trucks straight to the cans processing area - bags and other
containers of cans are weighted on a scale - a small paper note, describing items and total weight
delivered, is given to suppliers who can then collect their cash payment from the cashier's office
on the way out.
o The offloaded goods, still in their bags or other containers, are thrown by hand onto the cans
collection area. This area is rather large and extremely messy: there are piles of multi-colour
cans everywhere, as well as mountains of bags still to be opened. A map of the area is below.
2
o There are 3 workers assigned to this area. They: assist suppliers in offloading trucks and
weighing the delivered goods - throw the off-loaded goods in the cans collection area - when they
are not busy with suppliers they process cans and other scrap non-ferrous metal.
The scrap cans processing operations consist of:
o Sorting cans from other foreign objects. This is done in the cans collection area: workers walk
between piles of cans and bags - open small bags and other containers - throw cans in the cans
pile - throw foreign objects and plastic bags, cardboard, etc. in a big rubbish container (a big
cardboard box) - bring big bags (with "clean" supplies) next to the baling area (see below).
o Loading the hopper of the baling machine with cans. This is done: either straight from "clean"
bags (that get emptied directly in the hopper) - or through a big bucket, that is used to pick up
cans from the cans' pile - or even directly from "dirty" bags, sorting cans from rubbish directly in
the machine hopper. A side view of the baler/hopper/loading conveyor is here below:
3
o One of the 3 workers, in charge of the entire area, operates the baling machine (while the other 2
workers do sorting and loading of hopper). He reshuffles the cans in the machine pressing
compartment for better compaction and operates manually the baler's hydraulics (pressing and
ejecting). NB: the loading conveyor can be operated both from the machine front and from a
control button at its top.
o Other activities performed by the 3 workers include: emptying the rubbish container once a day -
hammering each bale just produced on its corners to make it fit well on a pallet - move a full
pallet of bales to the yard, for subsequent loading onto marine containers for export.
DATA SHEET
o The pressing operation cycle time is approx. 3 minutes (it takes 3 minutes to produce one bale).
This long cycle time is due: primarily, to the fully manual operation of the baler - but also due to
considerable time necessary to fill with cans the machine charge box from the hopper - and time
spent in removing a bale from the discharge conveyor, hammering its corner, and positioning it
on the pallet.
o The hopper can contain enough cans to fill the machine charge box in one go.
o None of the 3 workers is actually busy full time: all of them have considerable spare time (idling,
talking, waiting for things to happen...).
o Approx. 70% of the cans supplied can be considered "clean" (and supplied in big bags) and 30%
"dirty" (and supplied in small bags or cartons).
o Suppliers are very co-operative, and generally help considerably the 3 workers for off-loading,
weighing and positioning the supplied goods.
o Supplies arrive at random times every day of the week.
o The overall, average amount of cans received and processed in a week are equivalent to approx.
2 full pallets of processed cans (bales). 1 pallet contains 80 bales (10 layers of 8 bales per layer).
o The actual overall cans processing time amounts to an average of 2 full days per week. However,
the operation is carried out irregularly every day of the week, whenever the team decides to do
it. The 3 workers are actually assigned to the "cans" operation and also to other operations
(copper, aluminium, and stainless steel receiving and processing).
o The team has ample idle time during the week: besides resting or talking (including some
primitive form of public relations with suppliers) or just waiting for things to happen (suppliers
arriving with new lots of scrap), they also (try to) keep the area tidy - remove the rubbish
cartons for disposal - and keep themselves busy at reshuffling scrap all around.
The area is very messy and really dis-organised - also the entire process is very naïf and it has never
been streamlined.
It is felt that by applying lean principles to this operation:
o Labour force may be reduced and productivity increased
o The area could be organised more rationally
What can be done?
What are your conclusions?
4
World-Class, Lean Performance Tutorials - Tutorial 05
deploying lean principles in non-manufacturing operations
scrap yard operations - scrap cans processing
conclusions
Analysis
The primary target in a case of this nature is to eliminate as much double-handling as possible. In the
present state, the supplied goods are handled:
o during the off-loading/weighing operation (necessary)
o when bags are thrown in the cans collection area (necessary, but can be organised differently)
o for sorting - in the can collection area (necessary, but can be streamlined)
o when loading the baler hopper (necessary, but can be streamlined)
A lean solution & conclusions must target at achieving a continuous as possible flow.
Hence the lean steps:
o Suppliers are very co-operative, and can be asked to position the off-loaded and weighted goods
