SlideShare a Scribd company logo
1 of 9
QMS ISO/TS 16949 INTERNAL AUDIT
AUDIT TREND MATRIX *  INDICATES, REPORT AWAITED 99 17 14 1 11 56 Total 1 NIL NIL NIL 1 NIL  75 9 3 1 NIL NIL 5 74 11 3 1 1 3 3 73 4 NIL 3 NIL NIL 1 72 3 * 1 NIL NIL 2 69 7 NIL 1 NIL 3 3 68 11 NIL 2 NIL NIL 9 66 21 3 3 NIL 1 14 65 32 8 2   NIL 3 19 64 Total Jul-05 Sep-04 May-04 Feb-04 Jan-04 Unit
FOCUS AREA 3   1 1   1   SYSTEM NOT FOLLOWED (HOLD/APQP/MSA) 1   1     LATEST MIP NOT FOLLOWED 1       1 REJECTION ANALYSIS NOT DONE 1 1       MICRO LEVEL PLAN INADEQUATE 17 3 3 3 8 TOTAL 1       1 PROCESS VALIDATION NOT DONE 3   1   2 INSPECTION NOT EVIDENCED 3 1   1 1 NO TRAINING IDENFITICATION/RECORDS 4     1 3 CONTROL PLAN UPDATION INADEQUATE TOTAL U74 U73 U65 U64 DISCREPANCIES
UNIT 64 INSPECTION FIRST OFF INSPECTION WILL BE CARRIED OUT AND RECORDED IN THE FIRST OFF INSPECTION REPORT IMMEDIATELY AND THE SAME WILL BE ENSURED BY THE SUPERVISOR (MANUFACTURING). FIRST INSPECTION CARRIED OUT BY THE OPERATOR NOT RECORDED IN THE FIRST INSPECTION REPORT. FIRST OFF REPORT NOT EVIDENCED FOR THE PART WHICH IS UNDER PRODUCTION. 64/03/03 TRAINING WHEN EVER NEW EMPLOYEES JOINED IN THE UNIT, ON THE JOB TRAINING WILL BE GIVEN AND THE TRAINING RECORD WILL BE UPATED IMMEDIATELY AND THE SAME WILL BE ENSURED BY THE UNIT HEAD. ON THE JOB TRAINING HAS BEEN GIVEN ON THE DAY OF PERSON JOINTED TO THE UNIT AND BUT RECORD NOT UPDATED. NO EVIDENCE OF PROVIDING ON THE JOB TRAINING TO THE OPERATOR PRIOR TO WORKING ON THE MACHINE INDEPENDENTLY. 64/03/02 CONTROL PLAN WHEN EVER ANY CHANGE/ERROR FOUND BY THE SUPERVISOR (MANUFACTURING) WILL INFORM  IMMDIATELY TO SUPERVISOR (TECHNICAL) WITHOUT MANUAL CORRECTION. ALTERNATE TOOLS AND ERROR IDENTIFIED BY THE SUPERVIOSR (MANUFACTURING) HAS BEEN WRITTEN MANUALLY AND NOT INFORMTED TO THE SUPERVISOR (TECHINCAL) FOR UPDATION. MANUAL CORRECTION MADE IN THE CONTROL PLAN OP.40, TO INDICATE ALTERNATIVE FIXTURES AND NOT INDICATED IN THE AMENDMENT 64/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
UNIT 64 INSPECTION  CALIBRATION 1). &quot;V&quot; BLOCK CLEANING FREQUENCY WILL UPDATED IN THE WORK INSTRUCTION AND FOLLOWED. 2).LIST OF INSTRUMENT WITH DUE DATE ARE DISPLAYED AT RECEIVING INSPECTION AND REVIEWED DAILY BY THE RI INCHARGE AND INSTRUMENTS WILL BE SENT TO STANDARD ROOM FOR CALIBRATION. 1). &quot;V&quot; BLOCK CONTACT WITH FLIGHT BAR WAS NOT THERE, IT WAS RECTIFIED IMMEDIATELY BY CLEANING THE &quot;V&quot; BLOCK 2).THIS PARTICULAR INSTRUMENT WAS NOT USED FOR LAST 15 DAYS, HENCE DUE DATE NOT NOTICED BY THE USER. MONITORING AND MEASUREMENT NOT CARRIED OUT AS PER THE REQUIREMENTS. E.G.  1). ELECTRO CLEAN VOLTMETER FOUND NOT WORKING  2).LEVER DIAL (REF.64LD08) IS NOT CALIBRATED. 