Mid Level Production Engineer with 4 yrs Experience
1. K A R T H I K M U T H U
Male, Indian, 28
No.18, Periyar Salai Paallam,
Ayanavaram,
Chennai-600023
Email: karthik1428@yahoo.co.in
Contact Number: +91 98843 98007
PERSONAL DETAILS
Father’s Name: E. Madurai Muthu
Date of Birth: 14th
April, 1986
Languages Known: English, Tamil
PERSONAL STATEMENT
A Qualified Mechanical Engineer with over 4 years of experience in Production Planning and Control.
Experienced as Project Engineer. Vast Experience in delegating work schedules, preparing JCs and handling
Customer Follow up. Proficient in implementing new techniques and ideas for cost and time saving in particular
process.
Right now seeking middle level assignments, to serve the organization with constant spirit and motivation, while
also taking up interesting and innovative tasks that mutually benefits the organization as well as my career.
ACADEMIC QUALIFICATION
SOFTWARE SKILL SET
Operating Systems: Windows, Linux, MacOS X
Packages: MS Office, MATLAB, AUTOCAD, Adobe Photoshop
EMPLOYMENT DETAILS
I. Drill Jig Bushing Company (Madras) PVT. LTD.
• Duration: May, 2012 to Present
• Department: Production Engineering Department (PED) and HRD
• Designation: Production Engineer (Planning/Manufacturing); HRD Member - Training Faculty
• Work Scope: Manpower Planning, Process/Machine Planning, Process Optimization,
Engineering Coordination, Technical Training, Shop Floor Training
II. Benco Thermal Technologies
• Duration: August, 2011 to Feb, 2012
• Department: Projects
Qualification Institute Board/University
Year of
Passing
Aggregate
(%)
M.B.A in Operation
Management (In
progress)
University of Madras
(Correspondence)
Madras University 2015
Awaiting
Final Score
B.E. (Mechanical) Veltech Engg. College Anna University 2007 75.00
High School (12th
)
Alagappa Matric.Hr.
Sec.School
State Board 2003 82.21
Secondary School (10th
) Ashok Matric. School Matric 2001 87.45
2. • Designation: Project/Site Engineer
• Work Scope: Site Engineer in erection of Heat Retreating Furnace, Operations in
Hardening and Tempering Process, Conveyor assembly
III. Metropolitan Transport Corporation
• Duration: February, 2010 to February, 2011
• Department: Depot and Tyre
• Designation: Graduate Apprentice Trainee/Assistant Engineer
• Work Scope: Depot Supervising, Assistant Engineer involved in Tyre Rethreading,
Tube Vulcanizing, KMPL Processing
IV. Sri Ganapathy Engineering
• Duration: January, 2009 to Feb, 2010
• Department: Production
• Designation: Production In-Charge
• Work Scope: In-Charge of Fabrication and Maintenance works using mini lathes, arc
and gas welding, Drilling etc.
PROJECT WORK/PROBLEMS SOLVED
Routing Changed For Reduction Sleeve
Company Employed In: Drill Fig Bushing Company (Madras) PVT. LTD.
Customer: Heimatec GmbH
Problems Faced:
The product has less wall thickness. After sparking job, there is a shrinkage, due to the fact that ID becomes
undersized and OD becomes oversized, causing a need for rework in both ID and OD.
Solution:
Changed the operation sequence, thereby:
1. Eliminating rejections due to deviation in sparking.
2. Rework cost and time is reduced.
3. Able to deliver the job on time without delay.
Fixture Made For MHI-VST Tie Rod
Company Employed In: Drill Fig Bushing Company (Madras) PVT. LTD.
Customer: Mahindra Heavy Industries – VST Diesel Systems PVT. LTD
Problems Faced:
Tie Rods are mounted using slip arrangement. This was time consuming, and desired flatness was not achieved.
Customer raised a serious complaint on this issue.
Solution:
Implemented Aluminium Fixtures, hence resulting in:
1. Customer is satisfied with the way of operation we handle.
2. Able to prove that blanks coming from customer end itself is problem.
3. Rejection at our end is prevented.
3. POKA YOKE Implementation
Company Employed In: Drill Fig Bushing Company (Madras) PVT. LTD.
Problems Faced:
There was a minor problem occurring, where the job for OD Unground bushes was mistaken as OD Ground
bush, due to wrong date in the system.
Solution:
1. Caution given in Prospin (Database Management Tool) so that Quality Inspector get an alert of OD
Unground bushes and can differentiate from normal bushes.
2. Poka Yoke is implemented (Jobs can’t be misplaced)
3. Prevention of job from rejection (due to OD grinding).
Designed Plug Gauge And Its Utilisation
Company Employed In: Drill Fig Bushing Company (Madras) PVT. LTD.
Problems Faced:
For Heimatec Sleeve it was new item which has Taper Bore with blind end.
Solution:
Used taper Plug gauge for Inspection purpose by designing and measuring the taper angle.
College Project
Project Title: Design/Analysis of Press Tool for Guard’s Lock Channel in Conventional Railway Coach
Project done in: Integral Coach Factory
Duration: 6th
October, 2007 to 10th
February, 2007
Scope of Project: Reducing total manufacturing time and cost in the production of Guard’s Lock Channel in
Conventional Railway Coaches.
My Role in Project: Involved in designing and analysing a tool which is able to perform three individual
operations in single process thereby reducing time and cost.
OTHER INFORMATION
• Avid Music Lover
• Play various sports, such as Cricket, Basketball, Football
• Gardening
• Hosting and Managing Online Game Server
• Was a Team Leader in school
• House Captain in School Annual Sports Day
• Certified as a Member in Internal Auditing for ISO/TS16949 certification by MARS consultant.
• Obtained Gold Ring in College for Top 10 Leading scorer in 1st
semester.