in "dedicated" areas - to the purpose the entire off-loading area has been re-designed.
o "Dedicated areas" means areas that can facilitate the achievement of a continuous style of flow.
Since the most important operations in the process are "sorting" (when required) and "loading
hopper", these dedicated areas should be as close as possible to the machine hopper. This will
create the necessary conditions to establish the flow.
o Furthermore: the present sorting operation is messy and time consuming. This is due to the fact
that sorting is done "in" the cans pile. This is very un-ergonomic: workers waste considerable
time to stretch, bend, search for small "dirty" bags, open them up while standing, throw good
cans in the pile and rubbish in the rubbish container, etc. The best way of sorting cans is at the
correct working level, i.e. at hopper level (or just above it).
o At hopper level means +- 1,2 m. from the floor level: this is a very convenient height to work at
ergonomically - possibly with workers standing on a pedestal - and on condition that a working
area is created at that height.
o This leads to the idea of creating the "bags storage area" at that very same level: in this way,
bags can be opened and sorted next to the hopper, and cans thrown in just by sliding them.
A plan and side view of the "future state area" are here below:
5
The main features of the future state are:
o The entire "storage-areas-before-processing" system has been re-designed, with "dedicated"
areas for each of the non-ferrous materials (aluminium, copper A, copper B, stainless steel, and
cans). Cans have a permanent storage area (see below), whereas all other non-ferrous materials
are stored on trolleys (two for each type of material). Full trolleys are brought to the baler for
pressing, on a rotation basis.
o With regard to scrap cans, two Temporary Storage Areas, respectively for clean and dirty
supplies, have been provided on a wooden stand. The 2 storage areas floor is inclined, to allow
descent of bags by gravity. Both storage areas have chipboard side walls (to prevent bags from
falling) and a front "stopper".
o Between cans storage areas and hopper, two "sorting tables" have been provided: workers may
comfortably do the sorting on these tables (possibly while standing on a small pedestal) and feed
the hopper simply by "sliding" cans into the hopper.
o With the new layout, it becomes possible to re-engineer entirely the can processing operation. An
analysis of the Takt Time reveals that on a 5-day operation Takt Time = 13 minutes per
processed bale (@ 7 working hours per day = 420 minutes per day = 2100 minutes per week,
the Takt Time is 2100/160 = 13,1 minutes per bale). But, on a 2-day in the week operation (as it
is presently), the Takt Time becomes 840/160 = 5,25 minutes per bale. This means that if cans
are processed continuously for 2 days, there are more than 5 minutes to get one bale out. (*)
o With an available cycle time (sort - load hopper - press and compact - hammer corners of bale -
position bale on the pallet) of over 5 minutes, one worker alone can comfortably implement the
whole processing operation. The new, ergonomic layout allows him to walk from machine to
sorting tables - open clean bags and load the hopper - OR, open small bags, do the sorting,
dispose of rubbish, and load the hopper - then start loading the machine pressing compartment
(there is an operating button at the top of the loading conveyor) - then walk back to the machine
front and operate the machine for pressing/compacting - then slide out the processed bale - then
hammer its corners, and position it onto the pallet.
o Obviously things may be streamlined even further with an electro-hydraulic operation of the baler
and duplicated commands next to the sorting tables. But this would help only marginally (it would
just prevent some walking).
o While one worker processes cans, the other 2 take care of suppliers, off-loading goods,
positioning, etc.
o Best results are achieved if the 3 workers are fully interchangeable (all of them trained to operate
the baler).
o The cans processing operation does not need to be continuous (over 2 full days) - it can be done
in lots of a few hours at a time - so that also other scrap materials may be baled every day, when
required.
(*) TAKT TIME - REMARKS
The way the Takt Time principle has been adopted in this case is not the classical one. The definition of
Takt Time is = customer demand/available time.
In this case the ratio supplier offer/available time has been used instead. Yet, its use is perfectly valid,
since the Takt Time is what sets the speed and pace of production.
6
This paper is freely distributed through https://www.scodanibbio.com . You may publish this article in your web site/s
or distribute it for free as long as you are not changing any content or any links or any other details. If you wish to
publish or distribute this article on your web site/s you have to link back to https://www.scodanibbio.com - just copy
and paste this code in your site, in the same page in which this paper is going to be published:
<a href=”https://www.scodanibbio.com” title=”Carlo Scodanibbio – Industrial and Business Consultant – Lean
Management Consultant”>by Carlo Scodanibbio, Lean Management Consultant</a>
https://www.scodanibbio.com
Copyright: © Carlo Scodanibbio 2008 onwards

