1. BIO – DATA
Post Applied For : MECHANICAL TECHNICIAN
Name : SANJAYKUMAR PREMABHAI PATEL
Father’s Name : Premabhai Dahyabhai Patel
Permanent Address : At : Japtisath Street, Vill : Bhimpore,
Post : Dumas, Tal : Choryasi,
Dist : Surat – 394550.
Gujarat State, INDIA
Mobile No. : 0091 9913914287- 8347617088
E Mail : sanjaykumarpatel50@yahoo.com
Date & Place of Birth : 22/07/1978, at Bhimpore
Gender : Male
Nationality : Indian
Language Known : Gujarati, Hindi, English
Education Qualification : Diploma In Mechanical Engineering.
(2003 To 2005 A-Grade)
I.T.I. Passed in Trade of FITTER year of 1998.
PASSPORT DETAILS
Passport No. : L – 4310945
Date of Issue : 23/10/2013
Place of Issue : Surat
Date of Expiry : 22/10/2023
E.C.N.R. : OK
2. SERVICE EXPERIENCE
Sr.
No.
Name of Company Designation Period
1. Reliance Industries Pvt. Ltd Mechanical
Technician
02/02/2013to
Continues
2. Qatar KENTZ W.L.L. in Barzan
Offshore Project, at Doha Qatar
Mechanical
Technician
30/12/2010 to
02/01/2013
3. Prime Project International
General Trading (L.L.C.) at, Iraq
Mechanical
Technician
01/05/2007 to
21/02/2010
4. C.C.C. Company,
at Oman (L.L.C.)
Mechanical
Technician
04/02/2006 to
10/06/2006
5. Al Jaber Grinaker – LTA,
at Abu Dhabi
Mechanical
Technician
14/08/2004 to
20/10/2005
6. Pressure Parts Engineering Co.
At O.N.G.C. Ltd., Hazira, Surat
Mechanical
Technician
20/05/2002 to
30/08/2003
7. Essar Gujarat Limited (Essar Power
Project) At Hazira, Surat
Mechanical
Technician
01/11/2000 to
03/05/2002
8. United Vender Horst Ltd.
At O.N.G.C. Ltd., hazira, Surat
Mechanical
Technician
15/08/1998 to
22/10/2000
JOBS INVOLED
I have experience in Refinery, Petrochemical Plants, LNG Plants and Gas Plants. I
have experience in maintenance job of Rotary and static equipment, all type of
valve, pumps, compressors, boiler, Gas Turbine, Generator, heat exchanger, fin
fan coolers, column, vessels, hydro testing of exchanger, vessels and all type
Valve.
I have also experience of the pre-commissioning & commissioning. Motor solorun
test, checking vibration of motor and temperature of the bearing, final
alignment. couple the unit and start up like pump or compressors. I can read
P&ID drawing, Monitoring of the centrifugal pump & compressors, Check the
parameters according to the manual. Dynamic Test of the centrifugal &
reciprocating pump &compressor.
3. SAFETY TRAININGS
Interactive Safety Induction
Hydrogen Sulfide Escape (BA)
Permit to Work (PTW)
Job Safety Analysis (JSA)
Permit to Work Signatory
Fire Fighting
Confine Space Entry
Work at Height
CENTRIFUGAL PUMP
Alignment Checking
Bearing Replacement
Mechanical Seal Replacement
Condition Monitoring – Temperature, Vibration, Leakage, Abnormal Sound etc.
Impeller & Casing Wearing Clearance Checking.
