SlideShare a Scribd company logo
1 of 7
BIO – DATA
Post Applied For : MECHANICAL TECHNICIAN
Name : SANJAYKUMAR PREMABHAI PATEL
Father’s Name : Premabhai Dahyabhai Patel
Permanent Address : At : Japtisath Street, Vill : Bhimpore,
Post : Dumas, Tal : Choryasi,
Dist : Surat – 394550.
Gujarat State, INDIA
Mobile No. : 0091 9913914287- 8347617088
E Mail : sanjaykumarpatel50@yahoo.com
Date & Place of Birth : 22/07/1978, at Bhimpore
Gender : Male
Nationality : Indian
Language Known : Gujarati, Hindi, English
Education Qualification : Diploma In Mechanical Engineering.
(2003 To 2005 A-Grade)
I.T.I. Passed in Trade of FITTER year of 1998.
PASSPORT DETAILS
Passport No. : L – 4310945
Date of Issue : 23/10/2013
Place of Issue : Surat
Date of Expiry : 22/10/2023
E.C.N.R. : OK
SERVICE EXPERIENCE
Sr.
No.
Name of Company Designation Period
1. Reliance Industries Pvt. Ltd Mechanical
Technician
02/02/2013to
Continues
2. Qatar KENTZ W.L.L. in Barzan
Offshore Project, at Doha Qatar
Mechanical
Technician
30/12/2010 to
02/01/2013
3. Prime Project International
General Trading (L.L.C.) at, Iraq
Mechanical
Technician
01/05/2007 to
21/02/2010
4. C.C.C. Company,
at Oman (L.L.C.)
Mechanical
Technician
04/02/2006 to
10/06/2006
5. Al Jaber Grinaker – LTA,
at Abu Dhabi
Mechanical
Technician
14/08/2004 to
20/10/2005
6. Pressure Parts Engineering Co.
At O.N.G.C. Ltd., Hazira, Surat
Mechanical
Technician
20/05/2002 to
30/08/2003
7. Essar Gujarat Limited (Essar Power
Project) At Hazira, Surat
Mechanical
Technician
01/11/2000 to
03/05/2002
8. United Vender Horst Ltd.
At O.N.G.C. Ltd., hazira, Surat
Mechanical
Technician
15/08/1998 to
22/10/2000
JOBS INVOLED
I have experience in Refinery, Petrochemical Plants, LNG Plants and Gas Plants. I
have experience in maintenance job of Rotary and static equipment, all type of
valve, pumps, compressors, boiler, Gas Turbine, Generator, heat exchanger, fin
fan coolers, column, vessels, hydro testing of exchanger, vessels and all type
Valve.
I have also experience of the pre-commissioning & commissioning. Motor solorun
test, checking vibration of motor and temperature of the bearing, final
alignment. couple the unit and start up like pump or compressors. I can read
P&ID drawing, Monitoring of the centrifugal pump & compressors, Check the
parameters according to the manual. Dynamic Test of the centrifugal &
reciprocating pump &compressor.
SAFETY TRAININGS
 Interactive Safety Induction
 Hydrogen Sulfide Escape (BA)
 Permit to Work (PTW)
 Job Safety Analysis (JSA)
 Permit to Work Signatory
 Fire Fighting
 Confine Space Entry
 Work at Height
CENTRIFUGAL PUMP
 Alignment Checking
 Bearing Replacement
 Mechanical Seal Replacement
 Condition Monitoring – Temperature, Vibration, Leakage, Abnormal Sound etc.
 Impeller & Casing Wearing Clearance Checking.
RECIPROCATING PUMPS
 Sution/Discharge Valve Checking
 Plunger and Cylinder Clearance Checking
 Plunger Packing Checking
 Crank Chamber Checking
 Small end & Big end Bearing Clearance Checking
 Crank Shaft Main Bearing Checking
 Alignment Checking
RECIPROCATING COMPRESSOR
 Suction/Discharge Valve Checking and Testing
 Piston and Piston Ring Checking
 Liner Clearance Checking (With inside Micrometer)
 Stuffing Box Assembly Check
 Oil Scrapper Ring Check
 Cross Head Checking
 Big and Small end Bearing Checking
 Connecting Rod Gudeon Pin Checking
 Crank Shaft Main Bearing (Radial Bearing) Checking
