SlideShare a Scribd company logo
1 of 2
ASHU GARG
Contact address: Email Address:
#704,Ward no.9, Near Old Telephone Exchange ashugarg94@gmail.com
Boha, District Mansa, Mob: +91-86995-72517
Punjab-151503
Objective:
To join a progressive organization where I can work in a challenging atmosphere, make my significant growth
opportunity and a sense of responsibility.
Academic Summary
GRADUATION (Jul’10-Jun’14)
Completed Graduation in Mechanical Engineering from P.T.U.G.Z.S Campus, Bathinda, Punjab.
( %age of Graduation-75.5%)
BASIC
Completed Senior Secondary School Education (XII) with 69.0% through C.B.S.E Board Mar’10
Completed Secondary School Education (X) with 86.9% aggregate through P.S.E.B Mar’08
Professional Qualifications (B. Tech - Mechanical Engineering)
Institute: Giani Zail Singh, Punjab Technical University, Bathinda Jul’10-Jun’14
Trainings
4 Weeks Training in College Campus
Major Projects Undertaken
Centre Lathe Machine: Cutting, Knurling & Finishing processes
Industrial Exposure
P&R Infra Projects Ltd (Fabrication And Erection) Aug’14- Till Date
LUCKNOW DEVELOPMENT AUTHOURITY / Third Party Inspection (Lloyd’s Register)
1. Successfully Fabrication & Erection of MS TUBULAR PIPE TRUSS IN ARCH SHAPE (700, 1000
& 1200DIA) FOR 48MTR. SPAN ROOFING OF INDIA’S FIRST MULTIPURPOSE COURTS,
CONVENTIONAL HALL,CONNECTING BRIDGE,PORCH,MEDIA GALLERY,HELIPAD,OAT
STAICASE,CAFETERIA & SWIMMING POOL under project name JAI PARKESH NARAIN
INTERNATIONAL CONVENTION CENTER GOMTI NAGAR LUCKNOW.
2. East Central Railway/ SPSCPL Fabrication of 4-Lane High Level Bridge (I-Girder, 3 Span )
over River Kosi near Vijayghat in Bihar.
3. Fabrication For Project Engineer for COMPREHESIVE DEVELOPMENT OF CORRIDOR
BETWEEN VIKASPURI TO MUKARBA CHOWK AND PREMBARI PUL TO AZADPUR (DELHI)
3300MT. Flyover Bridge (I-Section Girder & Diaphragm OF Steel IS 2062- E410 BR)
M/S HIMADRI HYDRO POWER PROJECTS PVT. LTD.
4. Presently working on Fabrication of Anni Behna H.E. Project FOR (2*2.5MW) Penstock.
Honda Motorcyles & Scooters India Pvt Ltd. (Industrial Trg.)
Undergone 6 months Industrial Training from Jan’14 to June’14 at Honda Motorcycles & Scooters India Pvt.
Ltd.
Key Projects undertaken:
• Improving Compressor efficiency & FAD from 85%  96% by minimizing air leakage at paint shop,
assembly line and high pressure die casting.
• Study & Observation of Cooling Towers (Weld shop, Gravity Dry Casting etc) Calculate Efficiency and
then improve it by thorough checking of all components.
• Participation & Co-ordination for Quality Audit & Environment Audit for Utility Department.
Standard Corporation Pvt. LTD. Barnala (Industrial Trg.)
Undergone 6 weeks Industrial Training at Standard Corporation, Barnala, Punjab. (Campus Selection)
Major Trainings: Assembling of Tractor Engine, Testing of Engine, Testing of Tyres, Quality Check of Gears
in Quality Department
Strengths
• Comprehensive Problem Solving abilities
• Willingness to Learn, Hard Working
• Punctual, Confident
• Good Communication Skills
Extra Curricular Activities
• Active Member of SAE (Socity of Automobile Engineering, 2013)
• Member of Student Placement Cell in College Campus
• Actively particapted in Quiz Competition
_______________________________________________________________________
Personal Details
Name : Ashu Garg
Father’s Name : Ram Pal Garg
Gender : Male
Marital Status : Single
Date of Birth : Nov. 23rd
, 1992
Permanent Address : S/O Sh.Ram Pal Garg,
#974 Near old telephone exchange
Boha, Distt. Mansa, Punjab – 151503

