 TOC was developed by Dr. Eliyahu Goldratt, a Israeli physicist in the
mid 1980’s with his business novel The Goal.
 Initially Dr. Eliyahu invented a software named OPT This software
package quickly and effectively scheduled production in even
complex environments by separating bottleneck and non-bottleneck
operations.
 But as this was introduced under license hence many of its topics
were not clearly understood and couldn’t fetch the attention of
scientists.
 Hence Dr. Goldratt published his book named as ‘The Goal’ in
1987, in which he suggested and explained TOC after which
TOC was widely implemented in various fields.
 The Theory of Constraints is a
management policy which provides the determination of the factors
which limits a company reaching its objectives and the application of
necessary changes to remove these factors generally known as
constraints.
 TOC drives manager to attack these constraints in order to reach the
company's primary goal-i.e. to make Money
 TOC views System as Chain
 Number of links together form a chain in similar manner as number
of elements are responsible for System’s formation.
 TOC determines an element which limits the system progress and
suggest remedy for eliminating that element(Constraint).
 A Constraint is anything that prevents the system from achieving
more of its goal. There are many ways that constraints can show up,
but a core principle within TOC is that there are not tens or hundreds
of constraints. There is at least one and at most a few constraint in
any given system.
 Constraints can be internal or external to the system.
 There is no choice in the matter of constraints; either you manage the
constraints or they manage you.
 The constraint will determine the output of the system whether they
are acknowledged and managed, or not.
 The system is as strong as its constraint's
TYPES OF
CONSTRAINTS
BEHAVIORAL
CONSTRAINT
Eg. Workers attitude, mental
state, mood, etc.
MANAGERIAL
CONSTRAINT
Eg. Management Policies.
CAPACITY
CONSTRAINT
Eg. When Demand > Actual
capacity.
MARKET
CONSTRAINT
Eg. When Demand < Actual
capacity.
LOGISTICAL
CONSTRAINT
Eg. Problems due to
Planning and control
system.
The TOC process seeks to identify the constraint and restructure the
rest of the organization around it, through the use of the
Five Focusing Steps:
1. Identify the Constraint
2. Exploit the Constraint
3. Sub ordinate everything
to the Constraint
4. Elevate the Constraint
5. Repeat for the new
Constraint
 Drum-Buffer-rope scheduling method- The DBR process was designed as a means of
implementing the five-step process of continuous profit improvement. It is used to represent how a
factory should be scheduled based on TOC. The DBR methodology consists of three elements:
 Drum
 The drum is the schedule for the system’s constraint(s) and represents a portion of the
exploitation phase of the five-step improvement process. It is used to maximize the available
time of the constraint and to create the master production schedule (MPS). Like the bass
drum in a marching band, it is the drumbeat of the manufacturing facility. All other resources
produce in synchronization to the constraint’s schedule.
 Buffer
 The buffer is a time mechanism used to allow for those things that will go wrong, and it
determines the lead time for products from the gating operations. The buffer is equal to the
processing time plus the setup time plus an estimate of the aggregated amount of protective
time required to ensure that the product will get to the buffer origin when needed.
 Rope
 The rope is the synchronization mechanism for the other resources and consists of the release
schedule for all gating operations. Technically the rope is equal to the constraint schedule
date minus the buffer time. The release of material determines the timing for parts being
processed on the nonconstraint resources.
 The thinking processes are a set of tools to help managers walk
through the steps of initiating and implementing TOC.
 Tools of Thinking processes of TOC
TOOLS OF THINKING
PROCESS
Current
Reality
Tree(CRT)
Evaporating
cloud(EC)
Future Reality
Tree(FRT)
Transition
Tree
Prerequisite
Tree(PT)
What to
Change?
What to
Change to?
How to
Change?
 FINANCIAL
MEASUREMENT
 Net Profit- An absolute
measurement in rupees
 Return on Investment- A
relative measurement based on
investment.
 Cash Flow- Money coming in
VS money coming out
 OPERATIONAL
MEASUREMENT
 Throughput- Money flowing In
 Rate at which a system generates
money through sales
 Inventory- Money inside company
▪ Inventory refers to all the
money that the system has
invested in things that are
expected to be sold.
 Operating Expenses- Money
flowing Out
▪ All the money a system
spends in turning inventory
into throughput
 Potential for tremendous increases in productivity with minimal
changes to operations.
 Most powerful and cost effective tool for increasing production
capacity.
 Very simple to communicate and apply, making it ideal for shop floor
teams.
 Great for fostering teamwork as different areas become aware of the
constraint and the need to work together to assist the constraint
process.
 It provides immediate and very tangible benefits.
 Allows growth of turnover/productivity without the need for
additional space or staff.
 Provides a means to evaluate the true value of changes (using T, O, I),
and utilize this to select the best options, and drive the right
behavior/decisions.
 The considerable length of training time required to achieve mastery
of the theory.
 The considerable length of time required to complete the problem
identification and solving process.
 The need for the cooperation and enthusiasm of all the people
involved with the problem, and
 Its over reliance on group work.
 Background-
• Case study was carried out in a Electromechanic factory located
in Istanbul.
• This factory is a supplier of keys.
• The problem face by the factory was that it was lacking in
manufacture of the required quantity of keys as demanded by
the company. i.e. The company's demand was 500quantity of
keys whereas this firms capacity was 450 quantity of keys in
given time.
• Then so as to increase productivity TOC was implemented and
results were as discussed below-
Step1. Identify the Constraint-
o This steps focuses on finding the constraints that limits the firms capacity.
o Hence , the table indicating firms current capacity was prepared.(refer table 1)
o From table the column current indicates current processing time of firm and the column Total indicates
the processing time required to produce 500 keys.
o It clearly shows that all other operation have required processing time less than the current processing
time, except the plastic injection machine.
o This indicates that the constraint is the Plastic injection machine
 Step2 - Exploiting the Constraint
o The machine is continuously working even during meal breaks and other breaks.
o An operator works on machine every time so there is nothing to do on this phase, it’s
time to examine the next phase.
 Step3- Subordinating everything else-
o In this step other resources are managed to get maximum efficiency at constraint point.
o But here it seems that plastic injection is the initial operation so late supply of raw
material was examined but there seemed no fault in it.
 Step4 – Elevating the systems Constraints.
o The process of plastic injection was examined. From table it was observed that setup
time of plastic injection could be controlled.
o Hence a PLC(Programmable Logic control) system was used to reduce the setup time
of injection machine.
o The use of PLC system reduced the setup
time from 20mins to 1 min. And eventually
reduced the processing time of Plastic
Injection Machine to1hr. 26 mins.
The adjacent table shows the same.
Step5 –Back to Step 1
o As observed in table below the factory now
has its increased productivity and company's
demand is fulfilled.
o Now another constraint arises i.e. Market
constraint and hence back to step 1 to
eliminate it.
 Hence with help of above case study we can conclude that
TOC, with its Five focusing steps and all of its related
philosophy including Thinking process and drum buffer-rope
scheduling method, provides an approaches for identifying and
exploiting bottlenecks in the organization.
 These steps of TOC leads to improvements in operations,
decrease in lead time, decrease in cycle time, improves the
due date performance, throughput increases and eventually
contributes in improvement of the whole system.
THANK YOU

