Write a research paper on a selected topic of project
management.
Topic: - Project management critical success factors.
This report should include an introduction to the research paper
that is a minimum of 800 words in length and includes at least
four (4) references in APA format. The purpose of the progress
report is to help the student begin the task of identifying
relevant literature and better framing the overall research
process.
Summary:
Follow the APA format for your report. Use spell check,
grammar check, etc., to make sure that your report is written in
professional form with no keyboarding or grammatical errors.
APA Format
Resource: http://owl.english.purdue.edu/owl/section/2/10
ffirs.qxd 1/3/13 3:48 PM Page i
PROJECT
MANAGEMENT
ffirs.qxd 1/3/13 3:48 PM Page i
Dr. Kerzner’s 16 Points to Project
Management Maturity
1. Adopt a project management methodology and use it
consistently.
2. Implement a philosophy that drives the company toward
project
management maturity and communicate it to everyone.
3. Commit to developing effective plans at the beginning of
each project.
4. Minimize scope changes by committing to realistic
objectives.
5. Recognize that cost and schedule management are
inseparable.
6. Select the right person as the project manager.
7. Provide executives with project sponsor information, not
project
management information.
8. Strengthen involvement and support of line management.
9. Focus on deliverables rather than resources.
10. Cultivate effective communication, cooperation, and trust to
achieve
rapid project management maturity.
11. Share recognition for project success with the entire project
team and
line management.
12. Eliminate nonproductive meetings.
13. Focus on identifying and solving problems early, quickly,
and cost
effectively.
14. Measure progress periodically.
15. Use project management software as a tool—not as a
substitute for
effective planning or interpersonal skills.
16. Institute an all-employee training program with periodic
updates based
upon documented lessons learned.
ffirs.qxd 1/3/13 3:48 PM Page ii
P RO J E C T
MANAGEMENT
A Systems Approach to
Planning, Scheduling,
and Controlling
E L E V E N T H E D I T I O N
H A R O L D K E R Z N E R , P h . D .
Senior Executive Director for Project Management
The International Institute for Learning
New York, New York
ffirs.qxd 1/3/13 3:48 PM Page iii
Cover illustration: xiaoke ma/iStockphoto
This book is printed on acid-free paper.
Copyright © 2013 by John Wiley & Sons, Inc. All rights
reserved
Published by John Wiley & Sons, Inc., Hoboken, New Jersey
Published simultaneously in Canada
No part of this publication may be reproduced, stored in a
retrieval system, or transmitted in any form or by any
means, electronic, mechanical, photocopying, recording,
scanning, or otherwise, except as permitted under
Section 107 or 108 of the 1976 United States Copyright Act,
without either the prior written permission of the Publisher, or
autho-
rization through payment of the appropriate per-copy fee to the
Copyright Clearance Center, 222 Rosewood Drive, Danvers,
MA
01923, (978) 750-8400, fax (978) 646-8600, or on the web at
www.copyright.com. Requests to the Publisher for permission
should
be addressed to the Permissions Department, John Wiley &
Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-
6011, fax
(201) 748-6008, or online at www.wiley.com/go/permissions.
Limit of Liability/Disclaimer of Warranty: While the publisher
and author have used their best efforts in preparing this book,
they
make no representations or warranties with the respect to the
accuracy or completeness of the contents of this book and
specifically
disclaim any implied warranties of merchantability or fitness
for a particular purpose. No warranty may be created or
extended by
sales representatives or written sales materials. The advice and
strategies contained herein may not be suitable for your
situation.
You should consult with a professional where appropriate.
Neither the publisher nor the author shall be liable for damages
arising
herefrom.
For general information about our other products and services,
please contact our Customer Care Department within the United
States at (800) 762-2974, outside the United States at (317)
572-3993 or fax (317) 572-4002.
Wiley publishes in a variety of print and electronic formats and
by print-on-demand. Some material included with standard print
versions of this book may not be included in e-books or in
print-on-demand. If this book refers to media such as a CD or
DVD that
is not included in the version you purchased, you may download
this material at http://booksupport.wiley.com. For more
informa-
tion about Wiley products, visit www.wiley.com.
Library of Congress Cataloging-in-Publication Data:
Kerzner, Harold.
Project management : a systems approach to planning,
scheduling, and controlling / Harold Kerzner, Ph. D. Senior
Executive
Director for Project Management, the International Institute for
Learning, New York, New York. — Eleventh edition.
pages cm
Includes bibliographical references and index.
ISBN 978-1-118-02227-6 (cloth); ISBN 978-1-118-41585-6
(ebk); ISBN 978-1-118-41855-0 (ebk); ISBN 978-1-118-43357-
7
(ebk); ISBN 978-1-118-48322-0 (ebk); ISBN 978-1-118-48323-
7 (ebk) 1. Project management. 2. Project management—Case
studies. I. Title.
HD69.P75K47 2013
658.4’04 —dc23
2012026239
Printed in the United States of America
10 9 8 7 6 5 4 3 2 1
ffirs.qxd 1/3/13 3:48 PM Page iv
http://www.copyright.com
http://www.wiley.com/go/permissions
http://www.wiley.com
http://booksupport.wiley.com
To
Dr. Herman Krier,
my Friend and Guru,
who taught me well the
meaning of the word “persistence”
ffirs.qxd 1/3/13 3:48 PM Page v
ffirs.qxd 1/3/13 3:48 PM Page vi
Contents
Preface xxiii
1 OVERVIEW 1
1.0 Introduction 1
1.1 Understanding Project Management 2
1.2 Defining Project Success 7
1.3 Success, Trade-Offs, and Competing Constraints 8
1.4 The Project Manager–Line Manager Interface 9
1.5 Defining the Project Manager’s Role 14
1.6 Defining the Functional Manager’s Role 15
1.7 Defining the Functional Employee’s Role 18
1.8 Defining the Executive’s Role 19
1.9 Working with Executives 19
1.10 Committee Sponsorship/Governance 20
1.11 The Project Manager as the Planning Agent 23
1.12 Project Champions 24
1.13 The Downside of Project Management 25
1.14 Project-Driven versus Non–Project-Driven Organizations
25
1.15 Marketing in the Project-Driven Organization 28
1.16 Classification of Projects 30
1.17 Location of the Project Manager 30
1.18 Differing Views of Project Management 32
1.19 Public-Sector Project Management 34
1.20 International Project Management 38
1.21 Concurrent Engineering: A Project Management Approach
38
1.22 Added Value 39
1.23 Studying Tips for the PMI® Project Management
Certification Exam 40
Problems 42
Case Study
Williams Machine Tool Company 44
vii
ftoc.qxd 1/3/13 3:50 PM Page vii
2 PROJECT MANAGEMENT GROWTH: CONCEPTS
AND DEFINITIONS 47
2.0 Introduction 47
2.1 General Systems Management 48
2.2 Project Management: 1945–1960 48
2.3 Project Management: 1960–1985 49
2.4 Project Management: 1985–2012 55
2.5 Resistance to Change 59
2.6 Systems, Programs, and Projects: A Definition 64
2.7 Product versus Project Management: A Definition 66
2.8 Maturity and Excellence: A Definition 68
2.9 Informal Project Management: A Definition 69
2.10 The Many Faces of Success 70
2.11 The Many Faces of Failure 73
2.12 The Stage-Gate Process 76
2.13 Project Life Cycles 78
2.14 Gate Review Meetings (Project Closure) 83
2.15 Engagement Project Management 84
2.16 Project Management Methodologies: A Definition 85
2.17 Enterprise Project Management Methodologies 87
2.18 Methodologies Can Fail 91
2.19 Organizational Change Management and Corporate
Cultures 94
2.20 Project Management Intellectual Property 100
2.21 Systems Thinking 101
2.22 Studying Tips for the PMI® Project Management
Certification Exam 104
Problems 107
Case Study
Creating a Methodology 108
3 ORGANIZATIONAL STRUCTURES 111
3.0 Introduction 111
3.1 Organizational Work Flow 113
3.2 Traditional (Classical) Organization 114
3.3 Developing Work Integration Positions 117
3.4 Line-Staff Organization (Project Coordinator) 121
3.5 Pure Product (Projectized) Organization 122
3.6 Matrix Organizational Form 125
3.7 Modification of Matrix Structures 132
3.8 The Strong, Weak, or Balanced Matrix 136
3.9 Center for Project Management Expertise 136
3.10 Matrix Layering 137
viii CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page viii
3.11 Selecting the Organizational Form 138
