Project Report: City Profile
•Ambernath-Badlapur
•Kalyan-Dombivli

Prepared by:
Mr. Nipun Shivalkar
Management Trainee, Business Development.
Contents:
   An Overview of the cities
   Connectivity and linkages
   City profile and growth trends
   Population: Socio-economic profile & Statistics
   Real estate scenario in the city
     Leisure, Entertainment & Real Estate destinations
     Social Infrastructure
     Development Initiatives
   Potentials and challenges for proposed development
   Identification of growth corridor and land parcels for proposed
    development
   Land case studies
   Ranking of land parcels
   Inference
   Recommendations
June 28, 2010.

Mr. Bajrang Bararia, AGM
Kalpataru Ltd.
Santacruz (East), Mumbai.

Respected Sir,
As a part of my Summer Internship with Kalpataru Ltd. for the period of May 2010 to July 2010, I am
submitting the attached report entitled “City Profile: Kalyan-Dombivli, Ambernath-Badlapur”

This report examines the current real estate scenario in Kalyan, Dombivli, Ambernath & Badlapur. It
includes a study of competitive benchmarking projects, social infrastructure and development initiatives
by the respective ULB’s and private players. The emergence of new and future development in these
areas and its implications. Also discussed are the potential and challenges in these areas and inferences
deciphered from the same. The report gives recommendations in perspective of an Integrated Township
development in these areas and its feasibility.

I hope you find this report satisfactory.

Sincerely yours,



Mr. Nipun Shivalkar,
Management Trainee, Business Development (Summer Internship 2010)
National Institute of Construction Management & Research (NICMAR).
Balewadi, Pune.
Procedure adopted for preparing the report:
Secondary Research:
• A study of Demographics of the areas selected.
• Studying the existing projects in the neighborhoods.
• Determining the Market price of properties.
• Determining demand/ supply factors affecting real estate.
• Identifying and comparing the proposed projects in the areas & existing projects of a similar nature.
• Type/ nature of projects in the area.
• Mark major land parcels in the area.
• Study Development plan by the respective Urban Local Body.
• Study and highlight provisions in JNNURM for the areas under consideration.
• Study the proposals of new infrastructure in the selected areas i.e. BRTS, Rail-routes and roads etc.
• The type of development that the existing infrastructure of the area supports
• The understanding of trends in growth of the areas under consideration.
• Collecting information from various websites.

Primary Research:
• Studying the ready-reckoner for identifying the market price of residential property.
• Collecting development reports of the respective areas from its ULB’s.
• Identifying special rules in DCR’s for the areas under consideration.
• Collecting local maps, plans and sanctioned plans of the area.
• Collecting information from major brokerage firms and local real estate agents.
• One to one research with local brokers as per further discussions.
• Identifying MIDC projects in the area.
• Identifying processes of land acquisition, land mapping, land banking going on in the areas under
    consideration.
Overview – Kalyan-Dombivli:
•Kalyan is a city in the Thane district of Maharashtra, and a major railway junction in the vicinity of
Mumbai, India.
•It is the capital of Kalyan Taluka, an administrative subdivision of the district. The city has been combined
with its neighbouring township of Dombivli to form the City Corporation of Kalyan-Dombivli i.e.
Kalyan Dombivli Municipal Corporation.
•It is considered a part of the Greater Mumbai metropolitan agglomeration, along with Navi Mumbai and
the cities of Bhiwandi, Thane.
•KDMC is a municipal corporation with its headquarters located in Kalyan in Thane district in the Indian
state of Maharashtra.
•It was formed in 1982 to administer the twin townships of Kalyan and Dombivali. KDMC has a population
1,193,266 (2001 census), and covers 137.15 square km, giving a density of 8,700 people per square km.
•Males constitute 53% of the population and females 47%. Kalyan-Dombivali has an average literacy rate
of 80%, higher than the national average of 59.5%, Male literacy is 84%, and female literacy is 75%.
•In Kalyan-Dombivali, 12% of the population is under 6 years of age. Kalyan-Dombivli is also considered as
the most Faster Developing node of Greater Mumbai.
•There are six CFC’s (Citizen Facilitation Centres) spread across Kalyan & Dombivli. They are well equipped
with the necessary infrastructure to assist the citizens.
•Today, with total 6 CFCs, located in various ward offices of KDMC, connected by Leased Lines, Fiber Optics
or Radio Frequency, KDMC's e-Governance is by far, the most comprehensive & successful
computerization project in Maharashtra and perhaps across India, and has set an example of good
governance for all Government Organizations in India.
•Kalyan – Dombivli is also proud to have over 94 schools & colleges.
•Pallava city is a planned development emerging on the Kalyan- Shil Phata road comprising of world class
residential and commercial Townships & an IT SEZ.
•Dombivli is well known for rapid Industrial growth with major Dye's, Paints, Chemical and Heavy Metal
Factories based in the Industrial Part of the town. Some of the well known of them are Gharda Chemicals,
Vicco Labs, Llyod Steel, Deepak Fertilizers, etc.
Overview: Ambernath- Badlapur
•Like all Mumbai suburbs Ambernath is divided into East Ambernath and West Ambernath by Railway. Ambernath
West is in an Industrial zone and is home to hundreds of small and large chemical factories.
•Many people also live in an area called Ordnance Estate which is meant for the Ordnance Factory nearby that
manufactures artillery and bomb shells.
•WIMCO,India's largest manufacturers of safety matchsticks, is also located in Ambernath on the Kalyan-Badlapur
Road.
•Ambernath is a small self contained township which has very prominent schools like Bhausaheb Paranjape
Vidyalaya, InnerWheel School, Kendriya Vidyalaya (Central School), SICES, Fatima High School and Mahatma Gandhi
Vidyalaya.
•It also has two junior and senior colleges offering bachelors in commerce science and arts.
•As of 2001 India census, Ambernath had a population of 203,795. Males constitute 53% of the population and
females 47%. 13% of the population is over 60 years of age.
•Badlapur city is in Thane district in Maharashtra State and is a railway station on the Mumbai-Pune route of
the Central Railway.
•It is located about 68 km (42.25 M) from Mumbai and is a terminal station for many Mumbai Suburban local trains.
The town is well connected to the Mumbai-Pune expressway and to Vashi through the MIDC road.
•As of 2001 India census, there were 97,917 people residing in Badlapur. Males constituted 53% (51,878) of the
population and females 47% (46,039).
•Badlapur had an overall literacy rate of 76.12%, higher than the national average of 59.5%; with 81.01% of the
males and 72.15% of females literate. 12% (11,999) of the population is under 6 years of age.
•Badlapur is 5 kilometres from the railway station. Due to the population growth in the nearby cities, many people
working in Mumbai have moved to Badlapur for affordable real estate prices, pleasant weather, beautiful location
and quiet neighborhoods.
•Badlapur city encompasses the Old Badlapur Village, Kulgaon, Manjarli, Belavali, Katrap and many other small
villages.
Connectivity – Kalyan-Dombivli:
• Railway
       • Kalyan station lies on Mumbai-Bhusawal-Nagpur line and the Mumbai- Pune railway line. Several train
         services originate from Kalyan and head towards Mumbai CST.
       • Kalyan Junction is a very important railway station for suburban as well as for long distance travel.
       • Guwahati Express, Sinhagad Express, Pushpak Express, Panchavati Express, Sahyadri Express, Godavari
         Express, Konark Express and Udyan Express are among the trains that halt at this station.

•Airport
      • Chhatrapati Shivaji International Airport is the nearest airport from Kalyan.
      • The Kalyan-Newali location is being considered for the second international airport for the Mumbai
        Metropolitan Region.

•Municipal Transport
     • This transport undertaking was started by the Kalyan Dombivli Municipal Corporation (KDMC) in 1997.
     • Kalyan has its own KDMC-run bus service - Kalyan Dombivli Municipal Transport (KDMT). The services
       are shared between the twin cities of Kalyan and Dombivli as well as the villages around.
     • It has its own routes connecting the city to Vashi and Belapur in Navi Mumbai.
     • The first bus service started was on the ring route - Kalyan Stn -Durgadi-Birla College-Kalyan Stn.
     • There are total 80 buses of the undertaking and 77 buses are operating on the route.

•State Transport
      • The state transport bus facility too is easily available from Kalyan.
      • Plying to places like Nagar, Murud, Raver, Chiplun, Shirur, Alibaug, Usmanabad, Kolhapur through ST
        buses is quite easy for Kalyan residents.
Connectivity: Ambernath- Badlapur
• Railway
       • Both Ambernath & Badlapur are a railway station on the Mumbai-Pune route of the Central Railway.
       • Badlapur is located about 68 km (42.25 M) from Mumbai, 34 km (21 M) from Thane and 10 km
         (6.21 M) from Ulhasnagar.
       • Both Ambernath & Badlapur are terminal stations for many Mumbai Suburban local trains.

•Airport
      • Nearest Airport is Mumbai International Airport (approx. 65 km)
      • The Kalyan-Newali location is being considered for the second international airport for the Mumbai
        Metropolitan Region (approx. 20 km).

•Municipal Transport
     • Ambernath Bus Station is in Thane District and runs buses regularly from Ambernath to almost all
       important places in Maharashtra.
     • There are frequent buses from Ambernath to Kalyan, Thane, Matheran and Murbad.

•State Transport
      • The state transport bus facility too is available from both Ambernath & Badlapur.
      • It should be noted that the level of service, especially in Badlapur, is poor.
City profile & growth – Kalyan-Dombivli:


                                           To Bapgaon, Devrung village
          To Bhiwandi                                                    To Ambivli


                                                                                      To Murbad




                                                                                      To Badlapur



         Kalyan-Shil Phata & NH4
City profile & growth: Land Use plan – Badlapur city
TO AMBERNATH
                                                     TO AMBERNATH



TO MUMBAI

                          VALIVLI                  YERNZAD



                      BELAVLI                                                TO NERAL


                                    MANJARLI         SONIVLI

     BELAVLI                             KULGAON

                                                             BADLAPUR GAON




               SHIRGAON

                                        KHARVAI




                             MANKIVLI

                                     JOVELI
                                                     TO KARJAT
Population Statistics – Kalyan-Dombivli:




             CITIES WITH MILLION PLUS POPULATION
      CITIES        1991(LAKH) 2001(LAKH) DECINNIAL GROWTH(%)
 GREATER MUMBAI        99.1      119.14           20.23
     NAGPUR           16.22       20.51           26.45
       PUNE            15.6       25.4            62.87
 KALYAN-DOMBIVLI      10.14       11.93           17.67
      THANE            7.97       12.62           58.36
      NASHIK           6.47       10.77           66.48
PIMPRI-CHINCHWAD       5.16       10.06           95.06


PER 1000 DISTRIBUTION OF STATUS OF EMPLOYMENT AGED 15YRS &
                           ABOVE
NAME OF THE CITY/    SELF    REGULAR WAGE/
                                            CASUAL LABOUR       EMPLOYED PERSONS PER 1000 PERSONS AGED 15YRS & ABOVE
      TOWN        EMPLOYED       SALARY
KALYAN-DOMBIVLI      311           678            11             NAME OF THE CITY/ TOWN        MALES          FEMALES
    MUMBAI           403           517            80                KALYAN-DOMBIVLI              730            203
    NAGPUR           421           417           161                    MUMBAI                   786            267
      PUNE           296           591           113                    NAGPUR                   720            289
     THANE           344           607            49                      PUNE                   712            291
     NASHIK          344           402           254                     THANE                   736            223
     PIMPRI-                                                             NASHIK                  610            187
                     348           570            83
  CHINCHWAD                                                        PIMPRI-CHINCHWAD              774            212
Population Statistics – Kalyan-Dombivli:




• Number of households having none of the specified assets (car/ jeep/ van, scooter/ motorcycle/
  moped, television, radio/ transistor, bicycle) in Kalyan-Dombivli is only 12.51% which is lesser than
  Thane (15.85%) and Nashik (14.58%).
• Percentage of population having scooter/ motorcycle/ moped in Maharashtra:
     • Highest – Pune (42.60%)
     • Lowest – Kalyan-Dombivli (9.9%)
•Percentage of population having car/ jeep/ van in Maharashtra:
     • Highest – Pune (10.96%)
     • Lowest – Kalyan-Dombivli (2.45%)
Population Statistics : Ambernath- Badlapur



          Population for Ambernath city                                  Projected population for Ambernath city
 Year   Population          Decadal Growth                  Method of Projection           2011        2021            2031
                      Numbers          Percentage         Arithmetic Increase Method     245571      287338           325104
 1961     36737              -              -
                                                           Geometric Bores Method        308106      465788           704169
 1971     58797           22060          60.05
                                                         Incremental Increase Method     263597      341417           437262
 1981    100537           41740          70.99
 1991    127665           27128          26.98             Graphical Trend Method        306000      428000           556000
 2001    203804           76139          59.64             Geometric Ratio Method        314705      485952           750384




                             Population for Badlapur city                                        Projected Population for
                                                                  %       Incremental                 Badlapur city
Area (sq. km.)   Total population   Population      Increase
                                                               Increase     Increase        S.No.    Particulars      Persons
    35.68             1961            12,527                                                  1     Population 2006   1,66,000
    35.68             1971            18,077         5,550      44.30                         2         2011          2,55,412
    35.68             1981            31,460        13,383      74.03        7,833            3         2016          3,49,936
    35.68             1991            52,197        20,737      65.92        7,354            4         2021          4,46,617
    35.68             2001            97,948        45,751      87.65       25,014            5         2026          5,43,378
             AVG.                                   21,355      65.98       13,400            6         2031          6,29,924
Population Statistics: Badlapur city



                  Status of Male & Female workforce
                            Workers (in Nos.)       Workers (in %)
 Year Total Population
                        Male Female Total Male Female Total
 1991       52,157      14448    3169   17617                   33.78
 2001       97,948      27917    6097   34014   53.79   13.23   34.73




