Bill of Quantities
Taylor’s Garden Carpark and Pedestrian Bridge
Taylor’s Pedestrian Bridge:
Description Unit Quantity Nett Rate (RM) Nett Amount (RM)
Taylor’s Pedestrian Bridge LEVEL 3 - -
GROUND WORKS LEVEL 4 - -
FILL LEVEL 5 - -
Backfill to structures m3 1400 2.20 3080.00
SITE INVESTIGATION LEVEL 5 - -
Number of boreholes on land nr 1 500.00 500.00
Drilling; on land; avg length 29m m 26 50.00 1300.00
E.O. drilling in rock; on land; length m 3 150.00 450.00
SPT nr 7 30.00 210.00
Field vane nr 10 10.00 100.00
Cone penetration test; on land; avg nr 1 50.00 50.00
Seismic cone test; on land; avg length nr 1 70.00 70.00
Laboratory tests (allow 30%) item 1 100.00 100.00
SUB-STRUCTURES LEVEL 4 - -
PIERS LEVEL 5 - -
Concrete to piers; fc=40 MPa m3 12 500.00 6000.00
Concrete to crossheads; fc=40 MPa m3 23 200.00 4600.00
Formwork to piers; curved m2 59 56.00 3304.00
Formwork to crossheads m2 34 75.00 2550.00
Reinforcements to piers tonne 5 100.00 500.00
ABUTMENTS LEVEL 5 - -
Concrete to abutments; fc=35 MPa m3 240 1.00 240.00
Formwork to abutments Minor Structures m2 173 1.50 259.50
Reinforcements abutments tonne 30 10.00 300.00
FOUNDATION LEVEL 5 - -
PILES LEVEL 6 - -
Driven piles; establishment of HP item 1 40.00 40.00
Driven piles; HP 310x110; number nr 50 4.00 200.00
HP 310x110; average driven depth 20 - m 1250 1.50 1875.00
HP 310x 110 m 1250 1.50 1875.00
500mm dia. circular steel pipe filled m 41 5.00 2005.00
Dynamic load test (capwap or similar) nr 3 50.00 150.00
CAPS AND FOOTINGS LEVEL 6 - -
Blinding m3 8 40.00 400.00
Concrete to caps and footings; fc=35 MPa m3 81 20.00 1620.00
Formwork to caps and footings m2 114 5.00 570.00
Reinforcements to caps & footing tonne 6 30.00 180.00
SUPERSTRUCTURES LEVEL 4 - -
BEARINGS LEVEL 5 - -
Laminated Elastomeric; 500x400x30 nr 10 50.00 500.00
Plain Elastomeric; 500x400x20 nr 10 50.00 500.00
BEAMS LEVEL 5 - -
Precast beams NEBT 1400 m 322 3.40 1094.80
SLABS WESTERN APPROACH (PIER 26 TO LEVEL 5 - -
Concrete to decks; fc=40 MPa m3 180 1.50 270.00
Formwork to decks; PC Beams m2 299 1.30 388.70
Reinforcements to deck tonne 22 4.00 88.00
SAFETY FENCES AND PAVEMENT LEVEL 5 - -
Concrete parapet; type 201 m 152 1.50 228.00
Bituminous wearing course; EG-10; 65mm m2 650 2.00 1300.00
APPROACHES LEVEL 4 - -
WING WALL / RETURN LEVEL 5 - -
Mechanically stabilized earthwall m2 114 2.00 228.00
Bill of Quantities
Taylor’s Garden Carpark and Pedestrian Bridge
Pedestrian Bridge:
Description Unit Quantity Nett Rate (RM) Nett Amount ( R M
TRANSITION SLABS LEVEL 5 - -
Transition concrete slabs; 350mm thick m2 120 3.00 360.00
Reinforcements to transition slabs tonne 3 30.00 90.00
Bituminous wearing course; EG-10; 65mm m2 120 2.00 240.00
PROTECTION LEVEL 4 - -
BITUMINOUS MEMBRANE LEVEL 5 - -
Waterproof membrane m2 657 1.20 788.40
DRAINAGE LEVEL 5 - -
Drainage to abutments item 1 100.00 100.00
Drainage to piers item 1 100.00 100.00
Drainage to decks item 1 100.00 100.00
COUNTER CORROSION PROTECTION LEVEL 5 - -
Silane or similar protection treatment m2 280 12.00 3360.00
Total (RM) 42264.40
Total i n numbers : 42,264.40
Total i n letters : Forty two thousand two hundred sixty four and forty cents
Name of the contractor : Jason Lee Yaue Shen
Authorized signature :
Signature and Sealing :
Title : Taylor’s Garden Carpark & Pedestrian Bridge
Telephone : 03-9076-6856
Fax : 03-9076-6857
Mobile : 012-362-5551