64/03/06 PROCESS VALDIATION CONTROL PLAN WILL BE UDPATED ONLY AFTER VALIDATION REPORT IS COMPILED AND THE SAME WILL BE ENSURED BY THE UNIT HEAD. PROCESS RE-VALIDATION HAS BEEN CARRIED OUT, BUT FORMAL REPORT WAS NOT COMPILED. IN CHROME PLATING PROCESS, THE PROCESS (<S>) PARAMETERS FOUND CHANGED. PROCESS RE-VALIDATION IS NOT EVIDENT FOR THE SAME 64/03/05 CONTROL PLAN IF ANY CUSTOMER SPECIFIC REQUIREMENTS IDENTIFIED DURING NEW PART ADDITON TO THE COMMON CONTROL PLAN THE SPECIAL INDICATION WILL BE MADE AND FOLLOWED.  THIS IS APPLCIABLE ONLY FOR THE P.NO.29320723 (QUALIS/TAVERA), HENCE NOT INDICATED IN THE COMMON CONTROL PLAN. TIME AND VOLTAGE OF ELECTRO CLEAN, CHROME ETCH AND CHROME PLATING THICKNESS ARE IDENTIFIED AS &quot;<S>&quot; IN THE FMEA IS NOT ADDRESSED IN THE CONTROL PLAN. 64/03/04 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
UNIT 64 REJECTION ANALYSIS DAILY ANALYSIS BEING CARRIED OUT BY CFT AND REVIEWED DAILY IN THE DAILAY MANAGEMENT REVIEW MEETING BY UNIT HEAD. MONTHLY IN THE REJECTION & REWORK MANAGEMENT REVIEW BY THE TOP MANAGEMENT. TAGET HAS BEEN FIXED DURING REJECTION REVIEW. THIS IS ACHIEVED OVER A PERIOD OF TIME NO EVIDENCE OF INITIATING ACTIONS TO ACHIEVE PLANNED RESUTLS (SET TARGET) REF. REJECTION AND REWORK TREND. TARGET FIZED  64/03/08 CONTROL PLAN ALL THE CORRECTIVE ACTION IDENTIFIED (TEMPORARY OR PERMENANT) DURING ANALYSIS WILL BE UPDATED IN THE CONTROL PLAN AND ENSURED BY UH. CORRECTIVE ACTIONS INDENTIFIED IS TEMPORARY, HINCE NOT UPDATED IN THE CONTROL PLAN. NO EVIDENCE OF INDICATING CONTAINMENT ACTION WITH RESPONSIBILITY IN CORRECTIVE ACTION COLUMN OF CONTROL PLAN TO ENSURE 100% CLAMPING TO ORIGINAL POSITION BY THE OPERATOR. 64/03/07 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
UNIT 65 SYSTEM NOT FOLLOWED ALL MSA STUDIES WILL BE PLANNED AND CONDUCTED AS PER PLAN. ONLY R&R STUDIES WERE CONDUCTED AND NOT PLANNED FOR OTHER STUDIES LIKE BIAS, LINEARITY & STABILITY BIAS, LINEARITY AND STABILITY STUDIES ARE NOT EVIDENCED. 65/03/03 CONTROL PLAN WHENEVER THE CONTROL PLAN UPDATED, THE  ADEQUACY WILL BE CHECKED AND AUTHORIZING BY THE UNIT HEAD. TYPOGRAPHICAL ERROR. INSPECTION FREQUENCY NOT INLINE WIHT CONTROL PLAN (EVERY 4 HOURS INSPECTED INSTEAD EVERY1 HOUR FOR RETRACTED DIMN.) 65/03/02 TRAINING TRAINING IDENTIFICATION WILL BE TAKEN FROM COMPETENCY GAPS AND SEPARATE LIST AS PER FORMAT (FM/HRM/T&D/03, SEP-03). COMPETENCY GAPS HAS BEEN TAKEN PRIMARY IDENTIFICATION, HENCE NO SEPARATE LIST MAINTAINED. THERE IS NO EVIDENCE OF TRAINING IDENTIFICATION FOR THE SUPERVISORY EMPLOYEES. 65/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