3.12 Structuring the Small Company 143
3.13 Strategic Business Unit (SBU) Project Management 146
3.14 Transitional Management 147
3.15 Barriers to Implementing Project Management in Emerging
Markets 149
3.16 Seven Fallacies that Delay Project Management Maturity
156
3.17 Studying Tips for the PMI® Project Management
Certification Exam 159
Problems 161
Case Studies
Jones and Shephard Accountants, Inc. 166
Coronado Communications 168
4 ORGANIZING AND STAFFING THE PROJECT OFFICE
AND TEAM 171
4.0 Introduction 171
4.1 The Staffing Environment 172
4.2 Selecting the Project Manager: An Executive Decision 174
4.3 Skill Requirements for Project and Program Managers 178
4.4 Special Cases in Project Manager Selection 184
4.5 Selecting the Wrong Project Manager 184
4.6 Next Generation Project Managers 188
4.7 Duties and Job Descriptions 189
4.8 The Organizational Staffing Process 193
4.9 The Project Office 199
4.10 The Functional Team 204
4.11 The Project Organizational Chart 205
4.12 Special Problems 208
4.13 Selecting the Project Management Implementation Team
210
4.14 Mistakes Made by Inexperienced Project Managers 213
4.15 Studying Tips for the PMI® Project Management
Certification Exam 214
Problems 216
5 MANAGEMENT FUNCTIONS 223
5.0 Introduction 223
5.1 Controlling 225
5.2 Directing 225
5.3 Project Authority 230
5.4 Interpersonal Influences 237
5.5 Barriers to Project Team Development 240
5.6 Suggestions for Handling the Newly Formed Team 243
Contents ix
ftoc.qxd 1/3/13 3:50 PM Page ix
5.7 Team Building as an Ongoing Process 246
5.8 Dysfunctions of a Team 247
5.9 Leadership in a Project Environment 250
5.10 Life-Cycle Leadership 252
5.11 Value-Based Project Leadership 255
5.12 Organizational Impact 257
5.13 Employee–Manager Problems 259
5.14 Management Pitfalls 262
5.15 Communications 265
5.16 Project Review Meetings 274
5.17 Project Management Bottlenecks 275
5.18 Cross-Cutting Skills 276
5.19 Active Listening 277
5.20 Project Problem-Solving 278
5.21 Brainstorming 288
5.22 Project Decision-Making 293
5.23 Predicting the Outcome of a Decision 301
5.24 Facilitation 303
5.25 Handling Negative Team Dynamics 306
5.26 Communication Traps 307
5.27 Proverbs and Laws 309
5.28 Human Behavior Education 311
5.29 Management Policies and Procedures 312
5.30 Studying Tips for the PMI® Project Management
Certification Exam 313
Problems 318
Case Studies
The Trophy Project 327
Communication Failures 329
McRoy Aerospace 332
The Poor Worker 333
The Prima Donna 334
The Team Meeting 335
Leadership Effectiveness (A) 337
Leadership Effectiveness (B) 341
Motivational Questionnaire 347
6 MANAGEMENT OF YOUR TIME AND STRESS 355
6.0 Introduction 355
6.1 Understanding Time Management 356
6.2 Time Robbers 356
6.3 Time Management Forms 358
x CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page x
6.4 Effective Time Management 359
6.5 Stress and Burnout 360
6.6 Studying Tips for the PMI® Project Management
Certification Exam 362
Problems 363
Case Study
The Reluctant Workers 364
7 CONFLICTS 365
7.0 Introduction 365
7.1 Objectives 366
7.2 The Conflict Environment 367
7.3 Types of Conflicts 368
7.4 Conflict Resolution 371
7.5 Understanding Superior, Subordinate, and Functional
Conflicts 372
7.6 The Management of Conflicts 374
7.7 Conflict Resolution Modes 375
7.8 Studying Tips for the PMI® Project Management
Certification Exam 377
Problems 379
Case Studies
Facilities Scheduling at Mayer Manufacturing 382
Telestar International 383
Handling Conflict in Project Management 384
8 SPECIAL TOPICS 391
8.0 Introduction 392
8.1 Performance Measurement 392
8.2 Financial Compensation and Rewards 399
8.3 Critical Issues with Rewarding Project Teams 405
8.4 Effective Project Management in the Small Business
Organization 408
8.5 Mega Projects 410
8.6 Morality, Ethics, and the Corporate Culture 411
8.7 Professional Responsibilities 414
8.8 Internal Partnerships 417
8.9 External Partnerships 418
8.10 Training and Education 420
8.11 Integrated Product/Project Teams 422
8.12 Virtual Project Teams 424
8.13 Breakthrough Projects 427
Contents xi
ftoc.qxd 1/3/13 3:50 PM Page xi
xii CONTENTS
8.14 Managing Innovation Projects 427
8.15 Agile Project Management 430
8.16 Studying Tips for the PMI® Project Management
Certification Exam 431
Problems 437
Case Study
Is It Fraud? 440
9 THE VARIABLES FOR SUCCESS 443
9.0 Introduction 443
9.1 Predicting Project Success 444
9.2 Project Management Effectiveness 448
9.3 Expectations 449
9.4 Lessons Learned 450
9.5 Understanding Best Practices 451
9.6 Best Practices versus Proven Practices 458
9.7 Studying Tips for the PMI® Project Management
Certification Exam 459
Problems 460
Case Study
Radiance International 460
10 WORKING WITH EXECUTIVES 463
10.0 Introduction 463
10.1 The Project Sponsor 464
10.2 Handling Disagreements with the Sponsor 474
10.3 The Collective Belief 475
10.4 The Exit Champion 476
10.5 The In-House Representatives 477
10.6 Stakeholder Relations Management 478
10.7 Politics 486
10.8 Studying Tips for the PMI® Project Management
Certification Exam 487
Problems 488
Case Studies
Corwin Corporation 491
The Prioritization of Projects 499
The Irresponsible Sponsors 500
Selling Executives on Project Management 502
ftoc.qxd 1/3/13 3:50 PM Page xii
11 PLANNING 505
11.0 Introduction 505
11.1 Validating the Assumptions 508
11.2 Validating the Objectives 509
11.3 General Planning 510
11.4 Life-Cycle Phases 513
11.5 Proposal Preparation 516
11.6 Kickoff Meetings 516
11.7 Understanding Participants’ Roles 519
11.8 Project Planning 519
11.9 The Statement of Work 521
11.10 Project Specifications 526
11.11 Milestone Schedules 528
11.12 Work Breakdown Structure 529
11.13 WBS Decomposition Problems 536
11.14 Work Breakdown Structure Dictionary 540
11.15 Role of the Executive in Project Selection 541
11.16 Role of the Executive in Planning 546
11.17 The Planning Cycle 546
11.17 Work Planning Authorization 547
11.19 Why Do Plans Fail? 548
11.20 Stopping Projects 549
11.21 Handling Project Phaseouts and Transfers 550
11.22 Detailed Schedules and Charts 551
11.23 Master Production Scheduling 554
11.24 Project Plan 556
11.25 Total Project Planning 561
11.26 The Project Charter 565
11.27 Project Baselines 566
11.28 Verification and Validation 570
11.29 Requirements Traceability Matrix 571
11.30 Management Control 572
11.31 The Project Manager–Line Manager Interface 575
11.32 Fast-Tracking 577
11.33 Configuration Management 578
11.34 Enterprise Project Management Methodologies 579
11.35 Project Audits 582
11.36 Studying Tips for the PMI® Project Management
Certification Exam 583
Problems 586
12 NETWORK SCHEDULING TECHNIQUES 597
12.0 Introduction 597
12.1 Network Fundamentals 600
Contents xiii
ftoc.qxd 1/3/13 3:50 PM Page xiii
12.2 Graphical Evaluation and Review Technique (GERT) 604
12.3 Dependencies 605
12.4 Slack Time 606
12.5 Network Replanning 612
12.6 Estimating Activity Time 616
12.7 Estimating Total Project Time 617
12.8 Total PERT/CPM Planning 618
12.9 Crash Times 620
12.10 PERT/CPM Problem Areas 623
12.11 Alternative PERT/CPM Models 626
12.12 Precedence Networks 627
12.13 Lag 630
12.14 Scheduling Problems 632
12.15 The Myths of Schedule Compression 632
12.16 Understanding Project Management Software 634
12.17 Software Features Offered 634
12.18 Software Classification 636
12.19 Implementation Problems 637
12.20 Critical Chain 638
12.21 Studying Tips for the PMI® Project Management
Certification Exam 640
Problems 643
Case Studies
Crosby Manufacturing Corporation 656
The Invisible Sponsor 658
13 PROJECT GRAPHICS 661
13.0 Introduction 661
13.1 Customer Reporting 662
13.2 Bar (Gantt) Chart 663
13.3 Other Conventional Presentation Techniques 670
13.4 Logic Diagrams/Networks 673
13.5 Studying Tips for the PMI® Project Management
Certification Exam 674
Problems 675
14 PRICING AND ESTIMATING 677
14.0 Introduction 677
14.1 Global Pricing Strategies 678
14.2 Types of Estimates 679
14.3 Pricing Process 682
14.4 Organizational Input Requirements 684
14.5 Labor Distributions 686
xiv CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page xiv
14.6 Overhead Rates 690
14.7 Materials/Support Costs 692
14.8 Pricing Out the Work 695
14.9 Smoothing Out Department Man-Hours 696
14.10 The Pricing Review Procedure 698
14.11 Systems Pricing 700
14.12 Developing the Supporting/Backup Costs 701
14.13 The Low-Bidder Dilemma 705
14.14 Special Problems 705
14.15 Estimating Pitfalls 706
14.16 Estimating High-Risk Projects 707
14.17 Project Risks 708
14.18 The Disaster of Applying the 10 Percent
Solution
