SlideShare a Scribd company logo
1 of 45
How can you use the Training and Education function model
mentioned in Hill in Abercrombie and Fitch
1
Krishna
How can you use the Training and Education function model
mentioned in Hill
2
Krishna
Include all the key aspects of training and education mentioned
in Hill including assessing needs, identifying resources, develop
training, delivery, and evaluation
3
Krishna
Include all the key aspects of training and education mentioned
in Hill including assessing needs, identifying resources, develop
training, delivery, and evaluation
4
Krishna
The
CompleTe
projeCT
managemenT
offiCe
handbook
ESI International Project Management Series
Series Editor
J. LeRoy Ward, Executive Vice President
ESI International
Arlington, Virginia
Practical Guide to Project Planning
Ricardo Viana Vargas
1-4200-4504-0
The Complete Project Management Office Handbook, Second
Edition
Gerard M. Hill
1-4200-4680-2
Determining Project Requirements
Hans Jonasson
1-4200-4502-4
Other ESI International Titles Available from
Auerbach Publications, Taylor & Francis Group
PMP® Challenge! Fourth Edition
J. LeRoy Ward and Ginger Levin
ISBN: 1-8903-6740-0
PMP® Exam: Practice Test and Study Guide, Seventh Edition
J. LeRoy Ward
ISBN: 1-8903-6741-9
The Project Management Drill Book: A Self-Study Guide
Carl L. Pritchard
ISBN: 1-8903-6734-6
Project Management Terms: A Working Glossary, Second
Edition
J. LeRoy Ward
ISBN: 1-8903-6725-7
Project Management Tools CD, Version 4.3
ESI International
ISBN: 1-8903-6736-2
Risk Management: Concepts and Guidance, Third Edition
Carl L. Pritchard
ISBN: 1-8903-6739-7
Boca Raton New York
Auerbach Publications is an imprint of the
Taylor & Francis Group, an informa business
The
CompleTe
projeCT
managemenT
offiCe
handbook
gerard m. hill
Auerbach Publications
Taylor & Francis Group
6000 Broken Sound Parkway NW, Suite 300
Boca Raton, FL 33487-2742
© 2008 by Taylor & Francis Group, LLC
Auerbach is an imprint of Taylor & Francis Group, an Informa
business
No claim to original U.S. Government works
Printed in the United States of America on acid-free paper
10 9 8 7 6 5 4 3 2 1
International Standard Book Number-10: 1-4200-4680-2
(Hardcover)
International Standard Book Number-13: 978-1-4200-4680-9
(Hardcover)
This book contains information obtained from authentic and
highly regarded sources. Reprinted
material is quoted with permission, and sources are indicated. A
wide variety of references are
listed. Reasonable efforts have been made to publish reliable
data and information, but the author
and the publisher cannot assume responsibility for the validity
of all materials or for the conse-
quences of their use.
No part of this book may be reprinted, reproduced, transmitted,
or utilized in any form by any
electronic, mechanical, or other means, now known or hereafter
invented, including photocopying,
microfilming, and recording, or in any information storage or
retrieval system, without written
permission from the publishers.
222 Rosewood Drive, Danvers, MA 01923, 978-750-8400. CCC
is a not-for-profit organization that
provides licenses and registration for a variety of users. For
organizations that have been granted a
photocopy license by the CCC, a separate system of payment
has been arranged.
Trademark Notice: Product or corporate names may be
trademarks or registered trademarks, and
are used only for identification and explanation without intent
to infringe.
Library of Congress Cataloging-in-Publication Data
Hill, Gerard M.
The complete project management office handbook / Gerard M.
Hill. -- 2nd ed.
p. cm. -- (ESI international project management series)
Includes bibliographical references and index.
ISBN-13: 978-1-4200-4680-9 (alk. paper)
1. Project management--Handbooks, manuals, etc. I. Title.
HD69.P75H54 2008
658.4’04--dc22 2007011249
Visit the Taylor & Francis Web site at
and the Auerbach Web site at
AU4680_C000.fm Page iv Monday, July 16, 2007 3:47 PM
For permission to photocopy or use material electronically from
this work, please access www.
copyright.com (http://www.copyright.com/) or contact the
Copyright Clearance Center, Inc. (CCC)
http://www.taylorandfrancis.com
http://www.auerbach-publications.com
http://www.copyright.com
http://www.copyright.com
http://www.copyright.com
http://www.taylorandfrancis.com
http://www.auerbach-publications.com
v
Contents
Acknowledgments....................................................................
................................. xv
Introduction............................................................................
................................. xvii
Section I Practice Management
1
Project Management Methodology
.............................................3
Project Environment Interface
Concepts......................................................... 4
Business Environment Interface
Concepts...................................................... 5
Project Management Methodology Activities across the PMO
Continuum..............................................................................
......................... 6
Project Management Methodology Function Model
...................................... 8
Establish Basis for Project Management Methodology
............................. 9
Convene Methodology Development Team
......................................... 9
Prepare Methodology Deployment Strategy
....................................... 12
Examine Current
Practices.................................................................... 20
Develop Methodology
Solution
................................................................ 24
Identify Methodology Components
..................................................... 25
Design Life-Cycle Processes
................................................................. 26
Develop Project Management Practices
.............................................. 33
Introduce Methodology Platform
......................................................... 35
Conduct Methodology
Implementation.................................................... 38
Plan Methodology
Implementation...................................................... 38
Plan Project Transition
.......................................................................... 42
Conduct Methodology Training and Implementation
........................ 45
Manage Methodology Maturity
................................................................. 46
Evaluate Methodology Implementation
............................................... 46
Analyze Methodology
Performance..................................................... 47
Manage Methodology Maintenance
..................................................... 49
Postscript for the Smaller PMO
..................................................................... 50
Establish Simple, Critical Processes for Project
Management............ 50
Gain Increased Support for Process Expansion
................................. 51
Expand and Incorporate Technical and Business
Processes............. 52
AU4680_C000.fm Page v Monday, July 16, 2007 3:47 PM
vi
�
The Complete Project Management Office Handbook
2
Project Management Tools
........................................................55
Project Environment Interface
Concepts....................................................... 56
Business Environment Interface
Concepts.................................................... 58
Project Management Tools Activities across the PMO
Continuum ............. 60
Project Management Tools Function Model
................................................. 61
Select Project Management Tools
............................................................. 63
Identify the Need for Project Management Tools
.............................. 63
Examine General Types of Project Management
Tools..................... 65
Assess Specific Project Management Tools
......................................... 67
Acquire Project Management Tools
..................................................... 69
Implement Project Management
Tools..................................................... 70
Plan Tool Implementation
.................................................................... 70
Plan Tool
Transition..............................................................................
71
Conduct Tool User
Training................................................................. 72
Conduct Tool Implementation
............................................................. 72
Evaluate Tool Performance
....................................................................... 73
Identify and Resolve Utilization Problems
.......................................... 73
Identify and Resolve Functional Problems
......................................... 74
Assess Overall Tool Effectiveness
........................................................ 74
Postscript for the Smaller PMO
..................................................................... 75
3
Standards and Metrics
...............................................................77
Project Environment Interface
Concepts....................................................... 78
Business Environment Interface
Concepts.................................................... 79
Standards and Metrics Activities across the PMO Continuum
.................... 80
Standards and Metrics Function
Model......................................................... 82
Implement Project Management
Standards.............................................. 83
Examine Standards
Sources.................................................................. 83
Identify Applicable Standards
.............................................................. 87
Introduce Preferred
Standards.............................................................. 89
Conduct Benchmarking
........................................................................ 92
Determine Project Metrics Requirements
................................................. 93
Identify Process Management and Improvement
Metrics.................. 94
Identify Project Performance
Metrics................................................... 97
Identify Business Management Metrics
............................................. 101
Introduce and Use Project Metrics
......................................................... 102
Establish Metrics Measurements Plan
................................................ 103
Compare Metrics Performance
........................................................... 104
Establish Corrective Actions
............................................................... 104
Postscript for the Smaller PMO
................................................................... 105
4
Project Knowledge Management
............................................109
Project Environment Interface
Concepts..................................................... 110
Business Environment Interface
Concepts.................................................. 111
Project Knowledge Management Activities across the PMO
Continuum..............................................................................
..................... 112
Project Knowledge Management Function Model
..................................... 114
AU4680_C000.fm Page vi Monday, July 16, 2007 3:47 PM
Contents
�
vii
Establish Knowledge Management
Framework..................................... 115
Information
Management.................................................................... 116
Document
Management...................................................................... 119
Process
Management...........................................................................
121
Collaboration
Management................................................................. 122
Project Archive and Reference Library Management
....................... 125
Introduce Knowledge Management