UNIT 73 SYSTEM NOT FOLLOWED HOLD SYSTEM WILL BE FOLLOWED, EVEN IF SEGGRIGATED AND CLEARED ON THE DAY OF AUDIT ITSELF. ON THE DAY OF AUDIT ITSELF THE SUSPECTED LOTS WERE SEGGRIGATED, HENCE NOT KEPT UNDER &quot;HOLD&quot;. PRODUCT NOT KEPT UNDER &quot;HOLD&quot; FOR NONCONFORMANCE FOUND DURING PRODUCT AUDIT 73/03/03 SYSTEM NOT FOLLOWED LATEST MATERIAL INSPECTION PLAN (MIP) WILL BE UPDATED IN THE  COMPUTER MATERIAL ACCOUNTING SYTEM (INGRESS) AND FOLLOWED. LATEST MATERIAL INSPECTION PLAN (MIP) NOT UPDATED IN THE  COMPUTER MATERIAL ACCOUNTING SYTEM (INGRESS) THE SAMPLE SIZE RECIVED AS PER THE MIC FOR THE MATERIAL INSPECTION IS NOT AS PER THE LATEST MATERIAL INSPECTION  73/03/02 INSPECTION OBSERVATION RECORD WILL BE MAINTAINED IN BOOK FORM TO RECORD OBSERVATIONS IN ORDER AVOID MISSING DURING HANDLING. SALT SPRAY TEST OBSERVATIONS RECORD WAS IN LOOSE SHEET FORM AND THE SAME WAS MISSED DURING HANDLING / FILING. EVIDENCE OF THIS TEST BEING DONE IS NOT AVAILABLE. (PAD SALT SPRAY TEST) 73/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
UNIT 74 SYSTEM INADEQUATE ALL THE ACTIVITIES AS PER PROJECT APQP  WILL BE INCORPORATED IN THE INTENAL MICRO LEVEL PLAN AND FOLLOWED. SAME PROJECT APQP AND TOOLING PLAN HAS BEEN FOR DESIGN DEVELOPMENT OF PRODUCT/PROCESS. HENCE NO SEPARATE PLAN USED FOR PROCESS DESIGN AND DEVELOPMENT. MICRO LEVEL TIMING PLAN DERIVED FROM PROJECT APQP PLAN NOT CAPTURING ALL THE APPLICABLE ACTIVITIES OF PE&MSE, ALSO MFG. PROCESS DESIGN AND DEVELOPMENT NOT EVIDENCED 74/03/03 SYSTEM NOT FOLLOWED FOR MODIFIED PRODUCT, ITERNAL PLAN WILL BE PREPARED FOR CHANGE CHILD PART DEVELOPMENT AND IMPLEMENTED AS PER THE PLAN. ONLY PAD ASSEMBLIES IS CHANGE IN THE EXISTING PRODUCT, HENCE NO NEW PRODUCT ROUTING FOLLOWED. THERE IS NO EVIDENCE FOLLOWING PROJECT APQP, PPAP APPROVAL, AND GETTING APPROVAL/WAIVER FOR DIMENSIONAL DEVIATION FOR THE PRODUCT DISPATCHED TO CUSTOMER. 74/03/02 TRAINING TRAINING IDENTIFICATION WILL BE TAKEN FROM COMPETENCY GAPS AND SEPARATE LIST AS PER FORMAT (FM/HRM/T&D/03, SEP-03). COMPETENCY GAPS HAS BEEN TAKEN PRIMARY IDENTIFICATION, HENCE NO SEPARATE LIST MAINTAINED. THERE IS NO EVIDENCE OF TRAINING NEED IDENTIFICATION AGAINST THE COMPETENCY GAPS. 74/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.