More Related Content

What's hot

Element site preparation new
Element site preparation newElement site preparation new
Element site preparation new
aizat76
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
ahmong4
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
Minh Bui Si
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
Duc Tran Xuan
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
Est
 

What's hot (20)

ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Element site preparation new
Element site preparation newElement site preparation new
Element site preparation new
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Boq piling works
Boq   piling worksBoq   piling works
Boq piling works
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Problem in bored pile
Problem in bored pileProblem in bored pile
Problem in bored pile
 
Eca presentation slides
Eca presentation slidesEca presentation slides
Eca presentation slides
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Piling work method statement cm- ms- bw - 002
Piling work method statement   cm- ms- bw - 002Piling work method statement   cm- ms- bw - 002
Piling work method statement cm- ms- bw - 002
 
Method statement for structure excavation
Method statement for structure excavationMethod statement for structure excavation
Method statement for structure excavation
 
Compacting Factor Test
Compacting Factor TestCompacting Factor Test
Compacting Factor Test
 
ECA form
ECA formECA form
ECA form
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
M3 EG BQ for timber panel door
M3 EG BQ for timber panel doorM3 EG BQ for timber panel door
M3 EG BQ for timber panel door
 
Site preparation works
Site preparation worksSite preparation works
Site preparation works
 
Aggregate impact value test experiment
Aggregate impact value test experimentAggregate impact value test experiment
Aggregate impact value test experiment
 
Slump Test
Slump TestSlump Test
Slump Test
 

Similar to P.bridge bq

Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
ashleyyeap
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
Angeline KH
 
Vs30 measurements for Seismic Site Classification
Vs30 measurements for Seismic Site ClassificationVs30 measurements for Seismic Site Classification
Vs30 measurements for Seismic Site Classification
Ali Osman Öncel
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
imaduddin91
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles Roucher
Charles Roucher
 
Concrete Shallow Foundation
Concrete Shallow FoundationConcrete Shallow Foundation
Concrete Shallow Foundation
Tyler Edgington
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
Edel Fox
 

Similar to P.bridge bq (20)

Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Draft report
Draft reportDraft report
Draft report
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
DFI india 2014 defects in piles
DFI india 2014 defects in pilesDFI india 2014 defects in piles
DFI india 2014 defects in piles
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
Vs30 measurements for Seismic Site Classification
Vs30 measurements for Seismic Site ClassificationVs30 measurements for Seismic Site Classification
Vs30 measurements for Seismic Site Classification
 
Ejemplo_AG3
Ejemplo_AG3Ejemplo_AG3
Ejemplo_AG3
 
BORED pile and pile cap design.ppt
BORED pile and pile cap design.pptBORED pile and pile cap design.ppt
BORED pile and pile cap design.ppt
 
Project Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, OmanProject Execution Plan for Muscat Runway Construction, Oman
Project Execution Plan for Muscat Runway Construction, Oman
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
Project 4 Presentation
Project 4 PresentationProject 4 Presentation
Project 4 Presentation
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles Roucher
 
Concrete Shallow Foundation
Concrete Shallow FoundationConcrete Shallow Foundation
Concrete Shallow Foundation
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Itemized project budget
Itemized project budgetItemized project budget
Itemized project budget
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure Reinforced Concrete Frame Structure
Reinforced Concrete Frame Structure
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 

More from Preston Liew

More from Preston Liew (20)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016Architectural design project project 1a brief august 2016
Architectural design project project 1a brief august 2016
 
Architectural design project module outline august 2016
Architectural design project module outline august 2016Architectural design project module outline august 2016
Architectural design project module outline august 2016
 
PUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CYPUTRAJAYA SITE ANALSYS - TEAM CY
PUTRAJAYA SITE ANALSYS - TEAM CY
 
Site analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANISite analysis JALAN IPOH TEAM NANI
Site analysis JALAN IPOH TEAM NANI
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
 
Studio brief
Studio briefStudio brief
Studio brief
 
Studio module outline
Studio module outline Studio module outline
Studio module outline
 
B tech report proj 2 PRESTON
B tech report proj 2 PRESTONB tech report proj 2 PRESTON
B tech report proj 2 PRESTON
 
Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016Project brief 2 btech1 march 2016
Project brief 2 btech1 march 2016
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
 
Btech brief assignment 1
Btech brief assignment 1Btech brief assignment 1
Btech brief assignment 1
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Light report compiled
Light report compiledLight report compiled
Light report compiled
 
Sound final
Sound finalSound final
Sound final
 
Project 2 integration
Project 2  integrationProject 2  integration
Project 2 integration
 
Project 1 performance evaluation
Project 1 performance evaluationProject 1 performance evaluation
Project 1 performance evaluation
 
Research questions preston liew
Research questions   preston liewResearch questions   preston liew
Research questions preston liew
 
Spirituality & sense of place
Spirituality & sense of placeSpirituality & sense of place
Spirituality & sense of place
 
Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015Islamic architecture arc 2342 project 1 brief august 2015
Islamic architecture arc 2342 project 1 brief august 2015
 

P.bridge bq

  • 1. Bill of Quantities Taylor’s Garden Carpark and Pedestrian Bridge Taylor’s Pedestrian Bridge: Description Unit Quantity Nett Rate (RM) Nett Amount (RM) Taylor’s Pedestrian Bridge LEVEL 3 - - GROUND WORKS LEVEL 4 - - FILL LEVEL 5 - - Backfill to structures m3 1400 2.20 3080.00 SITE INVESTIGATION LEVEL 5 - - Number of boreholes on land nr 1 500.00 500.00 Drilling; on land; avg length 29m m 26 50.00 1300.00 E.O. drilling in rock; on land; length m 3 150.00 450.00 SPT nr 7 30.00 210.00 Field vane nr 10 10.00 100.00 Cone penetration test; on land; avg nr 1 50.00 50.00 Seismic cone test; on land; avg length nr 1 70.00 70.00 Laboratory tests (allow 30%) item 1 100.00 100.00 SUB-STRUCTURES LEVEL 4 - - PIERS LEVEL 5 - - Concrete to piers; fc=40 MPa m3 12 500.00 6000.00 Concrete to crossheads; fc=40 MPa m3 23 200.00 4600.00 Formwork to piers; curved m2 59 56.00 3304.00 Formwork to crossheads m2 34 75.00 2550.00 Reinforcements to piers tonne 5 100.00 500.00 ABUTMENTS LEVEL 5 - - Concrete to abutments; fc=35 MPa m3 240 1.00 240.00 Formwork to abutments Minor Structures m2 173 1.50 259.50 Reinforcements abutments tonne 30 10.00 300.00 FOUNDATION LEVEL 5 - - PILES LEVEL 6 - - Driven piles; establishment of HP item 1 40.00 40.00 Driven piles; HP 310x110; number nr 50 4.00 200.00 HP 310x110; average driven depth 20 - m 1250 1.50 1875.00 HP 310x 110 m 1250 1.50 1875.00 500mm dia. circular steel pipe filled m 41 5.00 2005.00 Dynamic load test (capwap or similar) nr 3 50.00 150.00 CAPS AND FOOTINGS LEVEL 6 - - Blinding m3 8 40.00 400.00 Concrete to caps and footings; fc=35 MPa m3 81 20.00 1620.00 Formwork to caps and footings m2 114 5.00 570.00 Reinforcements to caps & footing tonne 6 30.00 180.00 SUPERSTRUCTURES LEVEL 4 - - BEARINGS LEVEL 5 - - Laminated Elastomeric; 500x400x30 nr 10 50.00 500.00 Plain Elastomeric; 500x400x20 nr 10 50.00 500.00 BEAMS LEVEL 5 - - Precast beams NEBT 1400 m 322 3.40 1094.80 SLABS WESTERN APPROACH (PIER 26 TO LEVEL 5 - - Concrete to decks; fc=40 MPa m3 180 1.50 270.00 Formwork to decks; PC Beams m2 299 1.30 388.70 Reinforcements to deck tonne 22 4.00 88.00 SAFETY FENCES AND PAVEMENT LEVEL 5 - - Concrete parapet; type 201 m 152 1.50 228.00 Bituminous wearing course; EG-10; 65mm m2 650 2.00 1300.00 APPROACHES LEVEL 4 - - WING WALL / RETURN LEVEL 5 - - Mechanically stabilized earthwall m2 114 2.00 228.00
  • 2. Bill of Quantities Taylor’s Garden Carpark and Pedestrian Bridge Pedestrian Bridge: Description Unit Quantity Nett Rate (RM) Nett Amount ( R M TRANSITION SLABS LEVEL 5 - - Transition concrete slabs; 350mm thick m2 120 3.00 360.00 Reinforcements to transition slabs tonne 3 30.00 90.00 Bituminous wearing course; EG-10; 65mm m2 120 2.00 240.00 PROTECTION LEVEL 4 - - BITUMINOUS MEMBRANE LEVEL 5 - - Waterproof membrane m2 657 1.20 788.40 DRAINAGE LEVEL 5 - - Drainage to abutments item 1 100.00 100.00 Drainage to piers item 1 100.00 100.00 Drainage to decks item 1 100.00 100.00 COUNTER CORROSION PROTECTION LEVEL 5 - - Silane or similar protection treatment m2 280 12.00 3360.00 Total (RM) 42264.40 Total i n numbers : 42,264.40 Total i n letters : Forty two thousand two hundred sixty four and forty cents Name of the contractor : Jason Lee Yaue Shen Authorized signature : Signature and Sealing : Title : Taylor’s Garden Carpark & Pedestrian Bridge Telephone : 03-9076-6856 Fax : 03-9076-6857 Mobile : 012-362-5551