to Project Estimates 712
14.19 Life-Cycle Costing (LCC) 714
14.20 Logistics Support 719
14.21 Economic Project Selection Criteria: Capital Budgeting
720
14.22 Payback Period 720
14.23 The Time Value of Money 721
14.24 Net Present Value (NPV) 722
14.25 Internal Rate of Return (IRR) 723
14.26 Comparing IRR, NPV, and Payback 724
14.27 Risk Analysis 724
14.28 Capital Rationing 725
14.29 Project Financing 726
14.30 Studying Tips for the PMI® Project Management
Certification Exam 728
Problems 730
Case Study
The Estimating Problem 734
15 COST CONTROL 737
15.0 Introduction 737
15.1 Understanding Control 741
15.2 The Operating Cycle 744
15.3 Cost Account Codes 745
15.4 Budgets 750
15.5 The Earned Value Measurement System (EVMS) 752
15.6 Variance and Earned Value 754
15.7 The Cost Baseline 773
15.8 Justifying the Costs 775
15.9 The Cost Overrun Dilemma 778
15.10 Recording Material Costs Using Earned Value
Measurement 779
15.11 The Material Accounting Criterion 782
Contents xv
ftoc.qxd 1/3/13 3:50 PM Page xv
15.12 Material Variances: Price and Usage 783
15.13 Summary Variances 784
15.14 Status Reporting 785
15.15 Cost Control Problems 792
15.16 Project Management Information Systems 793
15.17 Enterprise Resource Planning 793
15.18 Project Metrics 794
15.19 Key Performance Indicators 800
15.20 Value-Based Metrics 806
15.21 Dashboards and Scorecards 812
15.22 Business Intelligence 815
15.23 Infographics 816
15.24 Studying Tips for the PMI® Project Management
Certification Exam 816
Problems 820
Case Studies
The Bathtub Period 838
Franklin Electronics 839
Trouble in Paradise 841
16 TRADE-OFF ANALYSIS IN A PROJECT ENVIRONMENT
845
16.0 Introduction 845
16.1 Methodology for Trade-Off Analysis 848
16.2 Contracts: Their Influence on Projects 865
16.3 Industry Trade-Off Preferences 866
16.4 Conclusion 869
16.5 Studying Tips for the PMI® Project Management
Certification Exam 869
17 RISK MANAGEMENT 871
17.0 Introduction 872
17.1 Definition of Risk 873
17.2 Tolerance for Risk 875
17.3 Definition of Risk Management 876
17.4 Certainty, Risk, and Uncertainty 877
17.5 Risk Management Process 883
17.6 Plan Risk Management (11.1) 884
17.7 Risk Identification (11.2) 885
17.8 Risk Analysis (11.3, 11.4) 892
17.9 Qualitative Risk Analysis (11.3) 897
17.10 Quantitative Risk Analysis (11.4) 903
17.11 Probability Distributions and the Monte Carlo Process
904
17.12 Plan Risk Response (11.5) 913
xvi CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page xvi
17.13 Monitor and Control Risks (11.6) 919
17.14 Some Implementation Considerations 920
17.15 The Use of Lessons Learned 921
17.16 Dependencies Between Risks 925
17.17 The Impact of Risk Handling Measures 930
17.18 Risk and Concurrent Engineering 933
17.19 Studying Tips for the PMI® Project Management
Certification Exam 936
Problems 940
Case Studies
Teloxy Engineering (A) 948
Teloxy Engineering (B) 948
The Risk Management Department 949
18 LEARNING CURVES 953
18.0 Introduction 953
18.1 General Theory 954
18.2 The Learning Curve Concept 954
18.3 Graphic Representation 956
18.4 Key Words Associated with Learning Curves 958
18.5 The Cumulative Average Curve 958
18.6 Sources of Experience 960
18.7 Developing Slope Measures 963
18.8 Unit Costs and Use of Midpoints 964
18.9 Selection of Learning Curves 965
18.10 Follow-On Orders 966
18.11 Manufacturing Breaks 966
18.12 Learning Curve Limitations 968
18.13 Prices and Experience 968
18.14 Competitive Weapon 970
18.15 Studying Tips for the PMI® Project Management
Certification Exam 971
Problems 972
19 CONTRACT MANAGEMENT 975
19.0 Introduction 975
19.1 Procurement 976
19.2 Plan Procurements 978
19.3 Conducting the Procurements 981
19.4 Conduct Procurements: Request Seller Responses 983
19.5 Conduct Procurements: Select Sellers 983
19.6 Types of Contracts 987
19.7 Incentive Contracts 991
19.8 Contract Type versus Risk 994
Contents xvii
ftoc.qxd 1/3/13 3:50 PM Page xvii
19.9 Contract Administration 995
19.10 Contract Closure 998
19.11 Using a Checklist 999
19.12 Proposal-Contractual Interaction 1000
19.13 Summary 1003
19.14 Studying Tips for the PMI® Project Management
Certification Exam 1004
Case Studies
The Scheduling Dilemma 1009
To Bid or Not to Bid 1011
The Management Reserve 1012
20 QUALITY MANAGEMENT 1015
20.0 Introduction 1016
20.1 Definition of Quality 1017
20.2 The Quality Movement 1019
20.3 Comparison of the Quality Pioneers 1022
20.4 The Taguchi Approach 1023
20.5 The Malcolm Baldrige National Quality Award 1026
20.6 ISO 9000 1027
20.7 Quality Management Concepts 1029
20.8 The Cost of Quality 1032
20.9 The Seven Quality Control Tools 1035
20.10 Process Capability (CP) 1052
20.11 Acceptance Sampling 1054
20.12 Implementing Six Sigma 1054
20.13 Lean Six Sigma and DMAIC 1056
20.14 Quality Leadership 1057
20.15 Responsibility for Quality 1058
20.16 Quality Circles 1058
20.17 Just-In-Time Manufacturing (JIT) 1059
20.18 Total Quality Management (TQM) 1061
20.19 Studying Tips for the PMI® Project Management
Certification Exam 1065
21 MODERN DEVELOPMENTS IN PROJECT MANAGEMENT
1069
21.0 Introduction 1069
21.1 The Project Management Maturity Model (PMMM) 1070
21.2 Developing Effective Procedural Documentation 1074
21.3 Project Management Methodologies 1078
21.4 Continuous Improvement 1079
21.5 Capacity Planning 1080
21.6 Competency Models 1082
21.7 Managing Multiple Projects 1084
21.8 End-of-Phase Review Meetings 1085
xviii CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page xviii
Case Study
Honicker Corporation 1086
22 THE BUSINESS OF SCOPE CHANGES 1089
22.0 Introduction 1089
22.1 Need for Business Knowledge 1091
22.2 Timing of Scope Changes 1092
22.3 Business Need for a Scope Change 1093
22.4 Rationale for Not Approving a Scope Change 1094
Case Study
Kemko Manufacturing 1094
23 THE PROJECT OFFICE 1097
23.0 Introduction 1097
23.1 Present-Day Project Office 1098
23.2 Implementation Risks 1099
23.3 Types of Project Offices 1100
23.4 Networking Project Management Offices 1101
23.5 Project Management Information Systems 1101
23.6 Dissemination of Information 1103
23.7 Mentoring 1104
23.8 Development of Standards and Templates 1105
23.9 Project Management Benchmarking 1105
23.10 Business Case Development 1106
23.11 Customized Training (Related to Project Management)
1107
23.12 Managing Stakeholder Relations 1108
23.13 Continuous Improvement 1109
23.14 Capacity Planning 1109
23.15 Risks of Using a Project Office 1110
23.16 Project Portfolio Management 1111
Case Study
The Project Management Lawsuit 1116
24 MANAGING CRISIS PROJECTS 1119
24.0 Introduction 1119
24.1 Understanding Crisis Management 1119
24.2 Ford versus Firestone 1121
24.3 The Air France Concorde Crash 1122
24.4 Intel and the Pentium Chip 1123
24.5 The Russian Submarine Kursk 1123
24.6 The Tylenol Poisonings 1124
Contents xix
ftoc.qxd 1/3/13 3:50 PM Page xix
24.7 Nestlé’s Marketing of Infant Formula 1127
24.8 The Space Shuttle Challenger Disaster 1129
24.9 The Space Shuttle Columbia Disaster 1130
24.10 Victims Versus Villains 1131
24.11 Life-Cycle Phases 1132
24.12 Project Management Implications 1133
25 FUTURE OF PROJECT MANAGEMENT 1135
25.0 Changing Times 1135
25.1 Complex Projects 1139
25.2 Complexity Theory 1144
25.3 Scope Creep 1145
25.4 Project Health Checks 1151
25.5 Managing Troubled Projects 1155
26 THE RISE, FALL, AND RESURRECTION OF IRIDIUM:
A PROJECT MANAGEMENT PERSPECTIVE 1167
26.0 Introduction 1167
26.1 Naming the Project “Iridium” 1169
26.2 Obtaining Executive Support 1170
26.3 Launching the Venture 1170
26.4 The Iridium System 1172
26.5 The Terrestrial and Space-Based Network 1172
26.6 Project Initiation: Developing the Business Case 1173
26.7 The “Hidden” Business Case 1175
26.8 Risk Management 1175
26.9 The Collective Belief 1177
26.10 The Exit Champion 1177
26.11 Iridium’s Infancy Years 1178
26.12 Debt Financing 1181
26.13 The M-Star Project 1182
26.14 A New CEO 1183
26.15 Satellite Launches 1183
26.16 An Initial Public Offering (IPO) 1184
26.17 Signing Up Customers 1184
26.18 Iridium’s Rapid Ascent 1185
26.19 Iridium’s Rapid Descent 1187
26.20 The Iridium “Flu” 1191
26.21 Searching for a White Knight 1192
26.22 The Definition of Failure (October, 1999) 1192
26.23 The Satellite Deorbiting Plan 1193
26.24 Iridium is Rescued for $25 Million 1194
26.25 Iridium Begins to Grow 1194
xx CONTENTS
ftoc.qxd 1/3/13 3:50 PM Page xx
26.26 Shareholder Lawsuits 1195
26.27 The Bankruptcy Court Ruling 1195
26.28 Autopsy 1196
26.29 Financial Impact of the Bankruptcy 1197
26.30 What Really Went Wrong? 1198
26.31 Lessons Learned 1200
26.32 Conclusion 1202
Appendix A.