              Main & Marginal workers                     Access to basic services by slum dwellers, 2006
 S.No.   Population      Persons Male      Female        S.No.               Particulars
   1   Total Population   97948    51899    46089          1           Municipal water supply         85%
   2    Total Workers     34014    27917     6097          2              Drainage facility           20%
   3    Main Workers      32129    26785     5344          3             Community toilets            60%
   4   Marginal Workers    1885     1132     753           4     Solid waste management services       nil
Leisure, entertainment & real estate:   OLD DEVELOPMENT
Kalyan-Dombivli                         NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT
Leisure, entertainment & real estate:   OLD DEVELOPMENT
Kalyan-Dombivli                         NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT
Leisure, entertainment & real estate:   OLD DEVELOPMENT
Kalyan-Dombivli                         NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT
Leisure, entertainment & real estate:   OLD DEVELOPMENT
Kalyan-Dombivli                         NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT
Leisure, entertainment & real estate:   OLD DEVELOPMENT
Kalyan-Dombivli                         NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT
Leisure, entertainment & real estate:   LEISURE PLACES
Ambernath-Badlapur                      NEW DEVELOPMENT
                                        FUTURE DEVELOPMENT




                               `




                                                         20
Social infrastructure: Dombivli




HOSPITALS IN DOMBIVLI             SCHOOLS IN DOMBIVLI
Social infrastructure: Kalyan




HOSPITALS IN KALYAN             SCHOOLS IN KALYAN
Social Infrastructure: Ambernath city




  HOSPITALS IN AMBERNATH                SCHOOLS IN AMBERNATH
Social Infrastructure: Badlapur city




  HOSPITALS IN BADLAPUR                SCHOOLS IN BADLAPUR
Competitive benchmarking projects – Khadakpada area

                 Name of
   Sr. No.                        Location      Project name       Type of units    No. of units Price/ Sqft. (INR)      Remarks
                Developer
                                                                     1/ 1.5/ 2/ 3                                       Phase-wise
     1       Nirmal Lifestyles     Vadavli      Lifestyle City        Bedroom           840         2000 + FR          development,
                                                                    Apartments                                         Good location
                  Godrej                                             2 Bedroom                                             Good
     2                           Godrej Hill   Godrej Riverside                         210            2950
                Properties                                          Apartments                                         Construction
                                                                   3/ 4 Bedroom
     3        Mohan group        Adharwadi     Mohan Heights                            144            3850            Bad planning
                                                                    Apartments
                                                                   1/ 2 Bedroom
                                                                                        112            2500            Bad planning
                                                                    Apartments
                                                                  2/ 3/ 4 Bedroom
     4        Mohan group        Adharwadi      Mohan Pride                             540            3000               Sold out
                                                                    Apartments
                                                                   2/ 3 Bedroom
     5        Mohan group        Adharwadi     Mohan Paradise                           246            2952               Sold out
                                                                    Apartments
                                                                   1/ 2 Bedroom
     6        Mohan group        Adharwadi     Mohan Regency                            450            2550           Remote location
                                                                    Apartments
                                                                      2/ 2.5/ 3
     7       Madhav group        Khadakpada    Madhav Sankalp         Bedroom           360            3124            Good location
                                                                    Apartments
                                                                  1/ 2/ 3 Bedroom
     8       Madhav group        Khadakpada    Madhav Sansar                             -             2669            Good location
                                                                    Apartments
                                                                   1/ 2 Bedroom
     9       Madhav group        Khadakpada    Madhav Shrishti                           -             2500           Value for money
                                                                    Apartments
                                                                  1/ 2/ 3 Bedroom
     10        Saket group       Adharwadi     Saket Paradise                           280            2350           Remote location
                                                                    Apartments
                                                                      1/ 1.5/ 2
               Aashapura                                                                                              Remote location,
     11                          Adharwadi       Crown City           Bedroom           406            1881
               developers                                                                                             Value for money
                                                                    Apartments
                                                                  1/ 2/ 3 Bedroom                                     Value for money,
     12         Tharwani         Godrej Hill       Rosalie                              552            2241
                                                                    Apartments                                        Good amenities
Competitive benchmarking projects – Shil Phata road

 Sr.     Name of                                                                 No. of Price/ Sqft.
                          Location       Project name        Type of units                                 Remarks
 No.    Developer                                                                units     (INR)
                                                                                                       A/c Condominiums
 1     Lodha group     Shil phata road     Golflinks      3 Bedroom condos        70        2830

                                                                                                       Independent, A/C
                                                           4 Bedroom Villas       27        7640
                                                                                                         luxurious villas

                                          Casa Bella
 2     Lodha group     Shil phata road                  1-2 Bedroom Apartments   4056       2700       Excellent location
                                            Gold
                                                                                                        A/c apartments,
                                                        3 Bedroom Apartments      576       2808
                                                                                                        good amenities

 3     Lodha group     Shil phata road    Casa Bella    1-2 Bedroom Apartments   2376       2750         Good planning

                                                                                                        A/c apartments,
                                                        3 Bedroom Apartments      360       2930
                                                                                                         Good location

 4     Lodha group     Shil phata road     Casa Rio     1-2 Bedroom Apartments   1824       2520        Good amenities


                                                        3 Bedroom Apartments      768       2700        Value for money

                                                                                                          Phase-wise
 5     Regency group   Shil phata road Regency Estate 2-3 Bedroom Apartments     1152       3135         development,
                                                                                                        Remote location

                       Shankeshwar         Sanghvi
 6     Sanghvi group                                    2-3 Bedroom Apartments    224       2825            Sold out
                          nagar            Garden
Competitive benchmarking projects: Ambernath-Badlapur

              Name of                                                                                                Expected
Sr. No.                        Location       Project name       Type of units    No. of units Price/ Sqft. (INR)
             Developer                                                                                              completion

              Arihant
                                                                 1/ 2 Bedroom
  1        Superstructures    Badlapur-W      Arihant Aksh                           330+            1900            Dec 2011
                                                                  Apartments
                Ltd.
                                                                  1/ 1.5/ 2/ 3
  2          Marathon         Badlapur-E     Marathon Nagri        Bedroom            NA             1891              Ready
                                                                  Apartments

                                                                 1/ 2 Bedroom                                          Under
  3        Panvelkar group    Ambernath-E      Green City                           1000+            1850
                                                                  Apartments                                        construction

           Shri Mahalaxmi                                        1/ 2 Bedroom
  4                           Ambernath-E      Royal Park                            700+            1950              Ready
             developers                                           Apartments

                                                                1/ 2/ 3 Bedroom
  5          KK Homes         Badlapur-W    Mohan Tulsi Vihar                        200+            1400            June 2010
                                                                  Apartments

                                                                   1/ 2/ 3/ 4
  6          KK Homes         Badlapur-E      Tulsi Aangan         Bedroom           350+            1711            Dec 2010
                                                                  Apartments
                                                                  1 RK/ 1-2-3
          Usha Construction                    UshaKiran
  7                           Badlapur-E                           Bedroom           900+            1650               NA
                 Co.                           Residency
                                                                  Apartments

          Siddhitech Homes                                       1/ 2 Bedroom
  8                           Badlapur-E      Morning Star                            75+            1651               NA
               Pvt. Ltd                                           Apartments

                                                                 1/ 2 Bedroom
  9           Pranjee         Badlapur-E       Garden City                           290+            1894               NA
                                                                  Apartments
Development initiatives: Kalyan-Dombivli
•A four-lane expressway to enable people to travel between Virar-Vasai-Diva-Bhiwandi-Kalyan-Panvel to Alibaug
in a matter of few hours. The four-lane expressway will have wide footpaths, subways, foot-over bridges and
service roads linking the major towns on the route.
•MMRDA has plans for a multi-modal Bus Rapid Transport System (BRTS) and Mass Rapid Transport System
(MRTS) which will cover Kalyan as well.
•Rs 247.25 crore are being spent on development of roads in KDMC area utilising Jawaharlal Nehru National
Urban Renewal Mission (JNNURM) funds. The project involves developing outer road to Kalyan, Dombivli and
Ambivli.
•A sum of Rs. 74.75 crore is being spent on construction of foot-over bridges, railway over-bridge, bridges, under-
passes and subways.
•Besides this Rs. 19.55 crore will be spent on developing the Kalyan-Dombivli station areas.
•The MMRDA, in a joint venture with Housing Development and Infrastructure Limited (HDIL), is constructing
35,000 homes having area of 160 sq ft each at Ambivli. (rental housing)
•The project of e-Governed Municipal Corporation at Kalyan and Dombivli, the twin suburban cities of Mumbai
stands out on their own for having created an example of use of Information Technology for betterment of
administration and delivery of public services.
      • Benefits of E-Governance to Citizens –
             • Time bound service delivery.
             • Transparency & Accountability in Corporations functioning.
             • Hassle free interactions with quicker response time for all the services.
             • Objectiveness in decision making, leading to more impartial and transparent governance.
      • Benefits of E-Governance to Corporation –
             • Increase in Revenue.
             • Creation of effective Management Information System.
             • Reduction in Manpower requirement.
Advantages of E-Governance by KDMC:
                            Service Name                Parameter              Prior to CFC Launch          After CFC Launch
                                                 Time taken for Process       More than 3 Months &
                                                                                                             About 21 Days
                                                         flow                        20 Days
                                                 Manpower involved for
                                                                                        62                         24
                                                      the process
                                                    Objections on Bills       About 25 % of the New      About 2 % of the New
                                                   (Average every year)           assessments               Assessments
                                                                              December 2002 - $3.7
                        Assessment Of Property     Revenue Collection               million               January 2004 - $5.94
                                                     (April to End of         December 2003 - $3.9              million
                                                       December)                    million
                                                                                                   Focus on collections at
                                                                         Focus on door-to-door     CFC. Collection spread
                                                 Methodology of Revenue collection. The collection over all the 12 months.
                                                       Collection       was concentrated in Jan, This helps in maintaining
                                                                              Feb & March.          a proper liquidity of
                                                                                                        corporation.
                                                  Time taken for Process
                                                                                More than 2 Days           About 45 Minutes
                                                          flow
                                                    Manpower for the
                             Birth / Death                                               8                          4
                                                        process
                            Registrations &
                          Certificate Issuance   No. of Certificates Issued
                                                                                   About 15,000            More than 37,000
                                                         in an year
                                                                               About INR*30,000/-       More than INR 370,000/-
                                                   Revenue Collection
                                                                              (INR 2/- per Certificate) (INR 10/- per Certificate)
                                                  Time taken for Process
                                                                                  About 6 weeks              About 14 days
                                                          flow
                        New Water Connection     Manpower involved for
                              Service                                             More than 24                  About 14
                                                       the process
                                                 No. of LOI's Issued in an
                                                                                    About 600                  About 1500
                                                           year
Development initiatives - Kalyan bypass project:
Bhiwandi – Kalyan – Shilphata Road           Phase II: Constructing the Kalyan Bypass
MSRDC is planning to widen and strengthen    (with major bridge on Ulhas river and an ROB
the Bhiwandi-Kalyan - Shilphata highway on   on the Central Railway Line along with the
a BOT basis.                                 approach roads).
The project has two phases:
Phase I: Strengthening the existing 4-       Halcrow Consulting India Ltd. is to study
lane divided carriageway and widening the    and assess the existing traffic scenario,
existing 2-lane carriageway to a             forecast it for the future and estimate the
4-lane divided carriageway.                  revenues for the stated concession period.
Development initiatives - Kalyan-Bhwandi-Thane MONORAIL project:
• The Mumbai Metropolitan Region Development
  Authority has given clearance for building a 30-km
  Monorail line between Thane-Bhiwandi-Kalyan at
  a cost of Rs 3,750 crore.
• The project is being built by a consortium of
  Larsen & Toubro with Scomi Engineering Bhd,
  Malaysia
• The Thane-Bhiwandi line will be built on a Public
  Private Partnership basis and will be operated by a
  private party for a stipulated period of time.
• The MMRDA will call for bids in December.
• As per its plans, the MMRDA will extend the line
  from Kalyan to Badlapur.
• The MMRDA is contemplating setting up a 10-15
  line Monorail network across the city for east-
  west connectivity.
• It has already appointed consultancy firm LEA
  Associates to find our probable routes for the
  monorail in the city.
• The Monorail’s first phase will have five corridors:
  Seepz- Lokhandwala, Thane-Bhiwandi- Kalyan,
  Mulund-Goregaon, Virar-Chikaldongri and Thane-
  Dahisar, all of which MMRDA hopes to complete
  by 2015.
• The second phase will consist of three routes:
  KDMC Ring Route, Chembur-Koparkhairane and
  Mahape-Kalyan, expected to be complete by
  2021.
Methodology adopted for preparation                    Sector-wise Capital Investment summary
of CDP (KDMC):
                                                    Mission Areas/Core       Capital Investment
Step 1 - Appointment of Consultant-           Sl.                                                     % Age
Step 2-Meetings with Official groups -                    Sectors           Estimate (Rs.in Crores)
Step 3-Peoples Participation-
Step 4-Meetings with Corporate groups,         1           Roads                    225.75             29
M.L.A., M.P. and office bearers
Step 5-Presentation to General Body of                Foot Over Bridge
                                               2                                    68.25               9
KDMC-                                                 Rob’s, Subways
KDMC prioritized its projects for the                  Station Area
following –                                    3       Development                  17.85               2
                                                         Scheme
 • Water Supply
 • Underground Sewerage scheme                         Parks and Play
                                               4                                     5.09               1
 • Storm Water Drains                                    Grounds
 • Solid Waste Management
 •                                                  Lake Beautification &
   e-Governance                                5                                      6.3               1
 • Roads, Traffic & Transport                           Preservation
 • Station Area Development Scheme             6       Electric Works                 21                3
 • Development of Parks and Playgrounds
 • Street Lighting                                     Water Supply
 • Urban Poverty & Social Development          7                                    183.75             23
                                                       Department
   & Slum Upgrading
 • Conservation of Water Bodies                        Under Ground
                                               8                                     168               21
                                                        Sewerage
The KDMC Vision 2020 is to have the area as
‘An Ecofriendly, High-Tech, Cultural City’.    9    Storm Water Drains               52.5               7

                                                        Solid Waste
                                              10                                      20                3
                                                       Management