System........................................... 129
Conduct Installation and Establish Connectivity
.............................. 129
Perform Function and Feature Customization
.................................. 130
Introduce Project Knowledge Management Content
....................... 133
Implement Knowledge Management
System......................................... 134
Develop Project Management Information System
(PMIS).............. 134
Develop Executive
Dashboard........................................................... 144
Construct Project Management
Library.............................................. 145
Implement Online Project
Collaboration........................................... 146
Implement Other Knowledge Management Tools
........................... 148
Postscript for the Smaller PMO
................................................................... 149
Section II Infrastructure Management
5
Project Governance
..................................................................153
Project Environment Interface
Concepts..................................................... 154
Business Environment Interface
Concepts.................................................. 155
Project Governance Activities across the PMO Continuum
...................... 156
Project Governance Function
Model........................................................... 158
Prepare and Maintain PMO Charter
....................................................... 158
Define Business Purpose
.................................................................... 160
Specify Organizational
Alignment...................................................... 162
Highlight Functional Responsibility
................................................... 163
Specify PMO Authority
....................................................................... 164
Identify PMO Funding
........................................................................ 165
Develop Project Management Policies
................................................... 165
Evaluate Policy Needs
........................................................................ 166
Demonstrate Senior Management
Support........................................ 167
Prepare Policy Guidance
.................................................................... 168
Develop Project Classification Guidance
............................................... 169
Examine Project Classification
Purpose............................................. 170
Identify Project Classification Criteria
................................................ 170
Implement Project Classification
Guidance....................................... 173
Establish Project Manager
Authority....................................................... 173
Establish Executive Control Board
......................................................... 175
Determine Executive Oversight Requirements
................................. 176
Set Control Board Parameters
............................................................ 178
Prepare Control Board Operating
Procedures.................................. 178
Align Business and Technical Committees
............................................ 180
Postscript for the Smaller PMO
................................................................... 181
AU4680_C000.fm Page vii Monday, July 16, 2007 3:47 PM
viii
�
The Complete Project Management Office Handbook
6
Assessment
................................................................................183
Project Environment Interface
Concepts..................................................... 184
Business Environment Interface
Concepts.................................................. 185
Assessment Activities across the PMO Continuum
.................................... 185
Assessment Function
Model......................................................................... 187
Conduct Competency
Assessments......................................................... 187
Identify Competency Assessments
..................................................... 188
Conduct Competency
Assessments.................................................... 189
Implement Competency Improvement
Plans.................................... 190
Conduct Capability
Assessments............................................................. 191
Identify Capability Assessments
......................................................... 192
Conduct Capability Assessments
........................................................ 194
Implement Capability Improvement
Plans........................................ 196
Conduct Maturity
Assessments................................................................ 198
Identify Maturity Assessments
............................................................ 198
Conduct Maturity Assessments
........................................................... 200
Implement Maturity Advancement
Plans........................................... 202
Postscript for the Smaller PMO
................................................................... 203
7
Organization and Structure
.....................................................205
Project Environment Interface
Concepts..................................................... 206
Business Environment Interface
Concepts.................................................. 206
Organization and Structure Activities across the PMO
Continuum .......... 207
Organization and Structure Function Model
.............................................. 209
Set Up the PMO
Structure....................................................................... 209
Identify Staff Needs for PMO Functions
........................................... 210
Introduce PMO Staff
........................................................................... 214
Analyze and Establish PMO
Relationships........................................ 215
Establish Project Team
Structure............................................................. 216
Specify Project Team and PMO Relationship
................................... 217
Define Standard Project Team Structure
........................................... 221
Define Extended Project Team
Alignment........................................ 225
Develop Stakeholder Participation
......................................................... 228
Manage Internal Project Team
Stakeholders..................................... 229
Manage Internal Oversight
Stakeholders........................................... 230
Manage Internal-Support
Stakeholders.............................................. 231
Manage Customer Stakeholders
......................................................... 233
Manage Vendor and Contractor Stakeholders
.................................. 234
Manage Other Project
Stakeholders................................................... 235
Postscript for the Smaller PMO
................................................................... 237
8
Facilities and Equipment Support
..........................................239
Project Environment Interface
Concepts..................................................... 240
Business Environment Interface
Concepts.................................................. 241
Facilities and Equipment Support Activities across the PMO
Continuum..............................................................................
..................... 242
Facilities and Equipment Support Function
Model.................................... 242
AU4680_C000.fm Page viii Monday, July 16, 2007 3:47 PM
Contents
�
ix
Establish Project Team
Requirements..................................................... 244
Establish Workspace
Requirements.................................................... 245
Establish Equipment
Requirements.................................................... 246
Manage Project Facilities
......................................................................... 250
Manage Facility Acquisition Options
................................................. 251
Monitor Facility Utilization
................................................................. 253
Ensure Adequacy of Facilities
............................................................ 253
Monitor Facility Disposition
............................................................... 255
Manage Project Equipment
..................................................................... 257
Manage Equipment Acquisition
......................................................... 258
Manage Equipment Assignments
....................................................... 260
Monitor Equipment Assignments
....................................................... 261
Manage Equipment Disposition
......................................................... 262
Postscript for the Smaller PMO
................................................................... 263
Section III Resource Integration
9
Resource Management
.............................................................267
Project Environment Interface
Concepts..................................................... 268
Business Environment Interface
Concepts.................................................. 269
Resource Management Activities across the PMO
Continuum.................. 269
Resource Management Function Model
...................................................... 270
Acquire Project Resources
....................................................................... 272
Identify Resource
Providers................................................................ 272
Establish Resource
Requirements....................................................... 275
Fulfill Resource
Requests.................................................................... 277
Assign Project Resources
......................................................................... 278
Prepare Resource Assignment
Notifications...................................... 279
Obtain Individual Resource Commitments
....................................... 279
Introduce Resources to the Project Team
......................................... 279
Deploy Project
Resources........................................................................ 280
Perform Deployment Administration
................................................. 281
Identify and Arrange Relevant Training
............................................ 282
Monitor Travel
Arrangements............................................................. 284
Manage Resource
Performance............................................................... 284
Develop Performance Management Guidance
................................. 284
Conduct Project Resource Performance Reviews
............................. 286
Monitor Project Resource Performance
............................................. 288
Close Project Resource Assignments
...................................................... 289
Coordinate Resource
Extensions........................................................ 289
Facilitate Resource Transfers and Reassignments
............................. 289
Manage Resource Terminations
......................................................... 290
Postscript for the Smaller PMO
................................................................... 290
10
Training and Education
...........................................................293
Project Environment Interface
Concepts..................................................... 294
Business Environment Interface
Concepts.................................................. 294
AU4680_C000.fm Page ix Monday, July 16, 2007 3:47 PM
x
�
The Complete Project Management Office Handbook
Training and Education Activities across the PMO Continuum
................ 295
Training and Education Function Model
.................................................... 297
Establish Training