More Related Content

Similar to Write a research paper on a selected topic of project management..docx

Marking Criteria(The marks for each criterion are to illustrate .docx
Marking Criteria(The marks for each criterion are to illustrate .docxMarking Criteria(The marks for each criterion are to illustrate .docx
Marking Criteria(The marks for each criterion are to illustrate .docxalfredacavx97
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Managementhatemk
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.pptnatisil1
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project ManagementGregory A. Garrett
 
Web-Project-Management-Best-Practice-Guidelines
Web-Project-Management-Best-Practice-GuidelinesWeb-Project-Management-Best-Practice-Guidelines
Web-Project-Management-Best-Practice-GuidelinesVu Nam Hung
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThoughtworks
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Where is the Project Manager in Agile Project
Where is the Project Manager in Agile ProjectWhere is the Project Manager in Agile Project
Where is the Project Manager in Agile ProjectVaidas Adomauskas
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product developmentMrinal Singh
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product developmentMrinal Singh
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product developmentMrinal Singh
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product developmentMrinal Singh
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product developmentMrinal Singh
 
Project Management Revised 6eProject Management Re.docx
Project Management     Revised 6eProject Management     Re.docxProject Management     Revised 6eProject Management     Re.docx
Project Management Revised 6eProject Management Re.docxwkyra78
 
Project Management Revised 6eProject Management Re.docx
Project Management     Revised 6eProject Management     Re.docxProject Management     Revised 6eProject Management     Re.docx
Project Management Revised 6eProject Management Re.docxbriancrawford30935
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...GlobalSkillup
 

Similar to Write a research paper on a selected topic of project management..docx (20)

Marking Criteria(The marks for each criterion are to illustrate .docx
Marking Criteria(The marks for each criterion are to illustrate .docxMarking Criteria(The marks for each criterion are to illustrate .docx
Marking Criteria(The marks for each criterion are to illustrate .docx
 
Manpro ppt
Manpro pptManpro ppt
Manpro ppt
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
PM-1 Overview.ppt
PM-1 Overview.pptPM-1 Overview.ppt
PM-1 Overview.ppt
 
WEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-ReconfigWEBINAR : PeopleWiz-Reconfig
WEBINAR : PeopleWiz-Reconfig
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project Management
 
Web-Project-Management-Best-Practice-Guidelines
Web-Project-Management-Best-Practice-GuidelinesWeb-Project-Management-Best-Practice-Guidelines
Web-Project-Management-Best-Practice-Guidelines
 
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development ApproachThe Total Economic Impact of Using ThoughtWorks' Agile Development Approach
The Total Economic Impact of Using ThoughtWorks' Agile Development Approach
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
PMBOK_Slides.pdf
PMBOK_Slides.pdfPMBOK_Slides.pdf
PMBOK_Slides.pdf
 
Where is the Project Manager in Agile Project
Where is the Project Manager in Agile ProjectWhere is the Project Manager in Agile Project
Where is the Project Manager in Agile Project
 
1. introduction
1. introduction1. introduction
1. introduction
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product development
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product development
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product development
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product development
 
Demystifying outsourced product development
Demystifying outsourced product developmentDemystifying outsourced product development
Demystifying outsourced product development
 
Project Management Revised 6eProject Management Re.docx
Project Management     Revised 6eProject Management     Re.docxProject Management     Revised 6eProject Management     Re.docx
Project Management Revised 6eProject Management Re.docx
 
Project Management Revised 6eProject Management Re.docx
Project Management     Revised 6eProject Management     Re.docxProject Management     Revised 6eProject Management     Re.docx
Project Management Revised 6eProject Management Re.docx
 
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
Online PMP Training Material for PMP Exam - Integration Management Knowledge ...
 

More from arnoldmeredith47041

Write a scholarly paper in which you apply the concepts of epide.docx
Write a scholarly paper in which you apply the concepts of epide.docxWrite a scholarly paper in which you apply the concepts of epide.docx
Write a scholarly paper in which you apply the concepts of epide.docxarnoldmeredith47041
 
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docx
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docxWrite a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docx
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docxarnoldmeredith47041
 
Write a Risk Management Plan for a School FacilityInclude th.docx
Write a Risk Management Plan for a School FacilityInclude th.docxWrite a Risk Management Plan for a School FacilityInclude th.docx
Write a Risk Management Plan for a School FacilityInclude th.docxarnoldmeredith47041
 
Write a review that 750 - 1000 words in length about one chapter in .docx
Write a review that 750 - 1000 words in length about one chapter in .docxWrite a review that 750 - 1000 words in length about one chapter in .docx
Write a review that 750 - 1000 words in length about one chapter in .docxarnoldmeredith47041
 
write a resume using the example belowCONTACT INFOFirs.docx
write a resume using the example belowCONTACT INFOFirs.docxwrite a resume using the example belowCONTACT INFOFirs.docx
write a resume using the example belowCONTACT INFOFirs.docxarnoldmeredith47041
 
Write a resume and cover letter for the following positionOnline.docx
Write a resume and cover letter for the following positionOnline.docxWrite a resume and cover letter for the following positionOnline.docx
Write a resume and cover letter for the following positionOnline.docxarnoldmeredith47041
 
Write a response to the peers post based on the readings. Origi.docx
Write a response to the peers post based on the readings. Origi.docxWrite a response to the peers post based on the readings. Origi.docx
Write a response to the peers post based on the readings. Origi.docxarnoldmeredith47041
 
Write a response to the following prompt.Analyze the characteriz.docx
Write a response to the following prompt.Analyze the characteriz.docxWrite a response to the following prompt.Analyze the characteriz.docx
Write a response to the following prompt.Analyze the characteriz.docxarnoldmeredith47041
 
Write a response to a peers post that adds or extends to the discus.docx
Write a response to a peers post that adds or extends to the discus.docxWrite a response to a peers post that adds or extends to the discus.docx
Write a response to a peers post that adds or extends to the discus.docxarnoldmeredith47041
 
Write a response mini-essay of at least 150 to 300 words on  the dis.docx
Write a response mini-essay of at least 150 to 300 words on  the dis.docxWrite a response mini-essay of at least 150 to 300 words on  the dis.docx
Write a response mini-essay of at least 150 to 300 words on  the dis.docxarnoldmeredith47041
 
Write a response for each document.Instructions Your post sho.docx
Write a response for each document.Instructions Your post sho.docxWrite a response for each document.Instructions Your post sho.docx
Write a response for each document.Instructions Your post sho.docxarnoldmeredith47041
 
write a resonse paper mla styleHAIRHair deeply affects people,.docx
write a resonse paper mla styleHAIRHair deeply affects people,.docxwrite a resonse paper mla styleHAIRHair deeply affects people,.docx
write a resonse paper mla styleHAIRHair deeply affects people,.docxarnoldmeredith47041
 