More Related Content

What's hot (20)

AKASH PATEL
AKASH PATELAKASH PATEL
AKASH PATEL
 
Resume shivam gupta1
Resume shivam gupta1 Resume shivam gupta1
Resume shivam gupta1
 
CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)CURRICULUM VITAE RAHUL SHARMA (1) (1)
CURRICULUM VITAE RAHUL SHARMA (1) (1)
 
My cv-5
My cv-5My cv-5
My cv-5
 
Manisha CV
Manisha CVManisha CV
Manisha CV
 
indrasen
indrasenindrasen
indrasen
 
resume updated
resume updatedresume updated
resume updated
 
Harsh _CV
Harsh _CVHarsh _CV
Harsh _CV
 
Abhishek resume
Abhishek resumeAbhishek resume
Abhishek resume
 
nilesh cv
nilesh cvnilesh cv
nilesh cv
 
Resume
ResumeResume
Resume
 
Pallav Jain Updated
Pallav Jain UpdatedPallav Jain Updated
Pallav Jain Updated
 
Akhil Chandran gulf with visa details-final
Akhil Chandran  gulf with visa details-finalAkhil Chandran  gulf with visa details-final
Akhil Chandran gulf with visa details-final
 
Resume_Sachin_New
Resume_Sachin_NewResume_Sachin_New
Resume_Sachin_New
 
ramnivasachari with personel details-1ramram
ramnivasachari with personel details-1ramramramnivasachari with personel details-1ramram
ramnivasachari with personel details-1ramram
 
resume
resumeresume
resume
 
Anand Kr. Singh
Anand Kr. SinghAnand Kr. Singh
Anand Kr. Singh
 
RESUME 2016 -EXPERIENCE
RESUME 2016 -EXPERIENCERESUME 2016 -EXPERIENCE
RESUME 2016 -EXPERIENCE
 
Devendra bhole resume
Devendra bhole resumeDevendra bhole resume
Devendra bhole resume
 
Update Resume
Update ResumeUpdate Resume
Update Resume
 

Viewers also liked

Keuzesessie Gelaagdheid in differentatie
Keuzesessie Gelaagdheid in differentatieKeuzesessie Gelaagdheid in differentatie
Keuzesessie Gelaagdheid in differentatieVUBrussel
 
Octane Athletics Training Systems Ironman Texas Race Recon Seminar
Octane Athletics Training Systems Ironman Texas Race Recon SeminarOctane Athletics Training Systems Ironman Texas Race Recon Seminar
Octane Athletics Training Systems Ironman Texas Race Recon SeminarDavid Jimenez
 
Annotations for DPS
Annotations for DPS Annotations for DPS
Annotations for DPS Simran Mattu
 
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...Lafarge Polska
 
Ieeepro techno solutions 2014 ieee dotnet project - assessing collaboration...
Ieeepro techno solutions   2014 ieee dotnet project - assessing collaboration...Ieeepro techno solutions   2014 ieee dotnet project - assessing collaboration...
Ieeepro techno solutions 2014 ieee dotnet project - assessing collaboration...ASAITHAMBIRAJAA
 
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨SARTORIALISIMO
 
El circuito algodonero
El circuito algodoneroEl circuito algodonero
El circuito algodoneromoscosobianca
 

Viewers also liked (11)

ABC@isfftar
ABC@isfftarABC@isfftar
ABC@isfftar
 
Keuzesessie Gelaagdheid in differentatie
Keuzesessie Gelaagdheid in differentatieKeuzesessie Gelaagdheid in differentatie
Keuzesessie Gelaagdheid in differentatie
 
