Beyond the EU: DORA and NIS 2 Directive's Global Impact
Film opening title sequence shoot risk assessment form
1. FILM OPENING TITLE SEQUENCE SHOOT RISK ASSESSMENT
This document is intended as a basic template to assist in the completion of a risk assessment for film production activities.
Detailed information is available from a variety of risk management and risk assessment specialists. Useful information can also be obtained
from the Health & Safety Executive www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards; who may be harmed, property which may be damaged, and the controls
already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level. The further
action(s) to be considered will be determined by the level of risk assessment.
HAZARD IN WHICH SCENE
IS THIS HAZARD
PRESENT?
PERSON WHO MAY
BE HARMED
PROPERTY THAT
COULD BE
DAMAGED
RISK CONTROLS
ALREADY IN PLACE
RISK ASSESSMENT
*See chart
FURTHER ACTION
TO BE TAKEN
Fire 9th Myself & others in
my house
My house could of
burnt down
Take care when fire
is lit & have water
prepared in case
anything sets alight.
EXTREME Get water and put it
out, if anything
serious happens
then seek
emergency
attention.
Knife 7th Stabbing, cut Take care when
holding the knife.
EXTREME Seek emergency
attention.
Candle 6th Could of set
something on fire
Everything in the
surrounding areas.
Make sure the
candle is away from
anything flammable.
HIGH Get water and put it
out.
2. Risk Assessment Chart
Hazard likelihood / Consequences RISK ASSESSMENT
VERY LIKELY TO HAPPEN or SEVERE CONSEQUENCES (ie. Someone could get
EXTREME
seriously hurt)
Could happen or mild consequences (i.e. someone could suffer a minor
injury)
HIGH
Unlikely to happen or minor consequences (i.e. production could be slightly
delayed)
MODERATE
Rarely happens and very insignificant consequences LOW