Write a response about the topic in the reading (see attached) and m.docx
Write a response about the topic in the reading (see attached) and m.docxWrite a response about the topic in the reading (see attached) and m.docx
Write a response about the topic in the reading (see attached) and m.docxarnoldmeredith47041
 
Write a research report based on a hypothetical research study.  Con.docx
Write a research report based on a hypothetical research study.  Con.docxWrite a research report based on a hypothetical research study.  Con.docx
Write a research report based on a hypothetical research study.  Con.docxarnoldmeredith47041
 
Write a Research Paper with the topic Pregnancy in the adolesce.docx
Write a Research Paper with the topic Pregnancy in the adolesce.docxWrite a Research Paper with the topic Pregnancy in the adolesce.docx
Write a Research Paper with the topic Pregnancy in the adolesce.docxarnoldmeredith47041
 
Write a Research Paper with the topic Autism a major problem. T.docx
Write a Research Paper with the topic Autism a major problem. T.docxWrite a Research Paper with the topic Autism a major problem. T.docx
Write a Research Paper with the topic Autism a major problem. T.docxarnoldmeredith47041
 
Write a research paper that explains how Information Technology (IT).docx
Write a research paper that explains how Information Technology (IT).docxWrite a research paper that explains how Information Technology (IT).docx
Write a research paper that explains how Information Technology (IT).docxarnoldmeredith47041
 
Write a research paper outlining possible career paths in the field .docx
Write a research paper outlining possible career paths in the field .docxWrite a research paper outlining possible career paths in the field .docx
Write a research paper outlining possible career paths in the field .docxarnoldmeredith47041
 
Write a Research paper on the Legal issues associated with pentestin.docx
Write a Research paper on the Legal issues associated with pentestin.docxWrite a Research paper on the Legal issues associated with pentestin.docx
Write a Research paper on the Legal issues associated with pentestin.docxarnoldmeredith47041
 
Write a research paper on one of the following topics .docx
Write a research paper on one of the following topics .docxWrite a research paper on one of the following topics .docx
Write a research paper on one of the following topics .docxarnoldmeredith47041
 

More from arnoldmeredith47041 (20)

Write a scholarly paper in which you apply the concepts of epide.docx
Write a scholarly paper in which you apply the concepts of epide.docxWrite a scholarly paper in which you apply the concepts of epide.docx
Write a scholarly paper in which you apply the concepts of epide.docx
 
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docx
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docxWrite a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docx
Write a S.M.A.R.T. goal to improve the Habit 5 Seek First to .docx
 
Write a Risk Management Plan for a School FacilityInclude th.docx
Write a Risk Management Plan for a School FacilityInclude th.docxWrite a Risk Management Plan for a School FacilityInclude th.docx
Write a Risk Management Plan for a School FacilityInclude th.docx
 
Write a review that 750 - 1000 words in length about one chapter in .docx
Write a review that 750 - 1000 words in length about one chapter in .docxWrite a review that 750 - 1000 words in length about one chapter in .docx
Write a review that 750 - 1000 words in length about one chapter in .docx
 
write a resume using the example belowCONTACT INFOFirs.docx
write a resume using the example belowCONTACT INFOFirs.docxwrite a resume using the example belowCONTACT INFOFirs.docx
write a resume using the example belowCONTACT INFOFirs.docx
 
Write a resume and cover letter for the following positionOnline.docx
Write a resume and cover letter for the following positionOnline.docxWrite a resume and cover letter for the following positionOnline.docx
Write a resume and cover letter for the following positionOnline.docx
 
Write a response to the peers post based on the readings. Origi.docx
Write a response to the peers post based on the readings. Origi.docxWrite a response to the peers post based on the readings. Origi.docx
Write a response to the peers post based on the readings. Origi.docx
 
Write a response to the following prompt.Analyze the characteriz.docx
Write a response to the following prompt.Analyze the characteriz.docxWrite a response to the following prompt.Analyze the characteriz.docx
Write a response to the following prompt.Analyze the characteriz.docx
 
Write a response to a peers post that adds or extends to the discus.docx
Write a response to a peers post that adds or extends to the discus.docxWrite a response to a peers post that adds or extends to the discus.docx
Write a response to a peers post that adds or extends to the discus.docx
 
Write a response mini-essay of at least 150 to 300 words on  the dis.docx
Write a response mini-essay of at least 150 to 300 words on  the dis.docxWrite a response mini-essay of at least 150 to 300 words on  the dis.docx
Write a response mini-essay of at least 150 to 300 words on  the dis.docx
 
Write a response for each document.Instructions Your post sho.docx
Write a response for each document.Instructions Your post sho.docxWrite a response for each document.Instructions Your post sho.docx
Write a response for each document.Instructions Your post sho.docx
 
write a resonse paper mla styleHAIRHair deeply affects people,.docx
write a resonse paper mla styleHAIRHair deeply affects people,.docxwrite a resonse paper mla styleHAIRHair deeply affects people,.docx
write a resonse paper mla styleHAIRHair deeply affects people,.docx
 
Write a response about the topic in the reading (see attached) and m.docx
Write a response about the topic in the reading (see attached) and m.docxWrite a response about the topic in the reading (see attached) and m.docx
Write a response about the topic in the reading (see attached) and m.docx
 
Write a research report based on a hypothetical research study.  Con.docx
Write a research report based on a hypothetical research study.  Con.docxWrite a research report based on a hypothetical research study.  Con.docx
Write a research report based on a hypothetical research study.  Con.docx
 
Write a Research Paper with the topic Pregnancy in the adolesce.docx
Write a Research Paper with the topic Pregnancy in the adolesce.docxWrite a Research Paper with the topic Pregnancy in the adolesce.docx
Write a Research Paper with the topic Pregnancy in the adolesce.docx
 
Write a Research Paper with the topic Autism a major problem. T.docx
Write a Research Paper with the topic Autism a major problem. T.docxWrite a Research Paper with the topic Autism a major problem. T.docx
Write a Research Paper with the topic Autism a major problem. T.docx
 
Write a research paper that explains how Information Technology (IT).docx
Write a research paper that explains how Information Technology (IT).docxWrite a research paper that explains how Information Technology (IT).docx
Write a research paper that explains how Information Technology (IT).docx
 
Write a research paper outlining possible career paths in the field .docx
Write a research paper outlining possible career paths in the field .docxWrite a research paper outlining possible career paths in the field .docx
Write a research paper outlining possible career paths in the field .docx
 
Write a Research paper on the Legal issues associated with pentestin.docx
Write a Research paper on the Legal issues associated with pentestin.docxWrite a Research paper on the Legal issues associated with pentestin.docx
Write a Research paper on the Legal issues associated with pentestin.docx
 
Write a research paper on one of the following topics .docx
Write a research paper on one of the following topics .docxWrite a research paper on one of the following topics .docx
Write a research paper on one of the following topics .docx
 