More Related Content

What's hot

IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesAmit Mishra
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysisgatelyw396
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools 博行 門眞
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisNafis Ahmad
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisECC International
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
Fmea presentation
Fmea presentationFmea presentation
Fmea presentationMurat Terzi
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenanceManishaHalai1
 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009roycohen
 
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseRoot Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseCraig Thornton
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleFrank-G. Adler
 

What's hot (20)

Apqp la
Apqp laApqp la
Apqp la
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phases
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
FMEA
FMEAFMEA
FMEA
 
Autonomous maintenance preview
Autonomous maintenance previewAutonomous maintenance preview
Autonomous maintenance preview
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Root cause analysis training
Root cause analysis trainingRoot cause analysis training
Root cause analysis training
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
Fmea presentation
Fmea presentationFmea presentation
Fmea presentation
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
 
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root CauseRoot Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
Root Cause Analysis - Tools, Tips and Tricks to Get to the Bottom of Root Cause
 
Root-Cause-Analysis.pptx
Root-Cause-Analysis.pptxRoot-Cause-Analysis.pptx
Root-Cause-Analysis.pptx
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 

Viewers also liked

Internal audits for ISO/TS 16949
Internal audits for ISO/TS 16949Internal audits for ISO/TS 16949
Internal audits for ISO/TS 16949Nukool Thanuanram
 
Process Analysis by Turtle Diagram
Process Analysis by Turtle DiagramProcess Analysis by Turtle Diagram
Process Analysis by Turtle DiagramNukool Thanuanram
 
Surface treatment plating process
Surface treatment   plating processSurface treatment   plating process
Surface treatment plating processMuhammad Ahmad
 
Internal auditors training programme
Internal auditors training programmeInternal auditors training programme
Internal auditors training programmeVIBHASH SINGH
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionKanriConsulting
 
Zinc and zinc alloy plating
Zinc and zinc alloy platingZinc and zinc alloy plating
Zinc and zinc alloy platingErik Galdames
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016Toyo Gustaman
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Trainingsrmortensen
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
Orientation & Training
Orientation & TrainingOrientation & Training
Orientation & Trainingnurewan
 

Viewers also liked (12)

Internal audits for ISO/TS 16949
Internal audits for ISO/TS 16949Internal audits for ISO/TS 16949
Internal audits for ISO/TS 16949
 
Process Analysis by Turtle Diagram
Process Analysis by Turtle DiagramProcess Analysis by Turtle Diagram
Process Analysis by Turtle Diagram
 
Surface treatment plating process
Surface treatment   plating processSurface treatment   plating process
Surface treatment plating process
 
Internal auditors training programme
Internal auditors training programmeInternal auditors training programme
Internal auditors training programme
 
PPAP
PPAPPPAP
PPAP
 
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - IntroductionISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
ISO 9001:2008 Internal Auditing of Quality Management Systems - Introduction
 
Iatf 16949-2016
Iatf 16949-2016Iatf 16949-2016
Iatf 16949-2016
 
Zinc and zinc alloy plating
Zinc and zinc alloy platingZinc and zinc alloy plating
Zinc and zinc alloy plating
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Training
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
Orientation & Training
Orientation & TrainingOrientation & Training
Orientation & Training
 

Similar to Ts16949 Internal Audit (Jul05) Nc Rs

Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject0
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfAbdulSalamSagir1
 
Some critical facets in air pollution
Some critical facets in air pollutionSome critical facets in air pollution
Some critical facets in air pollutionECRD2015
 
Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...IRJET Journal
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica engFernanda Lopes
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.AKunal Roy
 