 Intermediate Cooler & After Cooler and Trap Checking
MECHANICAL SEAL
 Single and Double Mechanical Seal, Cartridge and None Cartridge Type
Seal, Multi Spring and Single Coil Spring Type Seal
 ALIGNMENT METHODS
 Rim and Face, Reverse Indication, Soft foot Checking,
 laser alignment,
GEAR BOX
 (Speed Reduce/Speed Increase)
 Completely Overhauling with Bearing and Gear Teeth Checking
 Bearing Clearance Checking
 Run Out of Pinion Shaft (Low Speed/high Speed)
 Backlash of Pinion and Bull Gear
 Bull Gear, Low Speed/High Speed Thrust Checking
 D.P. Check of All Bearing and Gears any checked
GAS TURBINES
 Running maintenance and trouble shooting of gas turbine
 Carryout combustion inspection (between 8000hrs to 12000hrs)
 Carryout Hot path gas inspection (between 16000hrs to 24000hrs) S
Carryout majors overhaul with GE vendors (between 32000 hrs to 48000hrs)
 Carryout compressor crank wash (every 6 months)
 Fuel nozzle changing at regular intervals
 IGV (Inlet Guide Vane) inspection and maintenance
 Boroscope inspection at inspection holes at periodic intervals.
 Monitoring wheel space temperature
 Weekly routine readings inspection and etc.
 Make: Ge frame 5.
STEAM TURBINES (MULTI STAGE)
 Inspection and renewal of journal
bearings / Inspection and renewal of thrust bearings
 Checking clearances of journal and
thrust bearings
 Checking and setting the nozzle
clearance of turbine
 Checking and correcting carbon seal
clearance and labyrinths
 Checking the rotor blade tip
clearances
 Checking and correcting that internal
alignment of turbine
 Checking and setting the axial float of
rotor
 Checking and correcting alignment by
reverse dial method
 Make: Siemens
CENTRIFUGAL (VERTICAL PUMP)
 checked clearance in axial ( Shaft Float)
 Installation of impeller, diffuser, cashing, shaft, collar, m.seal, bearing
(Thrust bearing Angular contact ball bearing)
HEAT EXCHANGER :
 Maintenance of Static Equipment like Different Types of Exchanger.
 Cleaning of Shell and Tube by Chemical, Hydro Jetting and Wire Brush.
 Knowledge about Different types of Test like :
1. Shell Test, 2. Tube Test, 3. Final Test
 Maintenance and Repairing work during Hydro Test and also Box up work.
COLUMN :
 Drain and Washed of Column after Shut Down.
 Open Manhole for Washing by Steam, Water and Air.
 Knowledge about Checking and Cleaning of Tray and Shell.
 Knowledge about tray modification
 Help for NDT Test, Ultra Sonic Test and D.P. Test.
 Knowledge about Gas Test after Box Up.
VESSELS :
 Vessels : Vertical & Horizontal
 Proper positive Isolation, I.G. Purging, Air Purging.
 Opening Manhole.
 D.P. Test of Internal Welder Surface Area.
 Demister Pad Replacement & Cleaning, Internal Cleaning & of Vessel &
Boxing Up.
VALAVE :
 Globe Valve, Gate Valve, Ball Valve, NRV Valve, Niddle Valve,
Diaphragm Valve, Butterfly Valve, Plug Valve, PSV Valve, PRV Valve, MOV
Valve, ROV Valve, Control Valve Etc.
 Gland Replacement, Stem Replacement, Valve Sheet Lapping by
Diamond Cut Paste.
If, I am selected for the same post, I shall try my level best to endeavor your
confident by my hard and honest work. I wish your interview call.
Thanking you……
Yours Faithful
(Sanjay P. Patel)
If, I am selected for the same post, I shall try my level best to endeavor your
confident by my hard and honest work. I wish your interview call.
Thanking you……
Yours Faithful
(Sanjay P. Patel)