Recently uploaded

Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 

Write a research paper on a selected topic of project management..docx

  • 1. Write a research paper on a selected topic of project management. Topic: - Project management critical success factors. This report should include an introduction to the research paper that is a minimum of 800 words in length and includes at least four (4) references in APA format. The purpose of the progress report is to help the student begin the task of identifying relevant literature and better framing the overall research process. Summary: Follow the APA format for your report. Use spell check, grammar check, etc., to make sure that your report is written in professional form with no keyboarding or grammatical errors. APA Format Resource: http://owl.english.purdue.edu/owl/section/2/10 ffirs.qxd 1/3/13 3:48 PM Page i PROJECT MANAGEMENT ffirs.qxd 1/3/13 3:48 PM Page i
  • 2. Dr. Kerzner’s 16 Points to Project Management Maturity 1. Adopt a project management methodology and use it consistently. 2. Implement a philosophy that drives the company toward project management maturity and communicate it to everyone. 3. Commit to developing effective plans at the beginning of each project. 4. Minimize scope changes by committing to realistic objectives. 5. Recognize that cost and schedule management are inseparable. 6. Select the right person as the project manager. 7. Provide executives with project sponsor information, not project management information. 8. Strengthen involvement and support of line management. 9. Focus on deliverables rather than resources. 10. Cultivate effective communication, cooperation, and trust to achieve rapid project management maturity. 11. Share recognition for project success with the entire project team and
  • 3. line management. 12. Eliminate nonproductive meetings. 13. Focus on identifying and solving problems early, quickly, and cost effectively. 14. Measure progress periodically. 15. Use project management software as a tool—not as a substitute for effective planning or interpersonal skills. 16. Institute an all-employee training program with periodic updates based upon documented lessons learned. ffirs.qxd 1/3/13 3:48 PM Page ii P RO J E C T MANAGEMENT A Systems Approach to Planning, Scheduling, and Controlling E L E V E N T H E D I T I O N H A R O L D K E R Z N E R , P h . D . Senior Executive Director for Project Management The International Institute for Learning
  • 4. New York, New York ffirs.qxd 1/3/13 3:48 PM Page iii Cover illustration: xiaoke ma/iStockphoto This book is printed on acid-free paper. Copyright © 2013 by John Wiley & Sons, Inc. All rights reserved Published by John Wiley & Sons, Inc., Hoboken, New Jersey Published simultaneously in Canada No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or autho- rization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646-8600, or on the web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley &
  • 5. Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748- 6011, fax (201) 748-6008, or online at www.wiley.com/go/permissions. Limit of Liability/Disclaimer of Warranty: While the publisher and author have used their best efforts in preparing this book, they make no representations or warranties with the respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. No warranty may be created or extended by sales representatives or written sales materials. The advice and strategies contained herein may not be suitable for your situation. You should consult with a professional where appropriate. Neither the publisher nor the author shall be liable for damages arising herefrom. For general information about our other products and services, please contact our Customer Care Department within the United States at (800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002. Wiley publishes in a variety of print and electronic formats and by print-on-demand. Some material included with standard print
  • 6. versions of this book may not be included in e-books or in print-on-demand. If this book refers to media such as a CD or DVD that is not included in the version you purchased, you may download this material at http://booksupport.wiley.com. For more informa- tion about Wiley products, visit www.wiley.com. Library of Congress Cataloging-in-Publication Data: Kerzner, Harold. Project management : a systems approach to planning, scheduling, and controlling / Harold Kerzner, Ph. D. Senior Executive Director for Project Management, the International Institute for Learning, New York, New York. — Eleventh edition. pages cm Includes bibliographical references and index. ISBN 978-1-118-02227-6 (cloth); ISBN 978-1-118-41585-6 (ebk); ISBN 978-1-118-41855-0 (ebk); ISBN 978-1-118-43357- 7 (ebk); ISBN 978-1-118-48322-0 (ebk); ISBN 978-1-118-48323- 7 (ebk) 1. Project management. 2. Project management—Case studies. I. Title. HD69.P75K47 2013 658.4’04 —dc23
  • 7. 2012026239 Printed in the United States of America 10 9 8 7 6 5 4 3 2 1 ffirs.qxd 1/3/13 3:48 PM Page iv http://www.copyright.com http://www.wiley.com/go/permissions http://www.wiley.com http://booksupport.wiley.com To Dr. Herman Krier, my Friend and Guru, who taught me well the meaning of the word “persistence” ffirs.qxd 1/3/13 3:48 PM Page v ffirs.qxd 1/3/13 3:48 PM Page vi Contents Preface xxiii
  • 8. 1 OVERVIEW 1 1.0 Introduction 1 1.1 Understanding Project Management 2 1.2 Defining Project Success 7 1.3 Success, Trade-Offs, and Competing Constraints 8 1.4 The Project Manager–Line Manager Interface 9 1.5 Defining the Project Manager’s Role 14 1.6 Defining the Functional Manager’s Role 15 1.7 Defining the Functional Employee’s Role 18 1.8 Defining the Executive’s Role 19 1.9 Working with Executives 19 1.10 Committee Sponsorship/Governance 20 1.11 The Project Manager as the Planning Agent 23 1.12 Project Champions 24 1.13 The Downside of Project Management 25 1.14 Project-Driven versus Non–Project-Driven Organizations 25 1.15 Marketing in the Project-Driven Organization 28 1.16 Classification of Projects 30 1.17 Location of the Project Manager 30 1.18 Differing Views of Project Management 32 1.19 Public-Sector Project Management 34 1.20 International Project Management 38 1.21 Concurrent Engineering: A Project Management Approach 38 1.22 Added Value 39 1.23 Studying Tips for the PMI® Project Management Certification Exam 40 Problems 42 Case Study Williams Machine Tool Company 44
  • 9. vii ftoc.qxd 1/3/13 3:50 PM Page vii 2 PROJECT MANAGEMENT GROWTH: CONCEPTS AND DEFINITIONS 47 2.0 Introduction 47 2.1 General Systems Management 48 2.2 Project Management: 1945–1960 48 2.3 Project Management: 1960–1985 49 2.4 Project Management: 1985–2012 55 2.5 Resistance to Change 59 2.6 Systems, Programs, and Projects: A Definition 64 2.7 Product versus Project Management: A Definition 66 2.8 Maturity and Excellence: A Definition 68 2.9 Informal Project Management: A Definition 69 2.10 The Many Faces of Success 70 2.11 The Many Faces of Failure 73 2.12 The Stage-Gate Process 76 2.13 Project Life Cycles 78 2.14 Gate Review Meetings (Project Closure) 83 2.15 Engagement Project Management 84 2.16 Project Management Methodologies: A Definition 85 2.17 Enterprise Project Management Methodologies 87 2.18 Methodologies Can Fail 91 2.19 Organizational Change Management and Corporate Cultures 94 2.20 Project Management Intellectual Property 100 2.21 Systems Thinking 101 2.22 Studying Tips for the PMI® Project Management Certification Exam 104
  • 10. Problems 107 Case Study Creating a Methodology 108 3 ORGANIZATIONAL STRUCTURES 111 3.0 Introduction 111 3.1 Organizational Work Flow 113 3.2 Traditional (Classical) Organization 114 3.3 Developing Work Integration Positions 117 3.4 Line-Staff Organization (Project Coordinator) 121 3.5 Pure Product (Projectized) Organization 122 3.6 Matrix Organizational Form 125 3.7 Modification of Matrix Structures 132 3.8 The Strong, Weak, or Balanced Matrix 136 3.9 Center for Project Management Expertise 136 3.10 Matrix Layering 137 viii CONTENTS ftoc.qxd 1/3/13 3:50 PM Page viii 3.11 Selecting the Organizational Form 138 3.12 Structuring the Small Company 143 3.13 Strategic Business Unit (SBU) Project Management 146 3.14 Transitional Management 147 3.15 Barriers to Implementing Project Management in Emerging Markets 149 3.16 Seven Fallacies that Delay Project Management Maturity 156 3.17 Studying Tips for the PMI® Project Management Certification Exam 159