Program...................................................................... 298
Assess Training Needs
........................................................................ 298
Determine Training Requirements
..................................................... 300
Identify Training Resources
................................................................ 302
Prepare Training Plan
......................................................................... 305
Select and Develop Training Courses
............................................... 306
Manage Training Program
....................................................................... 308
Establish Training Registration Capability
......................................... 308
Publicize and Promote Training Program
......................................... 310
Conduct Project Management Training
............................................. 311
Evaluate Training Program
...................................................................... 313
Evaluate Training Plan Implementation
............................................ 313
Evaluate Training
Resources............................................................... 314
Update Training Program
................................................................... 315
Postscript for the Smaller PMO
................................................................... 315
11
Career Development
................................................................317
Project Environment Interface
Concepts..................................................... 318
Business Environment Interface
Concepts.................................................. 319
Career Development Activities across the PMO
Continuum..................... 320
Career Development Function Model
......................................................... 320
Develop Project Management Career Path
............................................ 322
Establish Project Management as a Professional Discipline
............ 323
Define Career Advancement
Model................................................... 327
Construct Position Descriptions and Qualifications
......................... 334
Integrate New Career Path into the
Organization............................ 336
Support Project Management Career
Planning...................................... 338
Provide General Career Guidance
..................................................... 338
Promote Business Skill
Development................................................ 339
Implement Career Planning Support
................................................. 341
Establish Professional Certification
......................................................... 341
Develop Project Management Certification Program
....................... 342
Facilitate Technical and Professional Certification
........................... 345
Postscript for the Smaller PMO
................................................................... 346
12
Team Development
..................................................................347
Project Environment Interface
Concepts..................................................... 348
Business Environment Interface
Concepts.................................................. 348
Team Development Activities across the PMO Continuum
...................... 349
Team Development Function
Model........................................................... 351
Facilitate Cohesive Team Formation
...................................................... 351
Examine Project Team
Composition.................................................. 353
Develop Project Team Orientation
Program..................................... 355
Integrate Vendors and Contractors
.................................................... 356
Facilitate Virtual Team Management
...................................................... 358
Establish Virtual Team Alignment
...................................................... 359
AU4680_C000.fm Page x Monday, July 16, 2007 3:47 PM
Contents
�
xi
Facilitate Virtual Team
Interactions.................................................... 360
Introduce Virtual Team Technology
.................................................. 364
Enable Project Team Development
........................................................ 365
Promote Team Skill Learning
............................................................. 365
Develop Project Manager Tools and
Techniques............................. 366
Facilitate Leadership Development
.................................................... 367
Monitor Project Team
Performance........................................................ 369
Assess Team
Dynamics....................................................................... 369
Examine Team Effectiveness
.............................................................. 370
Conduct Team Improvement Activities
............................................. 371
Postscript for the Smaller PMO
................................................................... 373
Section IV Technical Support
13
Mentoring...............................................................................
...377
Project Environment Interface
Concepts..................................................... 378
Business Environment Interface
Concepts.................................................. 380
Mentoring Activities across the PMO Continuum
...................................... 381
Mentoring Function
Model........................................................................... 383
Establish Project Management Mentoring
Program............................... 383
Develop the Mentoring Approach
..................................................... 383
Identify Mentor–Protégé Roles and Responsibilities
........................ 390
Determine Mentor Sourcing Process
................................................. 396
Engage Project Management Mentors
.................................................... 400
Identify Mentor Candidates
................................................................ 400
Conduct Mentor Candidate
Qualification.......................................... 402
Prepare Project Management
Mentors............................................... 403
Conduct Project Management Mentoring
............................................... 404
Identify Engagement
........................................................................... 405
Assign Mentor (or Mentors)
............................................................... 405
Prepare for Mentoring
Engagement................................................... 406
Perform Mentoring Engagement Activities
........................................ 407
Closeout Mentor–Protégé
Relationship.............................................. 408
Evaluate Mentoring
Program................................................................... 408
Evaluate Mentor Performance
............................................................ 408
Monitor Mentoring Program Results
.................................................. 409
Postscript for the Smaller PMO
................................................................... 410
14
Project Planning
.......................................................................413
Project Environment Interface
Concepts..................................................... 414
Business Environment Interface
Concepts.................................................. 415
Project Planning Activities across the PMO
Continuum............................ 416
Project Planning Function Model
................................................................ 418
Establish Project Planning Capability
..................................................... 419
Define Project Plan
Components....................................................... 419
Implement Project Planning Processes and
Tools............................ 421
Establish Planning Facilitation and Support
Capability.................... 426
AU4680_C000.fm Page xi Monday, July 16, 2007 3:47 PM
xii
�
The Complete Project Management Office Handbook
Facilitate Project Planning Workshop
..................................................... 431
Manage Planning Workshop Arrangements
...................................... 431
Facilitate Project Workplan Development
......................................... 434
Perform Follow-Up Planning Support
............................................... 436
Administer Project Planning
.................................................................... 438
Specify Primary Project Management Plans
...................................... 439
Recommend Essential Project Support
Plans.................................... 453
Prepare Project Plan Content
Guidance............................................ 457
Evaluate Project Planning
................................................................... 458
Postscript for the Smaller PMO
................................................................... 462
15
Project Auditing
........................................................................465
Project Environment Interface
Concepts..................................................... 466
Business Environment Interface
Concepts.................................................. 467
Project Auditing Activities across the PMO Continuum
............................ 467
Project Auditing Function Model
................................................................. 470
Set Up Project Auditing Capability
......................................................... 470
Determine Project Auditing Needs
.................................................... 471
Identify Project Auditing
Resources................................................... 481
Establish Project Audit Performance Points
...................................... 485
Conduct Project Auditing
........................................................................ 487
Prepare for Project Audits and Reviews
........................................... 487
Conduct Project
Audit......................................................................... 489
Prepare Project Audit Report
............................................................. 491
Manage Project Auditing Results
............................................................ 492
Review Project Audit
Results.............................................................. 492
Analyze Aggregate Program Results
.................................................. 494
Monitor Project Audit Follow-Up Actions
......................................... 495
Postscript for the Smaller PMO
................................................................... 496
16
Project
Recovery.......................................................................499
Project Environment Interface
Concepts..................................................... 500
Business Environment Interface
Concepts.................................................. 501
Project Recovery Activities across the PMO Continuum
........................... 501
Project Recovery Function
Model................................................................ 503
Develop Recovery Assessment
Process.................................................. 505
Identify Recovery
Indicators............................................................... 505
Assess Project and Identify Problem
Areas....................................... 506
Prepare Project Recovery Decision Package
.................................... 514
Coordinate Project Recovery Decision
.............................................. 515
Plan and Conduct Project Recovery
....................................................... 516
Establish Project Recovery Team
....................................................... 516
Develop Project Recovery
Plan.......................................................... 522
Stabilize Project Using Recovery