                                              11       e-Governance                   4.7               1
                                                Total Capital Investment Estimate           773.19     100
Development initiatives by Private players: Shil Phata road
• Located at the junction of Navi Mumbai and
  Dombivali, Palava by Lodha Developers is envisioned         BRIDGE CONNECTING
  to become the largest ever private, completely              LIFESTYLE CITY & KHADAKPADA
  planned development in urban India.
• Extends over a vast 5,000 acres, ranking as
  Maharashtra’s first mega-city.
• An area of 2,200 acres is already earmarked for
  development in the first phase, to be completed over
  the next 8 years.
• Home to over 1 lac residents.
• Efforts such as rain water harvesting, vermi-
  composting and 100% sewage recycling systems
  making it an environment-sensitive haven.
• Walking distance to Nilje railway station, along the
  Diva-Panvel railway line. Giving an easy connectivity to
  Diva and, from there, on to Thane and CST.
• A wide 6-lane entrance road leads from Kalyan-Shil
  Road into Palava.
• Private bus service, taking people from home to
  Dombivali station.
• Less than 20 kms. away from Mumbai’s proposed new
  international airport.                                      PALAVA CITY
• A tie-up with a leading independent power company
  assures 24-hour power supply, with world-class
  transmission and distribution networks .
• A world-class ICSE school, Shopping mall and Health
  care facility part of the project.
Development initiatives: Ambernath (MIDC)

• MSEB proposed new Power Supply sources at MIDC with the capacity of 220 / 22 KVA at additional Ambernath
  MIDC direct from PADHGHA via JAMBUL. All L.T. Connections will be underground.
• The MIDC has made its own arrangement for supplying filtered & disinfected water to the industrial units in the
  area. Water lifted from Barvi River through Jackwell is brought to the water treatment plant.
• MIDC has provided asphalt roads of length having width varying from 3.75 to 16 mts. In Additional Ambernath
  Industrial Area asphalt roads are mainly two lane roads having central verge with plantation of bougainvillea and
  raised footpath on both sides of road.
• Considering planned development in Ambernath, the requirement of fire station was necessary, MIDC has
  constructed fire station having an area of 3600 sq.mts.
• Ambernath is having recreation clubs of the companies like Ordinance Factory of Ambernath Wimco, DMCC &
  Clubs like Rotary & Lions.
• Drainage MIDC has constructed common effluent treatment plant of capacity 7.5 mld. On order to treat
  effluent from Knitwear, Leather and Chemical zones. This confirms to standards prescribed by
  Maharashtra Pollution Control Board ( MPCB ).
• Common Facility Centre A common facility centre has been developed by MIDC near the helipad with
  pleasant elevation. This structure has ground + 3 stories.
• Helipad MIDC has constructed its own helipad. This will facilitate visits by both entrepreneurs andtheir
  customers.
• Institutional Zone One building to accommodate Research Training Institute & design studies has
  beenConstructed by MIDC to promote excellence in quality and design branches ofCentral Leather
  Research Institute (CLRI ). Footwear Design and Development Institute (FDDI) LIDCOM can also operate within
  the complex.
Eco-Sensitive initiatives: KBMC

HARVESTING RAIN FOR 24/7 WATER:
•Kulgaon-Badlapur, one of the faster growing towns in Mumbai, has taken the age-old tradition of rainwater
harvesting to a whole new level.
•In March 2007, Badlapur residents installed a rainwater harvesting demonstration unit in their town using
modern methods.
•About 2,000 residents-beneficiaries now get water 24 hours a day, 7 days a week from Badlapur’s rainwater
harvesting system, which provides about 100 liters per person per day—more than enough to meet washing,
toileting, and other domestic water needs.
•It also unburdens the demand for water from the piped system, which is now only used for drinking and
cooking purposes. A big plus of the system is that less water is taken from groundwater sources.

PERCOLATING PRECIPITATION:
•The project cost Rs.1.7 million (about US$40,000) to build, but help from the Mumbai Metropolitan Region
Development Authority (MMRDA) made constructing the system possible.
•The MMRDA provided Rs.1 million fund and another Rs.0.5 million loan without interest.
•KBMC raised the rest of the amount. Each household pays only 2 to 3 rupees a day, which is enough to cover
maintenance costs and full loan payment within 2 years.

BADLAPUR IS ALSO TAKING ON A NUMBER OF OTHER CHALLENGING DEVELOPMENT ACTIVITIES, SUCH AS:
•A school-based eco-sanitation project that aims to transform human urine & excreta into biogas fuel that can
be used for street lighting, cooking, etc.
•Construction and/or rehabilitation of public toilets, houses for the poor, Public Welfare Centers,
   public libraries, and a decentralized drainage system
•Capacity development for solid waste management, sanitation, health, and environmental Mgmt.
•Establishment of various women’s livelihood and saving groups and creation of computer training programs for
the poor.
Development initiatives: Ongoing projects by KBMC
• Proposed Building Of Kulgaon Badlapur Municipal Council
  @ S.No.39, Kulgaon. 7777 sq m plot area.
• Skywalk: In order to lessen the increasing crowd at western
  and central railway station area, construction of Skywalk has
  already started.
• Vegetable & Fruit Market: City Survey No. 408, Area 1450
  sq. m. Includes in all 45 stalls and 2 multi purpose halls.
• Parking Facility: 3000 feet covered parking and 1000 feet
  open parking.Survey No 41, Hissa No. 2, Kulgaon Station
  Area.
• D. P. Road: Asphalting Road & WBM 50 feet D. P. Road from
  Yashwant Plaza Sankul, Ashtivinayak Building to Chaitanya
  Sankul in KBMC Area.
Development initiatives: Future projects by KBMC
• “A sustainable slum-less city“ rehabilitation program
  for slums in various locations in the city.
       • Providing affordable, safe, self-owned,
         adequate shelter to urban poor.
       • Master plan for integrated basic services & civic
         amenities.
       • Keeping eco-friendly city environment KBMC to
         introduce land as a capital asset.
       • Project financing through JNNURM funds +
         beneficiaries contribution (by availing loan) +
         ULB contribution.




  • Mono Rail: Efforts to build Mono Rail on BOT terms.      • Club House & Open Marriage Hall
Development initiatives: KBMC - Successful projects
• On 13 Aug 2009, Ram Patkar, President of KBMC & S S
  Dhupe, Chief Officer received 'Special Mention Award'
  from Hon. President of India - Pratibhatai Patil for KBMC' s
  initiative in implementing eco-sanitation technologies for
  institutional sanitation.
• National Awards For The Welfare Of Persons With
  Disabilities - 2002.
  Ministry Of Social Justice And Empowerment Government Of
  India New Delhi. BARRIER - FREE
  ENVIRONMENT (Government Sector).
• Rainwater Harvesting project of KBMC, funded by MMR
  Environment Improvement Society. 'Best Water
  Management Municipal' by Water Awards & recognised by
  UNESCO for Outstanding Contribution in the field of water in
  India in the year 2007 - 08.
• National Urban Water Award in the year 2008. KBMC
  President Shri Nandkishor (Ram) Patkar receiving award for
  24 X 7 Water Supply in Shiv Darshan Society due to efficient
  Rainwater Harvesting.
• This project is about a “Ecological Sanitation” system for
  Adarsh College of Arts & Commerce in Badlapur,
  Maharashtra, established in the context of the EU pilot
  project “ASIA PRO ECO II”.
• Railway Over Bridge connects East - West of Kulgaon -
  Badlapur. This intiative by Kulgaon Badlapur Municipal
  Council has solved the long reigning traffic problems of the
  fast moving citizens of Kulgaon Badlapur.
Sector-wise capital investment: Ambernath city


                                      Amount     Amount     Total Investment Required (Rs. in
 Sr. No.            Sector
                                      Phase I    Phase II                Million)
                                      1269.43     90.54                 1359.97
   1            Water Supply
                                      (31.87)    (15.57)                (29.79)
                                      711.82     189.88                  901.70
   2              Sewerage
                                      (17.87)    (32.65)                 (19.75)
                                      410.00                             410.00
   3        Storm Water Drainage                    -
                                      (10.29)                            (8.98)
                                      1439.50    281.00                 1720.50
   4        Roads and Street Lights
                                      (36.14)    (48.32)                (37.69)
                                       52.00      20.00                   72.0
   5       Solid Waste Management
                                       (1.30)     (3.43)                 (1.57)
                                      100.00                             100.00
   6       Other Municipal Projects                 -
                                      (2.51)                             (2.19)
                                      3982.75     581.42                4564.17
                Total
                                      (100.00)   (100.00)               (100.00)
Sector-wise capital investment: Badlapur city

   Sl.                                            Capital Investment
                   Nature of Investment                                % Age
   No.                                           Estimate (Rs. Crores)
    1.                  Road Projects                   53.70         17.12

    2.       Transport and traffic management           12.00          3.83

    3.           Water Supply Department                15.00          4.78

    4.              Sewerage & drainage                136.00         43.35

    5.                 Street lighting                  6.00           1.91

    6.            Solid Waste Management                5.00           1.59

    7.                    Markets                       2.50           0.80

    8.       Others including urban governance          37.25         11.87

    9.               Urban governance                   14.00          4.46

   10.                      BSUP                        32.25         10.28

         Total Capital Investment Estimate             313.70         100.00
Potential: Kalyan-Dombivli
• Good connectivity by rail and road.
• Very important junction with most of the outgoing trains stopping at it.
• Growth along the major transport corridors and outskirts.
• Robust demand of residential properties.
• About 5-6 % increase in property rates in the last Quarter.
• An ideal range of homes for MIG, LIG.
• Good vision and development proposals by ULB, MMRDA and private players.
• Second international airport for Mumbai proposed near Kalyan (Nevali).
• Positioning of Kalyan-Dombivli as Socio-economic capital of State
• Second cultural capital of India after Pune
• A monorail service from Shil Junction to Mahape to Kalyan will pass through Palava city,
 giving yet another travel option.
• Frequent helicopter services are also operational from Mahalaxmi and Juhu, getting people to
 Palava city in just 15 minutes.
• Also nearby are commercial hubs like:
       • Mahape, home to many IT companies.
       • Airoli, a growing commercial hub.
       • Dhirubhai Ambani Knowledge City and other Reliance headquarters.
       • A developing IT SEZ.
• With its own Central Business District, developed over 200 acres, Palava city developed by
 Lodha Developers will offer over 2.5 lac professionals their choice of employment in luxurious,
 fully-equipped office complexes that are home to global IT and ITES companies, financial
 institutions and other corporations.
Challenges: Kalyan-Dombivli
• Many competitors in the residential market – Godrej, Lok group, Ajmera group, Mohan
 group, Deshmukh Brothers, D.S.K. group, Mantri group, Ravi Constructions, Lodha group,
 Nirmal Lifestyles.
• Traditionally developed areas in vicinity of the railway stations are congested leaving no scope for
 new planned development.
• The location of an apt land parcel required for development in the Kalyan-Dombivli belt may be
 relatively remote in nature.
• Providing world class amenities at competitive property rates to be at par with similar projects.
• Moreover, these property rates maybe required to be further discounted.
• Infrastructure development needs to be at par with the recent trends in Real Estate.
• Traffic engineering concept needs to be applied as road infrastructure forms the lifeline of a city.
• Un-interupted power supply to be assured and unplanned power-cuts to be avoided as these are
 major concerns in this area.
Potential: Ambernath-Badlapur
• Well connected by rail and road.
• Terminal station for many Suburban trains on this route.
• Concentric growth along existing Residential Zones, therefore easy NA + clear title.
• Robust demand of open land parcels and residential properties.
• Good market for future investment/ development as land is available at a lower price.
• Good market for a integrated township project.
• Land parcels available in plenty.
• About 20-25% appreciation in residential property rates over the last year.
• An apt market for residential property - LIG, MIG.
• Good vision and development initiatives by KBMC.
• Second international airport for Mumbai proposed near Kalyan-Nevali (25 km).
• A monorail service from Thane-Bhiwandi-Kalyan to be extended to Badlapur
• Scenic environment, quiet neighbourhoods & green landscape – enticing factors for a choice of
 residence here.

Challenges: Ambernath-Badlapur
• Competitive projects are by Shree Mahalaxmi Developers, Panvelkar group, KK Homes, Arihant Superstructures,
  Raj group, Marathon, Pranjee & Mohan group.
• Developed areas in vicinity of the railway stations are congested leaving no scope for new development.
• The region is yet to see an entry by a major player of the real estate sector.
• The location of an apt land parcel required for development may be remote in nature.
• Developed infrastructure ,e.g. good road network, is absent, as per current situation.
• Amenities are scattered and insufficient.
• Infrastructure development is steady yet slow.
• Transportation options are limited, bare minimum for the existing population.
• Un-interupted power supply to be assured and unplanned power-cuts to be avoided as these are major
  concerns as this area suffers load shedding for almost 5 hours in a day..
Future Growth corridor: Kalyan-Dombivli
• Shil Phata road, Dombivli.                                    Bapgaon village
                                                                                         Devrung village
• Khadakpada & Adharwadi in Kalyan.                                       3
                                                                                  4
                                                      Adharwadi
                                                                      2
Other potential locations:
• Ambivali.
• Bapgaon.
• Devrung.
• Nandivli.
                                                                  5
Land parcels identified:                                    1         Nandivli village
• Near Regency Estate (20 Acres)
• Adharwadi road (120 Acres)                       Shil-phata road

• Near Bapgaon village (500 Acres)
• Near Devrung village (200 Acres)
• Near Relax Hotel, Nandivli village (100 Acres)

Observations:
• Huge land parcels available on both sides of
 Shil-Phata road, Nandivali village, Adharwadi
 village area, Godrej Hill area, Bapgaon-
 Devrung village and Khadakpada areas.
Comparative study of land parcels: Kalyan-Dombivli

                     Land near Regency estate


                          Dnyaneshwar Nagar, Near Shivaji Rao S.
        Location          Jondhale College of Engineering, Kalyan -
                                         Shil Road


       Land Area                            20 Acres

     Present usage                         Open plot

    Proposed usage                    Residential/ Housing

                         2-4 lane from Shil-Phata road, 4-6 lane Kalyan -
         Access
                                        Shil Phata road.

