REPORT
ON
PRACTICAL TRAINING
A
SAIL( BHILAI STEEL PLANT)
Submitted in the partial fulfillment of
Bachelor of Technology Degree
of Jodhpur National University,
Jodhpur.
SUBMITTED To: SUBMITTED BY :
Ms.------------------ Narendra Singh Shekhawat
Seminar Incharge Roll No.: 14ET405205
Department of MECH 4th Year (7th semester)
DEPARTMENT OF ELECTRONICS & COMMUNICATION ENGINEERING
FACULTY OF ENGINEERING & TECHNOLOGY
JODHPUR NATIONAL UNIVERSITY, JODHPUR (RAJ.)
2015-2016
Acknowledgement
As the technologically advancement will enable us to get the environment
we desire. The basic beatitude, bliss, euphoria & our endeavor to achieve
complete and perfect knowledge in the field we choose that accompany the
successful completion of any task would not be complete without the
expression of appreciation of simple virtues to the people who made it
possible. So, with reverence honor I acknowledge all those guidance and
encouragement has made successful completion of training.
I am thankful to Mr. S.K.Marathe, H.R.D. Department, for his
constant cooperation and able guidance & without his support this work
would not have been so understandable.
I am also thankful to Ms¸ , HOD Mechanical
Department, JNU . who is always mentor to us.
I am also very thankful to all respected persons who have directly or
indirectly helped me in my earnest effort to accomplish this training.
Submitted By
Narendra Singh Shekhawat
Preface
Content
CHAPTER-1......................................................................................................1-5
1.1 INTRODUCTION..........................................................................................1
1.2 BHILAI STEEL PLANT................................................................................1
1.3HUMAN PROFILE........................................................................................ 3
1.4 BHILAI STEEL PLANT - MAJOR LANDMARKS....................................5
CHAPTER-2......................................................................................................6-8
2.1 ORE HANDLING PLANT .....................................................................6
2.2 SALIENT FEATURES OF OHP………………………………………….. 6
2.3 RECEIPT / UNLOADING OF RAW MATERIALS…………………….... 7
2.4 STORAGE / BEDDING -BLENDING OF RAW MATERIALS…………. 7
2.5 SUPPLY OF RAW MATERIALS TO CONSUMER SHOPS …………….7
2.6 OBJECTIVES OF OHP……………………………………………………. 8
CHAPTER-3....................................................................................................9-11
3.1 SINTERING PLANT -1.................................................................................9
3.2 FUNCTION....................................................................................................9
3.3 RAW MATERIALS RECEIVING SECTION..............................................9
3.4 RAW MATERIALS SCREENING AND FLUX CRUSHING...................10
3.4.1 SECTION........................................................................................10
3.5 FUEL CRUSHING & FLUX SCREENING SECTION..............................10
3.6 MACHINE BUILDING...............................................................................10
CHAPTER-4..................................................................................................12-14
4.1 SINTERING PLANT –II..............................................................................12
4.2 GENERAL....................................................................................................12
4.3 RAW MATERIALS.....................................................................................12
4.4 RAW MATERIAL SECTION......................................................................13
4.5 INSTALLATION OF RAW MATERIAL SCREEN................................. 13
CHAPTER-5..................................................................................................15-17
5.1 COKE OVEN...............................................................................................15
5.2 IMPORTANCE OF COKE IN IRON & STEEL INDUSTRY....................15
5.3 FUNCTION OF COKE OVEN..............................................................15
5.4 THE COKE OVEN DEPARTMENT SUB-SECTION .........................16
5.5 CONVERSION OF COAL INTO COKE..............................................16
5.6 COMPOSITIONOF COKE OVEN GAS ...................................................17
CHAPTER-6..................................................................................................18-24
6.1 BLAST FURNACE......................................................................................18
6.1.1 IRON PRODUCTIONBASICS...............................................................18
6.2 WHAT IS A BLAST FURNACE?..............................................................19
6.3 BLAST FURNACE CONSTRUCTIONALFEATURES...........................20
6.4 THE BASIC RAW MATERIALS AND THEIR FUNCTION...................21
6.5 DIFFERENT TEMPERATURE IN BF.......................................................22
6.6 VITAL FUNCTION OF THE HOT GAS ...............................................22
6.7 TAPPING................................................................................................23
6.8 REACTION IN THE THE BLAST FURNACE......................................23
6.8.1 UPPER STACK ZONE.............................................................23
6.8.2 MIDDLE STACK ZONE...............................................................24
6.8.3 LOWER STACK ZONE................................................................24
CHAPTER-7..................................................................................................25-30
7.1 STEEL MELTING SHOP-I .........................................................................25
7.1.1 MIXER............................................................................................26
7.1.2 STOCKYARD............................................................................... 27
7.1.3 FURNACE..................................................................................... 28
7.1.4STRIPPER YARD...........................................................................29
CHAPTER-8..................................................................................................31-35
8.1 MERCHANT MILL ....................................................................................31
8.2 RAW MATERIALS.....................................................................................32
8.3 IMPORTANT TECHNICAL PARAMETERS OF THE FURNACE........32
8.4 THE WORKING OF THE MILL.................................................................33
8.5 NOTES ON IMPORTANT MODIFICATIONS ........................................ 35
CHAPTER-9..................................................................................................36-64
9.1 STEEL MELTING SHOP-II.......................................................................36
9.2 BSP STEEL MAKING:CONV. & CONCAST ROUTE........................... 37
9.3 OPERATION CYCLE ................................................................................37
9.4 CONVERTOR SHOP: KEY POINTS ...................................................38
9.5 REACTIONS......................................................................................38