Balugaon_Orientation_02Apr13.pptx
Balugaon_Orientation_02Apr13.pptxBalugaon_Orientation_02Apr13.pptx
Balugaon_Orientation_02Apr13.pptxtesternagesh2
 
Wind mills audit report copy
Wind mills audit report   copyWind mills audit report   copy
Wind mills audit report copylakshminaran
 
Aging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectAging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectUkrainian Nuclear Society
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controleSAT Journals
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceDibyendu De
 

Similar to Ts16949 Internal Audit (Jul05) Nc Rs (20)

Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
 
Some critical facets in air pollution
Some critical facets in air pollutionSome critical facets in air pollution
Some critical facets in air pollution
 
Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...Condition monitoring of screw compressors and induction motors in a food proc...
Condition monitoring of screw compressors and induction motors in a food proc...
 
QualityMannualsII.pdf
QualityMannualsII.pdfQualityMannualsII.pdf
QualityMannualsII.pdf
 
QualityMannualsI.pdf
QualityMannualsI.pdfQualityMannualsI.pdf
QualityMannualsI.pdf
 
Pg og sms 018 procedimento de integridade mecânica eng
Pg og sms 018   procedimento de integridade mecânica engPg og sms 018   procedimento de integridade mecânica eng
Pg og sms 018 procedimento de integridade mecânica eng
 
MAINTENANCE
MAINTENANCEMAINTENANCE
MAINTENANCE
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.A
 
Balugaon_Orientation_02Apr13.pptx
Balugaon_Orientation_02Apr13.pptxBalugaon_Orientation_02Apr13.pptx
Balugaon_Orientation_02Apr13.pptx
 
Wind mills audit report copy
Wind mills audit report   copyWind mills audit report   copy
Wind mills audit report copy
 
Condition Based Maintenance
Condition Based MaintenanceCondition Based Maintenance
Condition Based Maintenance
 
Aging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectAging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR Project
 
Aging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR ProjectAging Management Experience. Status of the IVMR Project
Aging Management Experience. Status of the IVMR Project
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Spc
Spc  Spc
Spc
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Survey Procedures
Survey ProceduresSurvey Procedures
Survey Procedures
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 

More from rpatils

Sap Hr Overveiw 947 172
Sap Hr Overveiw 947 172Sap Hr Overveiw 947 172
Sap Hr Overveiw 947 172rpatils
 
Presentation1 (1)
Presentation1 (1)Presentation1 (1)
Presentation1 (1)rpatils
 
Training Games
Training GamesTraining Games
Training Gamesrpatils
 
Business Plan Pajm
Business Plan   PajmBusiness Plan   Pajm
Business Plan Pajmrpatils
 
Presentation1
Presentation1Presentation1
Presentation1rpatils
 

More from rpatils (7)

Sap Hr Overveiw 947 172
Sap Hr Overveiw 947 172Sap Hr Overveiw 947 172
Sap Hr Overveiw 947 172
 
Presentation1 (1)
Presentation1 (1)Presentation1 (1)
Presentation1 (1)
 