     Basic Financial                            -

 Distance from Highway                 9.6 Kms from NH4

   Immediate vicinity                    Regency Estate

    Ownership Title                             -

   Mode of Disposal                             -

       Approvals                                -                           Location is adjacent to Regency Estate. A fast
                                                                            developing locality with many Lodha Projects in
         Status                             For Sale
                                                                            vicinity. Good connectivity to NH4 via Kalyan-Shil
                                                                            Phata road.
Comparative study of land parcels: Kalyan-Dombivli

                    Land near Mutha college

                            Opposite Seth Hirachand Mutha College,
        Location
                                        Umbarde Gaon

        Land Area                          120 Acres

      Present usage            Open plot with sparse vegetation

     Proposed usage             Residential/ Housing (Township)

                          Road facing land parcel, connected via 2 lane
         Access
                                 road from Adharwadi jail road

     Basic Financial                            -

  Distance from Highway              2.14 Kms from NH222

                              near upcoming Crown city project by
    Immediate vicinity
                                     Aashapura developers

     Ownership Title                            -

    Mode of Disposal                            -

        Approvals                               -
                                                                          Location is very near to Khadakpada area. The site
                          Under negotiation with KABRA developers for     faces road on one side. Good connectivity to NH3
         Status
                                             sale
                                                                          and NH222.
Comparative study of land parcels: Kalyan-Dombivli

              Land near Bapgaon EHV area

       Location           Beyond Gandhari bridge, Bapgaon, Kalyan

       Land Area                      Approx. 500 Acres

     Present usage       Open land with small village of ' Agri ' people

    Proposed usage             Residential/ Mixed Use Township


                         Connected by Gandhari Bridge to Khadakpada
        Access
                                   and Adharwadi jail road


    Basic Financial                             -

 Distance from Highway               3.0 Kms from NH222

   Immediate vicinity                    Bapgaon EHV

    Ownership Title                             -

   Mode of Disposal                             -

       Approvals                                -
                                                                           Location is very near to Khadakpada area. The site
        Status
                            Under talks for sale, with Hiranandani         faces road on one side and stream on the other.
                                         Developers                        Also nearby is the location of Nirmal Lifestyle city.
Comparative study of land parcels: Kalyan-Dombivli

                  Land near Devrung village
       Location           Beyond Gandhari bridge, Bapgaon, Kalyan

       Land Area                     Approx. 200 Acres

     Present usage             Open land with very few houses

    Proposed usage            Residential/ Mixed Use Township

                         Connected by Gandhari Bridge to Khadakpada
        Access
                                   and Adharwadi jail road

    Basic Financial                           -

 Distance from Highway              3.0 Kms from NH222


                         Bapgaon and Devrung villages and diagonally
   Immediate vicinity
                          opposite to proposed Nirmal Lifestyle City


    Ownership Title                           -

   Mode of Disposal                           -

       Approvals                              -
                                                                       Location is very near to Khadakpada area. The site
                            Under talks for sale, with Hiranandani     faces road on one side and stream on the other.
        Status
                                         Developers                    Also nearby is the location of Nirmal Lifestyle city.
Comparative study of land parcels: Kalyan-Dombivli

             Land near Relax Hotel, Kalyan-East


                          Haji Malang road, Nandivli village area,
        Location         Near Relax Hotel Kalyan-East, off Kalyan -
                                        Shil Road


       Land Area                      Approx. 100 Acres

     Present usage                        Open plot

    Proposed usage        Residential Township/ Bungalow scheme

                         2-4 lane Haji Malang road, 4-6 lane Kalyan -
         Access
                                       Shil Phata road.

     Basic Financial                           -

 Distance from Highway              14.31 Kms from NH4

   Immediate vicinity     Relax Hotel, Essar petrol pump, Brick kilns

    Ownership Title                            -

   Mode of Disposal                            -

       Approvals                               -                        Location is Nandivli Village. A fast developing
                                                                        locality with many Lodha Projects in vicinity. Good
         Status                            For Sale
                                                                        connectivity to NH4 via Kalyan-Shil Phata road.
Ranking of selected land parcels:
                                                      Land parcels considered for proposed Integrated Township development

 SR. No.                  Parameter                     Near           Opposite                                     Near
                                                                                    Bapgaon        Devrung
                                                      Regency           Mutha                                     Nandivli
                                                                                     village        village
                                                       Estate           college                                    village
    1                      Location
             Access Road (status and ROW of the
    2
                            road)
    3             Frontage of the property
    4            Contiguity of the land parcel
    5            Catchments for the property
                         Residential
                         Commercial
    6          Title of the property/ownership          NA               NA              NA          NA             NA
               Suitability of the property for a
    7
                township development today
              Pricing (considering the achievable
    8
                           sale price)
    9                 Final score / rank                 5                2              3            4              1


Base on the above methodology, the ranking of parcels is as follows:
Rank 1     LAND NEAR RELAX HOTEL, NANDIVLI VILLAGE                        3       High
Rank 2     LAND OPPSITE MUTHA COLLEGE, ADHARWADI                          2       Mid
Rank 3     LAND NEAR BAPGAON VILLAGE                                      1       Low
Inference: Kalyan-Dombivli
•   Residential property markets in Kalyan-Dombivli witnessed steady demand over last 3-4 years with an
    increase in migration of working class population.
•   Land in prime locations in Khadakpada, Godrej Hill and Shil Phata areas is extremely costly with per Sq.Ft
    cost is as high as Rs.3200
•   Rapid growth is observed in Khadakpada, Godrej hill, Adharwadi, Ambivli, Kalyan-Bhiwandi Shil Phata road
    and Nandivli areas.
•   A strong demand for 2-BHK and 3BHK homes in the range of 900 sft to 1500 sft.
•   Amenities such as swimming pool, jogging track, Acupressure Park, children’s play area, cycling track,
    community hall, etc. are on offer.
•   Some projects also provide bus service to station. We would also highlight the fact that bus service is one
    of the most preferred amenities amongst the prospective home buyers.
•   The average property rate for residential projects are in the range of Rs. 2100–2900 per sqft.
•   The average rate for projects in Kalyan-Dombivali belt is around Rs. 2400 per sq ft. and for projects in
    Badlapur-Ambernath belt is around Rs. 1700 per sq ft.
•   We have observed that the property prices of projects located in Mumbai beyond Thane have increased in
    the range of 5-6% as compared to previous quarter, possibly a pointer to improving sentiments in the
    market.
•   The area presents various affordable options to home buyers. Most of the buyers belong to the Lower
    Income Group (household income upto Rs. 25,000/- p.m.) and the Middle Income Group (household
    income Rs. 25,000 to Rs. 50,000 p.m.).
•   Given the base capital value of each type of apartment i.e. 1 BHK (12.75 lacs), 2 BHK (19.08 lacs) and 3 BHK
    (24.82 lacs), the average monthly income levels required to purchase the property, assuming that the
    home buyer opts for a home loan equal to 80% of the Property value for a term of 20 years, would be as
    below –
      • 1 BHK @ 12.75 lacs onwards >= 24500
      • 2 BHK @ 19.08 lacs onwards >= 37000
      • 3 BHK @ 24.82 lacs onwards >= 48000
•   Most of the developers are expecting majority of the transactions to happen during the festive season
    (Dussera to Diwali).
•   Construction quality is largely average.
•   It is also observed that there is a deficiency of quality Shopping Malls and multiplexes in the area and
    hence, of spaces like Lifestyles, In Orbit, Korum mall etc.
Inference: Ambernath-Badlapur
•   Residential property markets in Ambernath-Badlapur witnessed steady demand over last 3-4 years with an
    increase in migration of working Middleclass population.
•   A strong demand for 1-BHK and 2-BHK homes in the range of 400 sft to 900 sft.
•   Also, a healthy supply of 3-BHK homes and Row houses is noticed.
•   Amenities such as swimming pool, club house, children’s play area & gymnasium etc. are on offer.
•   We would also highlight the fact that bus service to station would be one of the best selling points and a
    preferred amenity amongst the prospective home buyers.
•   The average property rate for residential projects are in the range of Rs. 1200–2100 per sqft.
•   The average rate for projects in Badlapur-Ambernath belt is around Rs. 1800 per sq ft.
•   We have observed that the residential property prices in the Ambernath-Badlapur belt have increased
     by 20-25% over the previous year.
•   The area presents various affordable options to home buyers. Most of the buyers belong to the Lower
    Income Group (household income upto Rs. 25,000/- p.m.) and the Middle Income Group (household
    income Rs. 25,000 to Rs. 50,000 p.m.).
•   Given the base capital value of each type of apartment i.e. 1 BHK (11.77 lacs), 2 BHK (15.93 lacs), the
    average monthly income levels required to purchase the property, assuming that the home buyer opts for
    a home loan equal to 80% of the Property value for a term of 20 years, would be as below –
      • 1 BHK @ 11.77 lacs onwards >= 22,716
      • 2 BHK @ 15.93 lacs onwards >= 30,745
•   Most of the developers are expecting major transactions to happen during the festive season.
•   Construction quality is largely poor to average.
•   The value of land parcels in the green zone or in the vicinity of green zone is comparatively cheaper than
    that in the residential zone, especially the ones in vicinity of river Ulhas.
Recommendations: Kalyan-Dombivli
•   The residential property market in Kalyan-Dombivli is highly attractive for immediate commencement of
    a large integrated township development supported with world-class amenities.
•   Large size land parcels are available at and around Khadakpada/ Godrej Hill area & Kalyan-Shil Phata
    areas which are highly suitable for the proposed township development.
•   Good connectivity and fast developing infrastructure facilities support immediate development and
    project take-off, keeping in mind the improving sentiments of the real estate sector.
•   An Integrated Township with a combination of 1, 2 & 3 BHK homes targeted towards LIG/ MIG with good
    amenities and open spaces will be successful even in remote locations like Adharwadi and Nandivali and
    can be classified as a premium residential project in the Kalyan-Dombivli belt taking into account the
    amenities offered in the project.
•   Such areas have good future potential owing to the current projects in Khadakpada and Kalyan-Bhiwandi
    Shil Phata road, respectively and ongoing projects of a simlar kind have received a very good response.
•   The average property rate of projects with similar amenities is in the range of Rs. 2900 – Rs. 3100 per
    sqft.
•   However we opine that, to arrive at a competitive rate to be at par with similar kind of residential
    development, this rate may be discounted on account of the reasons given below-
      • Location: Considering the location of the proposed township which may be comparatively remote; the
        rate prevalent for such kind of development in Kalyan-Dombivli needs to be discounted.
      • Stage of Construction: The construction of the project is yet to commence, thus we opine that there is
        a need to discount the property rate further.
      • On account of all the above-mentioned factors, even after considering the amenities provided, overall
        the property rate for the proposed township needs to be discounted by 10-15%.
      • The competitive rate thus works out to be in the range of Rs. 2610 - 2790 per sq ft.
Recommendations: Ambernath-Badlapur
•   The residential property market in Ambernath-Badlapur is highly attractive for development like a large
    integrated township development.
•   Large size land parcels are available at and around Badlapur village that are highly suitable for the
    proposed township development.
•   Good connectivity and developing infrastructure facilities supports such an investment in land parcel.
•   An Integrated Township with a combination of 1, 2 & 3 BHK homes, Villas, Bungalows, Row houses
    targeted towards LIG/ MIG with good amenities + open spaces will be successful in remote locations like
    Badlapur village or even Shirgaon for example.
•   It will be considered as a premium residential project in the Ambernath-Badlapur belt taking into account
    the amenities offered in the project and will have a good future potential + land value appreciation.
•   The average property rate of projects with similar amenities is in the range of Rs. 1200 – Rs. 2100 per
    sqft.
•   However we opine that, to arrive at a competitive rate to be at par with similar kind of residential
    development in the future, this rate may be discounted on account of the reasons given below-
      • Location: Considering the location of the proposed township which may be comparatively remote; the
        rate prevalent for such kind of development in Ambernath-Badlapur needs to be discounted.
      • Stage of Construction: The construction of the project is yet to commence, thus we opine that there is
        a need to discount the property rate further.
      • On account of all the above-mentioned factors, even after considering the amenities provided, overall
        the property rate for the proposed township needs to be discounted by approx. 10%.
      • The competitive rate thus works out to be in the range of Rs. 1080 - 1890 per sq ft approx.
      • It would also recommended that discounted rate is to be provided only if the development in this
        region is of the same nature and competence level.
Thank you.
- Nipun Shivalkar

More Related Content

What's hot

Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanDivya Kothari
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan reviewvikashsaini78
 
Basic services to Urban poors(BSUP)
Basic services to Urban poors(BSUP)Basic services to Urban poors(BSUP)
Basic services to Urban poors(BSUP)Simran Vats
 
The Punjab Regional and Town Planning and Development Act,1995
The Punjab Regional and Town Planning and Development Act,1995The Punjab Regional and Town Planning and Development Act,1995
The Punjab Regional and Town Planning and Development Act,1995JIT KUMAR GUPTA
 
Chandigarh city case study
Chandigarh city case studyChandigarh city case study
Chandigarh city case studySakshiGadakh
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning SandeEp VeRma
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONIntekhab Alam
 
Planning Theories presents in the city UJJAIN
Planning Theories presents in the city UJJAINPlanning Theories presents in the city UJJAIN
Planning Theories presents in the city UJJAINPraveen Mukati
 
National Urban Housing and Habitat Policy 2007.pdf
 National Urban Housing and Habitat Policy 2007.pdf National Urban Housing and Habitat Policy 2007.pdf
National Urban Housing and Habitat Policy 2007.pdfThirumeni Madavan
 
Kancheepuram - Urban Heritage and Conservation
Kancheepuram - Urban Heritage and ConservationKancheepuram - Urban Heritage and Conservation
Kancheepuram - Urban Heritage and ConservationLahari Yaddanapudi
 

What's hot (20)

Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development Plan
 
Jaipur master plan review
Jaipur master plan reviewJaipur master plan review
Jaipur master plan review
 