More Related Content

What's hot

Introduction To Theory of Constraints
Introduction To Theory of ConstraintsIntroduction To Theory of Constraints
Introduction To Theory of ConstraintsHasham22
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTnishu tyagi
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAAJ Raina
 
Die Verschwendungsarten
Die VerschwendungsartenDie Verschwendungsarten
Die VerschwendungsartenLeonardo Group
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsEka Darmadi
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsMOHD ARISH
 
Book review the goal
Book review   the goalBook review   the goal
Book review the goaldhvani1234
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assemblyHammaduddin
 
The Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book ReviewThe Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book ReviewRahul Wane
 
Inventory models
Inventory modelsInventory models
Inventory modelsJavi Dela
 

What's hot (20)

Introduction To Theory of Constraints
Introduction To Theory of ConstraintsIntroduction To Theory of Constraints
Introduction To Theory of Constraints
 
JIT- JUST IN TIME PPT
JIT- JUST IN TIME PPTJIT- JUST IN TIME PPT
JIT- JUST IN TIME PPT
 
The eoq model
The eoq modelThe eoq model
The eoq model
 
Kanban
KanbanKanban
Kanban
 
Inventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBAInventory Management - a ppt for PGDM/MBA
Inventory Management - a ppt for PGDM/MBA
 
Die Verschwendungsarten
Die VerschwendungsartenDie Verschwendungsarten
Die Verschwendungsarten
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Lean System
Lean SystemLean System
Lean System
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Jit
JitJit
Jit
 
Process analysis
Process analysisProcess analysis
Process analysis
 
Theory of Constraint
Theory of ConstraintTheory of Constraint
Theory of Constraint
 
Book review the goal
Book review   the goalBook review   the goal
Book review the goal
 
Just In Time(JIT)
Just In Time(JIT)Just In Time(JIT)
Just In Time(JIT)
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Make to order, stock, assembly
Make to order, stock, assemblyMake to order, stock, assembly
Make to order, stock, assembly
 
The Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book ReviewThe Goal by Eliyahu M. Goldratt - A Book Review
The Goal by Eliyahu M. Goldratt - A Book Review
 
Inventory control
Inventory controlInventory control
Inventory control
 
Inventory models
Inventory modelsInventory models
Inventory models
 

Viewers also liked

Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyVector Consulting Group
 
Theory of Constraints- A Case study
Theory of Constraints- A Case studyTheory of Constraints- A Case study
Theory of Constraints- A Case studykhushboo choudhary
 
Theory of constraints in banking sector
Theory of constraints in banking sectorTheory of constraints in banking sector
Theory of constraints in banking sectorshasanka sahu
 
Theory of constraint
Theory of constraintTheory of constraint
Theory of constraintRubab Shaikh
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of ConstraintsUldis Sturms
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsSourabh Joshi
 
Understanding theory of constraints
Understanding theory of constraintsUnderstanding theory of constraints
Understanding theory of constraintsVictorkarv
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsMani Sarkar
 
Theory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors InterviewTheory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors InterviewBusiness901
 
Theory of constraints -SIOM
Theory of constraints -SIOMTheory of constraints -SIOM
Theory of constraints -SIOMadcom2015
 
TlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six SigmaTlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six SigmaBusiness901
 
Week 1 building blocks of scm
Week 1 building blocks of scmWeek 1 building blocks of scm
Week 1 building blocks of scmFassam Consulting
 
Lean management ppt @ bec doms
Lean management ppt @ bec domsLean management ppt @ bec doms
Lean management ppt @ bec domsBabasab Patil
 
Improving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryImproving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryAndrew Rusling
 
Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraintsshawncarner
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsmzpkn
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 

Viewers also liked (20)

Theory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case StudyTheory of Constraints Implementation in FMCG Industry : A Case Study
Theory of Constraints Implementation in FMCG Industry : A Case Study
 
Theory of Constraints- A Case study
Theory of Constraints- A Case studyTheory of Constraints- A Case study
Theory of Constraints- A Case study
 
Theory of constraints in banking sector
Theory of constraints in banking sectorTheory of constraints in banking sector
Theory of constraints in banking sector
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraint
Theory of constraintTheory of constraint
Theory of constraint
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Understanding theory of constraints
Understanding theory of constraintsUnderstanding theory of constraints
Understanding theory of constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors InterviewTheory of Constraints Handbook Co-authors Interview
Theory of Constraints Handbook Co-authors Interview
 
Theory of constraints -SIOM
Theory of constraints -SIOMTheory of constraints -SIOM
Theory of constraints -SIOM
 
TlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six SigmaTlS: Theory Of Cosntraints & Lean Six Sigma
TlS: Theory Of Cosntraints & Lean Six Sigma
 
Week 1 building blocks of scm
Week 1 building blocks of scmWeek 1 building blocks of scm
Week 1 building blocks of scm
 
Lean management ppt @ bec doms
Lean management ppt @ bec domsLean management ppt @ bec doms
Lean management ppt @ bec doms
 
Rapid replenishment s&t tree
Rapid replenishment s&t treeRapid replenishment s&t tree
Rapid replenishment s&t tree
 
Improving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing TheoryImproving throughput with the Theory of Constraints and Queuing Theory
Improving throughput with the Theory of Constraints and Queuing Theory
 
Theory Of Constraints
Theory Of ConstraintsTheory Of Constraints
Theory Of Constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of Constraints
Theory of ConstraintsTheory of Constraints
Theory of Constraints
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 

Similar to Theory of constraints(toc) & its application in a manufacturing firm

A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docxransayo
 
Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2MOHD ARISH
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training coursenewar_07
 
Unconstrained Benefits Assignment
Unconstrained Benefits AssignmentUnconstrained Benefits Assignment
Unconstrained Benefits AssignmentJames Dunford
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsritukaushikmba25
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingramuaa130
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &eSAT Publishing House
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...yearstart1
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...ramuaa124
 
Throughput Accounting.pdf notes from accounting and finance
Throughput Accounting.pdf notes  from accounting and financeThroughput Accounting.pdf notes  from accounting and finance
Throughput Accounting.pdf notes from accounting and financeTimothMbwilo
 
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English VersionA IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English VersionJackson Bezerra
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...ramuaa127
 
In an industry, Identify the SystemSolution .pdf
In an industry, Identify the SystemSolution                 .pdfIn an industry, Identify the SystemSolution                 .pdf
In an industry, Identify the SystemSolution .pdfamitbanik23
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingramuaa126
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingyearstart2
 