More Related Content

Similar to Tutorial05: Deploying lean principles in non-manufacturing operations - Scrap Yard operations - Scrap Cans processing

presentation on wastemanagement-20240421 RADHIKA.pptx
presentation on wastemanagement-20240421 RADHIKA.pptxpresentation on wastemanagement-20240421 RADHIKA.pptx
presentation on wastemanagement-20240421 RADHIKA.pptx
Varsha Khetrapal Kumar
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
Rosidah Saad
 

Similar to Tutorial05: Deploying lean principles in non-manufacturing operations - Scrap Yard operations - Scrap Cans processing (14)

Didi
DidiDidi
Didi
 
20131125 1
20131125 120131125 1
20131125 1
 
20131125 1
20131125 120131125 1
20131125 1
 
LAUNDRY EQUIPMENTS.ppt
LAUNDRY EQUIPMENTS.pptLAUNDRY EQUIPMENTS.ppt
LAUNDRY EQUIPMENTS.ppt
 
presentation on wastemanagement-20240421 RADHIKA.pptx
presentation on wastemanagement-20240421 RADHIKA.pptxpresentation on wastemanagement-20240421 RADHIKA.pptx
presentation on wastemanagement-20240421 RADHIKA.pptx
 
Ivt load sense
Ivt load senseIvt load sense
Ivt load sense
 
Yes Bank Transformation series 2017 Submission (First Round)
Yes Bank Transformation series 2017 Submission (First Round)Yes Bank Transformation series 2017 Submission (First Round)
Yes Bank Transformation series 2017 Submission (First Round)
 
study on Blowroom line and its machineries .pdf
study on Blowroom line and its machineries .pdfstudy on Blowroom line and its machineries .pdf
study on Blowroom line and its machineries .pdf
 
Collection method, transfer and disposal.pptx
Collection method, transfer and disposal.pptxCollection method, transfer and disposal.pptx
Collection method, transfer and disposal.pptx
 
waste collection and transportation present
waste collection and transportation presentwaste collection and transportation present
waste collection and transportation present
 
Food Packaging and Machinery
Food Packaging and Machinery Food Packaging and Machinery
Food Packaging and Machinery
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Sada Zero - how it works
Sada Zero - how it worksSada Zero - how it works
Sada Zero - how it works
 
Mass transfer equipment
Mass transfer equipmentMass transfer equipment
Mass transfer equipment
 

More from Carlo Scodanibbio

More from Carlo Scodanibbio (17)

Tutorial08: Deploying lean principles is imperative in the service industry!
Tutorial08: Deploying lean principles is imperative in the service industry!Tutorial08: Deploying lean principles is imperative in the service industry!
Tutorial08: Deploying lean principles is imperative in the service industry!
 
Tutorial04:What makes the difference between lean and non-lean?
Tutorial04:What makes the difference between lean and non-lean?Tutorial04:What makes the difference between lean and non-lean?
Tutorial04:What makes the difference between lean and non-lean?
 
Tutorial02: World-Class and Third-Class Performance in the Service Industry
Tutorial02: World-Class and Third-Class Performance in the Service Industry Tutorial02: World-Class and Third-Class Performance in the Service Industry
Tutorial02: World-Class and Third-Class Performance in the Service Industry
 
Tutorial01: How to introduce Flow Production in a small size Factory - the "P...
Tutorial01: How to introduce Flow Production in a small size Factory - the "P...Tutorial01: How to introduce Flow Production in a small size Factory - the "P...
Tutorial01: How to introduce Flow Production in a small size Factory - the "P...
 
Total Productive Maintenance: what is it?
Total Productive Maintenance: what is it?Total Productive Maintenance: what is it?
Total Productive Maintenance: what is it?
 
Total Employee Involvement: is it possible?
Total Employee Involvement: is it possible?Total Employee Involvement: is it possible?
Total Employee Involvement: is it possible?
 