Basic services to Urban poors(BSUP)
Basic services to Urban poors(BSUP)Basic services to Urban poors(BSUP)
Basic services to Urban poors(BSUP)
 
The Punjab Regional and Town Planning and Development Act,1995
The Punjab Regional and Town Planning and Development Act,1995The Punjab Regional and Town Planning and Development Act,1995
The Punjab Regional and Town Planning and Development Act,1995
 
Chandigarh city case study
Chandigarh city case studyChandigarh city case study
Chandigarh city case study
 
Industrial towns in India
Industrial towns in India Industrial towns in India
Industrial towns in India
 
Sri Rangam
Sri RangamSri Rangam
Sri Rangam
 
Village Case Study
Village Case Study Village Case Study
Village Case Study
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning
 
Gandhinagar- Town Planning
Gandhinagar- Town PlanningGandhinagar- Town Planning
Gandhinagar- Town Planning
 
TEMPLE TOWN - Madurai and Omkareswar, India
TEMPLE TOWN - Madurai and Omkareswar, IndiaTEMPLE TOWN - Madurai and Omkareswar, India
TEMPLE TOWN - Madurai and Omkareswar, India
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGION
 
National Housing Policies- Jyoti arora
National Housing Policies- Jyoti aroraNational Housing Policies- Jyoti arora
National Housing Policies- Jyoti arora
 
Planning Theories presents in the city UJJAIN
Planning Theories presents in the city UJJAINPlanning Theories presents in the city UJJAIN
Planning Theories presents in the city UJJAIN
 
National Urban Housing and Habitat Policy 2007.pdf
 National Urban Housing and Habitat Policy 2007.pdf National Urban Housing and Habitat Policy 2007.pdf
National Urban Housing and Habitat Policy 2007.pdf
 
A Slum Redevelopment Project
A Slum Redevelopment ProjectA Slum Redevelopment Project
A Slum Redevelopment Project
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 
Kancheepuram - Urban Heritage and Conservation
Kancheepuram - Urban Heritage and ConservationKancheepuram - Urban Heritage and Conservation
Kancheepuram - Urban Heritage and Conservation
 
Mumbai
Mumbai Mumbai
Mumbai
 
casestudy.pptx
casestudy.pptxcasestudy.pptx
casestudy.pptx
 

Similar to City profile

Transport infrastructure
Transport infrastructureTransport infrastructure
Transport infrastructureAnupam sunil
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbaiaziz khan
 
Bengaluru Suburban Rail Brochure - 4 page
Bengaluru Suburban Rail Brochure - 4 pageBengaluru Suburban Rail Brochure - 4 page
Bengaluru Suburban Rail Brochure - 4 pageKhader Syed
 
Mumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyMumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyPiter Biswas
 
01-Transportation Engg_Prof. Aamir.pptx
01-Transportation Engg_Prof. Aamir.pptx01-Transportation Engg_Prof. Aamir.pptx
01-Transportation Engg_Prof. Aamir.pptxSamratRoy57
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hubDhanuraj D
 
Mysore City :: Traffic and Transportation
Mysore City :: Traffic and TransportationMysore City :: Traffic and Transportation
Mysore City :: Traffic and TransportationRavi Varma reddy
 
Mumbai Metropolitan Region Development Authority.pdf
Mumbai Metropolitan Region Development Authority.pdfMumbai Metropolitan Region Development Authority.pdf
Mumbai Metropolitan Region Development Authority.pdfnayanaNMH
 
Ahmedabad,The Metropolitan city
Ahmedabad,The Metropolitan cityAhmedabad,The Metropolitan city
Ahmedabad,The Metropolitan cityHimanshu Pipaliya
 
Necessity of Smart City
Necessity of Smart CityNecessity of Smart City
Necessity of Smart Citykalyanibedekar
 
Indore and ahmedabad urban comparison
Indore and ahmedabad urban comparisonIndore and ahmedabad urban comparison
Indore and ahmedabad urban comparisonSona Rawat
 
INDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETINGINDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETINGAMAR ID
 
Smart city plan of vellore project cle stage 2 (Surveying)
Smart city plan of vellore project cle stage 2 (Surveying)Smart city plan of vellore project cle stage 2 (Surveying)
Smart city plan of vellore project cle stage 2 (Surveying)Vishwajeet Singh
 

Similar to City profile (20)

Transport infrastructure
Transport infrastructureTransport infrastructure
Transport infrastructure
 
Public transport problems in mumbai
Public transport problems in mumbaiPublic transport problems in mumbai
Public transport problems in mumbai
 
Bengaluru Suburban Rail Brochure - 4 page
Bengaluru Suburban Rail Brochure - 4 pageBengaluru Suburban Rail Brochure - 4 page
Bengaluru Suburban Rail Brochure - 4 page
 
Connectivity and Conversion
Connectivity and ConversionConnectivity and Conversion
Connectivity and Conversion
 
Mumbai Urban Transport Project Study
Mumbai Urban Transport Project StudyMumbai Urban Transport Project Study
Mumbai Urban Transport Project Study
 
Vellore cmp
Vellore cmpVellore cmp
Vellore cmp
 
Mumbai Local trains
Mumbai Local trainsMumbai Local trains
Mumbai Local trains
 
01-Transportation Engg_Prof. Aamir.pptx
01-Transportation Engg_Prof. Aamir.pptx01-Transportation Engg_Prof. Aamir.pptx
01-Transportation Engg_Prof. Aamir.pptx
 
Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hub
 
Mysore City :: Traffic and Transportation
Mysore City :: Traffic and TransportationMysore City :: Traffic and Transportation
Mysore City :: Traffic and Transportation
 
Project report smart city
Project report smart cityProject report smart city
Project report smart city
 
Mumbai Metropolitan Region Development Authority.pdf
Mumbai Metropolitan Region Development Authority.pdfMumbai Metropolitan Region Development Authority.pdf
Mumbai Metropolitan Region Development Authority.pdf
 
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTSBRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Ahmedabad,The Metropolitan city
Ahmedabad,The Metropolitan cityAhmedabad,The Metropolitan city
Ahmedabad,The Metropolitan city
 
Necessity of Smart City
Necessity of Smart CityNecessity of Smart City
Necessity of Smart City
 
Indore and ahmedabad urban comparison
Indore and ahmedabad urban comparisonIndore and ahmedabad urban comparison
Indore and ahmedabad urban comparison
 
INDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETINGINDIAN RAILWAYS SERVICE MARKETING
INDIAN RAILWAYS SERVICE MARKETING
 
Smart city plan of vellore project cle stage 2 (Surveying)
Smart city plan of vellore project cle stage 2 (Surveying)Smart city plan of vellore project cle stage 2 (Surveying)
Smart city plan of vellore project cle stage 2 (Surveying)
 
Navi mumbai
Navi mumbaiNavi mumbai
Navi mumbai
 

Recently uploaded

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service AvailableBankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Availablepr788182
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
KOLKATA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOLKATA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOLKATA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOLKATA 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 

Recently uploaded (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service AvailableBankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
Bankura Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Available
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableChandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Chandrapur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
KOLKATA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOLKATA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOLKATA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOLKATA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 