Spc
SpcSpc
Spc
 
5 S
5 S5 S
5 S
 
Training Games
Training GamesTraining Games
Training Games
 
Business Plan Pajm
Business Plan   PajmBusiness Plan   Pajm
Business Plan Pajm
 
Presentation1
Presentation1Presentation1
Presentation1
 

Ts16949 Internal Audit (Jul05) Nc Rs

  • 1. QMS ISO/TS 16949 INTERNAL AUDIT
  • 2. AUDIT TREND MATRIX * INDICATES, REPORT AWAITED 99 17 14 1 11 56 Total 1 NIL NIL NIL 1 NIL  75 9 3 1 NIL NIL 5 74 11 3 1 1 3 3 73 4 NIL 3 NIL NIL 1 72 3 * 1 NIL NIL 2 69 7 NIL 1 NIL 3 3 68 11 NIL 2 NIL NIL 9 66 21 3 3 NIL 1 14 65 32 8 2   NIL 3 19 64 Total Jul-05 Sep-04 May-04 Feb-04 Jan-04 Unit
  • 3. FOCUS AREA 3   1 1   1   SYSTEM NOT FOLLOWED (HOLD/APQP/MSA) 1   1     LATEST MIP NOT FOLLOWED 1       1 REJECTION ANALYSIS NOT DONE 1 1       MICRO LEVEL PLAN INADEQUATE 17 3 3 3 8 TOTAL 1       1 PROCESS VALIDATION NOT DONE 3   1   2 INSPECTION NOT EVIDENCED 3 1   1 1 NO TRAINING IDENFITICATION/RECORDS 4     1 3 CONTROL PLAN UPDATION INADEQUATE TOTAL U74 U73 U65 U64 DISCREPANCIES
  • 4. UNIT 64 INSPECTION FIRST OFF INSPECTION WILL BE CARRIED OUT AND RECORDED IN THE FIRST OFF INSPECTION REPORT IMMEDIATELY AND THE SAME WILL BE ENSURED BY THE SUPERVISOR (MANUFACTURING). FIRST INSPECTION CARRIED OUT BY THE OPERATOR NOT RECORDED IN THE FIRST INSPECTION REPORT. FIRST OFF REPORT NOT EVIDENCED FOR THE PART WHICH IS UNDER PRODUCTION. 64/03/03 TRAINING WHEN EVER NEW EMPLOYEES JOINED IN THE UNIT, ON THE JOB TRAINING WILL BE GIVEN AND THE TRAINING RECORD WILL BE UPATED IMMEDIATELY AND THE SAME WILL BE ENSURED BY THE UNIT HEAD. ON THE JOB TRAINING HAS BEEN GIVEN ON THE DAY OF PERSON JOINTED TO THE UNIT AND BUT RECORD NOT UPDATED. NO EVIDENCE OF PROVIDING ON THE JOB TRAINING TO THE OPERATOR PRIOR TO WORKING ON THE MACHINE INDEPENDENTLY. 64/03/02 CONTROL PLAN WHEN EVER ANY CHANGE/ERROR FOUND BY THE SUPERVISOR (MANUFACTURING) WILL INFORM IMMDIATELY TO SUPERVISOR (TECHNICAL) WITHOUT MANUAL CORRECTION. ALTERNATE TOOLS AND ERROR IDENTIFIED BY THE SUPERVIOSR (MANUFACTURING) HAS BEEN WRITTEN MANUALLY AND NOT INFORMTED TO THE SUPERVISOR (TECHINCAL) FOR UPDATION. MANUAL CORRECTION MADE IN THE CONTROL PLAN OP.40, TO INDICATE ALTERNATIVE FIXTURES AND NOT INDICATED IN THE AMENDMENT 64/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