Stupidity: a major obstacle to Lean Management
Stupidity: a major obstacle to Lean Management Stupidity: a major obstacle to Lean Management
Stupidity: a major obstacle to Lean Management
 
Lean Thinking: what is it?
Lean Thinking: what is it?Lean Thinking: what is it?
Lean Thinking: what is it?
 
Lean Management: the origins, the principles, the approach
Lean Management: the origins, the principles, the approachLean Management: the origins, the principles, the approach
Lean Management: the origins, the principles, the approach
 
Lean Kaizen: continuous, step-by-step improvement in the Lean direction
Lean Kaizen: continuous, step-by-step improvement in the Lean directionLean Kaizen: continuous, step-by-step improvement in the Lean direction
Lean Kaizen: continuous, step-by-step improvement in the Lean direction
 
Kaizen: what does it mean?
Kaizen: what does it mean?Kaizen: what does it mean?
Kaizen: what does it mean?
 
Flow Production: why and how
Flow Production: why and howFlow Production: why and how
Flow Production: why and how
 
Flow Production: a target for today's Manufacturing Industry
Flow Production: a target for today's Manufacturing IndustryFlow Production: a target for today's Manufacturing Industry
Flow Production: a target for today's Manufacturing Industry
 
Covid-19 and the future of "Lean"
Covid-19 and the future of "Lean"Covid-19 and the future of "Lean"
Covid-19 and the future of "Lean"
 
Companies Changing Hands - The Lean Approach
Companies Changing Hands - The Lean ApproachCompanies Changing Hands - The Lean Approach
Companies Changing Hands - The Lean Approach
 
Carlo Scodanibbio: my philosophy, my vision, my mission
Carlo Scodanibbio: my philosophy, my vision, my missionCarlo Scodanibbio: my philosophy, my vision, my mission
Carlo Scodanibbio: my philosophy, my vision, my mission
 
Achieving Quick Change-Over: dream or reality?
Achieving Quick Change-Over: dream or reality?Achieving Quick Change-Over: dream or reality?
Achieving Quick Change-Over: dream or reality?
 

Recently uploaded

SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
CaitlinCummins3
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
EADTU
 

Recently uploaded (20)

Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading RoomSternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
Sternal Fractures & Dislocations - EMGuidewire Radiology Reading Room
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes GuàrdiaPersonalisation of Education by AI and Big Data - Lourdes Guàrdia
Personalisation of Education by AI and Big Data - Lourdes Guàrdia
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 

Tutorial05: Deploying lean principles in non-manufacturing operations - Scrap Yard operations - Scrap Cans processing