More Related Content

Similar to How can you use the Training and Education function model mentio.docx

Project management professional exam outline
Project management professional exam outlineProject management professional exam outline
Project management professional exam outlineDadunoor Kamati
 
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docx
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docxHarrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docx
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docxshericehewat
 
Lean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeLean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeXuan Tran Phu
 
performance-management.pdf
performance-management.pdfperformance-management.pdf
performance-management.pdfValerieBez1
 
A Critical Success Factor S Relevance Model For SAP Implementation Projects
A Critical Success Factor S Relevance Model For SAP Implementation ProjectsA Critical Success Factor S Relevance Model For SAP Implementation Projects
A Critical Success Factor S Relevance Model For SAP Implementation ProjectsLori Moore
 
A_Critical_Success_Factors_Relevance_Mod.pdf
A_Critical_Success_Factors_Relevance_Mod.pdfA_Critical_Success_Factors_Relevance_Mod.pdf
A_Critical_Success_Factors_Relevance_Mod.pdfmike763419
 
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docxoswald1horne84988
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThoughtworks
 
(PMBOK® Guide) – Fifth Edition
(PMBOK® Guide) – Fifth Edition(PMBOK® Guide) – Fifth Edition
(PMBOK® Guide) – Fifth EditionRolf Pinto
 
Organization assessment guide
Organization assessment guideOrganization assessment guide
Organization assessment guiderajatoba1
 
SABPP - HR Standards - HR Africa 2013
SABPP - HR Standards - HR Africa 2013SABPP - HR Standards - HR Africa 2013
SABPP - HR Standards - HR Africa 2013SABPP
 
Stephanie WroteA lean organization understands customer value a.docx
Stephanie WroteA lean organization understands customer value a.docxStephanie WroteA lean organization understands customer value a.docx
Stephanie WroteA lean organization understands customer value a.docxrjoseph5
 
Sample uk-search-engine-marketing-benchmark-report
Sample uk-search-engine-marketing-benchmark-reportSample uk-search-engine-marketing-benchmark-report
Sample uk-search-engine-marketing-benchmark-reportSalahuddin Khan
 
The Walt Disney Company – The Cohesion Case – is featured chapter .docx
The Walt Disney Company – The Cohesion Case – is featured chapter .docxThe Walt Disney Company – The Cohesion Case – is featured chapter .docx
The Walt Disney Company – The Cohesion Case – is featured chapter .docxchristalgrieg
 
Write a research paper on a selected topic of project management..docx
Write a research paper on a selected topic of project management..docxWrite a research paper on a selected topic of project management..docx
Write a research paper on a selected topic of project management..docxarnoldmeredith47041
 
DIA TIO Career Path Implementation Guide_2014
DIA TIO Career Path Implementation Guide_2014DIA TIO Career Path Implementation Guide_2014
DIA TIO Career Path Implementation Guide_2014Dr. Stephen Pick, PMP
 
Universität St. Gallens Framework for Corporate Data Quality Management?
Universität St. Gallens Framework for Corporate Data Quality Management?Universität St. Gallens Framework for Corporate Data Quality Management?
Universität St. Gallens Framework for Corporate Data Quality Management?Torben Haagh
 

Similar to How can you use the Training and Education function model mentio.docx (20)

Project management professional exam outline
Project management professional exam outlineProject management professional exam outline
Project management professional exam outline
 
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docx
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docxHarrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docx
Harrisburg UniversityHomework # 1 (100-Points)ISEM547IT Mana.docx
 
TerryBrightPortfolio
TerryBrightPortfolioTerryBrightPortfolio
TerryBrightPortfolio
 
Lean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledgeLean six sigma - practical body of knowledge
Lean six sigma - practical body of knowledge
 
Rbpms
RbpmsRbpms
Rbpms
 
performance-management.pdf
performance-management.pdfperformance-management.pdf
performance-management.pdf
 
A Critical Success Factor S Relevance Model For SAP Implementation Projects
A Critical Success Factor S Relevance Model For SAP Implementation ProjectsA Critical Success Factor S Relevance Model For SAP Implementation Projects
A Critical Success Factor S Relevance Model For SAP Implementation Projects
 
A_Critical_Success_Factors_Relevance_Mod.pdf
A_Critical_Success_Factors_Relevance_Mod.pdfA_Critical_Success_Factors_Relevance_Mod.pdf
A_Critical_Success_Factors_Relevance_Mod.pdf
 
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx
◆Rapid InstructionalDesignLearning ID Fast and RightS E C .docx
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
 
(PMBOK® Guide) – Fifth Edition
(PMBOK® Guide) – Fifth Edition(PMBOK® Guide) – Fifth Edition
(PMBOK® Guide) – Fifth Edition
 
Organization assessment guide
Organization assessment guideOrganization assessment guide
Organization assessment guide
 
SABPP - HR Standards - HR Africa 2013
SABPP - HR Standards - HR Africa 2013SABPP - HR Standards - HR Africa 2013
SABPP - HR Standards - HR Africa 2013
 
Stephanie WroteA lean organization understands customer value a.docx
Stephanie WroteA lean organization understands customer value a.docxStephanie WroteA lean organization understands customer value a.docx
Stephanie WroteA lean organization understands customer value a.docx
 
Sample uk-search-engine-marketing-benchmark-report
Sample uk-search-engine-marketing-benchmark-reportSample uk-search-engine-marketing-benchmark-report
Sample uk-search-engine-marketing-benchmark-report
 
The Walt Disney Company – The Cohesion Case – is featured chapter .docx
The Walt Disney Company – The Cohesion Case – is featured chapter .docxThe Walt Disney Company – The Cohesion Case – is featured chapter .docx
The Walt Disney Company – The Cohesion Case – is featured chapter .docx
 
Write a research paper on a selected topic of project management..docx
Write a research paper on a selected topic of project management..docxWrite a research paper on a selected topic of project management..docx
Write a research paper on a selected topic of project management..docx
 
DIA TIO Career Path Implementation Guide_2014
DIA TIO Career Path Implementation Guide_2014DIA TIO Career Path Implementation Guide_2014
DIA TIO Career Path Implementation Guide_2014
 
Universität St. Gallens Framework for Corporate Data Quality Management?
Universität St. Gallens Framework for Corporate Data Quality Management?Universität St. Gallens Framework for Corporate Data Quality Management?
Universität St. Gallens Framework for Corporate Data Quality Management?
 