  • 5. UNIT 64 INSPECTION CALIBRATION 1). &quot;V&quot; BLOCK CLEANING FREQUENCY WILL UPDATED IN THE WORK INSTRUCTION AND FOLLOWED. 2).LIST OF INSTRUMENT WITH DUE DATE ARE DISPLAYED AT RECEIVING INSPECTION AND REVIEWED DAILY BY THE RI INCHARGE AND INSTRUMENTS WILL BE SENT TO STANDARD ROOM FOR CALIBRATION. 1). &quot;V&quot; BLOCK CONTACT WITH FLIGHT BAR WAS NOT THERE, IT WAS RECTIFIED IMMEDIATELY BY CLEANING THE &quot;V&quot; BLOCK 2).THIS PARTICULAR INSTRUMENT WAS NOT USED FOR LAST 15 DAYS, HENCE DUE DATE NOT NOTICED BY THE USER. MONITORING AND MEASUREMENT NOT CARRIED OUT AS PER THE REQUIREMENTS. E.G. 1). ELECTRO CLEAN VOLTMETER FOUND NOT WORKING 2).LEVER DIAL (REF.64LD08) IS NOT CALIBRATED. 64/03/06 PROCESS VALDIATION CONTROL PLAN WILL BE UDPATED ONLY AFTER VALIDATION REPORT IS COMPILED AND THE SAME WILL BE ENSURED BY THE UNIT HEAD. PROCESS RE-VALIDATION HAS BEEN CARRIED OUT, BUT FORMAL REPORT WAS NOT COMPILED. IN CHROME PLATING PROCESS, THE PROCESS (<S>) PARAMETERS FOUND CHANGED. PROCESS RE-VALIDATION IS NOT EVIDENT FOR THE SAME 64/03/05 CONTROL PLAN IF ANY CUSTOMER SPECIFIC REQUIREMENTS IDENTIFIED DURING NEW PART ADDITON TO THE COMMON CONTROL PLAN THE SPECIAL INDICATION WILL BE MADE AND FOLLOWED. THIS IS APPLCIABLE ONLY FOR THE P.NO.29320723 (QUALIS/TAVERA), HENCE NOT INDICATED IN THE COMMON CONTROL PLAN. TIME AND VOLTAGE OF ELECTRO CLEAN, CHROME ETCH AND CHROME PLATING THICKNESS ARE IDENTIFIED AS &quot;<S>&quot; IN THE FMEA IS NOT ADDRESSED IN THE CONTROL PLAN. 64/03/04 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
  • 6. UNIT 64 REJECTION ANALYSIS DAILY ANALYSIS BEING CARRIED OUT BY CFT AND REVIEWED DAILY IN THE DAILAY MANAGEMENT REVIEW MEETING BY UNIT HEAD. MONTHLY IN THE REJECTION & REWORK MANAGEMENT REVIEW BY THE TOP MANAGEMENT. TAGET HAS BEEN FIXED DURING REJECTION REVIEW. THIS IS ACHIEVED OVER A PERIOD OF TIME NO EVIDENCE OF INITIATING ACTIONS TO ACHIEVE PLANNED RESUTLS (SET TARGET) REF. REJECTION AND REWORK TREND. TARGET FIZED 64/03/08 CONTROL PLAN ALL THE CORRECTIVE ACTION IDENTIFIED (TEMPORARY OR PERMENANT) DURING ANALYSIS WILL BE UPDATED IN THE CONTROL PLAN AND ENSURED BY UH. CORRECTIVE ACTIONS INDENTIFIED IS TEMPORARY, HINCE NOT UPDATED IN THE CONTROL PLAN. NO EVIDENCE OF INDICATING CONTAINMENT ACTION WITH RESPONSIBILITY IN CORRECTIVE ACTION COLUMN OF CONTROL PLAN TO ENSURE 100% CLAMPING TO ORIGINAL POSITION BY THE OPERATOR. 64/03/07 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
  • 7. UNIT 65 SYSTEM NOT FOLLOWED ALL MSA STUDIES WILL BE PLANNED AND CONDUCTED AS PER PLAN. ONLY R&R STUDIES WERE CONDUCTED AND NOT PLANNED FOR OTHER STUDIES LIKE BIAS, LINEARITY & STABILITY BIAS, LINEARITY AND STABILITY STUDIES ARE NOT EVIDENCED. 65/03/03 CONTROL PLAN WHENEVER THE CONTROL PLAN UPDATED, THE ADEQUACY WILL BE CHECKED AND AUTHORIZING BY THE UNIT HEAD. TYPOGRAPHICAL ERROR. INSPECTION FREQUENCY NOT INLINE WIHT CONTROL PLAN (EVERY 4 HOURS INSPECTED INSTEAD EVERY1 HOUR FOR RETRACTED DIMN.) 65/03/02 TRAINING TRAINING IDENTIFICATION WILL BE TAKEN FROM COMPETENCY GAPS AND SEPARATE LIST AS PER FORMAT (FM/HRM/T&D/03, SEP-03). COMPETENCY GAPS HAS BEEN TAKEN PRIMARY IDENTIFICATION, HENCE NO SEPARATE LIST MAINTAINED. THERE IS NO EVIDENCE OF TRAINING IDENTIFICATION FOR THE SUPERVISORY EMPLOYEES. 65/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