Similar to Theory of constraints(toc) & its application in a manufacturing firm (20)

A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
A p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docxA p r i l  2 0 0 5 I S T R AT E G I C  F I N A N C E 5 1A.docx
A p r i l 2 0 0 5 I S T R AT E G I C F I N A N C E 5 1A.docx
 
Theory Of Constraints 2
Theory Of Constraints  2Theory Of Constraints  2
Theory Of Constraints 2
 
Motion & time study
Motion & time studyMotion & time study
Motion & time study
 
T 1 industry preparedness training course
T 1 industry preparedness training courseT 1 industry preparedness training course
T 1 industry preparedness training course
 
Unconstrained Benefits Assignment
Unconstrained Benefits AssignmentUnconstrained Benefits Assignment
Unconstrained Benefits Assignment
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
Session 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraintsSession 3_TOC.pptx in theory if constraints
Session 3_TOC.pptx in theory if constraints
 
Which of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecastingWhich of the following is not one of the basic types of forecasting
Which of the following is not one of the basic types of forecasting
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...A simple project listing of five activities and their respective time estimat...
A simple project listing of five activities and their respective time estimat...
 
Quality tip 10
Quality tip 10Quality tip 10
Quality tip 10
 
Throughput Accounting.pdf notes from accounting and finance
Throughput Accounting.pdf notes  from accounting and financeThroughput Accounting.pdf notes  from accounting and finance
Throughput Accounting.pdf notes from accounting and finance
 
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English VersionA IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
A IMPLANTAÇÃO DO DFT EM INDÚSTRIAS BRASILEIRAS - English Version
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
In an industry, Identify the SystemSolution .pdf
In an industry, Identify the SystemSolution                 .pdfIn an industry, Identify the SystemSolution                 .pdf
In an industry, Identify the SystemSolution .pdf
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
Wcm4
Wcm4Wcm4
Wcm4
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 