Insurance Lead Management
Insurance Lead ManagementInsurance Lead Management
Insurance Lead Management
 

More from pooleavelina

httpswww.azed.govoelaselpsUse this to see the English Lang.docx
httpswww.azed.govoelaselpsUse this to see the English Lang.docxhttpswww.azed.govoelaselpsUse this to see the English Lang.docx
httpswww.azed.govoelaselpsUse this to see the English Lang.docxpooleavelina
 
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docx
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docxhttpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docx
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docxpooleavelina
 
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docx
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docxhttpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docx
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docxpooleavelina
 
httpfmx.sagepub.comField Methods DOI 10.117715258.docx
httpfmx.sagepub.comField Methods DOI 10.117715258.docxhttpfmx.sagepub.comField Methods DOI 10.117715258.docx
httpfmx.sagepub.comField Methods DOI 10.117715258.docxpooleavelina
 
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docx
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docxhttpsiexaminer.orgfake-news-personal-responsibility-must-trump.docx
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docxpooleavelina
 
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docx
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docxhttp1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docx
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docxpooleavelina
 
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docx
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docxhttpswww.medicalnewstoday.comarticles323444.phphttpsasco.docx
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docxpooleavelina
 
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docx
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docxhttpstheater.nytimes.com mem theater treview.htmlres=9902e6.docx
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docxpooleavelina
 
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docx
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docxhttpsfitsmallbusiness.comemployee-compensation-planThe pu.docx
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docxpooleavelina
 
httpsdoi.org10.11770002764219842624American Behaviora.docx
httpsdoi.org10.11770002764219842624American Behaviora.docxhttpsdoi.org10.11770002764219842624American Behaviora.docx
httpsdoi.org10.11770002764219842624American Behaviora.docxpooleavelina
 
httpsdoi.org10.11770896920516649418Critical Sociology.docx
httpsdoi.org10.11770896920516649418Critical Sociology.docxhttpsdoi.org10.11770896920516649418Critical Sociology.docx
httpsdoi.org10.11770896920516649418Critical Sociology.docxpooleavelina
 
httpsdoi.org10.11770894318420903495Nursing Science Qu.docx
httpsdoi.org10.11770894318420903495Nursing Science Qu.docxhttpsdoi.org10.11770894318420903495Nursing Science Qu.docx
httpsdoi.org10.11770894318420903495Nursing Science Qu.docxpooleavelina
 
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docx
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docxhttpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docx
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docxpooleavelina
 
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docx
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docxhttphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docx
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docxpooleavelina
 
httpswww.worldbank.orgencountryvietnamoverview---------.docx
httpswww.worldbank.orgencountryvietnamoverview---------.docxhttpswww.worldbank.orgencountryvietnamoverview---------.docx
httpswww.worldbank.orgencountryvietnamoverview---------.docxpooleavelina
 
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docx
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docxHTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docx
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docxpooleavelina
 
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docx
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docxhttpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docx
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docxpooleavelina
 
httpswww.vitalsource.comproductscomparative-criminal-justice-.docx
httpswww.vitalsource.comproductscomparative-criminal-justice-.docxhttpswww.vitalsource.comproductscomparative-criminal-justice-.docx
httpswww.vitalsource.comproductscomparative-criminal-justice-.docxpooleavelina
 
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docx
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docxhttpswww.nationaleatingdisorders.orglearnby-eating-disordera.docx
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docxpooleavelina
 
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docx
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docxhttpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docx
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docxpooleavelina
 

More from pooleavelina (20)

httpswww.azed.govoelaselpsUse this to see the English Lang.docx
httpswww.azed.govoelaselpsUse this to see the English Lang.docxhttpswww.azed.govoelaselpsUse this to see the English Lang.docx
httpswww.azed.govoelaselpsUse this to see the English Lang.docx
 
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docx
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docxhttpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docx
httpscdnapisec.kaltura.comindex.phpextwidgetpreviewpartner_.docx
 
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docx
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docxhttpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docx
httpsifes.orgsitesdefaultfilesbrijuni18countryreport_fi.docx
 
httpfmx.sagepub.comField Methods DOI 10.117715258.docx
httpfmx.sagepub.comField Methods DOI 10.117715258.docxhttpfmx.sagepub.comField Methods DOI 10.117715258.docx
httpfmx.sagepub.comField Methods DOI 10.117715258.docx
 
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docx
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docxhttpsiexaminer.orgfake-news-personal-responsibility-must-trump.docx
httpsiexaminer.orgfake-news-personal-responsibility-must-trump.docx
 
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docx
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docxhttp1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docx
http1500cms.comBECAUSE THIS FORM IS USED BY VARIOUS .docx
 
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docx
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docxhttpswww.medicalnewstoday.comarticles323444.phphttpsasco.docx
httpswww.medicalnewstoday.comarticles323444.phphttpsasco.docx
 
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docx
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docxhttpstheater.nytimes.com mem theater treview.htmlres=9902e6.docx
httpstheater.nytimes.com mem theater treview.htmlres=9902e6.docx
 
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docx
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docxhttpsfitsmallbusiness.comemployee-compensation-planThe pu.docx
httpsfitsmallbusiness.comemployee-compensation-planThe pu.docx
 
httpsdoi.org10.11770002764219842624American Behaviora.docx
httpsdoi.org10.11770002764219842624American Behaviora.docxhttpsdoi.org10.11770002764219842624American Behaviora.docx
httpsdoi.org10.11770002764219842624American Behaviora.docx
 
httpsdoi.org10.11770896920516649418Critical Sociology.docx
httpsdoi.org10.11770896920516649418Critical Sociology.docxhttpsdoi.org10.11770896920516649418Critical Sociology.docx
httpsdoi.org10.11770896920516649418Critical Sociology.docx
 
httpsdoi.org10.11770894318420903495Nursing Science Qu.docx
httpsdoi.org10.11770894318420903495Nursing Science Qu.docxhttpsdoi.org10.11770894318420903495Nursing Science Qu.docx
httpsdoi.org10.11770894318420903495Nursing Science Qu.docx
 
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docx
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docxhttpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docx
httpswww.youtube.comwatchtime_continue=8&v=rFV0aes0vYAN.docx
 
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docx
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docxhttphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docx
httphps.orgdocumentspregnancy_fact_sheet.pdfhttpswww.docx
 
httpswww.worldbank.orgencountryvietnamoverview---------.docx
httpswww.worldbank.orgencountryvietnamoverview---------.docxhttpswww.worldbank.orgencountryvietnamoverview---------.docx
httpswww.worldbank.orgencountryvietnamoverview---------.docx
 
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docx
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docxHTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docx
HTML WEB Page solutionAbout.htmlQuantum PhysicsHomeServicesAbou.docx
 
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docx
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docxhttpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docx
httpswww.huffpost.comentryonline-dating-vs-offline_b_4037867.docx
 
httpswww.vitalsource.comproductscomparative-criminal-justice-.docx
httpswww.vitalsource.comproductscomparative-criminal-justice-.docxhttpswww.vitalsource.comproductscomparative-criminal-justice-.docx
httpswww.vitalsource.comproductscomparative-criminal-justice-.docx
 
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docx
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docxhttpswww.nationaleatingdisorders.orglearnby-eating-disordera.docx
httpswww.nationaleatingdisorders.orglearnby-eating-disordera.docx
 
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docx
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docxhttpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docx
httpswww.youtube.comwatchtime_continue=59&v=Bh_oEYX1zNM&featu.docx
 

Recently uploaded

Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 

Recently uploaded (20)

Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 

How can you use the Training and Education function model mentio.docx

  • 1. How can you use the Training and Education function model mentioned in Hill in Abercrombie and Fitch 1 Krishna How can you use the Training and Education function model mentioned in Hill 2 Krishna Include all the key aspects of training and education mentioned in Hill including assessing needs, identifying resources, develop training, delivery, and evaluation 3 Krishna
  • 2. Include all the key aspects of training and education mentioned in Hill including assessing needs, identifying resources, develop training, delivery, and evaluation 4 Krishna The CompleTe projeCT managemenT offiCe handbook ESI International Project Management Series Series Editor J. LeRoy Ward, Executive Vice President ESI International Arlington, Virginia
  • 3. Practical Guide to Project Planning Ricardo Viana Vargas 1-4200-4504-0 The Complete Project Management Office Handbook, Second Edition Gerard M. Hill 1-4200-4680-2 Determining Project Requirements Hans Jonasson 1-4200-4502-4 Other ESI International Titles Available from Auerbach Publications, Taylor & Francis Group PMP® Challenge! Fourth Edition J. LeRoy Ward and Ginger Levin ISBN: 1-8903-6740-0 PMP® Exam: Practice Test and Study Guide, Seventh Edition J. LeRoy Ward ISBN: 1-8903-6741-9 The Project Management Drill Book: A Self-Study Guide Carl L. Pritchard ISBN: 1-8903-6734-6 Project Management Terms: A Working Glossary, Second Edition J. LeRoy Ward
  • 4. ISBN: 1-8903-6725-7 Project Management Tools CD, Version 4.3 ESI International ISBN: 1-8903-6736-2 Risk Management: Concepts and Guidance, Third Edition Carl L. Pritchard ISBN: 1-8903-6739-7 Boca Raton New York Auerbach Publications is an imprint of the Taylor & Francis Group, an informa business The CompleTe projeCT managemenT offiCe handbook gerard m. hill Auerbach Publications Taylor & Francis Group 6000 Broken Sound Parkway NW, Suite 300 Boca Raton, FL 33487-2742
  • 5. © 2008 by Taylor & Francis Group, LLC Auerbach is an imprint of Taylor & Francis Group, an Informa business No claim to original U.S. Government works Printed in the United States of America on acid-free paper 10 9 8 7 6 5 4 3 2 1 International Standard Book Number-10: 1-4200-4680-2 (Hardcover) International Standard Book Number-13: 978-1-4200-4680-9 (Hardcover) This book contains information obtained from authentic and highly regarded sources. Reprinted material is quoted with permission, and sources are indicated. A wide variety of references are listed. Reasonable efforts have been made to publish reliable data and information, but the author and the publisher cannot assume responsibility for the validity of all materials or for the conse- quences of their use. No part of this book may be reprinted, reproduced, transmitted, or utilized in any form by any electronic, mechanical, or other means, now known or hereafter invented, including photocopying, microfilming, and recording, or in any information storage or retrieval system, without written permission from the publishers. 222 Rosewood Drive, Danvers, MA 01923, 978-750-8400. CCC is a not-for-profit organization that provides licenses and registration for a variety of users. For organizations that have been granted a photocopy license by the CCC, a separate system of payment
  • 6. has been arranged. Trademark Notice: Product or corporate names may be trademarks or registered trademarks, and are used only for identification and explanation without intent to infringe. Library of Congress Cataloging-in-Publication Data Hill, Gerard M. The complete project management office handbook / Gerard M. Hill. -- 2nd ed. p. cm. -- (ESI international project management series) Includes bibliographical references and index. ISBN-13: 978-1-4200-4680-9 (alk. paper) 1. Project management--Handbooks, manuals, etc. I. Title. HD69.P75H54 2008 658.4’04--dc22 2007011249 Visit the Taylor & Francis Web site at and the Auerbach Web site at AU4680_C000.fm Page iv Monday, July 16, 2007 3:47 PM For permission to photocopy or use material electronically from this work, please access www. copyright.com (http://www.copyright.com/) or contact the Copyright Clearance Center, Inc. (CCC) http://www.taylorandfrancis.com http://www.auerbach-publications.com
  • 7. http://www.copyright.com http://www.copyright.com http://www.copyright.com http://www.taylorandfrancis.com http://www.auerbach-publications.com v Contents Acknowledgments.................................................................... ................................. xv Introduction............................................................................ ................................. xvii Section I Practice Management 1 Project Management Methodology .............................................3 Project Environment Interface Concepts......................................................... 4 Business Environment Interface Concepts...................................................... 5 Project Management Methodology Activities across the PMO Continuum..............................................................................
  • 8. ......................... 6 Project Management Methodology Function Model ...................................... 8 Establish Basis for Project Management Methodology ............................. 9 Convene Methodology Development Team ......................................... 9 Prepare Methodology Deployment Strategy ....................................... 12 Examine Current Practices.................................................................... 20 Develop Methodology Solution ................................................................ 24 Identify Methodology Components ..................................................... 25 Design Life-Cycle Processes ................................................................. 26 Develop Project Management Practices .............................................. 33 Introduce Methodology Platform ......................................................... 35 Conduct Methodology
  • 9. Implementation.................................................... 38 Plan Methodology Implementation...................................................... 38 Plan Project Transition .......................................................................... 42 Conduct Methodology Training and Implementation ........................ 45 Manage Methodology Maturity ................................................................. 46 Evaluate Methodology Implementation ............................................... 46 Analyze Methodology Performance..................................................... 47 Manage Methodology Maintenance ..................................................... 49 Postscript for the Smaller PMO ..................................................................... 50 Establish Simple, Critical Processes for Project Management............ 50 Gain Increased Support for Process Expansion ................................. 51 Expand and Incorporate Technical and Business Processes............. 52
  • 10. AU4680_C000.fm Page v Monday, July 16, 2007 3:47 PM vi � The Complete Project Management Office Handbook 2 Project Management Tools ........................................................55 Project Environment Interface Concepts....................................................... 56
  • 11. Business Environment Interface Concepts.................................................... 58 Project Management Tools Activities across the PMO Continuum ............. 60 Project Management Tools Function Model ................................................. 61 Select Project Management Tools ............................................................. 63 Identify the Need for Project Management Tools .............................. 63 Examine General Types of Project Management Tools..................... 65 Assess Specific Project Management Tools ......................................... 67 Acquire Project Management Tools ..................................................... 69 Implement Project Management Tools..................................................... 70 Plan Tool Implementation .................................................................... 70 Plan Tool Transition.............................................................................. 71
  • 12. Conduct Tool User Training................................................................. 72 Conduct Tool Implementation ............................................................. 72 Evaluate Tool Performance ....................................................................... 73 Identify and Resolve Utilization Problems .......................................... 73 Identify and Resolve Functional Problems ......................................... 74 Assess Overall Tool Effectiveness ........................................................ 74 Postscript for the Smaller PMO ..................................................................... 75 3 Standards and Metrics ...............................................................77
  • 13. Project Environment Interface Concepts....................................................... 78 Business Environment Interface Concepts.................................................... 79 Standards and Metrics Activities across the PMO Continuum .................... 80 Standards and Metrics Function Model......................................................... 82 Implement Project Management Standards.............................................. 83 Examine Standards Sources.................................................................. 83 Identify Applicable Standards .............................................................. 87 Introduce Preferred Standards.............................................................. 89 Conduct Benchmarking ........................................................................ 92 Determine Project Metrics Requirements ................................................. 93 Identify Process Management and Improvement Metrics.................. 94 Identify Project Performance
  • 14. Metrics................................................... 97 Identify Business Management Metrics ............................................. 101 Introduce and Use Project Metrics ......................................................... 102 Establish Metrics Measurements Plan ................................................ 103 Compare Metrics Performance ........................................................... 104 Establish Corrective Actions ............................................................... 104 Postscript for the Smaller PMO ................................................................... 105 4 Project Knowledge Management ............................................109 Project Environment Interface
  • 15. Concepts..................................................... 110 Business Environment Interface Concepts.................................................. 111 Project Knowledge Management Activities across the PMO Continuum.............................................................................. ..................... 112 Project Knowledge Management Function Model ..................................... 114 AU4680_C000.fm Page vi Monday, July 16, 2007 3:47 PM Contents � vii
  • 16. Establish Knowledge Management Framework..................................... 115 Information Management.................................................................... 116 Document Management...................................................................... 119 Process Management........................................................................... 121 Collaboration Management................................................................. 122 Project Archive and Reference Library Management ....................... 125 Introduce Knowledge Management System........................................... 129 Conduct Installation and Establish Connectivity .............................. 129 Perform Function and Feature Customization .................................. 130 Introduce Project Knowledge Management Content ....................... 133 Implement Knowledge Management System......................................... 134