  • 11. Problems 161 Case Studies Jones and Shephard Accountants, Inc. 166 Coronado Communications 168 4 ORGANIZING AND STAFFING THE PROJECT OFFICE AND TEAM 171 4.0 Introduction 171 4.1 The Staffing Environment 172 4.2 Selecting the Project Manager: An Executive Decision 174 4.3 Skill Requirements for Project and Program Managers 178 4.4 Special Cases in Project Manager Selection 184 4.5 Selecting the Wrong Project Manager 184 4.6 Next Generation Project Managers 188 4.7 Duties and Job Descriptions 189 4.8 The Organizational Staffing Process 193 4.9 The Project Office 199 4.10 The Functional Team 204 4.11 The Project Organizational Chart 205 4.12 Special Problems 208 4.13 Selecting the Project Management Implementation Team 210 4.14 Mistakes Made by Inexperienced Project Managers 213 4.15 Studying Tips for the PMI® Project Management Certification Exam 214 Problems 216 5 MANAGEMENT FUNCTIONS 223 5.0 Introduction 223 5.1 Controlling 225 5.2 Directing 225 5.3 Project Authority 230
  • 12. 5.4 Interpersonal Influences 237 5.5 Barriers to Project Team Development 240 5.6 Suggestions for Handling the Newly Formed Team 243 Contents ix ftoc.qxd 1/3/13 3:50 PM Page ix 5.7 Team Building as an Ongoing Process 246 5.8 Dysfunctions of a Team 247 5.9 Leadership in a Project Environment 250 5.10 Life-Cycle Leadership 252 5.11 Value-Based Project Leadership 255 5.12 Organizational Impact 257 5.13 Employee–Manager Problems 259 5.14 Management Pitfalls 262 5.15 Communications 265 5.16 Project Review Meetings 274 5.17 Project Management Bottlenecks 275 5.18 Cross-Cutting Skills 276 5.19 Active Listening 277 5.20 Project Problem-Solving 278 5.21 Brainstorming 288 5.22 Project Decision-Making 293 5.23 Predicting the Outcome of a Decision 301 5.24 Facilitation 303 5.25 Handling Negative Team Dynamics 306 5.26 Communication Traps 307 5.27 Proverbs and Laws 309 5.28 Human Behavior Education 311 5.29 Management Policies and Procedures 312 5.30 Studying Tips for the PMI® Project Management Certification Exam 313
  • 13. Problems 318 Case Studies The Trophy Project 327 Communication Failures 329 McRoy Aerospace 332 The Poor Worker 333 The Prima Donna 334 The Team Meeting 335 Leadership Effectiveness (A) 337 Leadership Effectiveness (B) 341 Motivational Questionnaire 347 6 MANAGEMENT OF YOUR TIME AND STRESS 355 6.0 Introduction 355 6.1 Understanding Time Management 356 6.2 Time Robbers 356 6.3 Time Management Forms 358 x CONTENTS ftoc.qxd 1/3/13 3:50 PM Page x 6.4 Effective Time Management 359 6.5 Stress and Burnout 360 6.6 Studying Tips for the PMI® Project Management Certification Exam 362 Problems 363 Case Study The Reluctant Workers 364
  • 14. 7 CONFLICTS 365 7.0 Introduction 365 7.1 Objectives 366 7.2 The Conflict Environment 367 7.3 Types of Conflicts 368 7.4 Conflict Resolution 371 7.5 Understanding Superior, Subordinate, and Functional Conflicts 372 7.6 The Management of Conflicts 374 7.7 Conflict Resolution Modes 375 7.8 Studying Tips for the PMI® Project Management Certification Exam 377 Problems 379 Case Studies Facilities Scheduling at Mayer Manufacturing 382 Telestar International 383 Handling Conflict in Project Management 384 8 SPECIAL TOPICS 391 8.0 Introduction 392 8.1 Performance Measurement 392 8.2 Financial Compensation and Rewards 399
  • 15. 8.3 Critical Issues with Rewarding Project Teams 405 8.4 Effective Project Management in the Small Business Organization 408 8.5 Mega Projects 410 8.6 Morality, Ethics, and the Corporate Culture 411 8.7 Professional Responsibilities 414 8.8 Internal Partnerships 417 8.9 External Partnerships 418 8.10 Training and Education 420 8.11 Integrated Product/Project Teams 422 8.12 Virtual Project Teams 424 8.13 Breakthrough Projects 427 Contents xi ftoc.qxd 1/3/13 3:50 PM Page xi xii CONTENTS 8.14 Managing Innovation Projects 427 8.15 Agile Project Management 430 8.16 Studying Tips for the PMI® Project Management Certification Exam 431 Problems 437 Case Study Is It Fraud? 440 9 THE VARIABLES FOR SUCCESS 443 9.0 Introduction 443 9.1 Predicting Project Success 444 9.2 Project Management Effectiveness 448
  • 16. 9.3 Expectations 449 9.4 Lessons Learned 450 9.5 Understanding Best Practices 451 9.6 Best Practices versus Proven Practices 458 9.7 Studying Tips for the PMI® Project Management Certification Exam 459 Problems 460 Case Study Radiance International 460 10 WORKING WITH EXECUTIVES 463 10.0 Introduction 463 10.1 The Project Sponsor 464 10.2 Handling Disagreements with the Sponsor 474 10.3 The Collective Belief 475 10.4 The Exit Champion 476 10.5 The In-House Representatives 477 10.6 Stakeholder Relations Management 478 10.7 Politics 486 10.8 Studying Tips for the PMI® Project Management Certification Exam 487 Problems 488 Case Studies
  • 17. Corwin Corporation 491 The Prioritization of Projects 499 The Irresponsible Sponsors 500 Selling Executives on Project Management 502 ftoc.qxd 1/3/13 3:50 PM Page xii 11 PLANNING 505 11.0 Introduction 505 11.1 Validating the Assumptions 508 11.2 Validating the Objectives 509 11.3 General Planning 510 11.4 Life-Cycle Phases 513 11.5 Proposal Preparation 516 11.6 Kickoff Meetings 516 11.7 Understanding Participants’ Roles 519 11.8 Project Planning 519 11.9 The Statement of Work 521 11.10 Project Specifications 526 11.11 Milestone Schedules 528 11.12 Work Breakdown Structure 529 11.13 WBS Decomposition Problems 536 11.14 Work Breakdown Structure Dictionary 540 11.15 Role of the Executive in Project Selection 541 11.16 Role of the Executive in Planning 546 11.17 The Planning Cycle 546 11.17 Work Planning Authorization 547 11.19 Why Do Plans Fail? 548 11.20 Stopping Projects 549 11.21 Handling Project Phaseouts and Transfers 550
  • 18. 11.22 Detailed Schedules and Charts 551 11.23 Master Production Scheduling 554 11.24 Project Plan 556 11.25 Total Project Planning 561 11.26 The Project Charter 565 11.27 Project Baselines 566 11.28 Verification and Validation 570 11.29 Requirements Traceability Matrix 571 11.30 Management Control 572 11.31 The Project Manager–Line Manager Interface 575 11.32 Fast-Tracking 577 11.33 Configuration Management 578 11.34 Enterprise Project Management Methodologies 579 11.35 Project Audits 582 11.36 Studying Tips for the PMI® Project Management Certification Exam 583 Problems 586 12 NETWORK SCHEDULING TECHNIQUES 597 12.0 Introduction 597 12.1 Network Fundamentals 600 Contents xiii ftoc.qxd 1/3/13 3:50 PM Page xiii 12.2 Graphical Evaluation and Review Technique (GERT) 604 12.3 Dependencies 605 12.4 Slack Time 606 12.5 Network Replanning 612 12.6 Estimating Activity Time 616 12.7 Estimating Total Project Time 617
  • 19. 12.8 Total PERT/CPM Planning 618 12.9 Crash Times 620 12.10 PERT/CPM Problem Areas 623 12.11 Alternative PERT/CPM Models 626 12.12 Precedence Networks 627 12.13 Lag 630 12.14 Scheduling Problems 632 12.15 The Myths of Schedule Compression 632 12.16 Understanding Project Management Software 634 12.17 Software Features Offered 634 12.18 Software Classification 636 12.19 Implementation Problems 637 12.20 Critical Chain 638 12.21 Studying Tips for the PMI® Project Management Certification Exam 640 Problems 643 Case Studies Crosby Manufacturing Corporation 656 The Invisible Sponsor 658 13 PROJECT GRAPHICS 661 13.0 Introduction 661 13.1 Customer Reporting 662 13.2 Bar (Gantt) Chart 663 13.3 Other Conventional Presentation Techniques 670 13.4 Logic Diagrams/Networks 673 13.5 Studying Tips for the PMI® Project Management Certification Exam 674 Problems 675 14 PRICING AND ESTIMATING 677
  • 20. 14.0 Introduction 677 14.1 Global Pricing Strategies 678 14.2 Types of Estimates 679 14.3 Pricing Process 682 14.4 Organizational Input Requirements 684 14.5 Labor Distributions 686 xiv CONTENTS ftoc.qxd 1/3/13 3:50 PM Page xiv 14.6 Overhead Rates 690 14.7 Materials/Support Costs 692 14.8 Pricing Out the Work 695 14.9 Smoothing Out Department Man-Hours 696 14.10 The Pricing Review Procedure 698 14.11 Systems Pricing 700 14.12 Developing the Supporting/Backup Costs 701 14.13 The Low-Bidder Dilemma 705 14.14 Special Problems 705 14.15 Estimating Pitfalls 706 14.16 Estimating High-Risk Projects 707 14.17 Project Risks 708 14.18 The Disaster of Applying the 10 Percent Solution to Project Estimates 712 14.19 Life-Cycle Costing (LCC) 714 14.20 Logistics Support 719