More Related Content

What's hot

Resume technician
Resume technicianResume technician
Resume technicianRaja paul
 
Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)JOHN PRINCE
 
Mario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive TechnicianMario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive TechnicianMario Clariza
 
Resume- N1 M Mokal New
Resume- N1 M Mokal NewResume- N1 M Mokal New
Resume- N1 M Mokal Newnitin mokal
 
CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)Armando Malasan
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNaseem Ansari
 
New resume thiru
New resume thiruNew resume thiru
New resume thiruTHIRR
 
CV Aircraft Structures Technician
CV Aircraft Structures TechnicianCV Aircraft Structures Technician
CV Aircraft Structures TechnicianReagan Leo Reyes
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)jesu lambert
 
23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)Shine K U
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay ParanjapeAbhay Paranjape
 

What's hot (20)

mechanical technician (1)
mechanical technician (1)mechanical technician (1)
mechanical technician (1)
 
Resume technician
Resume technicianResume technician
Resume technician
 
Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)
 
AJI CV
AJI CVAJI CV
AJI CV
 
Mario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive TechnicianMario V. Clariza Resume Automotive Technician
Mario V. Clariza Resume Automotive Technician
 
Resume- N1 M Mokal New
Resume- N1 M Mokal NewResume- N1 M Mokal New
Resume- N1 M Mokal New
 
CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)CV as Maintenance Technician (Armando Malasan)
CV as Maintenance Technician (Armando Malasan)
 
mark amt resume
mark  amt resumemark  amt resume
mark amt resume
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning Technician
 
New resume thiru
New resume thiruNew resume thiru
New resume thiru
 
CV Aircraft Structures Technician
CV Aircraft Structures TechnicianCV Aircraft Structures Technician
CV Aircraft Structures Technician
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
amjad advance
amjad advanceamjad advance
amjad advance
 
Cruz Mech Tech
Cruz Mech TechCruz Mech Tech
Cruz Mech Tech
 
23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)23-01-2015(Millwright Technicion)
23-01-2015(Millwright Technicion)
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
RVK 2016 RESUME
RVK 2016 RESUMERVK 2016 RESUME
RVK 2016 RESUME
 
cv update
cv updatecv update
cv update
 
RESUME
RESUMERESUME
RESUME
 
C V of Roopesh
C V of RoopeshC V of Roopesh
C V of Roopesh
 

Similar to sanjay_Mechanical_Technician_-1 (20)

Adham_CV
Adham_CVAdham_CV
Adham_CV
 
Commissioning Supervisor New
Commissioning Supervisor NewCommissioning Supervisor New
Commissioning Supervisor New
 
Shaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb AbdulvahabShaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb Abdulvahab
 
Jayshish (1)
Jayshish (1)Jayshish (1)
Jayshish (1)
 
nasrulla resume
nasrulla resumenasrulla resume
nasrulla resume
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
 
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaMINDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
INDUSTRIAL TRAINING REPORT BY ShRiDhAR KaDaM
 
JEGAN1 P
JEGAN1 PJEGAN1 P
JEGAN1 P
 
NANIK COMMISSIONING
NANIK COMMISSIONINGNANIK COMMISSIONING
NANIK COMMISSIONING
 
CV LIJO updated
CV LIJO updatedCV LIJO updated
CV LIJO updated
 
Pipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragadaPipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragada
 
Vivekananthan CV(1)
Vivekananthan CV(1)Vivekananthan CV(1)
Vivekananthan CV(1)
 
Chidambaram_cv
Chidambaram_cvChidambaram_cv
Chidambaram_cv
 
Chidambaram_cv sr,mech
Chidambaram_cv sr,mechChidambaram_cv sr,mech
Chidambaram_cv sr,mech
 
CV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHANCV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHAN
 
CV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHANCV. P.S.MANJUNATHAN
CV. P.S.MANJUNATHAN
 
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARSINDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
 
MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012MINNAL MANI PROD TECH CV 2012
MINNAL MANI PROD TECH CV 2012
 
Variable Springs Webinar
Variable Springs WebinarVariable Springs Webinar
Variable Springs Webinar
 
Engineered Spring Supports V.2
Engineered Spring Supports V.2Engineered Spring Supports V.2
Engineered Spring Supports V.2
 

sanjay_Mechanical_Technician_-1

  • 1. BIO – DATA Post Applied For : MECHANICAL TECHNICIAN Name : SANJAYKUMAR PREMABHAI PATEL Father’s Name : Premabhai Dahyabhai Patel Permanent Address : At : Japtisath Street, Vill : Bhimpore, Post : Dumas, Tal : Choryasi, Dist : Surat – 394550. Gujarat State, INDIA Mobile No. : 0091 9913914287- 8347617088 E Mail : sanjaykumarpatel50@yahoo.com Date & Place of Birth : 22/07/1978, at Bhimpore Gender : Male Nationality : Indian Language Known : Gujarati, Hindi, English Education Qualification : Diploma In Mechanical Engineering. (2003 To 2005 A-Grade) I.T.I. Passed in Trade of FITTER year of 1998. PASSPORT DETAILS Passport No. : L – 4310945 Date of Issue : 23/10/2013 Place of Issue : Surat Date of Expiry : 22/10/2023 E.C.N.R. : OK
  • 2. SERVICE EXPERIENCE Sr. No. Name of Company Designation Period 1. Reliance Industries Pvt. Ltd Mechanical Technician 02/02/2013to Continues 2. Qatar KENTZ W.L.L. in Barzan Offshore Project, at Doha Qatar Mechanical Technician 30/12/2010 to 02/01/2013 3. Prime Project International General Trading (L.L.C.) at, Iraq Mechanical Technician 01/05/2007 to 21/02/2010 4. C.C.C. Company, at Oman (L.L.C.) Mechanical Technician 04/02/2006 to 10/06/2006 5. Al Jaber Grinaker – LTA, at Abu Dhabi Mechanical Technician 14/08/2004 to 20/10/2005 6. Pressure Parts Engineering Co. At O.N.G.C. Ltd., Hazira, Surat Mechanical Technician 20/05/2002 to 30/08/2003 7. Essar Gujarat Limited (Essar Power Project) At Hazira, Surat Mechanical Technician 01/11/2000 to 03/05/2002 8. United Vender Horst Ltd. At O.N.G.C. Ltd., hazira, Surat Mechanical Technician 15/08/1998 to 22/10/2000 JOBS INVOLED I have experience in Refinery, Petrochemical Plants, LNG Plants and Gas Plants. I have experience in maintenance job of Rotary and static equipment, all type of valve, pumps, compressors, boiler, Gas Turbine, Generator, heat exchanger, fin fan coolers, column, vessels, hydro testing of exchanger, vessels and all type Valve. I have also experience of the pre-commissioning & commissioning. Motor solorun test, checking vibration of motor and temperature of the bearing, final alignment. couple the unit and start up like pump or compressors. I can read P&ID drawing, Monitoring of the centrifugal pump & compressors, Check the parameters according to the manual. Dynamic Test of the centrifugal & reciprocating pump &compressor.
  • 3. SAFETY TRAININGS  Interactive Safety Induction  Hydrogen Sulfide Escape (BA)  Permit to Work (PTW)  Job Safety Analysis (JSA)  Permit to Work Signatory  Fire Fighting  Confine Space Entry  Work at Height CENTRIFUGAL PUMP  Alignment Checking  Bearing Replacement  Mechanical Seal Replacement  Condition Monitoring – Temperature, Vibration, Leakage, Abnormal Sound etc.  Impeller & Casing Wearing Clearance Checking. RECIPROCATING PUMPS  Sution/Discharge Valve Checking  Plunger and Cylinder Clearance Checking  Plunger Packing Checking  Crank Chamber Checking  Small end & Big end Bearing Clearance Checking  Crank Shaft Main Bearing Checking  Alignment Checking RECIPROCATING COMPRESSOR  Suction/Discharge Valve Checking and Testing  Piston and Piston Ring Checking  Liner Clearance Checking (With inside Micrometer)  Stuffing Box Assembly Check  Oil Scrapper Ring Check  Cross Head Checking  Big and Small end Bearing Checking  Connecting Rod Gudeon Pin Checking  Crank Shaft Main Bearing (Radial Bearing) Checking  Intermediate Cooler & After Cooler and Trap Checking MECHANICAL SEAL