  • 17. Develop Project Management Information System (PMIS).............. 134 Develop Executive Dashboard........................................................... 144 Construct Project Management Library.............................................. 145 Implement Online Project Collaboration........................................... 146 Implement Other Knowledge Management Tools ........................... 148 Postscript for the Smaller PMO ................................................................... 149 Section II Infrastructure Management 5 Project Governance ..................................................................153 Project Environment Interface
  • 18. Concepts..................................................... 154 Business Environment Interface Concepts.................................................. 155 Project Governance Activities across the PMO Continuum ...................... 156 Project Governance Function Model........................................................... 158 Prepare and Maintain PMO Charter ....................................................... 158 Define Business Purpose .................................................................... 160 Specify Organizational Alignment...................................................... 162 Highlight Functional Responsibility ................................................... 163 Specify PMO Authority ....................................................................... 164 Identify PMO Funding ........................................................................ 165 Develop Project Management Policies ................................................... 165 Evaluate Policy Needs ........................................................................ 166
  • 19. Demonstrate Senior Management Support........................................ 167 Prepare Policy Guidance .................................................................... 168 Develop Project Classification Guidance ............................................... 169 Examine Project Classification Purpose............................................. 170 Identify Project Classification Criteria ................................................ 170 Implement Project Classification Guidance....................................... 173 Establish Project Manager Authority....................................................... 173 Establish Executive Control Board ......................................................... 175 Determine Executive Oversight Requirements ................................. 176 Set Control Board Parameters ............................................................ 178 Prepare Control Board Operating Procedures.................................. 178
  • 20. Align Business and Technical Committees ............................................ 180 Postscript for the Smaller PMO ................................................................... 181 AU4680_C000.fm Page vii Monday, July 16, 2007 3:47 PM viii � The Complete Project Management Office Handbook 6 Assessment
  • 21. ................................................................................183 Project Environment Interface Concepts..................................................... 184 Business Environment Interface Concepts.................................................. 185 Assessment Activities across the PMO Continuum .................................... 185 Assessment Function Model......................................................................... 187 Conduct Competency Assessments......................................................... 187 Identify Competency Assessments ..................................................... 188 Conduct Competency Assessments.................................................... 189 Implement Competency Improvement Plans.................................... 190 Conduct Capability Assessments............................................................. 191 Identify Capability Assessments ......................................................... 192
  • 22. Conduct Capability Assessments ........................................................ 194 Implement Capability Improvement Plans........................................ 196 Conduct Maturity Assessments................................................................ 198 Identify Maturity Assessments ............................................................ 198 Conduct Maturity Assessments ........................................................... 200 Implement Maturity Advancement Plans........................................... 202 Postscript for the Smaller PMO ................................................................... 203 7 Organization and Structure .....................................................205
  • 23. Project Environment Interface Concepts..................................................... 206 Business Environment Interface Concepts.................................................. 206 Organization and Structure Activities across the PMO Continuum .......... 207 Organization and Structure Function Model .............................................. 209 Set Up the PMO Structure....................................................................... 209 Identify Staff Needs for PMO Functions ........................................... 210 Introduce PMO Staff ........................................................................... 214 Analyze and Establish PMO Relationships........................................ 215 Establish Project Team Structure............................................................. 216 Specify Project Team and PMO Relationship ................................... 217 Define Standard Project Team Structure ........................................... 221 Define Extended Project Team
  • 24. Alignment........................................ 225 Develop Stakeholder Participation ......................................................... 228 Manage Internal Project Team Stakeholders..................................... 229 Manage Internal Oversight Stakeholders........................................... 230 Manage Internal-Support Stakeholders.............................................. 231 Manage Customer Stakeholders ......................................................... 233 Manage Vendor and Contractor Stakeholders .................................. 234 Manage Other Project Stakeholders................................................... 235 Postscript for the Smaller PMO ................................................................... 237 8 Facilities and Equipment Support
  • 25. ..........................................239 Project Environment Interface Concepts..................................................... 240 Business Environment Interface Concepts.................................................. 241 Facilities and Equipment Support Activities across the PMO Continuum.............................................................................. ..................... 242 Facilities and Equipment Support Function Model.................................... 242 AU4680_C000.fm Page viii Monday, July 16, 2007 3:47 PM Contents �
  • 26. ix Establish Project Team Requirements..................................................... 244 Establish Workspace Requirements.................................................... 245 Establish Equipment Requirements.................................................... 246 Manage Project Facilities ......................................................................... 250 Manage Facility Acquisition Options ................................................. 251 Monitor Facility Utilization ................................................................. 253 Ensure Adequacy of Facilities ............................................................ 253 Monitor Facility Disposition ............................................................... 255 Manage Project Equipment ..................................................................... 257 Manage Equipment Acquisition
  • 27. ......................................................... 258 Manage Equipment Assignments ....................................................... 260 Monitor Equipment Assignments ....................................................... 261 Manage Equipment Disposition ......................................................... 262 Postscript for the Smaller PMO ................................................................... 263 Section III Resource Integration 9 Resource Management .............................................................267 Project Environment Interface Concepts..................................................... 268 Business Environment Interface Concepts.................................................. 269
  • 28. Resource Management Activities across the PMO Continuum.................. 269 Resource Management Function Model ...................................................... 270 Acquire Project Resources ....................................................................... 272 Identify Resource Providers................................................................ 272 Establish Resource Requirements....................................................... 275 Fulfill Resource Requests.................................................................... 277 Assign Project Resources ......................................................................... 278 Prepare Resource Assignment Notifications...................................... 279 Obtain Individual Resource Commitments ....................................... 279 Introduce Resources to the Project Team ......................................... 279 Deploy Project Resources........................................................................ 280
  • 29. Perform Deployment Administration ................................................. 281 Identify and Arrange Relevant Training ............................................ 282 Monitor Travel Arrangements............................................................. 284 Manage Resource Performance............................................................... 284 Develop Performance Management Guidance ................................. 284 Conduct Project Resource Performance Reviews ............................. 286 Monitor Project Resource Performance ............................................. 288 Close Project Resource Assignments ...................................................... 289 Coordinate Resource Extensions........................................................ 289 Facilitate Resource Transfers and Reassignments ............................. 289 Manage Resource Terminations ......................................................... 290
  • 30. Postscript for the Smaller PMO ................................................................... 290 10 Training and Education ...........................................................293 Project Environment Interface Concepts..................................................... 294 Business Environment Interface Concepts.................................................. 294 AU4680_C000.fm Page ix Monday, July 16, 2007 3:47 PM x