  • 8. UNIT 73 SYSTEM NOT FOLLOWED HOLD SYSTEM WILL BE FOLLOWED, EVEN IF SEGGRIGATED AND CLEARED ON THE DAY OF AUDIT ITSELF. ON THE DAY OF AUDIT ITSELF THE SUSPECTED LOTS WERE SEGGRIGATED, HENCE NOT KEPT UNDER &quot;HOLD&quot;. PRODUCT NOT KEPT UNDER &quot;HOLD&quot; FOR NONCONFORMANCE FOUND DURING PRODUCT AUDIT 73/03/03 SYSTEM NOT FOLLOWED LATEST MATERIAL INSPECTION PLAN (MIP) WILL BE UPDATED IN THE COMPUTER MATERIAL ACCOUNTING SYTEM (INGRESS) AND FOLLOWED. LATEST MATERIAL INSPECTION PLAN (MIP) NOT UPDATED IN THE COMPUTER MATERIAL ACCOUNTING SYTEM (INGRESS) THE SAMPLE SIZE RECIVED AS PER THE MIC FOR THE MATERIAL INSPECTION IS NOT AS PER THE LATEST MATERIAL INSPECTION 73/03/02 INSPECTION OBSERVATION RECORD WILL BE MAINTAINED IN BOOK FORM TO RECORD OBSERVATIONS IN ORDER AVOID MISSING DURING HANDLING. SALT SPRAY TEST OBSERVATIONS RECORD WAS IN LOOSE SHEET FORM AND THE SAME WAS MISSED DURING HANDLING / FILING. EVIDENCE OF THIS TEST BEING DONE IS NOT AVAILABLE. (PAD SALT SPRAY TEST) 73/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.
  • 9. UNIT 74 SYSTEM INADEQUATE ALL THE ACTIVITIES AS PER PROJECT APQP WILL BE INCORPORATED IN THE INTENAL MICRO LEVEL PLAN AND FOLLOWED. SAME PROJECT APQP AND TOOLING PLAN HAS BEEN FOR DESIGN DEVELOPMENT OF PRODUCT/PROCESS. HENCE NO SEPARATE PLAN USED FOR PROCESS DESIGN AND DEVELOPMENT. MICRO LEVEL TIMING PLAN DERIVED FROM PROJECT APQP PLAN NOT CAPTURING ALL THE APPLICABLE ACTIVITIES OF PE&MSE, ALSO MFG. PROCESS DESIGN AND DEVELOPMENT NOT EVIDENCED 74/03/03 SYSTEM NOT FOLLOWED FOR MODIFIED PRODUCT, ITERNAL PLAN WILL BE PREPARED FOR CHANGE CHILD PART DEVELOPMENT AND IMPLEMENTED AS PER THE PLAN. ONLY PAD ASSEMBLIES IS CHANGE IN THE EXISTING PRODUCT, HENCE NO NEW PRODUCT ROUTING FOLLOWED. THERE IS NO EVIDENCE FOLLOWING PROJECT APQP, PPAP APPROVAL, AND GETTING APPROVAL/WAIVER FOR DIMENSIONAL DEVIATION FOR THE PRODUCT DISPATCHED TO CUSTOMER. 74/03/02 TRAINING TRAINING IDENTIFICATION WILL BE TAKEN FROM COMPETENCY GAPS AND SEPARATE LIST AS PER FORMAT (FM/HRM/T&D/03, SEP-03). COMPETENCY GAPS HAS BEEN TAKEN PRIMARY IDENTIFICATION, HENCE NO SEPARATE LIST MAINTAINED. THERE IS NO EVIDENCE OF TRAINING NEED IDENTIFICATION AGAINST THE COMPETENCY GAPS. 74/03/01 FOCUS AREA CORRECTIVE ACTION ROOT CAUSE OBSERVATIONS REF.