  • 1. 1 World-Class, Lean Performance Tutorials and Case Studies - Tutorial 05 scrap yard operations - scrap cans processing THE PRESENT STATUS: A Scrap Yard Business collects and processes scrap cool-drinks-cans for subsequent export. The scrap cans collection/processing operations consist of the following: o Scrap cans are actually delivered to the Scrap Yard by a number of "suppliers", including restaurants, hotels, fast-food outlets, small grocery shops and kiosks, as well as "professional" scrap items collectors - they come regularly to the yard by their own means to deliver scrap items. o Scrap Cans Suppliers are classified into two main groups: the "clean scrap" suppliers and the "dirty scrap" suppliers. o "Clean scrap" suppliers include restaurants, hotels and fast-food outlets. They are classified as "clean" because their scrap cans are "clean" (from straws - and not mixed with glass and plastic bottles and other non-metal items). This kind of suppliers actually does a "sorting" and separation operation in their premises, and their supplies consist only of cans. For this reason they are paid a premium price per Kg for their supplies. o "Dirty scrap" suppliers include small supermarkets and kiosks and scrap street collectors (these last suppliers do actually earn their living by collecting cans from street refusal bins). They are classified as "dirty" because their supplies are generally "unsorted" (contents include other objects that must be removed in the scrap yard before processing). These suppliers are paid the ongoing market price for scrap cans. o "Clean suppliers" generally supply their goods in large refusal bags. "Dirty suppliers" supply their goods in any type of bags (generally small, supermarket-size) and even in cardboard box type of containers. o Suppliers arrive at the scrap yard at any random time, and their goods are received and paid-for immediately: they drive their vans or trucks straight to the cans processing area - bags and other containers of cans are weighted on a scale - a small paper note, describing items and total weight delivered, is given to suppliers who can then collect their cash payment from the cashier's office on the way out. o The offloaded goods, still in their bags or other containers, are thrown by hand onto the cans collection area. This area is rather large and extremely messy: there are piles of multi-colour cans everywhere, as well as mountains of bags still to be opened. A map of the area is below.
  • 2. 2 o There are 3 workers assigned to this area. They: assist suppliers in offloading trucks and weighing the delivered goods - throw the off-loaded goods in the cans collection area - when they are not busy with suppliers they process cans and other scrap non-ferrous metal. The scrap cans processing operations consist of: o Sorting cans from other foreign objects. This is done in the cans collection area: workers walk between piles of cans and bags - open small bags and other containers - throw cans in the cans pile - throw foreign objects and plastic bags, cardboard, etc. in a big rubbish container (a big cardboard box) - bring big bags (with "clean" supplies) next to the baling area (see below). o Loading the hopper of the baling machine with cans. This is done: either straight from "clean" bags (that get emptied directly in the hopper) - or through a big bucket, that is used to pick up cans from the cans' pile - or even directly from "dirty" bags, sorting cans from rubbish directly in the machine hopper. A side view of the baler/hopper/loading conveyor is here below:
  • 3. 3 o One of the 3 workers, in charge of the entire area, operates the baling machine (while the other 2 workers do sorting and loading of hopper). He reshuffles the cans in the machine pressing compartment for better compaction and operates manually the baler's hydraulics (pressing and ejecting). NB: the loading conveyor can be operated both from the machine front and from a control button at its top. o Other activities performed by the 3 workers include: emptying the rubbish container once a day - hammering each bale just produced on its corners to make it fit well on a pallet - move a full pallet of bales to the yard, for subsequent loading onto marine containers for export. DATA SHEET o The pressing operation cycle time is approx. 3 minutes (it takes 3 minutes to produce one bale). This long cycle time is due: primarily, to the fully manual operation of the baler - but also due to considerable time necessary to fill with cans the machine charge box from the hopper - and time spent in removing a bale from the discharge conveyor, hammering its corner, and positioning it on the pallet. o The hopper can contain enough cans to fill the machine charge box in one go. o None of the 3 workers is actually busy full time: all of them have considerable spare time (idling, talking, waiting for things to happen...). o Approx. 70% of the cans supplied can be considered "clean" (and supplied in big bags) and 30% "dirty" (and supplied in small bags or cartons). o Suppliers are very co-operative, and generally help considerably the 3 workers for off-loading, weighing and positioning the supplied goods. o Supplies arrive at random times every day of the week. o The overall, average amount of cans received and processed in a week are equivalent to approx. 2 full pallets of processed cans (bales). 1 pallet contains 80 bales (10 layers of 8 bales per layer). o The actual overall cans processing time amounts to an average of 2 full days per week. However, the operation is carried out irregularly every day of the week, whenever the team decides to do it. The 3 workers are actually assigned to the "cans" operation and also to other operations (copper, aluminium, and stainless steel receiving and processing). o The team has ample idle time during the week: besides resting or talking (including some primitive form of public relations with suppliers) or just waiting for things to happen (suppliers arriving with new lots of scrap), they also (try to) keep the area tidy - remove the rubbish cartons for disposal - and keep themselves busy at reshuffling scrap all around. The area is very messy and really dis-organised - also the entire process is very naïf and it has never been streamlined. It is felt that by applying lean principles to this operation: o Labour force may be reduced and productivity increased o The area could be organised more rationally What can be done? What are your conclusions?
