This technical report describes the proposed design of a mixed-use development comprising office space, retail, and an auditorium. It includes analyses of sun and wind patterns to inform the design. Intelligent building features are proposed to promote energy efficiency and sustainability. Access points and security systems are designed with different access controls for private and public areas. Water supply and waste disposal systems are sized to meet demand. Central air conditioning and fire safety systems are designed to code. Vertical transportation includes lifts sized to handle peak occupant loads. Maintenance of the high-rise office tower is addressed through a roof-mounted maintenance unit.
2. CONTENT
1. DESCRIPTION OF BUILDING
2. SUN & WIND ANALYSIS
3. INTELLIGENT BUILDING FEATURES
4. ACCESS POINTS AND SECURITY
5. WATER SUPPLY & STORAGE
6. PROPOSED RWHT & OSD TANK
7. SOLID WASTE DISPOSAL
8. AIR CONDITIONING SYSTEM (ACMV)
9. FIRE FIGHTING
10. FIRE COMPARTMENTATION
11. FIRE FIGHTERS PROVISIONS
12. VERTICAL TRANSPORTATION
13. PROPOSED LIFT FOR OFFICE TOWER
14. BUILDING MAINTENANCE SYSTEM
3. BUILDING DATA:
Site Area : 4.7 Acres (19020 m2)
Building Height (Storeys) : 37
Building Height (Meters) : 161M
Gross Area per office tower floor : 19795sf per floor
Average square footage of office space per person : 20m2 (215sf)
Total number of occupancy of per office tower floor : 92 person
Office Type : 5
DESCRIPTION OF BUILDING:
The building is a mixed development comprising of 5 office types, 1 storey of podium, 3 storey of retail outlet, auditorium and 1 storey of
basement parking.
Type Of Tenancy
-Type A (4 tenants per floor) - 15 storeys
-Type B (2 tenants per floor) - 6 storeys
-Type C (1 tenant per floor) - 3 storeys
-Type D (2 tenants split level) - 6 storeys
-Type E (Co-working) - 2 storeys
-Retail - 3 storeys
OFFICE ZONING
4. - Prevailing winds
come from south
east. Passive fresh
air intake
Sunpath Diagram
22nd Oct 9.30 AM
22nd Oct 1.00 PM
22nd Oct 5.30 PM
Prevailing Wind Distribution
- Due to the large amount of
heat and light gain at east
and west facade, the sun
shading device is applies.
- S t a c k e f f e c t
ventilation is occur
due to the void in
the middle of each
floor to cool the
tower
-Diagram showed the sun path on
22nd Oct in morning, afternoon and
evening. East and West have the
most shaded area throughout the day
-Diagram showed the sun path
throughout the year.
-Diagram showed the prevailing wind
distribution throughout the year. South
east received the most prevailing wind.
SUN & WIND ANALYSIS:
5. INTELLIGENT BUILDING FEATURES:
1. Building environment performance assessment that provides real time information on the building's energy consumption and efficieny of
environment. This include:
• Intelligent Building Management System (BMS)
• Building environmental performance assessment dashboard which is visible public to create awereness on energy usage and efficiency.
• Micro-climate monitor stations for continuous comfort monitoring and feedback.
2. Active eco-friendly environment system that included:
• Intelligent lighting and management
• Regegnarative lift system that recycles energy loss for lift movement
• Recycled materials/ reduction of demolition and construction waste
• Access control and monitoring system
• Fire detection and alarm system with automatic fire suppression system
• Extensive use of energy efficient equipment and appliances
• Waterless urinal
• Water efficient sanitary ware
• Zero VOC sealer and paint
• Ultra - low overall thermal transfer value
• High perfromance glazing system
• Grey and black water recycling, rain water and haversting system
• Photvoltaic system
• Solar water heating system
3. Passive eco-environment system that included
• Climate responsive built form and orientation
• Cross ventilation layout
• Use of active skylight
• Room design for optimized daylightinh
• Optimized window to wall ratio for intenal comfort
• External solar shading
• Light shelf for better natural lighting internally
• Usage of low embodied carbon construction materials.
• Natural ventilation on common areas.
• Waste reduction/ sorting / recycling apartments
• Promoting oudoor living and eco-education through
common facilities
6. ACCESS POINTS & SECURITY :
Proposed appropriate access points for office tower, commercial,auditorium and others, taking consideration of security, public and services.