City profile

  • 1. Project Report: City Profile •Ambernath-Badlapur •Kalyan-Dombivli Prepared by: Mr. Nipun Shivalkar Management Trainee, Business Development.
  • 2. Contents:  An Overview of the cities  Connectivity and linkages  City profile and growth trends  Population: Socio-economic profile & Statistics  Real estate scenario in the city  Leisure, Entertainment & Real Estate destinations  Social Infrastructure  Development Initiatives  Potentials and challenges for proposed development  Identification of growth corridor and land parcels for proposed development  Land case studies  Ranking of land parcels  Inference  Recommendations
  • 3. June 28, 2010. Mr. Bajrang Bararia, AGM Kalpataru Ltd. Santacruz (East), Mumbai. Respected Sir, As a part of my Summer Internship with Kalpataru Ltd. for the period of May 2010 to July 2010, I am submitting the attached report entitled “City Profile: Kalyan-Dombivli, Ambernath-Badlapur” This report examines the current real estate scenario in Kalyan, Dombivli, Ambernath & Badlapur. It includes a study of competitive benchmarking projects, social infrastructure and development initiatives by the respective ULB’s and private players. The emergence of new and future development in these areas and its implications. Also discussed are the potential and challenges in these areas and inferences deciphered from the same. The report gives recommendations in perspective of an Integrated Township development in these areas and its feasibility. I hope you find this report satisfactory. Sincerely yours, Mr. Nipun Shivalkar, Management Trainee, Business Development (Summer Internship 2010) National Institute of Construction Management & Research (NICMAR). Balewadi, Pune.
  • 4. Procedure adopted for preparing the report: Secondary Research: • A study of Demographics of the areas selected. • Studying the existing projects in the neighborhoods. • Determining the Market price of properties. • Determining demand/ supply factors affecting real estate. • Identifying and comparing the proposed projects in the areas & existing projects of a similar nature. • Type/ nature of projects in the area. • Mark major land parcels in the area. • Study Development plan by the respective Urban Local Body. • Study and highlight provisions in JNNURM for the areas under consideration. • Study the proposals of new infrastructure in the selected areas i.e. BRTS, Rail-routes and roads etc. • The type of development that the existing infrastructure of the area supports • The understanding of trends in growth of the areas under consideration. • Collecting information from various websites. Primary Research: • Studying the ready-reckoner for identifying the market price of residential property. • Collecting development reports of the respective areas from its ULB’s. • Identifying special rules in DCR’s for the areas under consideration. • Collecting local maps, plans and sanctioned plans of the area. • Collecting information from major brokerage firms and local real estate agents. • One to one research with local brokers as per further discussions. • Identifying MIDC projects in the area. • Identifying processes of land acquisition, land mapping, land banking going on in the areas under consideration.
  • 5. Overview – Kalyan-Dombivli: •Kalyan is a city in the Thane district of Maharashtra, and a major railway junction in the vicinity of Mumbai, India. •It is the capital of Kalyan Taluka, an administrative subdivision of the district. The city has been combined with its neighbouring township of Dombivli to form the City Corporation of Kalyan-Dombivli i.e. Kalyan Dombivli Municipal Corporation. •It is considered a part of the Greater Mumbai metropolitan agglomeration, along with Navi Mumbai and the cities of Bhiwandi, Thane. •KDMC is a municipal corporation with its headquarters located in Kalyan in Thane district in the Indian state of Maharashtra. •It was formed in 1982 to administer the twin townships of Kalyan and Dombivali. KDMC has a population 1,193,266 (2001 census), and covers 137.15 square km, giving a density of 8,700 people per square km. •Males constitute 53% of the population and females 47%. Kalyan-Dombivali has an average literacy rate of 80%, higher than the national average of 59.5%, Male literacy is 84%, and female literacy is 75%. •In Kalyan-Dombivali, 12% of the population is under 6 years of age. Kalyan-Dombivli is also considered as the most Faster Developing node of Greater Mumbai. •There are six CFC’s (Citizen Facilitation Centres) spread across Kalyan & Dombivli. They are well equipped with the necessary infrastructure to assist the citizens. •Today, with total 6 CFCs, located in various ward offices of KDMC, connected by Leased Lines, Fiber Optics or Radio Frequency, KDMC's e-Governance is by far, the most comprehensive & successful computerization project in Maharashtra and perhaps across India, and has set an example of good governance for all Government Organizations in India. •Kalyan – Dombivli is also proud to have over 94 schools & colleges. •Pallava city is a planned development emerging on the Kalyan- Shil Phata road comprising of world class residential and commercial Townships & an IT SEZ. •Dombivli is well known for rapid Industrial growth with major Dye's, Paints, Chemical and Heavy Metal Factories based in the Industrial Part of the town. Some of the well known of them are Gharda Chemicals, Vicco Labs, Llyod Steel, Deepak Fertilizers, etc.
  • 6. Overview: Ambernath- Badlapur •Like all Mumbai suburbs Ambernath is divided into East Ambernath and West Ambernath by Railway. Ambernath West is in an Industrial zone and is home to hundreds of small and large chemical factories. •Many people also live in an area called Ordnance Estate which is meant for the Ordnance Factory nearby that manufactures artillery and bomb shells. •WIMCO,India's largest manufacturers of safety matchsticks, is also located in Ambernath on the Kalyan-Badlapur Road. •Ambernath is a small self contained township which has very prominent schools like Bhausaheb Paranjape Vidyalaya, InnerWheel School, Kendriya Vidyalaya (Central School), SICES, Fatima High School and Mahatma Gandhi Vidyalaya. •It also has two junior and senior colleges offering bachelors in commerce science and arts. •As of 2001 India census, Ambernath had a population of 203,795. Males constitute 53% of the population and females 47%. 13% of the population is over 60 years of age. •Badlapur city is in Thane district in Maharashtra State and is a railway station on the Mumbai-Pune route of the Central Railway. •It is located about 68 km (42.25 M) from Mumbai and is a terminal station for many Mumbai Suburban local trains. The town is well connected to the Mumbai-Pune expressway and to Vashi through the MIDC road. •As of 2001 India census, there were 97,917 people residing in Badlapur. Males constituted 53% (51,878) of the population and females 47% (46,039). •Badlapur had an overall literacy rate of 76.12%, higher than the national average of 59.5%; with 81.01% of the males and 72.15% of females literate. 12% (11,999) of the population is under 6 years of age. •Badlapur is 5 kilometres from the railway station. Due to the population growth in the nearby cities, many people working in Mumbai have moved to Badlapur for affordable real estate prices, pleasant weather, beautiful location and quiet neighborhoods. •Badlapur city encompasses the Old Badlapur Village, Kulgaon, Manjarli, Belavali, Katrap and many other small villages.
  • 7. Connectivity – Kalyan-Dombivli: • Railway • Kalyan station lies on Mumbai-Bhusawal-Nagpur line and the Mumbai- Pune railway line. Several train services originate from Kalyan and head towards Mumbai CST. • Kalyan Junction is a very important railway station for suburban as well as for long distance travel. • Guwahati Express, Sinhagad Express, Pushpak Express, Panchavati Express, Sahyadri Express, Godavari Express, Konark Express and Udyan Express are among the trains that halt at this station. •Airport • Chhatrapati Shivaji International Airport is the nearest airport from Kalyan. • The Kalyan-Newali location is being considered for the second international airport for the Mumbai Metropolitan Region. •Municipal Transport • This transport undertaking was started by the Kalyan Dombivli Municipal Corporation (KDMC) in 1997. • Kalyan has its own KDMC-run bus service - Kalyan Dombivli Municipal Transport (KDMT). The services are shared between the twin cities of Kalyan and Dombivli as well as the villages around. • It has its own routes connecting the city to Vashi and Belapur in Navi Mumbai. • The first bus service started was on the ring route - Kalyan Stn -Durgadi-Birla College-Kalyan Stn. • There are total 80 buses of the undertaking and 77 buses are operating on the route. •State Transport • The state transport bus facility too is easily available from Kalyan. • Plying to places like Nagar, Murud, Raver, Chiplun, Shirur, Alibaug, Usmanabad, Kolhapur through ST buses is quite easy for Kalyan residents.
  • 8. Connectivity: Ambernath- Badlapur • Railway • Both Ambernath & Badlapur are a railway station on the Mumbai-Pune route of the Central Railway. • Badlapur is located about 68 km (42.25 M) from Mumbai, 34 km (21 M) from Thane and 10 km (6.21 M) from Ulhasnagar. • Both Ambernath & Badlapur are terminal stations for many Mumbai Suburban local trains. •Airport • Nearest Airport is Mumbai International Airport (approx. 65 km) • The Kalyan-Newali location is being considered for the second international airport for the Mumbai Metropolitan Region (approx. 20 km). •Municipal Transport • Ambernath Bus Station is in Thane District and runs buses regularly from Ambernath to almost all important places in Maharashtra. • There are frequent buses from Ambernath to Kalyan, Thane, Matheran and Murbad. •State Transport • The state transport bus facility too is available from both Ambernath & Badlapur. • It should be noted that the level of service, especially in Badlapur, is poor.
  • 9. City profile & growth – Kalyan-Dombivli: To Bapgaon, Devrung village To Bhiwandi To Ambivli To Murbad To Badlapur Kalyan-Shil Phata & NH4
  • 10. City profile & growth: Land Use plan – Badlapur city TO AMBERNATH TO AMBERNATH TO MUMBAI VALIVLI YERNZAD BELAVLI TO NERAL MANJARLI SONIVLI BELAVLI KULGAON BADLAPUR GAON SHIRGAON KHARVAI MANKIVLI JOVELI TO KARJAT
  • 11. Population Statistics – Kalyan-Dombivli: CITIES WITH MILLION PLUS POPULATION CITIES 1991(LAKH) 2001(LAKH) DECINNIAL GROWTH(%) GREATER MUMBAI 99.1 119.14 20.23 NAGPUR 16.22 20.51 26.45 PUNE 15.6 25.4 62.87 KALYAN-DOMBIVLI 10.14 11.93 17.67 THANE 7.97 12.62 58.36 NASHIK 6.47 10.77 66.48 PIMPRI-CHINCHWAD 5.16 10.06 95.06 PER 1000 DISTRIBUTION OF STATUS OF EMPLOYMENT AGED 15YRS & ABOVE NAME OF THE CITY/ SELF REGULAR WAGE/ CASUAL LABOUR EMPLOYED PERSONS PER 1000 PERSONS AGED 15YRS & ABOVE TOWN EMPLOYED SALARY KALYAN-DOMBIVLI 311 678 11 NAME OF THE CITY/ TOWN MALES FEMALES MUMBAI 403 517 80 KALYAN-DOMBIVLI 730 203 NAGPUR 421 417 161 MUMBAI 786 267 PUNE 296 591 113 NAGPUR 720 289 THANE 344 607 49 PUNE 712 291 NASHIK 344 402 254 THANE 736 223 PIMPRI- NASHIK 610 187 348 570 83 CHINCHWAD PIMPRI-CHINCHWAD 774 212
  • 12. Population Statistics – Kalyan-Dombivli: • Number of households having none of the specified assets (car/ jeep/ van, scooter/ motorcycle/ moped, television, radio/ transistor, bicycle) in Kalyan-Dombivli is only 12.51% which is lesser than Thane (15.85%) and Nashik (14.58%). • Percentage of population having scooter/ motorcycle/ moped in Maharashtra: • Highest – Pune (42.60%) • Lowest – Kalyan-Dombivli (9.9%) •Percentage of population having car/ jeep/ van in Maharashtra: • Highest – Pune (10.96%) • Lowest – Kalyan-Dombivli (2.45%)
  • 13. Population Statistics : Ambernath- Badlapur Population for Ambernath city Projected population for Ambernath city Year Population Decadal Growth Method of Projection 2011 2021 2031 Numbers Percentage Arithmetic Increase Method 245571 287338 325104 1961 36737 - - Geometric Bores Method 308106 465788 704169 1971 58797 22060 60.05 Incremental Increase Method 263597 341417 437262 1981 100537 41740 70.99 1991 127665 27128 26.98 Graphical Trend Method 306000 428000 556000 2001 203804 76139 59.64 Geometric Ratio Method 314705 485952 750384 Population for Badlapur city Projected Population for % Incremental Badlapur city Area (sq. km.) Total population Population Increase Increase Increase S.No. Particulars Persons 35.68 1961 12,527 1 Population 2006 1,66,000 35.68 1971 18,077 5,550 44.30 2 2011 2,55,412 35.68 1981 31,460 13,383 74.03 7,833 3 2016 3,49,936 35.68 1991 52,197 20,737 65.92 7,354 4 2021 4,46,617 35.68 2001 97,948 45,751 87.65 25,014 5 2026 5,43,378 AVG. 21,355 65.98 13,400 6 2031 6,29,924
  • 14. Population Statistics: Badlapur city Status of Male & Female workforce Workers (in Nos.) Workers (in %) Year Total Population Male Female Total Male Female Total 1991 52,157 14448 3169 17617 33.78 2001 97,948 27917 6097 34014 53.79 13.23 34.73 Main & Marginal workers Access to basic services by slum dwellers, 2006 S.No. Population Persons Male Female S.No. Particulars 1 Total Population 97948 51899 46089 1 Municipal water supply 85% 2 Total Workers 34014 27917 6097 2 Drainage facility 20% 3 Main Workers 32129 26785 5344 3 Community toilets 60% 4 Marginal Workers 1885 1132 753 4 Solid waste management services nil
  • 15. Leisure, entertainment & real estate: OLD DEVELOPMENT Kalyan-Dombivli NEW DEVELOPMENT FUTURE DEVELOPMENT
  • 16. Leisure, entertainment & real estate: OLD DEVELOPMENT Kalyan-Dombivli NEW DEVELOPMENT FUTURE DEVELOPMENT
  • 17. Leisure, entertainment & real estate: OLD DEVELOPMENT Kalyan-Dombivli NEW DEVELOPMENT FUTURE DEVELOPMENT
  • 18. Leisure, entertainment & real estate: OLD DEVELOPMENT Kalyan-Dombivli NEW DEVELOPMENT FUTURE DEVELOPMENT
  • 19. Leisure, entertainment & real estate: OLD DEVELOPMENT Kalyan-Dombivli NEW DEVELOPMENT FUTURE DEVELOPMENT
  • 20. Leisure, entertainment & real estate: LEISURE PLACES Ambernath-Badlapur NEW DEVELOPMENT FUTURE DEVELOPMENT ` 20
  • 21. Social infrastructure: Dombivli HOSPITALS IN DOMBIVLI SCHOOLS IN DOMBIVLI
  • 22. Social infrastructure: Kalyan HOSPITALS IN KALYAN SCHOOLS IN KALYAN
  • 23. Social Infrastructure: Ambernath city HOSPITALS IN AMBERNATH SCHOOLS IN AMBERNATH
  • 24. Social Infrastructure: Badlapur city HOSPITALS IN BADLAPUR SCHOOLS IN BADLAPUR
  • 25. Competitive benchmarking projects – Khadakpada area Name of Sr. No. Location Project name Type of units No. of units Price/ Sqft. (INR) Remarks Developer 1/ 1.5/ 2/ 3 Phase-wise 1 Nirmal Lifestyles Vadavli Lifestyle City Bedroom 840 2000 + FR development, Apartments Good location Godrej 2 Bedroom Good 2 Godrej Hill Godrej Riverside 210 2950 Properties Apartments Construction 3/ 4 Bedroom 3 Mohan group Adharwadi Mohan Heights 144 3850 Bad planning Apartments 1/ 2 Bedroom 112 2500 Bad planning Apartments 2/ 3/ 4 Bedroom 4 Mohan group Adharwadi Mohan Pride 540 3000 Sold out Apartments 2/ 3 Bedroom 5 Mohan group Adharwadi Mohan Paradise 246 2952 Sold out Apartments 1/ 2 Bedroom 6 Mohan group Adharwadi Mohan Regency 450 2550 Remote location Apartments 2/ 2.5/ 3 7 Madhav group Khadakpada Madhav Sankalp Bedroom 360 3124 Good location Apartments 1/ 2/ 3 Bedroom 8 Madhav group Khadakpada Madhav Sansar - 2669 Good location Apartments 1/ 2 Bedroom 9 Madhav group Khadakpada Madhav Shrishti - 2500 Value for money Apartments 1/ 2/ 3 Bedroom 10 Saket group Adharwadi Saket Paradise 280 2350 Remote location Apartments 1/ 1.5/ 2 Aashapura Remote location, 11 Adharwadi Crown City Bedroom 406 1881 developers Value for money Apartments 1/ 2/ 3 Bedroom Value for money, 12 Tharwani Godrej Hill Rosalie 552 2241 Apartments Good amenities
  • 26. Competitive benchmarking projects – Shil Phata road Sr. Name of No. of Price/ Sqft. Location Project name Type of units Remarks No. Developer units (INR) A/c Condominiums 1 Lodha group Shil phata road Golflinks 3 Bedroom condos 70 2830 Independent, A/C 4 Bedroom Villas 27 7640 luxurious villas Casa Bella 2 Lodha group Shil phata road 1-2 Bedroom Apartments 4056 2700 Excellent location Gold A/c apartments, 3 Bedroom Apartments 576 2808 good amenities 3 Lodha group Shil phata road Casa Bella 1-2 Bedroom Apartments 2376 2750 Good planning A/c apartments, 3 Bedroom Apartments 360 2930 Good location 4 Lodha group Shil phata road Casa Rio 1-2 Bedroom Apartments 1824 2520 Good amenities 3 Bedroom Apartments 768 2700 Value for money Phase-wise 5 Regency group Shil phata road Regency Estate 2-3 Bedroom Apartments 1152 3135 development, Remote location Shankeshwar Sanghvi 6 Sanghvi group 2-3 Bedroom Apartments 224 2825 Sold out nagar Garden