  • 4. 4 World-Class, Lean Performance Tutorials - Tutorial 05 deploying lean principles in non-manufacturing operations scrap yard operations - scrap cans processing conclusions Analysis The primary target in a case of this nature is to eliminate as much double-handling as possible. In the present state, the supplied goods are handled: o during the off-loading/weighing operation (necessary) o when bags are thrown in the cans collection area (necessary, but can be organised differently) o for sorting - in the can collection area (necessary, but can be streamlined) o when loading the baler hopper (necessary, but can be streamlined) A lean solution & conclusions must target at achieving a continuous as possible flow. Hence the lean steps: o Suppliers are very co-operative, and can be asked to position the off-loaded and weighted goods in "dedicated" areas - to the purpose the entire off-loading area has been re-designed. o "Dedicated areas" means areas that can facilitate the achievement of a continuous style of flow. Since the most important operations in the process are "sorting" (when required) and "loading hopper", these dedicated areas should be as close as possible to the machine hopper. This will create the necessary conditions to establish the flow. o Furthermore: the present sorting operation is messy and time consuming. This is due to the fact that sorting is done "in" the cans pile. This is very un-ergonomic: workers waste considerable time to stretch, bend, search for small "dirty" bags, open them up while standing, throw good cans in the pile and rubbish in the rubbish container, etc. The best way of sorting cans is at the correct working level, i.e. at hopper level (or just above it). o At hopper level means +- 1,2 m. from the floor level: this is a very convenient height to work at ergonomically - possibly with workers standing on a pedestal - and on condition that a working area is created at that height. o This leads to the idea of creating the "bags storage area" at that very same level: in this way, bags can be opened and sorted next to the hopper, and cans thrown in just by sliding them. A plan and side view of the "future state area" are here below:
  • 5. 5 The main features of the future state are: o The entire "storage-areas-before-processing" system has been re-designed, with "dedicated" areas for each of the non-ferrous materials (aluminium, copper A, copper B, stainless steel, and cans). Cans have a permanent storage area (see below), whereas all other non-ferrous materials are stored on trolleys (two for each type of material). Full trolleys are brought to the baler for pressing, on a rotation basis. o With regard to scrap cans, two Temporary Storage Areas, respectively for clean and dirty supplies, have been provided on a wooden stand. The 2 storage areas floor is inclined, to allow descent of bags by gravity. Both storage areas have chipboard side walls (to prevent bags from falling) and a front "stopper". o Between cans storage areas and hopper, two "sorting tables" have been provided: workers may comfortably do the sorting on these tables (possibly while standing on a small pedestal) and feed the hopper simply by "sliding" cans into the hopper. o With the new layout, it becomes possible to re-engineer entirely the can processing operation. An analysis of the Takt Time reveals that on a 5-day operation Takt Time = 13 minutes per processed bale (@ 7 working hours per day = 420 minutes per day = 2100 minutes per week, the Takt Time is 2100/160 = 13,1 minutes per bale). But, on a 2-day in the week operation (as it is presently), the Takt Time becomes 840/160 = 5,25 minutes per bale. This means that if cans are processed continuously for 2 days, there are more than 5 minutes to get one bale out. (*) o With an available cycle time (sort - load hopper - press and compact - hammer corners of bale - position bale on the pallet) of over 5 minutes, one worker alone can comfortably implement the whole processing operation. The new, ergonomic layout allows him to walk from machine to sorting tables - open clean bags and load the hopper - OR, open small bags, do the sorting, dispose of rubbish, and load the hopper - then start loading the machine pressing compartment (there is an operating button at the top of the loading conveyor) - then walk back to the machine front and operate the machine for pressing/compacting - then slide out the processed bale - then hammer its corners, and position it onto the pallet. o Obviously things may be streamlined even further with an electro-hydraulic operation of the baler and duplicated commands next to the sorting tables. But this would help only marginally (it would just prevent some walking). o While one worker processes cans, the other 2 take care of suppliers, off-loading goods, positioning, etc. o Best results are achieved if the 3 workers are fully interchangeable (all of them trained to operate the baler). o The cans processing operation does not need to be continuous (over 2 full days) - it can be done in lots of a few hours at a time - so that also other scrap materials may be baled every day, when required. (*) TAKT TIME - REMARKS The way the Takt Time principle has been adopted in this case is not the classical one. The definition of Takt Time is = customer demand/available time. In this case the ratio supplier offer/available time has been used instead. Yet, its use is perfectly valid, since the Takt Time is what sets the speed and pace of production.
  • 6. 6 This paper is freely distributed through https://www.scodanibbio.com . You may publish this article in your web site/s or distribute it for free as long as you are not changing any content or any links or any other details. If you wish to publish or distribute this article on your web site/s you have to link back to https://www.scodanibbio.com - just copy and paste this code in your site, in the same page in which this paper is going to be published: <a href=”https://www.scodanibbio.com” title=”Carlo Scodanibbio – Industrial and Business Consultant – Lean Management Consultant”>by Carlo Scodanibbio, Lean Management Consultant</a> https://www.scodanibbio.com Copyright: © Carlo Scodanibbio 2008 onwards