Access control is to provide selective restriction of access to the building. It is important especially for a mixed development as in this project
due to the various groups of occupants or tenants that frequently enters and exits the premises.
Office Tower (Private)
Access control :
• Proposing 3 points of control access.
• First Point - access is controlled at the main entrance lobby (Ground floor) where the access key card is needed for office tenants or by visitor
registration (at information counter)
• Second point - access card only provides access to designated levels within the lift
• Third point - due to different type of tenancy per floor, each tenants needed to use the access card or password to access into their own
designated unit of office space through front point system.
Security System:
• to allow inter-communication between lobby ans office unit without direct access
• Combination of active security system such as motion sensors and CCTV on common areas, as well as proper for defensible space to allow for
visual surveillance of all areas such as corridor or foyer.
Register counter lobby Secuirty Guard Access Card Front Point System
7. Type B
Type A
Type CType D (lower) Type D (upper)Type E
Front Point System
Lift Lobby
Security Guard Control System
Lift lobby to control
movememnt and security. To
access to the lift lobby, office
tenants need access card to
access lift lobby at ground floor
8. WATER SUPPLY & STORAGE :
Calculate the water demand and propose the water tank location, storage capacity, rain water harvest tank, OSD tank and RWDP locations and quantities.
NO PROPOSED
DEVELOPMENT
GROSS AREA FLOOR DEMAND / UNIT
DEMAND/ BED
(LITRE/BED)
TOTAL
DEMAND
(LITRE/DAY)
REMARK
1 Office Tower 1200m2 31 10 per m2 372,000 Use water demand for
the office tower usage
2 COMMERCIAL
Retail
F & B
5000m2
4000m2
3
3
10 per m2
25 per m2
150,000
300,000
Use water demand for
the commercial usage
3 Auditorium 300m2 1 10 per m2 3,000
Total 825,000 217,942 gallons per
day
Note : Water demand is calculated in accordance to SPAN guideline.
Based on the water demand table :
The proposed water demand is 217,942 gallons per day for office tower, commercial & others.
Equivalent to 372 cubic metres DWT (Office Tower) x 2 days capacity = 744m, and 453 cubic metres DWT (Commercial & others) x 2 days capacity = 906m
Proposed storage capacity :
Storage capacity for Office Tower
= 12m (length) x 11m(width) x 3m (height)
= 396m3 - 372m3
Location
= Roof Top Level
Proposed storage capacity :
Storage capacity for commercial & others
= 13m (length) x 12m(width) x 3m (height)
= 468m3 -453m3
Location
= 4th Floor Roof
9. PROPOSED RWHT & OSD TANK :
The RWHT is proposed to be located at the podium level for irrigation usage and brak tank is located at level 17. The OSD tank is proposed at the basement
level before being discharge.
DCWT
RWHT
BREAK
TANK
OSD
Proposed RWDP (Rainwater Downpipe) quantity :
Based on the roof cathment area which is estimated at 900m2
Estimated 1 downpipe of 100mm every 47 m2 and not more
than 12m apart.
= 900m2 / 47 m2
= 19 nos of downpipe required.
- 25 nos provided for better efficiency.
10. SOLID WASTE DISPOSAL :
The refuse chamber is located at the back lane beside loading bay.
• The proposed method of storage
type is sprial waste bin with a
capacity of 8.2m3 for the
commercial usage. Model type
SWB-8.
• The proposed method of storage
type is spiral waste bin with a
capacity of 16m3 for the office
tower usage. Model type SWB-
16D
• The chamber are to be located in
gorund floor beside the loading
bay away from the main
entrances and lobbies to avoid
having it visible to the public.
• There will be on allocated bulky
waste room that contains a ro-ro
bin.
Location of Refuse Chamber
Refuse Bin Ro-Ro Bin
11. AIR CONDITIONING SYSTEM:
ACMV SYSTEMS
Proposed of the air-conditioning system fo the office tower, commercial and others.
The proposed air conditioning system for office, auditorium and retails is centralized air conditioning system because:
.
• Ideal for large areas of a building where split units do not have the capacity to cool such a large area efficiently.
• it makes less noise. The condeser, fan and compressor are located in an outdoor unit, instead of in a nearby window, indoor noise is barely detectable.
• It is possible for specialized central air conditioners to operate in a reversed cycle, heat pump, to not only cool air, but also pump out hot air. The same
central air system can heat and cool the home in one user freindly unit.
