Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Beads site (2) model
1. NW
NE
N
SW
W
S
E
SE
compound wall alignment
siteline
site line
+96.0 LVL
UP
UP
DN
BLOCK-D
(350
CAPACITY)
OAT
PATH WAY
PATH WAY
EXISTINGROAD
FUTURE STAFF
QUARTERS
EXISTINGROAD
EXISTING ROAD
LAWN
security ENTRY GATE
EXISTING ROAD
LANDSCAPELAWN
ENTRY SQUARE LAWN
LAWN
CARS AND BUS
ES
PAR
KING ZON
E
NATUR
AL LATTRITE
SUR
FAC
E
tennis courtas per site, in the quarry
TENNIS COURT
PATH WAY
PROPOSEDACADEMIC BLOCK TWO FIRST YEARACADEMIC BLOCK
UP
GUTTER
SLOPE
GUTTER
SLOPE
SEATING
SEATING
SEATING
SEATING
SEATING
LAWN
UP
GUTTER
SLOPE
GUTTER
SLOPE
GUTTER
SLOPE
GUTTER
SLOPE
SEATING
BASKET BALL
BASKET BALL/MULTI CO URT
LVL - 325
LVL +98.55
0
10
TRANSFORMER
TRANSFORMER
edge
of the
property
LVL +96.925
section
03
LVL - 1625
WORKSHOP (PHASE 1)
EXISTING
extension of the gutter line from
the main building block
PATH WAY
PATHWAY
BEARY'S KNOWAGE CAMPERS
SCALE 1:1000
A A'
B
B'
SECTION BB'
SECTION AA'
GROUND FLOOR PLAN
SCALE 1:250
1ST FLOOR PLAN
KEY PLAN