  • 21. 14.21 Economic Project Selection Criteria: Capital Budgeting 720 14.22 Payback Period 720 14.23 The Time Value of Money 721 14.24 Net Present Value (NPV) 722 14.25 Internal Rate of Return (IRR) 723 14.26 Comparing IRR, NPV, and Payback 724 14.27 Risk Analysis 724 14.28 Capital Rationing 725 14.29 Project Financing 726 14.30 Studying Tips for the PMI® Project Management Certification Exam 728 Problems 730 Case Study The Estimating Problem 734 15 COST CONTROL 737 15.0 Introduction 737 15.1 Understanding Control 741 15.2 The Operating Cycle 744 15.3 Cost Account Codes 745 15.4 Budgets 750
  • 22. 15.5 The Earned Value Measurement System (EVMS) 752 15.6 Variance and Earned Value 754 15.7 The Cost Baseline 773 15.8 Justifying the Costs 775 15.9 The Cost Overrun Dilemma 778 15.10 Recording Material Costs Using Earned Value Measurement 779 15.11 The Material Accounting Criterion 782 Contents xv ftoc.qxd 1/3/13 3:50 PM Page xv 15.12 Material Variances: Price and Usage 783 15.13 Summary Variances 784 15.14 Status Reporting 785 15.15 Cost Control Problems 792 15.16 Project Management Information Systems 793 15.17 Enterprise Resource Planning 793 15.18 Project Metrics 794 15.19 Key Performance Indicators 800 15.20 Value-Based Metrics 806 15.21 Dashboards and Scorecards 812
  • 23. 15.22 Business Intelligence 815 15.23 Infographics 816 15.24 Studying Tips for the PMI® Project Management Certification Exam 816 Problems 820 Case Studies The Bathtub Period 838 Franklin Electronics 839 Trouble in Paradise 841 16 TRADE-OFF ANALYSIS IN A PROJECT ENVIRONMENT 845 16.0 Introduction 845 16.1 Methodology for Trade-Off Analysis 848 16.2 Contracts: Their Influence on Projects 865 16.3 Industry Trade-Off Preferences 866 16.4 Conclusion 869 16.5 Studying Tips for the PMI® Project Management Certification Exam 869
  • 24. 17 RISK MANAGEMENT 871 17.0 Introduction 872 17.1 Definition of Risk 873 17.2 Tolerance for Risk 875 17.3 Definition of Risk Management 876 17.4 Certainty, Risk, and Uncertainty 877 17.5 Risk Management Process 883 17.6 Plan Risk Management (11.1) 884 17.7 Risk Identification (11.2) 885 17.8 Risk Analysis (11.3, 11.4) 892 17.9 Qualitative Risk Analysis (11.3) 897 17.10 Quantitative Risk Analysis (11.4) 903 17.11 Probability Distributions and the Monte Carlo Process 904 17.12 Plan Risk Response (11.5) 913 xvi CONTENTS ftoc.qxd 1/3/13 3:50 PM Page xvi 17.13 Monitor and Control Risks (11.6) 919
  • 25. 17.14 Some Implementation Considerations 920 17.15 The Use of Lessons Learned 921 17.16 Dependencies Between Risks 925 17.17 The Impact of Risk Handling Measures 930 17.18 Risk and Concurrent Engineering 933 17.19 Studying Tips for the PMI® Project Management Certification Exam 936 Problems 940 Case Studies Teloxy Engineering (A) 948 Teloxy Engineering (B) 948 The Risk Management Department 949 18 LEARNING CURVES 953 18.0 Introduction 953 18.1 General Theory 954 18.2 The Learning Curve Concept 954 18.3 Graphic Representation 956 18.4 Key Words Associated with Learning Curves 958 18.5 The Cumulative Average Curve 958 18.6 Sources of Experience 960 18.7 Developing Slope Measures 963
  • 26. 18.8 Unit Costs and Use of Midpoints 964 18.9 Selection of Learning Curves 965 18.10 Follow-On Orders 966 18.11 Manufacturing Breaks 966 18.12 Learning Curve Limitations 968 18.13 Prices and Experience 968 18.14 Competitive Weapon 970 18.15 Studying Tips for the PMI® Project Management Certification Exam 971 Problems 972 19 CONTRACT MANAGEMENT 975 19.0 Introduction 975 19.1 Procurement 976 19.2 Plan Procurements 978 19.3 Conducting the Procurements 981 19.4 Conduct Procurements: Request Seller Responses 983 19.5 Conduct Procurements: Select Sellers 983 19.6 Types of Contracts 987 19.7 Incentive Contracts 991 19.8 Contract Type versus Risk 994 Contents xvii
  • 27. ftoc.qxd 1/3/13 3:50 PM Page xvii 19.9 Contract Administration 995 19.10 Contract Closure 998 19.11 Using a Checklist 999 19.12 Proposal-Contractual Interaction 1000 19.13 Summary 1003 19.14 Studying Tips for the PMI® Project Management Certification Exam 1004 Case Studies The Scheduling Dilemma 1009 To Bid or Not to Bid 1011 The Management Reserve 1012 20 QUALITY MANAGEMENT 1015 20.0 Introduction 1016 20.1 Definition of Quality 1017 20.2 The Quality Movement 1019 20.3 Comparison of the Quality Pioneers 1022 20.4 The Taguchi Approach 1023
  • 28. 20.5 The Malcolm Baldrige National Quality Award 1026 20.6 ISO 9000 1027 20.7 Quality Management Concepts 1029 20.8 The Cost of Quality 1032 20.9 The Seven Quality Control Tools 1035 20.10 Process Capability (CP) 1052 20.11 Acceptance Sampling 1054 20.12 Implementing Six Sigma 1054 20.13 Lean Six Sigma and DMAIC 1056 20.14 Quality Leadership 1057 20.15 Responsibility for Quality 1058 20.16 Quality Circles 1058 20.17 Just-In-Time Manufacturing (JIT) 1059 20.18 Total Quality Management (TQM) 1061 20.19 Studying Tips for the PMI® Project Management Certification Exam 1065 21 MODERN DEVELOPMENTS IN PROJECT MANAGEMENT 1069 21.0 Introduction 1069 21.1 The Project Management Maturity Model (PMMM) 1070 21.2 Developing Effective Procedural Documentation 1074 21.3 Project Management Methodologies 1078 21.4 Continuous Improvement 1079
  • 29. 21.5 Capacity Planning 1080 21.6 Competency Models 1082 21.7 Managing Multiple Projects 1084 21.8 End-of-Phase Review Meetings 1085 xviii CONTENTS ftoc.qxd 1/3/13 3:50 PM Page xviii Case Study Honicker Corporation 1086 22 THE BUSINESS OF SCOPE CHANGES 1089 22.0 Introduction 1089 22.1 Need for Business Knowledge 1091 22.2 Timing of Scope Changes 1092 22.3 Business Need for a Scope Change 1093 22.4 Rationale for Not Approving a Scope Change 1094 Case Study Kemko Manufacturing 1094
  • 30. 23 THE PROJECT OFFICE 1097 23.0 Introduction 1097 23.1 Present-Day Project Office 1098 23.2 Implementation Risks 1099 23.3 Types of Project Offices 1100 23.4 Networking Project Management Offices 1101 23.5 Project Management Information Systems 1101 23.6 Dissemination of Information 1103 23.7 Mentoring 1104 23.8 Development of Standards and Templates 1105 23.9 Project Management Benchmarking 1105 23.10 Business Case Development 1106 23.11 Customized Training (Related to Project Management) 1107 23.12 Managing Stakeholder Relations 1108 23.13 Continuous Improvement 1109 23.14 Capacity Planning 1109 23.15 Risks of Using a Project Office 1110 23.16 Project Portfolio Management 1111 Case Study The Project Management Lawsuit 1116 24 MANAGING CRISIS PROJECTS 1119
  • 31. 24.0 Introduction 1119 24.1 Understanding Crisis Management 1119 24.2 Ford versus Firestone 1121 24.3 The Air France Concorde Crash 1122 24.4 Intel and the Pentium Chip 1123 24.5 The Russian Submarine Kursk 1123 24.6 The Tylenol Poisonings 1124 Contents xix ftoc.qxd 1/3/13 3:50 PM Page xix 24.7 Nestlé’s Marketing of Infant Formula 1127 24.8 The Space Shuttle Challenger Disaster 1129 24.9 The Space Shuttle Columbia Disaster 1130 24.10 Victims Versus Villains 1131 24.11 Life-Cycle Phases 1132 24.12 Project Management Implications 1133 25 FUTURE OF PROJECT MANAGEMENT 1135 25.0 Changing Times 1135
  • 32. 25.1 Complex Projects 1139 25.2 Complexity Theory 1144 25.3 Scope Creep 1145 25.4 Project Health Checks 1151 25.5 Managing Troubled Projects 1155 26 THE RISE, FALL, AND RESURRECTION OF IRIDIUM: A PROJECT MANAGEMENT PERSPECTIVE 1167 26.0 Introduction 1167 26.1 Naming the Project “Iridium” 1169 26.2 Obtaining Executive Support 1170 26.3 Launching the Venture 1170 26.4 The Iridium System 1172 26.5 The Terrestrial and Space-Based Network 1172 26.6 Project Initiation: Developing the Business Case 1173 26.7 The “Hidden” Business Case 1175 26.8 Risk Management 1175 26.9 The Collective Belief 1177 26.10 The Exit Champion 1177 26.11 Iridium’s Infancy Years 1178 26.12 Debt Financing 1181 26.13 The M-Star Project 1182 26.14 A New CEO 1183 26.15 Satellite Launches 1183
  • 33. 26.16 An Initial Public Offering (IPO) 1184 26.17 Signing Up Customers 1184 26.18 Iridium’s Rapid Ascent 1185 26.19 Iridium’s Rapid Descent 1187 26.20 The Iridium “Flu” 1191 26.21 Searching for a White Knight 1192 26.22 The Definition of Failure (October, 1999) 1192 26.23 The Satellite Deorbiting Plan 1193 26.24 Iridium is Rescued for $25 Million 1194 26.25 Iridium Begins to Grow 1194 xx CONTENTS ftoc.qxd 1/3/13 3:50 PM Page xx 26.26 Shareholder Lawsuits 1195 26.27 The Bankruptcy Court Ruling 1195 26.28 Autopsy 1196 26.29 Financial Impact of the Bankruptcy 1197 26.30 What Really Went Wrong? 1198 26.31 Lessons Learned 1200 26.32 Conclusion 1202