  • 4.  Single and Double Mechanical Seal, Cartridge and None Cartridge Type Seal, Multi Spring and Single Coil Spring Type Seal  ALIGNMENT METHODS  Rim and Face, Reverse Indication, Soft foot Checking,  laser alignment, GEAR BOX  (Speed Reduce/Speed Increase)  Completely Overhauling with Bearing and Gear Teeth Checking  Bearing Clearance Checking  Run Out of Pinion Shaft (Low Speed/high Speed)  Backlash of Pinion and Bull Gear  Bull Gear, Low Speed/High Speed Thrust Checking  D.P. Check of All Bearing and Gears any checked GAS TURBINES  Running maintenance and trouble shooting of gas turbine  Carryout combustion inspection (between 8000hrs to 12000hrs)  Carryout Hot path gas inspection (between 16000hrs to 24000hrs) S Carryout majors overhaul with GE vendors (between 32000 hrs to 48000hrs)  Carryout compressor crank wash (every 6 months)  Fuel nozzle changing at regular intervals  IGV (Inlet Guide Vane) inspection and maintenance  Boroscope inspection at inspection holes at periodic intervals.  Monitoring wheel space temperature  Weekly routine readings inspection and etc.  Make: Ge frame 5. STEAM TURBINES (MULTI STAGE)  Inspection and renewal of journal bearings / Inspection and renewal of thrust bearings  Checking clearances of journal and thrust bearings  Checking and setting the nozzle clearance of turbine  Checking and correcting carbon seal clearance and labyrinths  Checking the rotor blade tip clearances  Checking and correcting that internal alignment of turbine  Checking and setting the axial float of rotor
  • 5.  Checking and correcting alignment by reverse dial method  Make: Siemens CENTRIFUGAL (VERTICAL PUMP)  checked clearance in axial ( Shaft Float)  Installation of impeller, diffuser, cashing, shaft, collar, m.seal, bearing (Thrust bearing Angular contact ball bearing) HEAT EXCHANGER :  Maintenance of Static Equipment like Different Types of Exchanger.  Cleaning of Shell and Tube by Chemical, Hydro Jetting and Wire Brush.  Knowledge about Different types of Test like : 1. Shell Test, 2. Tube Test, 3. Final Test  Maintenance and Repairing work during Hydro Test and also Box up work. COLUMN :  Drain and Washed of Column after Shut Down.  Open Manhole for Washing by Steam, Water and Air.  Knowledge about Checking and Cleaning of Tray and Shell.  Knowledge about tray modification  Help for NDT Test, Ultra Sonic Test and D.P. Test.  Knowledge about Gas Test after Box Up. VESSELS :  Vessels : Vertical & Horizontal  Proper positive Isolation, I.G. Purging, Air Purging.  Opening Manhole.  D.P. Test of Internal Welder Surface Area.  Demister Pad Replacement & Cleaning, Internal Cleaning & of Vessel & Boxing Up. VALAVE :  Globe Valve, Gate Valve, Ball Valve, NRV Valve, Niddle Valve, Diaphragm Valve, Butterfly Valve, Plug Valve, PSV Valve, PRV Valve, MOV Valve, ROV Valve, Control Valve Etc.  Gland Replacement, Stem Replacement, Valve Sheet Lapping by Diamond Cut Paste.
  • 6. If, I am selected for the same post, I shall try my level best to endeavor your confident by my hard and honest work. I wish your interview call. Thanking you…… Yours Faithful (Sanjay P. Patel)
  • 7. If, I am selected for the same post, I shall try my level best to endeavor your confident by my hard and honest work. I wish your interview call. Thanking you…… Yours Faithful (Sanjay P. Patel)