Octane Athletics Training Systems Ironman Texas Race Recon Seminar
Octane Athletics Training Systems Ironman Texas Race Recon SeminarOctane Athletics Training Systems Ironman Texas Race Recon Seminar
Octane Athletics Training Systems Ironman Texas Race Recon Seminar
 
Annotations for DPS
Annotations for DPS Annotations for DPS
Annotations for DPS
 
Elessions eng
Elessions engElessions eng
Elessions eng
 
Abc phd call 32b tutto
Abc phd call 32b tuttoAbc phd call 32b tutto
Abc phd call 32b tutto
 
Infrastruktura 2017
Infrastruktura 2017Infrastruktura 2017
Infrastruktura 2017
 
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...
Lafarge Polska: Oferta i rozwiązania dla firm wykonawczych, projektantów i in...
 
Ieeepro techno solutions 2014 ieee dotnet project - assessing collaboration...
Ieeepro techno solutions   2014 ieee dotnet project - assessing collaboration...Ieeepro techno solutions   2014 ieee dotnet project - assessing collaboration...
Ieeepro techno solutions 2014 ieee dotnet project - assessing collaboration...
 
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨
TUTORIAL " PROCESOS DE LA FIBRA DE ALGODON PARA CAMISERÍA¨
 
El circuito algodonero
El circuito algodoneroEl circuito algodonero
El circuito algodonero
 

Similar to Ashu Garg (20)

Prahalad Rao G Resume
Prahalad Rao G ResumePrahalad Rao G Resume
Prahalad Rao G Resume
 
Resume
ResumeResume
Resume
 
Resume-Mech Engineer
Resume-Mech EngineerResume-Mech Engineer
Resume-Mech Engineer
 
rahul_btech_ME_two_yEAr_exp
rahul_btech_ME_two_yEAr_exprahul_btech_ME_two_yEAr_exp
rahul_btech_ME_two_yEAr_exp
 
iFEEL - MKTG - Ankit K Singh Resume
iFEEL - MKTG - Ankit K Singh ResumeiFEEL - MKTG - Ankit K Singh Resume
iFEEL - MKTG - Ankit K Singh Resume
 
Shivalik_Resume
Shivalik_ResumeShivalik_Resume
Shivalik_Resume
 
Latest Resume
Latest ResumeLatest Resume
Latest Resume
 
Himanshu
HimanshuHimanshu
Himanshu
 
M.Tahir cv
M.Tahir cvM.Tahir cv
M.Tahir cv
 
deepak
deepakdeepak
deepak
 
Sai Vishwanath Goud
Sai Vishwanath GoudSai Vishwanath Goud
Sai Vishwanath Goud
 
Prahalad Rao G Resume
Prahalad Rao G Resume Prahalad Rao G Resume
Prahalad Rao G Resume
 
NISHANT SAXENA QUALITY ENGINEER RESUME
NISHANT SAXENA QUALITY ENGINEER  RESUMENISHANT SAXENA QUALITY ENGINEER  RESUME
NISHANT SAXENA QUALITY ENGINEER RESUME
 
RAMESH PPC
RAMESH PPCRAMESH PPC
RAMESH PPC
 
C.V Dhairyashil patil
C.V Dhairyashil patilC.V Dhairyashil patil
C.V Dhairyashil patil
 