Centralized unit sned cool air directly through air ducts or vents located in each room. Each room can be cooled instead of cooling just one room. Ambient
air is pulled into the air handler unit from each room through return air ducts. The system filters the air that passes through it, removing airbone particles.
Filtered air ais then re-routed back to the room via a separated ductwork system.
Location Chiller and AC Condeser
Roof Plan
Commercial Uses : Central Type System
Split UnitCondenser
12. FIRE FIGHTING :
Fire Prevention
Fire Compartmentation and Separation
In accordance witht the designation of Purpose Group under the UBBL By-Law 134 (Schedule 5), the proposed development is categorized into variuos
classifications for different areas as following:
Mixed Development Building:
Number Of Purpose Group Decription Title
Purpose For which Building or
Compartment is intended to be used
iv Office Open Workplace
vii Place of Assembly Auditorium
v Shop Retail
vii Storage & General Carpark
Purpose Group Height Of Building Limits Of Dimension
(1) (2) Floor area of storey in building or
compartment (in m2) (3)
Cubic capacity of building or
compartment (in m3) (4)
vii Any Height 2000m2 No limit
v Any Height 2000m2 7000m3
vii No exceeding 28m No limit 21000m3
UBBL Clause 136 : With Automatic Sprinkler : limits shall be 2 times.
13. FIRE COMPARTMENTATION:
UBBL 137
Compartment Floors
Office
iii - 31 floor (does not require compartment walls)
UBBL 138 (d)
Compartment Floors
Basement viii - 1 floors(require compartment walls)
UBBL 137
Compartment Floors
Place of Assembly vii- 1 floor
(does not require compartment walls)
UBBL 137
Compartment Floors
Retail v - 3 floors (does not require compartment walls)
14. FIRE FIGHTER PROVISIONS :
Access for Fire Brigade
In accordance with By- Law 140, the building volume exceed 112,000 cubic m. Therefore, an open area of not less than 6 meters width around the building
for Fire Appliance Access is provided. The overhead clearancce of fire engine access roas shall be at least 4.5m for passage of fire appliances.
Fire staircase for the whole
development
Fire Access for Bomba
15. VERTICAL TRANSPORTATION:
The buildidng is a mixed development comprising of a Office Tower, Auditorium, 3 storey retail including ground and 1 basement carparks.
Calculation of 5 Minutes Handling Capacity for Lift Planning for Office.
Purpose
Development
Gross Area Occupant (s)/ Floor Basic Parameter Total peple per
Usable Space
Office Tower 37,200 m2 92 2 404
Office Tower:
Number of unit per floor : 4 units per floor
Total floors: 31 (max)
Required Handing Capacity (Office) 7%
= Total people per usable floor space x Required Handling Capacity
= 404 x 7%
= 28
= Estimate capacity of 28 people within the standard 5 mins handling capacity.
16. PROPOSED LIFT FOR OFFICE TOWER
KONE Minispace is proposed for the office tower due to it high performance lift solution and with a small machine
room.
Brand KONE MINISPACE
Description High -speed lift designed for especially
for mid and high-rise building. It
features a broad range of interior
options, superb ride comfort and
excellent eco-efficieny
Speed 4.0 m/s - 10.0 m/s
Max. travel Distance 200m - 400m
Max. Load 3000kg - 3500kg
Max. Persons Up to 30
Max. Lifts in a group 8
Car Size 2200mm x 2000mm
Opening Size 1200 mm entrnace opening
Pit depth 3800mm
Overhead height 6200mm
- Total of 7 lifts required with capacity of 30 person for office tower
17. BUILDING MAINTENANCE SYSTEM
Proposed building maintenance system for the office tower.
In the selected project of a office tower, the external of building maintenance
include the following aspects:
• Electrical system
• Lift or vertical transportation
• Plumbing system
• Structural Integrity
• Building Envelope
The building envelope is crucial to be maintain frequently. The overall height and
slender profile of tower block requires proper maintenance units to be installed. As
such, a building maintenance unit is proposed for the purpos of upkeeping the
exterior of the building. The Building Maintenance Unit, or BMU, is the best
solution for the tall and uniquely designed tower. They are to be installed on the
main roof on a track system due to the regular form of the roof plan. Telescopic
booms will assist in providing an ontput 0f 130 feet to reach the areas of
difficulty.This system completely eliminates the need for support equipment, such