Theory of constraints(toc) & its application in a manufacturing firm

  • 1. A SEMINAR ON Presented by- SARANG SANJAY DESHMUKH Department of Production Engineering K. K. Wagh Institute of Engineering Education & Research Nashik-42003 (2013 – 2014) Guided by- Prof. K.S. PATIL
  • 2.  TOC was developed by Dr. Eliyahu Goldratt, a Israeli physicist in the mid 1980’s with his business novel The Goal.  Initially Dr. Eliyahu invented a software named OPT This software package quickly and effectively scheduled production in even complex environments by separating bottleneck and non-bottleneck operations.  But as this was introduced under license hence many of its topics were not clearly understood and couldn’t fetch the attention of scientists.  Hence Dr. Goldratt published his book named as ‘The Goal’ in 1987, in which he suggested and explained TOC after which TOC was widely implemented in various fields.
  • 3.  The Theory of Constraints is a management policy which provides the determination of the factors which limits a company reaching its objectives and the application of necessary changes to remove these factors generally known as constraints.  TOC drives manager to attack these constraints in order to reach the company's primary goal-i.e. to make Money  TOC views System as Chain  Number of links together form a chain in similar manner as number of elements are responsible for System’s formation.  TOC determines an element which limits the system progress and suggest remedy for eliminating that element(Constraint).
  • 4.  A Constraint is anything that prevents the system from achieving more of its goal. There are many ways that constraints can show up, but a core principle within TOC is that there are not tens or hundreds of constraints. There is at least one and at most a few constraint in any given system.  Constraints can be internal or external to the system.  There is no choice in the matter of constraints; either you manage the constraints or they manage you.  The constraint will determine the output of the system whether they are acknowledged and managed, or not.  The system is as strong as its constraint's
  • 5. TYPES OF CONSTRAINTS BEHAVIORAL CONSTRAINT Eg. Workers attitude, mental state, mood, etc. MANAGERIAL CONSTRAINT Eg. Management Policies. CAPACITY CONSTRAINT Eg. When Demand > Actual capacity. MARKET CONSTRAINT Eg. When Demand < Actual capacity. LOGISTICAL CONSTRAINT Eg. Problems due to Planning and control system.
  • 6. The TOC process seeks to identify the constraint and restructure the rest of the organization around it, through the use of the Five Focusing Steps: 1. Identify the Constraint 2. Exploit the Constraint 3. Sub ordinate everything to the Constraint 4. Elevate the Constraint 5. Repeat for the new Constraint
  • 7.  Drum-Buffer-rope scheduling method- The DBR process was designed as a means of implementing the five-step process of continuous profit improvement. It is used to represent how a factory should be scheduled based on TOC. The DBR methodology consists of three elements:  Drum  The drum is the schedule for the system’s constraint(s) and represents a portion of the exploitation phase of the five-step improvement process. It is used to maximize the available time of the constraint and to create the master production schedule (MPS). Like the bass drum in a marching band, it is the drumbeat of the manufacturing facility. All other resources produce in synchronization to the constraint’s schedule.  Buffer  The buffer is a time mechanism used to allow for those things that will go wrong, and it determines the lead time for products from the gating operations. The buffer is equal to the processing time plus the setup time plus an estimate of the aggregated amount of protective time required to ensure that the product will get to the buffer origin when needed.  Rope  The rope is the synchronization mechanism for the other resources and consists of the release schedule for all gating operations. Technically the rope is equal to the constraint schedule date minus the buffer time. The release of material determines the timing for parts being processed on the nonconstraint resources.
  • 8.  The thinking processes are a set of tools to help managers walk through the steps of initiating and implementing TOC.  Tools of Thinking processes of TOC TOOLS OF THINKING PROCESS Current Reality Tree(CRT) Evaporating cloud(EC) Future Reality Tree(FRT) Transition Tree Prerequisite Tree(PT) What to Change? What to Change to? How to Change?
  • 9.  FINANCIAL MEASUREMENT  Net Profit- An absolute measurement in rupees  Return on Investment- A relative measurement based on investment.  Cash Flow- Money coming in VS money coming out  OPERATIONAL MEASUREMENT  Throughput- Money flowing In  Rate at which a system generates money through sales  Inventory- Money inside company ▪ Inventory refers to all the money that the system has invested in things that are expected to be sold.  Operating Expenses- Money flowing Out ▪ All the money a system spends in turning inventory into throughput
  • 10.  Potential for tremendous increases in productivity with minimal changes to operations.  Most powerful and cost effective tool for increasing production capacity.  Very simple to communicate and apply, making it ideal for shop floor teams.  Great for fostering teamwork as different areas become aware of the constraint and the need to work together to assist the constraint process.  It provides immediate and very tangible benefits.  Allows growth of turnover/productivity without the need for additional space or staff.  Provides a means to evaluate the true value of changes (using T, O, I), and utilize this to select the best options, and drive the right behavior/decisions.
  • 11.  The considerable length of training time required to achieve mastery of the theory.  The considerable length of time required to complete the problem identification and solving process.  The need for the cooperation and enthusiasm of all the people involved with the problem, and  Its over reliance on group work.
  • 12.  Background- • Case study was carried out in a Electromechanic factory located in Istanbul. • This factory is a supplier of keys. • The problem face by the factory was that it was lacking in manufacture of the required quantity of keys as demanded by the company. i.e. The company's demand was 500quantity of keys whereas this firms capacity was 450 quantity of keys in given time. • Then so as to increase productivity TOC was implemented and results were as discussed below-
  • 13. Step1. Identify the Constraint- o This steps focuses on finding the constraints that limits the firms capacity. o Hence , the table indicating firms current capacity was prepared.(refer table 1) o From table the column current indicates current processing time of firm and the column Total indicates the processing time required to produce 500 keys. o It clearly shows that all other operation have required processing time less than the current processing time, except the plastic injection machine. o This indicates that the constraint is the Plastic injection machine
  • 14.  Step2 - Exploiting the Constraint o The machine is continuously working even during meal breaks and other breaks. o An operator works on machine every time so there is nothing to do on this phase, it’s time to examine the next phase.  Step3- Subordinating everything else- o In this step other resources are managed to get maximum efficiency at constraint point. o But here it seems that plastic injection is the initial operation so late supply of raw material was examined but there seemed no fault in it.  Step4 – Elevating the systems Constraints. o The process of plastic injection was examined. From table it was observed that setup time of plastic injection could be controlled. o Hence a PLC(Programmable Logic control) system was used to reduce the setup time of injection machine.
  • 15. o The use of PLC system reduced the setup time from 20mins to 1 min. And eventually reduced the processing time of Plastic Injection Machine to1hr. 26 mins. The adjacent table shows the same. Step5 –Back to Step 1 o As observed in table below the factory now has its increased productivity and company's demand is fulfilled. o Now another constraint arises i.e. Market constraint and hence back to step 1 to eliminate it.
  • 16.  Hence with help of above case study we can conclude that TOC, with its Five focusing steps and all of its related philosophy including Thinking process and drum buffer-rope scheduling method, provides an approaches for identifying and exploiting bottlenecks in the organization.  These steps of TOC leads to improvements in operations, decrease in lead time, decrease in cycle time, improves the due date performance, throughput increases and eventually contributes in improvement of the whole system.