jay new resume
jay new  resumejay new  resume
jay new resume
 
linkedin resume
linkedin resumelinkedin resume
linkedin resume
 
New Resume - Copy
New Resume - CopyNew Resume - Copy
New Resume - Copy
 
ravindra_resume
ravindra_resumeravindra_resume
ravindra_resume
 
Mahesh Resume
Mahesh ResumeMahesh Resume
Mahesh Resume
 

Ashu Garg

  • 1. ASHU GARG Contact address: Email Address: #704,Ward no.9, Near Old Telephone Exchange ashugarg94@gmail.com Boha, District Mansa, Mob: +91-86995-72517 Punjab-151503 Objective: To join a progressive organization where I can work in a challenging atmosphere, make my significant growth opportunity and a sense of responsibility. Academic Summary GRADUATION (Jul’10-Jun’14) Completed Graduation in Mechanical Engineering from P.T.U.G.Z.S Campus, Bathinda, Punjab. ( %age of Graduation-75.5%) BASIC Completed Senior Secondary School Education (XII) with 69.0% through C.B.S.E Board Mar’10 Completed Secondary School Education (X) with 86.9% aggregate through P.S.E.B Mar’08 Professional Qualifications (B. Tech - Mechanical Engineering) Institute: Giani Zail Singh, Punjab Technical University, Bathinda Jul’10-Jun’14 Trainings 4 Weeks Training in College Campus Major Projects Undertaken Centre Lathe Machine: Cutting, Knurling & Finishing processes Industrial Exposure P&R Infra Projects Ltd (Fabrication And Erection) Aug’14- Till Date LUCKNOW DEVELOPMENT AUTHOURITY / Third Party Inspection (Lloyd’s Register) 1. Successfully Fabrication & Erection of MS TUBULAR PIPE TRUSS IN ARCH SHAPE (700, 1000 & 1200DIA) FOR 48MTR. SPAN ROOFING OF INDIA’S FIRST MULTIPURPOSE COURTS, CONVENTIONAL HALL,CONNECTING BRIDGE,PORCH,MEDIA GALLERY,HELIPAD,OAT STAICASE,CAFETERIA & SWIMMING POOL under project name JAI PARKESH NARAIN INTERNATIONAL CONVENTION CENTER GOMTI NAGAR LUCKNOW. 2. East Central Railway/ SPSCPL Fabrication of 4-Lane High Level Bridge (I-Girder, 3 Span ) over River Kosi near Vijayghat in Bihar. 3. Fabrication For Project Engineer for COMPREHESIVE DEVELOPMENT OF CORRIDOR BETWEEN VIKASPURI TO MUKARBA CHOWK AND PREMBARI PUL TO AZADPUR (DELHI) 3300MT. Flyover Bridge (I-Section Girder & Diaphragm OF Steel IS 2062- E410 BR)
  • 2. M/S HIMADRI HYDRO POWER PROJECTS PVT. LTD. 4. Presently working on Fabrication of Anni Behna H.E. Project FOR (2*2.5MW) Penstock. Honda Motorcyles & Scooters India Pvt Ltd. (Industrial Trg.) Undergone 6 months Industrial Training from Jan’14 to June’14 at Honda Motorcycles & Scooters India Pvt. Ltd. Key Projects undertaken: • Improving Compressor efficiency & FAD from 85%  96% by minimizing air leakage at paint shop, assembly line and high pressure die casting. • Study & Observation of Cooling Towers (Weld shop, Gravity Dry Casting etc) Calculate Efficiency and then improve it by thorough checking of all components. • Participation & Co-ordination for Quality Audit & Environment Audit for Utility Department. Standard Corporation Pvt. LTD. Barnala (Industrial Trg.) Undergone 6 weeks Industrial Training at Standard Corporation, Barnala, Punjab. (Campus Selection) Major Trainings: Assembling of Tractor Engine, Testing of Engine, Testing of Tyres, Quality Check of Gears in Quality Department Strengths • Comprehensive Problem Solving abilities • Willingness to Learn, Hard Working • Punctual, Confident • Good Communication Skills Extra Curricular Activities • Active Member of SAE (Socity of Automobile Engineering, 2013) • Member of Student Placement Cell in College Campus • Actively particapted in Quiz Competition _______________________________________________________________________ Personal Details Name : Ashu Garg Father’s Name : Ram Pal Garg Gender : Male Marital Status : Single Date of Birth : Nov. 23rd , 1992 Permanent Address : S/O Sh.Ram Pal Garg, #974 Near old telephone exchange Boha, Distt. Mansa, Punjab – 151503