  • 27. Competitive benchmarking projects: Ambernath-Badlapur Name of Expected Sr. No. Location Project name Type of units No. of units Price/ Sqft. (INR) Developer completion Arihant 1/ 2 Bedroom 1 Superstructures Badlapur-W Arihant Aksh 330+ 1900 Dec 2011 Apartments Ltd. 1/ 1.5/ 2/ 3 2 Marathon Badlapur-E Marathon Nagri Bedroom NA 1891 Ready Apartments 1/ 2 Bedroom Under 3 Panvelkar group Ambernath-E Green City 1000+ 1850 Apartments construction Shri Mahalaxmi 1/ 2 Bedroom 4 Ambernath-E Royal Park 700+ 1950 Ready developers Apartments 1/ 2/ 3 Bedroom 5 KK Homes Badlapur-W Mohan Tulsi Vihar 200+ 1400 June 2010 Apartments 1/ 2/ 3/ 4 6 KK Homes Badlapur-E Tulsi Aangan Bedroom 350+ 1711 Dec 2010 Apartments 1 RK/ 1-2-3 Usha Construction UshaKiran 7 Badlapur-E Bedroom 900+ 1650 NA Co. Residency Apartments Siddhitech Homes 1/ 2 Bedroom 8 Badlapur-E Morning Star 75+ 1651 NA Pvt. Ltd Apartments 1/ 2 Bedroom 9 Pranjee Badlapur-E Garden City 290+ 1894 NA Apartments
  • 28. Development initiatives: Kalyan-Dombivli •A four-lane expressway to enable people to travel between Virar-Vasai-Diva-Bhiwandi-Kalyan-Panvel to Alibaug in a matter of few hours. The four-lane expressway will have wide footpaths, subways, foot-over bridges and service roads linking the major towns on the route. •MMRDA has plans for a multi-modal Bus Rapid Transport System (BRTS) and Mass Rapid Transport System (MRTS) which will cover Kalyan as well. •Rs 247.25 crore are being spent on development of roads in KDMC area utilising Jawaharlal Nehru National Urban Renewal Mission (JNNURM) funds. The project involves developing outer road to Kalyan, Dombivli and Ambivli. •A sum of Rs. 74.75 crore is being spent on construction of foot-over bridges, railway over-bridge, bridges, under- passes and subways. •Besides this Rs. 19.55 crore will be spent on developing the Kalyan-Dombivli station areas. •The MMRDA, in a joint venture with Housing Development and Infrastructure Limited (HDIL), is constructing 35,000 homes having area of 160 sq ft each at Ambivli. (rental housing) •The project of e-Governed Municipal Corporation at Kalyan and Dombivli, the twin suburban cities of Mumbai stands out on their own for having created an example of use of Information Technology for betterment of administration and delivery of public services. • Benefits of E-Governance to Citizens – • Time bound service delivery. • Transparency & Accountability in Corporations functioning. • Hassle free interactions with quicker response time for all the services. • Objectiveness in decision making, leading to more impartial and transparent governance. • Benefits of E-Governance to Corporation – • Increase in Revenue. • Creation of effective Management Information System. • Reduction in Manpower requirement.
  • 29. Advantages of E-Governance by KDMC: Service Name Parameter Prior to CFC Launch After CFC Launch Time taken for Process More than 3 Months & About 21 Days flow 20 Days Manpower involved for 62 24 the process Objections on Bills About 25 % of the New About 2 % of the New (Average every year) assessments Assessments December 2002 - $3.7 Assessment Of Property Revenue Collection million January 2004 - $5.94 (April to End of December 2003 - $3.9 million December) million Focus on collections at Focus on door-to-door CFC. Collection spread Methodology of Revenue collection. The collection over all the 12 months. Collection was concentrated in Jan, This helps in maintaining Feb & March. a proper liquidity of corporation. Time taken for Process More than 2 Days About 45 Minutes flow Manpower for the Birth / Death 8 4 process Registrations & Certificate Issuance No. of Certificates Issued About 15,000 More than 37,000 in an year About INR*30,000/- More than INR 370,000/- Revenue Collection (INR 2/- per Certificate) (INR 10/- per Certificate) Time taken for Process About 6 weeks About 14 days flow New Water Connection Manpower involved for Service More than 24 About 14 the process No. of LOI's Issued in an About 600 About 1500 year
  • 30. Development initiatives - Kalyan bypass project: Bhiwandi – Kalyan – Shilphata Road Phase II: Constructing the Kalyan Bypass MSRDC is planning to widen and strengthen (with major bridge on Ulhas river and an ROB the Bhiwandi-Kalyan - Shilphata highway on on the Central Railway Line along with the a BOT basis. approach roads). The project has two phases: Phase I: Strengthening the existing 4- Halcrow Consulting India Ltd. is to study lane divided carriageway and widening the and assess the existing traffic scenario, existing 2-lane carriageway to a forecast it for the future and estimate the 4-lane divided carriageway. revenues for the stated concession period.
  • 31. Development initiatives - Kalyan-Bhwandi-Thane MONORAIL project: • The Mumbai Metropolitan Region Development Authority has given clearance for building a 30-km Monorail line between Thane-Bhiwandi-Kalyan at a cost of Rs 3,750 crore. • The project is being built by a consortium of Larsen & Toubro with Scomi Engineering Bhd, Malaysia • The Thane-Bhiwandi line will be built on a Public Private Partnership basis and will be operated by a private party for a stipulated period of time. • The MMRDA will call for bids in December. • As per its plans, the MMRDA will extend the line from Kalyan to Badlapur. • The MMRDA is contemplating setting up a 10-15 line Monorail network across the city for east- west connectivity. • It has already appointed consultancy firm LEA Associates to find our probable routes for the monorail in the city. • The Monorail’s first phase will have five corridors: Seepz- Lokhandwala, Thane-Bhiwandi- Kalyan, Mulund-Goregaon, Virar-Chikaldongri and Thane- Dahisar, all of which MMRDA hopes to complete by 2015. • The second phase will consist of three routes: KDMC Ring Route, Chembur-Koparkhairane and Mahape-Kalyan, expected to be complete by 2021.
  • 32. Methodology adopted for preparation Sector-wise Capital Investment summary of CDP (KDMC): Mission Areas/Core Capital Investment Step 1 - Appointment of Consultant- Sl. % Age Step 2-Meetings with Official groups - Sectors Estimate (Rs.in Crores) Step 3-Peoples Participation- Step 4-Meetings with Corporate groups, 1 Roads 225.75 29 M.L.A., M.P. and office bearers Step 5-Presentation to General Body of Foot Over Bridge 2 68.25 9 KDMC- Rob’s, Subways KDMC prioritized its projects for the Station Area following – 3 Development 17.85 2 Scheme • Water Supply • Underground Sewerage scheme Parks and Play 4 5.09 1 • Storm Water Drains Grounds • Solid Waste Management • Lake Beautification & e-Governance 5 6.3 1 • Roads, Traffic & Transport Preservation • Station Area Development Scheme 6 Electric Works 21 3 • Development of Parks and Playgrounds • Street Lighting Water Supply • Urban Poverty & Social Development 7 183.75 23 Department & Slum Upgrading • Conservation of Water Bodies Under Ground 8 168 21 Sewerage The KDMC Vision 2020 is to have the area as ‘An Ecofriendly, High-Tech, Cultural City’. 9 Storm Water Drains 52.5 7 Solid Waste 10 20 3 Management 11 e-Governance 4.7 1 Total Capital Investment Estimate 773.19 100
  • 33. Development initiatives by Private players: Shil Phata road • Located at the junction of Navi Mumbai and Dombivali, Palava by Lodha Developers is envisioned BRIDGE CONNECTING to become the largest ever private, completely LIFESTYLE CITY & KHADAKPADA planned development in urban India. • Extends over a vast 5,000 acres, ranking as Maharashtra’s first mega-city. • An area of 2,200 acres is already earmarked for development in the first phase, to be completed over the next 8 years. • Home to over 1 lac residents. • Efforts such as rain water harvesting, vermi- composting and 100% sewage recycling systems making it an environment-sensitive haven. • Walking distance to Nilje railway station, along the Diva-Panvel railway line. Giving an easy connectivity to Diva and, from there, on to Thane and CST. • A wide 6-lane entrance road leads from Kalyan-Shil Road into Palava. • Private bus service, taking people from home to Dombivali station. • Less than 20 kms. away from Mumbai’s proposed new international airport. PALAVA CITY • A tie-up with a leading independent power company assures 24-hour power supply, with world-class transmission and distribution networks . • A world-class ICSE school, Shopping mall and Health care facility part of the project.
  • 34. Development initiatives: Ambernath (MIDC) • MSEB proposed new Power Supply sources at MIDC with the capacity of 220 / 22 KVA at additional Ambernath MIDC direct from PADHGHA via JAMBUL. All L.T. Connections will be underground. • The MIDC has made its own arrangement for supplying filtered & disinfected water to the industrial units in the area. Water lifted from Barvi River through Jackwell is brought to the water treatment plant. • MIDC has provided asphalt roads of length having width varying from 3.75 to 16 mts. In Additional Ambernath Industrial Area asphalt roads are mainly two lane roads having central verge with plantation of bougainvillea and raised footpath on both sides of road. • Considering planned development in Ambernath, the requirement of fire station was necessary, MIDC has constructed fire station having an area of 3600 sq.mts. • Ambernath is having recreation clubs of the companies like Ordinance Factory of Ambernath Wimco, DMCC & Clubs like Rotary & Lions. • Drainage MIDC has constructed common effluent treatment plant of capacity 7.5 mld. On order to treat effluent from Knitwear, Leather and Chemical zones. This confirms to standards prescribed by Maharashtra Pollution Control Board ( MPCB ). • Common Facility Centre A common facility centre has been developed by MIDC near the helipad with pleasant elevation. This structure has ground + 3 stories. • Helipad MIDC has constructed its own helipad. This will facilitate visits by both entrepreneurs andtheir customers. • Institutional Zone One building to accommodate Research Training Institute & design studies has beenConstructed by MIDC to promote excellence in quality and design branches ofCentral Leather Research Institute (CLRI ). Footwear Design and Development Institute (FDDI) LIDCOM can also operate within the complex.
  • 35. Eco-Sensitive initiatives: KBMC HARVESTING RAIN FOR 24/7 WATER: •Kulgaon-Badlapur, one of the faster growing towns in Mumbai, has taken the age-old tradition of rainwater harvesting to a whole new level. •In March 2007, Badlapur residents installed a rainwater harvesting demonstration unit in their town using modern methods. •About 2,000 residents-beneficiaries now get water 24 hours a day, 7 days a week from Badlapur’s rainwater harvesting system, which provides about 100 liters per person per day—more than enough to meet washing, toileting, and other domestic water needs. •It also unburdens the demand for water from the piped system, which is now only used for drinking and cooking purposes. A big plus of the system is that less water is taken from groundwater sources. PERCOLATING PRECIPITATION: •The project cost Rs.1.7 million (about US$40,000) to build, but help from the Mumbai Metropolitan Region Development Authority (MMRDA) made constructing the system possible. •The MMRDA provided Rs.1 million fund and another Rs.0.5 million loan without interest. •KBMC raised the rest of the amount. Each household pays only 2 to 3 rupees a day, which is enough to cover maintenance costs and full loan payment within 2 years. BADLAPUR IS ALSO TAKING ON A NUMBER OF OTHER CHALLENGING DEVELOPMENT ACTIVITIES, SUCH AS: •A school-based eco-sanitation project that aims to transform human urine & excreta into biogas fuel that can be used for street lighting, cooking, etc. •Construction and/or rehabilitation of public toilets, houses for the poor, Public Welfare Centers, public libraries, and a decentralized drainage system •Capacity development for solid waste management, sanitation, health, and environmental Mgmt. •Establishment of various women’s livelihood and saving groups and creation of computer training programs for the poor.
  • 36. Development initiatives: Ongoing projects by KBMC • Proposed Building Of Kulgaon Badlapur Municipal Council @ S.No.39, Kulgaon. 7777 sq m plot area. • Skywalk: In order to lessen the increasing crowd at western and central railway station area, construction of Skywalk has already started. • Vegetable & Fruit Market: City Survey No. 408, Area 1450 sq. m. Includes in all 45 stalls and 2 multi purpose halls. • Parking Facility: 3000 feet covered parking and 1000 feet open parking.Survey No 41, Hissa No. 2, Kulgaon Station Area. • D. P. Road: Asphalting Road & WBM 50 feet D. P. Road from Yashwant Plaza Sankul, Ashtivinayak Building to Chaitanya Sankul in KBMC Area.
  • 37. Development initiatives: Future projects by KBMC • “A sustainable slum-less city“ rehabilitation program for slums in various locations in the city. • Providing affordable, safe, self-owned, adequate shelter to urban poor. • Master plan for integrated basic services & civic amenities. • Keeping eco-friendly city environment KBMC to introduce land as a capital asset. • Project financing through JNNURM funds + beneficiaries contribution (by availing loan) + ULB contribution. • Mono Rail: Efforts to build Mono Rail on BOT terms. • Club House & Open Marriage Hall
  • 38. Development initiatives: KBMC - Successful projects • On 13 Aug 2009, Ram Patkar, President of KBMC & S S Dhupe, Chief Officer received 'Special Mention Award' from Hon. President of India - Pratibhatai Patil for KBMC' s initiative in implementing eco-sanitation technologies for institutional sanitation. • National Awards For The Welfare Of Persons With Disabilities - 2002. Ministry Of Social Justice And Empowerment Government Of India New Delhi. BARRIER - FREE ENVIRONMENT (Government Sector). • Rainwater Harvesting project of KBMC, funded by MMR Environment Improvement Society. 'Best Water Management Municipal' by Water Awards & recognised by UNESCO for Outstanding Contribution in the field of water in India in the year 2007 - 08. • National Urban Water Award in the year 2008. KBMC President Shri Nandkishor (Ram) Patkar receiving award for 24 X 7 Water Supply in Shiv Darshan Society due to efficient Rainwater Harvesting. • This project is about a “Ecological Sanitation” system for Adarsh College of Arts & Commerce in Badlapur, Maharashtra, established in the context of the EU pilot project “ASIA PRO ECO II”. • Railway Over Bridge connects East - West of Kulgaon - Badlapur. This intiative by Kulgaon Badlapur Municipal Council has solved the long reigning traffic problems of the fast moving citizens of Kulgaon Badlapur.
  • 39. Sector-wise capital investment: Ambernath city Amount Amount Total Investment Required (Rs. in Sr. No. Sector Phase I Phase II Million) 1269.43 90.54 1359.97 1 Water Supply (31.87) (15.57) (29.79) 711.82 189.88 901.70 2 Sewerage (17.87) (32.65) (19.75) 410.00 410.00 3 Storm Water Drainage - (10.29) (8.98) 1439.50 281.00 1720.50 4 Roads and Street Lights (36.14) (48.32) (37.69) 52.00 20.00 72.0 5 Solid Waste Management (1.30) (3.43) (1.57) 100.00 100.00 6 Other Municipal Projects - (2.51) (2.19) 3982.75 581.42 4564.17 Total (100.00) (100.00) (100.00)
  • 40. Sector-wise capital investment: Badlapur city Sl. Capital Investment Nature of Investment % Age No. Estimate (Rs. Crores) 1. Road Projects 53.70 17.12 2. Transport and traffic management 12.00 3.83 3. Water Supply Department 15.00 4.78 4. Sewerage & drainage 136.00 43.35 5. Street lighting 6.00 1.91 6. Solid Waste Management 5.00 1.59 7. Markets 2.50 0.80 8. Others including urban governance 37.25 11.87 9. Urban governance 14.00 4.46 10. BSUP 32.25 10.28 Total Capital Investment Estimate 313.70 100.00
  • 41. Potential: Kalyan-Dombivli • Good connectivity by rail and road. • Very important junction with most of the outgoing trains stopping at it. • Growth along the major transport corridors and outskirts. • Robust demand of residential properties. • About 5-6 % increase in property rates in the last Quarter. • An ideal range of homes for MIG, LIG. • Good vision and development proposals by ULB, MMRDA and private players. • Second international airport for Mumbai proposed near Kalyan (Nevali). • Positioning of Kalyan-Dombivli as Socio-economic capital of State • Second cultural capital of India after Pune • A monorail service from Shil Junction to Mahape to Kalyan will pass through Palava city, giving yet another travel option. • Frequent helicopter services are also operational from Mahalaxmi and Juhu, getting people to Palava city in just 15 minutes. • Also nearby are commercial hubs like: • Mahape, home to many IT companies. • Airoli, a growing commercial hub. • Dhirubhai Ambani Knowledge City and other Reliance headquarters. • A developing IT SEZ. • With its own Central Business District, developed over 200 acres, Palava city developed by Lodha Developers will offer over 2.5 lac professionals their choice of employment in luxurious, fully-equipped office complexes that are home to global IT and ITES companies, financial institutions and other corporations.