  • 31. � The Complete Project Management Office Handbook Training and Education Activities across the PMO Continuum ................ 295 Training and Education Function Model .................................................... 297 Establish Training Program...................................................................... 298 Assess Training Needs ........................................................................ 298 Determine Training Requirements ..................................................... 300 Identify Training Resources ................................................................ 302 Prepare Training Plan ......................................................................... 305 Select and Develop Training Courses ............................................... 306 Manage Training Program
  • 32. ....................................................................... 308 Establish Training Registration Capability ......................................... 308 Publicize and Promote Training Program ......................................... 310 Conduct Project Management Training ............................................. 311 Evaluate Training Program ...................................................................... 313 Evaluate Training Plan Implementation ............................................ 313 Evaluate Training Resources............................................................... 314 Update Training Program ................................................................... 315 Postscript for the Smaller PMO ................................................................... 315 11 Career Development
  • 33. ................................................................317 Project Environment Interface Concepts..................................................... 318 Business Environment Interface Concepts.................................................. 319 Career Development Activities across the PMO Continuum..................... 320 Career Development Function Model ......................................................... 320 Develop Project Management Career Path ............................................ 322 Establish Project Management as a Professional Discipline ............ 323 Define Career Advancement Model................................................... 327 Construct Position Descriptions and Qualifications ......................... 334 Integrate New Career Path into the Organization............................ 336 Support Project Management Career Planning...................................... 338
  • 34. Provide General Career Guidance ..................................................... 338 Promote Business Skill Development................................................ 339 Implement Career Planning Support ................................................. 341 Establish Professional Certification ......................................................... 341 Develop Project Management Certification Program ....................... 342 Facilitate Technical and Professional Certification ........................... 345 Postscript for the Smaller PMO ................................................................... 346 12 Team Development ..................................................................347
  • 35. Project Environment Interface Concepts..................................................... 348 Business Environment Interface Concepts.................................................. 348 Team Development Activities across the PMO Continuum ...................... 349 Team Development Function Model........................................................... 351 Facilitate Cohesive Team Formation ...................................................... 351 Examine Project Team Composition.................................................. 353 Develop Project Team Orientation Program..................................... 355 Integrate Vendors and Contractors .................................................... 356 Facilitate Virtual Team Management ...................................................... 358 Establish Virtual Team Alignment ...................................................... 359 AU4680_C000.fm Page x Monday, July 16, 2007 3:47 PM
  • 36. Contents � xi Facilitate Virtual Team Interactions.................................................... 360 Introduce Virtual Team Technology .................................................. 364 Enable Project Team Development ........................................................ 365 Promote Team Skill Learning ............................................................. 365 Develop Project Manager Tools and Techniques............................. 366 Facilitate Leadership Development
  • 37. .................................................... 367 Monitor Project Team Performance........................................................ 369 Assess Team Dynamics....................................................................... 369 Examine Team Effectiveness .............................................................. 370 Conduct Team Improvement Activities ............................................. 371 Postscript for the Smaller PMO ................................................................... 373 Section IV Technical Support 13 Mentoring............................................................................... ...377 Project Environment Interface
  • 38. Concepts..................................................... 378 Business Environment Interface Concepts.................................................. 380 Mentoring Activities across the PMO Continuum ...................................... 381 Mentoring Function Model........................................................................... 383 Establish Project Management Mentoring Program............................... 383 Develop the Mentoring Approach ..................................................... 383 Identify Mentor–Protégé Roles and Responsibilities ........................ 390 Determine Mentor Sourcing Process ................................................. 396 Engage Project Management Mentors .................................................... 400 Identify Mentor Candidates ................................................................ 400 Conduct Mentor Candidate Qualification.......................................... 402 Prepare Project Management Mentors............................................... 403
  • 39. Conduct Project Management Mentoring ............................................... 404 Identify Engagement ........................................................................... 405 Assign Mentor (or Mentors) ............................................................... 405 Prepare for Mentoring Engagement................................................... 406 Perform Mentoring Engagement Activities ........................................ 407 Closeout Mentor–Protégé Relationship.............................................. 408 Evaluate Mentoring Program................................................................... 408 Evaluate Mentor Performance ............................................................ 408 Monitor Mentoring Program Results .................................................. 409 Postscript for the Smaller PMO ................................................................... 410
  • 40. 14 Project Planning .......................................................................413 Project Environment Interface Concepts..................................................... 414 Business Environment Interface Concepts.................................................. 415 Project Planning Activities across the PMO Continuum............................ 416 Project Planning Function Model ................................................................ 418 Establish Project Planning Capability ..................................................... 419 Define Project Plan Components....................................................... 419 Implement Project Planning Processes and Tools............................ 421 Establish Planning Facilitation and Support Capability.................... 426
  • 41. AU4680_C000.fm Page xi Monday, July 16, 2007 3:47 PM xii � The Complete Project Management Office Handbook Facilitate Project Planning Workshop ..................................................... 431 Manage Planning Workshop Arrangements ...................................... 431 Facilitate Project Workplan Development ......................................... 434 Perform Follow-Up Planning Support ............................................... 436 Administer Project Planning
  • 42. .................................................................... 438 Specify Primary Project Management Plans ...................................... 439 Recommend Essential Project Support Plans.................................... 453 Prepare Project Plan Content Guidance............................................ 457 Evaluate Project Planning ................................................................... 458 Postscript for the Smaller PMO ................................................................... 462 15 Project Auditing ........................................................................465 Project Environment Interface Concepts..................................................... 466 Business Environment Interface Concepts.................................................. 467
  • 43. Project Auditing Activities across the PMO Continuum ............................ 467 Project Auditing Function Model ................................................................. 470 Set Up Project Auditing Capability ......................................................... 470 Determine Project Auditing Needs .................................................... 471 Identify Project Auditing Resources................................................... 481 Establish Project Audit Performance Points ...................................... 485 Conduct Project Auditing ........................................................................ 487 Prepare for Project Audits and Reviews ........................................... 487 Conduct Project Audit......................................................................... 489 Prepare Project Audit Report ............................................................. 491 Manage Project Auditing Results ............................................................ 492
  • 44. Review Project Audit Results.............................................................. 492 Analyze Aggregate Program Results .................................................. 494 Monitor Project Audit Follow-Up Actions ......................................... 495 Postscript for the Smaller PMO ................................................................... 496 16 Project Recovery.......................................................................499 Project Environment Interface Concepts..................................................... 500 Business Environment Interface Concepts.................................................. 501 Project Recovery Activities across the PMO Continuum ........................... 501 Project Recovery Function
  • 45. Model................................................................ 503 Develop Recovery Assessment Process.................................................. 505 Identify Recovery Indicators............................................................... 505 Assess Project and Identify Problem Areas....................................... 506 Prepare Project Recovery Decision Package .................................... 514 Coordinate Project Recovery Decision .............................................. 515 Plan and Conduct Project Recovery ....................................................... 516 Establish Project Recovery Team ....................................................... 516 Develop Project Recovery Plan.......................................................... 522 Stabilize Project Using Recovery