RECIPROCATING PUMPS
Sution/Discharge Valve Checking
Plunger and Cylinder Clearance Checking
Plunger Packing Checking
Crank Chamber Checking
Small end & Big end Bearing Clearance Checking
Crank Shaft Main Bearing Checking
Alignment Checking
RECIPROCATING COMPRESSOR
Suction/Discharge Valve Checking and Testing
Piston and Piston Ring Checking
Liner Clearance Checking (With inside Micrometer)
Stuffing Box Assembly Check
Oil Scrapper Ring Check
Cross Head Checking
Big and Small end Bearing Checking
Connecting Rod Gudeon Pin Checking
Crank Shaft Main Bearing (Radial Bearing) Checking
Intermediate Cooler & After Cooler and Trap Checking
MECHANICAL SEAL
4. Single and Double Mechanical Seal, Cartridge and None Cartridge Type
Seal, Multi Spring and Single Coil Spring Type Seal
ALIGNMENT METHODS
Rim and Face, Reverse Indication, Soft foot Checking,
laser alignment,
GEAR BOX
(Speed Reduce/Speed Increase)
Completely Overhauling with Bearing and Gear Teeth Checking
Bearing Clearance Checking
Run Out of Pinion Shaft (Low Speed/high Speed)
Backlash of Pinion and Bull Gear
Bull Gear, Low Speed/High Speed Thrust Checking
D.P. Check of All Bearing and Gears any checked
GAS TURBINES
Running maintenance and trouble shooting of gas turbine
Carryout combustion inspection (between 8000hrs to 12000hrs)
Carryout Hot path gas inspection (between 16000hrs to 24000hrs) S
Carryout majors overhaul with GE vendors (between 32000 hrs to 48000hrs)
Carryout compressor crank wash (every 6 months)
Fuel nozzle changing at regular intervals
IGV (Inlet Guide Vane) inspection and maintenance
Boroscope inspection at inspection holes at periodic intervals.
Monitoring wheel space temperature
Weekly routine readings inspection and etc.
Make: Ge frame 5.
STEAM TURBINES (MULTI STAGE)
Inspection and renewal of journal
bearings / Inspection and renewal of thrust bearings
Checking clearances of journal and
thrust bearings
Checking and setting the nozzle
clearance of turbine
Checking and correcting carbon seal
clearance and labyrinths
Checking the rotor blade tip
clearances
Checking and correcting that internal
alignment of turbine
Checking and setting the axial float of
rotor
5. Checking and correcting alignment by
reverse dial method
Make: Siemens
CENTRIFUGAL (VERTICAL PUMP)
checked clearance in axial ( Shaft Float)
Installation of impeller, diffuser, cashing, shaft, collar, m.seal, bearing
(Thrust bearing Angular contact ball bearing)
HEAT EXCHANGER :
Maintenance of Static Equipment like Different Types of Exchanger.
Cleaning of Shell and Tube by Chemical, Hydro Jetting and Wire Brush.
Knowledge about Different types of Test like :
1. Shell Test, 2. Tube Test, 3. Final Test
Maintenance and Repairing work during Hydro Test and also Box up work.
COLUMN :
Drain and Washed of Column after Shut Down.
Open Manhole for Washing by Steam, Water and Air.
Knowledge about Checking and Cleaning of Tray and Shell.
Knowledge about tray modification
Help for NDT Test, Ultra Sonic Test and D.P. Test.
Knowledge about Gas Test after Box Up.
VESSELS :
Vessels : Vertical & Horizontal
Proper positive Isolation, I.G. Purging, Air Purging.
Opening Manhole.
D.P. Test of Internal Welder Surface Area.
Demister Pad Replacement & Cleaning, Internal Cleaning & of Vessel &
Boxing Up.
VALAVE :
Globe Valve, Gate Valve, Ball Valve, NRV Valve, Niddle Valve,
Diaphragm Valve, Butterfly Valve, Plug Valve, PSV Valve, PRV Valve, MOV
Valve, ROV Valve, Control Valve Etc.
Gland Replacement, Stem Replacement, Valve Sheet Lapping by
Diamond Cut Paste.
6. If, I am selected for the same post, I shall try my level best to endeavor your
confident by my hard and honest work. I wish your interview call.
Thanking you……
Yours Faithful
(Sanjay P. Patel)
7. If, I am selected for the same post, I shall try my level best to endeavor your
confident by my hard and honest work. I wish your interview call.
Thanking you……
Yours Faithful
(Sanjay P. Patel)