  • 42. Challenges: Kalyan-Dombivli • Many competitors in the residential market – Godrej, Lok group, Ajmera group, Mohan group, Deshmukh Brothers, D.S.K. group, Mantri group, Ravi Constructions, Lodha group, Nirmal Lifestyles. • Traditionally developed areas in vicinity of the railway stations are congested leaving no scope for new planned development. • The location of an apt land parcel required for development in the Kalyan-Dombivli belt may be relatively remote in nature. • Providing world class amenities at competitive property rates to be at par with similar projects. • Moreover, these property rates maybe required to be further discounted. • Infrastructure development needs to be at par with the recent trends in Real Estate. • Traffic engineering concept needs to be applied as road infrastructure forms the lifeline of a city. • Un-interupted power supply to be assured and unplanned power-cuts to be avoided as these are major concerns in this area.
  • 43. Potential: Ambernath-Badlapur • Well connected by rail and road. • Terminal station for many Suburban trains on this route. • Concentric growth along existing Residential Zones, therefore easy NA + clear title. • Robust demand of open land parcels and residential properties. • Good market for future investment/ development as land is available at a lower price. • Good market for a integrated township project. • Land parcels available in plenty. • About 20-25% appreciation in residential property rates over the last year. • An apt market for residential property - LIG, MIG. • Good vision and development initiatives by KBMC. • Second international airport for Mumbai proposed near Kalyan-Nevali (25 km). • A monorail service from Thane-Bhiwandi-Kalyan to be extended to Badlapur • Scenic environment, quiet neighbourhoods & green landscape – enticing factors for a choice of residence here. Challenges: Ambernath-Badlapur • Competitive projects are by Shree Mahalaxmi Developers, Panvelkar group, KK Homes, Arihant Superstructures, Raj group, Marathon, Pranjee & Mohan group. • Developed areas in vicinity of the railway stations are congested leaving no scope for new development. • The region is yet to see an entry by a major player of the real estate sector. • The location of an apt land parcel required for development may be remote in nature. • Developed infrastructure ,e.g. good road network, is absent, as per current situation. • Amenities are scattered and insufficient. • Infrastructure development is steady yet slow. • Transportation options are limited, bare minimum for the existing population. • Un-interupted power supply to be assured and unplanned power-cuts to be avoided as these are major concerns as this area suffers load shedding for almost 5 hours in a day..
  • 44. Future Growth corridor: Kalyan-Dombivli • Shil Phata road, Dombivli. Bapgaon village Devrung village • Khadakpada & Adharwadi in Kalyan. 3 4 Adharwadi 2 Other potential locations: • Ambivali. • Bapgaon. • Devrung. • Nandivli. 5 Land parcels identified: 1 Nandivli village • Near Regency Estate (20 Acres) • Adharwadi road (120 Acres) Shil-phata road • Near Bapgaon village (500 Acres) • Near Devrung village (200 Acres) • Near Relax Hotel, Nandivli village (100 Acres) Observations: • Huge land parcels available on both sides of Shil-Phata road, Nandivali village, Adharwadi village area, Godrej Hill area, Bapgaon- Devrung village and Khadakpada areas.
  • 45. Comparative study of land parcels: Kalyan-Dombivli Land near Regency estate Dnyaneshwar Nagar, Near Shivaji Rao S. Location Jondhale College of Engineering, Kalyan - Shil Road Land Area 20 Acres Present usage Open plot Proposed usage Residential/ Housing 2-4 lane from Shil-Phata road, 4-6 lane Kalyan - Access Shil Phata road. Basic Financial - Distance from Highway 9.6 Kms from NH4 Immediate vicinity Regency Estate Ownership Title - Mode of Disposal - Approvals - Location is adjacent to Regency Estate. A fast developing locality with many Lodha Projects in Status For Sale vicinity. Good connectivity to NH4 via Kalyan-Shil Phata road.
  • 46. Comparative study of land parcels: Kalyan-Dombivli Land near Mutha college Opposite Seth Hirachand Mutha College, Location Umbarde Gaon Land Area 120 Acres Present usage Open plot with sparse vegetation Proposed usage Residential/ Housing (Township) Road facing land parcel, connected via 2 lane Access road from Adharwadi jail road Basic Financial - Distance from Highway 2.14 Kms from NH222 near upcoming Crown city project by Immediate vicinity Aashapura developers Ownership Title - Mode of Disposal - Approvals - Location is very near to Khadakpada area. The site Under negotiation with KABRA developers for faces road on one side. Good connectivity to NH3 Status sale and NH222.
  • 47. Comparative study of land parcels: Kalyan-Dombivli Land near Bapgaon EHV area Location Beyond Gandhari bridge, Bapgaon, Kalyan Land Area Approx. 500 Acres Present usage Open land with small village of ' Agri ' people Proposed usage Residential/ Mixed Use Township Connected by Gandhari Bridge to Khadakpada Access and Adharwadi jail road Basic Financial - Distance from Highway 3.0 Kms from NH222 Immediate vicinity Bapgaon EHV Ownership Title - Mode of Disposal - Approvals - Location is very near to Khadakpada area. The site Status Under talks for sale, with Hiranandani faces road on one side and stream on the other. Developers Also nearby is the location of Nirmal Lifestyle city.
  • 48. Comparative study of land parcels: Kalyan-Dombivli Land near Devrung village Location Beyond Gandhari bridge, Bapgaon, Kalyan Land Area Approx. 200 Acres Present usage Open land with very few houses Proposed usage Residential/ Mixed Use Township Connected by Gandhari Bridge to Khadakpada Access and Adharwadi jail road Basic Financial - Distance from Highway 3.0 Kms from NH222 Bapgaon and Devrung villages and diagonally Immediate vicinity opposite to proposed Nirmal Lifestyle City Ownership Title - Mode of Disposal - Approvals - Location is very near to Khadakpada area. The site Under talks for sale, with Hiranandani faces road on one side and stream on the other. Status Developers Also nearby is the location of Nirmal Lifestyle city.
  • 49. Comparative study of land parcels: Kalyan-Dombivli Land near Relax Hotel, Kalyan-East Haji Malang road, Nandivli village area, Location Near Relax Hotel Kalyan-East, off Kalyan - Shil Road Land Area Approx. 100 Acres Present usage Open plot Proposed usage Residential Township/ Bungalow scheme 2-4 lane Haji Malang road, 4-6 lane Kalyan - Access Shil Phata road. Basic Financial - Distance from Highway 14.31 Kms from NH4 Immediate vicinity Relax Hotel, Essar petrol pump, Brick kilns Ownership Title - Mode of Disposal - Approvals - Location is Nandivli Village. A fast developing locality with many Lodha Projects in vicinity. Good Status For Sale connectivity to NH4 via Kalyan-Shil Phata road.
  • 50. Ranking of selected land parcels: Land parcels considered for proposed Integrated Township development SR. No. Parameter Near Opposite Near Bapgaon Devrung Regency Mutha Nandivli village village Estate college village 1 Location Access Road (status and ROW of the 2 road) 3 Frontage of the property 4 Contiguity of the land parcel 5 Catchments for the property Residential Commercial 6 Title of the property/ownership NA NA NA NA NA Suitability of the property for a 7 township development today Pricing (considering the achievable 8 sale price) 9 Final score / rank 5 2 3 4 1 Base on the above methodology, the ranking of parcels is as follows: Rank 1 LAND NEAR RELAX HOTEL, NANDIVLI VILLAGE 3 High Rank 2 LAND OPPSITE MUTHA COLLEGE, ADHARWADI 2 Mid Rank 3 LAND NEAR BAPGAON VILLAGE 1 Low
  • 51. Inference: Kalyan-Dombivli • Residential property markets in Kalyan-Dombivli witnessed steady demand over last 3-4 years with an increase in migration of working class population. • Land in prime locations in Khadakpada, Godrej Hill and Shil Phata areas is extremely costly with per Sq.Ft cost is as high as Rs.3200 • Rapid growth is observed in Khadakpada, Godrej hill, Adharwadi, Ambivli, Kalyan-Bhiwandi Shil Phata road and Nandivli areas. • A strong demand for 2-BHK and 3BHK homes in the range of 900 sft to 1500 sft. • Amenities such as swimming pool, jogging track, Acupressure Park, children’s play area, cycling track, community hall, etc. are on offer. • Some projects also provide bus service to station. We would also highlight the fact that bus service is one of the most preferred amenities amongst the prospective home buyers. • The average property rate for residential projects are in the range of Rs. 2100–2900 per sqft. • The average rate for projects in Kalyan-Dombivali belt is around Rs. 2400 per sq ft. and for projects in Badlapur-Ambernath belt is around Rs. 1700 per sq ft. • We have observed that the property prices of projects located in Mumbai beyond Thane have increased in the range of 5-6% as compared to previous quarter, possibly a pointer to improving sentiments in the market. • The area presents various affordable options to home buyers. Most of the buyers belong to the Lower Income Group (household income upto Rs. 25,000/- p.m.) and the Middle Income Group (household income Rs. 25,000 to Rs. 50,000 p.m.). • Given the base capital value of each type of apartment i.e. 1 BHK (12.75 lacs), 2 BHK (19.08 lacs) and 3 BHK (24.82 lacs), the average monthly income levels required to purchase the property, assuming that the home buyer opts for a home loan equal to 80% of the Property value for a term of 20 years, would be as below – • 1 BHK @ 12.75 lacs onwards >= 24500 • 2 BHK @ 19.08 lacs onwards >= 37000 • 3 BHK @ 24.82 lacs onwards >= 48000 • Most of the developers are expecting majority of the transactions to happen during the festive season (Dussera to Diwali). • Construction quality is largely average. • It is also observed that there is a deficiency of quality Shopping Malls and multiplexes in the area and hence, of spaces like Lifestyles, In Orbit, Korum mall etc.
  • 52. Inference: Ambernath-Badlapur • Residential property markets in Ambernath-Badlapur witnessed steady demand over last 3-4 years with an increase in migration of working Middleclass population. • A strong demand for 1-BHK and 2-BHK homes in the range of 400 sft to 900 sft. • Also, a healthy supply of 3-BHK homes and Row houses is noticed. • Amenities such as swimming pool, club house, children’s play area & gymnasium etc. are on offer. • We would also highlight the fact that bus service to station would be one of the best selling points and a preferred amenity amongst the prospective home buyers. • The average property rate for residential projects are in the range of Rs. 1200–2100 per sqft. • The average rate for projects in Badlapur-Ambernath belt is around Rs. 1800 per sq ft. • We have observed that the residential property prices in the Ambernath-Badlapur belt have increased by 20-25% over the previous year. • The area presents various affordable options to home buyers. Most of the buyers belong to the Lower Income Group (household income upto Rs. 25,000/- p.m.) and the Middle Income Group (household income Rs. 25,000 to Rs. 50,000 p.m.). • Given the base capital value of each type of apartment i.e. 1 BHK (11.77 lacs), 2 BHK (15.93 lacs), the average monthly income levels required to purchase the property, assuming that the home buyer opts for a home loan equal to 80% of the Property value for a term of 20 years, would be as below – • 1 BHK @ 11.77 lacs onwards >= 22,716 • 2 BHK @ 15.93 lacs onwards >= 30,745 • Most of the developers are expecting major transactions to happen during the festive season. • Construction quality is largely poor to average. • The value of land parcels in the green zone or in the vicinity of green zone is comparatively cheaper than that in the residential zone, especially the ones in vicinity of river Ulhas.
  • 53. Recommendations: Kalyan-Dombivli • The residential property market in Kalyan-Dombivli is highly attractive for immediate commencement of a large integrated township development supported with world-class amenities. • Large size land parcels are available at and around Khadakpada/ Godrej Hill area & Kalyan-Shil Phata areas which are highly suitable for the proposed township development. • Good connectivity and fast developing infrastructure facilities support immediate development and project take-off, keeping in mind the improving sentiments of the real estate sector. • An Integrated Township with a combination of 1, 2 & 3 BHK homes targeted towards LIG/ MIG with good amenities and open spaces will be successful even in remote locations like Adharwadi and Nandivali and can be classified as a premium residential project in the Kalyan-Dombivli belt taking into account the amenities offered in the project. • Such areas have good future potential owing to the current projects in Khadakpada and Kalyan-Bhiwandi Shil Phata road, respectively and ongoing projects of a simlar kind have received a very good response. • The average property rate of projects with similar amenities is in the range of Rs. 2900 – Rs. 3100 per sqft. • However we opine that, to arrive at a competitive rate to be at par with similar kind of residential development, this rate may be discounted on account of the reasons given below- • Location: Considering the location of the proposed township which may be comparatively remote; the rate prevalent for such kind of development in Kalyan-Dombivli needs to be discounted. • Stage of Construction: The construction of the project is yet to commence, thus we opine that there is a need to discount the property rate further. • On account of all the above-mentioned factors, even after considering the amenities provided, overall the property rate for the proposed township needs to be discounted by 10-15%. • The competitive rate thus works out to be in the range of Rs. 2610 - 2790 per sq ft.
  • 54. Recommendations: Ambernath-Badlapur • The residential property market in Ambernath-Badlapur is highly attractive for development like a large integrated township development. • Large size land parcels are available at and around Badlapur village that are highly suitable for the proposed township development. • Good connectivity and developing infrastructure facilities supports such an investment in land parcel. • An Integrated Township with a combination of 1, 2 & 3 BHK homes, Villas, Bungalows, Row houses targeted towards LIG/ MIG with good amenities + open spaces will be successful in remote locations like Badlapur village or even Shirgaon for example. • It will be considered as a premium residential project in the Ambernath-Badlapur belt taking into account the amenities offered in the project and will have a good future potential + land value appreciation. • The average property rate of projects with similar amenities is in the range of Rs. 1200 – Rs. 2100 per sqft. • However we opine that, to arrive at a competitive rate to be at par with similar kind of residential development in the future, this rate may be discounted on account of the reasons given below- • Location: Considering the location of the proposed township which may be comparatively remote; the rate prevalent for such kind of development in Ambernath-Badlapur needs to be discounted. • Stage of Construction: The construction of the project is yet to commence, thus we opine that there is a need to discount the property rate further. • On account of all the above-mentioned factors, even after considering the amenities provided, overall the property rate for the proposed township needs to be discounted by approx. 10%. • The competitive rate thus works out to be in the range of Rs. 1080 - 1890 per sq ft approx. • It would also recommended that discounted rate is to be provided only if the development in this region is of the same nature and competence level.
  • 55. Thank you. - Nipun Shivalkar