1. Reda C.V
Curriculum Vitae
==============
Personal Information
Name : Reda Sultan Hassan.
Date of birth : 22/9/1977
Nationality : Egyptian
Address : Kafr Elsheikh - Egypt.
Religion : Moslem
Marital status : Married
Military service : Exempted
Tel Company : +96893201434
E-mail :
miga_sultan@yahoo.com //redasultan@yahoo.com
Education
Qualification : BSc engineering 2002
University : Menoufia uni.(Faculty of electronic engineering)
Major : Auto .Control and industrial electronic department
Working Fields
Senior Electrical Engineer have 12 years experience in electrical & instrumental
installation , commissioning ,Protection engineer and substation installation for the
field of Reverse Osmosis desalination plants also have experience for the
desiging,proposal,Budget of project prepareing,tenders documents and operation and
maintenance of Reverse Osmosis desalination plants, the following are the expriance
and some work details:
Erection & commissioning of the Reverse Osmosis desalination Plants
As protection engineer for LV panel and substation (Transformer & RMU,HFU)
Prepare the commissioning reports as per the Procedure
Procurement of materials
Maintaining the stock of all spare
Preparing the Spares list and budgetary
Cost estimation and control of Project
Coordinate all commissioning related Works
Documentation of all commissioning reports
Coordinate with client
1/4
2. Reda C.V
Ensure the safety Procedures
Installation of VFD,(variable frequency device)
Installation of Transformers,RMU&HFU for 11KV
Installation of cable tray and designing for cable route
Installation of Industrial and normal lighting and fire alarm system
Designing of water level controller
Experience Record:-
(1) From: 2008 Till Date
Senior Electrical Enginner (GLOBAL CHEMICALS & MAINTENANCE SYSTEMS LLC)
List of the Projects which constructed under my supervision:
1:Construction of 2000 M3/D RO Plant at Diba (Wilayat Mussandam) tender # 159/2009 (PAEW client(
2:Construction of 2000 M3/D RO Plant at BUKHA (Wilayat Mussandam) tender # 366/2010 (PAEW client(
3:Construction of 2*500 M3/D RO Plant at HAIMA with MOD
Job Responsibilities:
Installing the new R.O. Plants, pre-commissioning and start up.
Installing substations (Transformer and RMU&HFU)
All tests and protection tests for substations and preparing the test record sheet
Preparing the list of quantitiy for installation of the new R.O. Plants
Preparing O&M requirements: staff, equipment, tools, materials, consumables,
spare parts,… etc.
Preparing O&M schedules and charts.
Commisioning & Start up of the new plants.
Installation and Maintaining the control panels such as (motor control center (MCC),
PLC s panels, Classic control Panels).
Installation and Maintaining the motor derives such as ( variable frequency derives
(ABB, Vacon, Toshiba), soft starter (Cutler hummer, Altistart ))
Possibility maintenance the grandfuse pumps BMET.
Determine the spare parts and performance for each plant.
Installation and Maintaining the bore wells ( motor, pumps, pipe line and cables connections
(2) From: 2005 Till 2008
2/4
3. Reda C.V
Employer: Tam Environmental Services Co (Egypt – Sharm El-Sheikh City).
Position: Senior Electrical Engineer (Reverse Osmosis Desalination Plants).
List of the Projects which constructed under my supervision:
Four Seasons Hotel R.O. plant 2000 m3/day (4*500m3/day)
Montazah R.O. Plant (2*2,000 m3/day).
Montazah R.O. Plant 4,000 m3/day electrical insallation and pre-commissioning.
Montazah new project 4,000m3/day insallation and pre-commissioning
Montazah new project one unit 6,000m3/day ,,,(Montazah plant total product now 18,000m3/day)
Team leader for insallation and pre-commissioning in project 6,000m3/day
Sea Life Hotel new R.O. Plant (2*700m3/day) electrical insallation and pre-commissioning.
Sun Beach Hotel new R.O. Plant ( 2*600m3/day) electrical insallation and pre-commissioning.
Sun Rise Hotel new R.O. Plant 750 m3/day electrical insallation and pre-commissioning.
Ghanaza Hotel new R.O. Plant 500 m3/day electrical insallation and pre-commissioning.
Grand Rotana Hotel R.O. Plant 750 m3/day
Coral Beach Tiran Hotel R.O. Plant 450 m3/day
MFO R.O. Plant 300m3/day
Blu Bay R.O. Plant 1*500m3/day&1*650m3day
Nesco R.O. Plant 2*750m3/day
(3) From: Oct. 2002 to Jan 2005:
Employer: International Environmental Technology Co. (Intech) (Egypt – Sharm El-Sheikh City)
Position: Electrical Desalination Engineer.
Projects Related:
bourg el arab and marina brackish water plant( 2*1000m3/day)
montazah r.o.desalination plant (2*2000m3/day) (sharm elsheikh).
dahab r.o.desalination plant (3*2000m3/d).
marsa matrouh desalination r.o. plant( 2*1500m3/day)
design of S/W and control panels and MCC
troublshooting for lcp & mcc.
calibration for lot types of instruments.
operation ro plsnts by using scada and touch screen.
design of central switch gear for ro & stp plants
3/4
4. Reda C.V
maintenance of union reciprocating h.p.p
maintenance of sulzer multistage h.p.p
maintenance of grundfos supmersable pumps
maintenance of grundfos filter feed pumps
evalauation of plants performance
executing of all membranes calaulation and scaling calculation
executing of all membranes cleaning
4/4