9.5.1 De-Siliconisation............................................................................ 38
9.5.2 De-Phosphorisation ........................................................................38
9.5.3 Manganese Removal ......................................................................39
9.5.4 De-Carburization............................................................................ 39
9.5.5 De-Sulphurisation ...........................................................................39
9.6 SAMPLE ANALYSIS AND TEMP. MEASUREMENT .......................39
9.7CONCEPT OF RE-BLOW.................................................................... 40
9.8 TAPPING OF STEEL ..........................................................................41
9.9 SLAG SPLASHING............................................................................. 41
9.10DIFFERENT SECTIONS OF CONVERTER SHOP................................ 42
9.10.1 SCRAP YARD....................................................................... 42
9.10.2 MIXER SECTION........................................................................43
9.10.2.1 PURPOSE.......................................................................44
9.10.3 HOT METAL DESULPHURISATION .....................................45
9.10.3.1PROCESS STEPS ...........................................................46
9.10.4 LADLE PREPARATIONSECTION......................................... 47
9.10.4.1 ACTIVITIES ..................................................................47
9.10.5 SLAG POT HANDLING SECTION..........................................47
9.10.5.1ACTIVITIES....................................................................47
9.10.6 FERRO ALLOY HANDLING SECTION ................................47
9.10.7 BULK MATERIAL HANDLING SECTION ............................48
9.10.8 GAS CLEANING PLANT ..........................................................49
9.11 ARGON RINSING BAY ..........................................................................49
9.11.1 ARGON RINSING UNIT .....................................................50
9.12 SMS-II SECONDARY REFINING UNITS COMPRIS THREE UNITS 50
9.13 LF OPERATION........................................................................................51
9.13.1 LF OPERATION CYCLE........................................................52
9.14 OBJECTIVES OF RH DEGASSER..........................................................53
9.14.1 RH OPERATIONCYCLE………………………………………54
9.14.2DESIGNPARAMETERS OF RH DEGASSER.....................................55
9.15 CONTINUOUS CASTING SHOP............................................................ 55
9.16 TUNDISH PREPARATIONBAY ............................................................55
9.17CASTING BAY..........................................................................................57
9.18 GENERAL FEATURES OF BLOOM CASTER......................................58
9.19 FEATURES OF NEW No. 6 SLAB CASTER..........................................58
9.20 CASTING PROCESS ……………………………………………………60
9.21 LADLE SUPPORT...............................................................................61
9.22 TUNDISH........................................................................................... 61
9.23 MOULDS AND MOULD OSCILLATION..............................................62
9.24 TYPES OF COOLING PROCESS ............................................................62
9.24.1 PRIMARY COOLING................................................................. 62
9.24.2 SECONDARY COOLING............................................................63
9.24.3 RADIATIVE COOLING..............................................................63
9.25 MAINTENANCE BAY............................................................................ 64
9.26 DISCHARGE BAY ..................................................................................64
9.27 SLAB & BLOOM STORAGEYARD ......................................................64
List of Figures
Figures=1 PLANT LAYOUT ........................................................................4
Figures=2 ORE HANDLING PLANT............................................................6
Figures=3 ELECTROTATIC PRECIPITATOR...........................................14
Figures=4 COKE OVEN.............................................................................15
Figures=5 CONVERSION OF COAL INTO COKE.........................................16
Figures=6 COKE OVEN LAYOUT...................................................................17
Figures=7 BLAST FURNACE......................................................................18
Figures=8 BLAST FURNACE CONSTRUCTIONALFEATURES................20
Figures=9 DIFFERENT TEMPERATURE IN BF...........................................22
Figures=10 STEEL MAKING ANIMATION..............................................24
Figures=11 STEEL MELTING SHOP-I............................................................25
Figures=12 FURNACE......................................................................................28
Figures=13 MERCHANT MILL........................................................................31
Figures=14 STEEL MELTING SHOP-II...........................................................36
Figures=15 STEEL MAKING:CONV. & CONCAST ROUTE........................37
Figures=16 CONCEPT OF RE-BLOW..........................................................40
Figures=17 SCRAP YARD................................................................................42
Figures=18 SCRAP YARD..............................................................................42
Figures=19 MIXER SECTION..........................................................................43
Figures=20 MIXER SECTION..........................................................................44
Figures=21 HOT METAL DESULPHURISATION..........................................45
Figures=22 HOT METAL DESULPHURISATION.........................................46
Figures=23 BULK MATERIAL HANDLING SECTION................................48
Figures=24 LF OPERATION............................................................................51
Figures=25 LF OPERATION CYCLE...............................................................52
Figures=26 OBJECTIVES OF RH DEGASSER..............................................53
Figures=27 RH OPERATIONCYCLE............................................................54
Figures=28 CASTING BAY.............................................................................56
Figures=29 CASTING PROCESS....................................................................60
Figures=30 TUNDISH:....................................................................................61
Figures=31 PRIMARY COOLING..................................................................62
Figures=32 SECONDARY COOLING............................................................63
List of Tables
Tables=1 BATTERY DATA..............................................................................17
Tables=2 OPERATION CYCLE........................................................................37
Tables=3 LF OPERATIONCYCLE..................................................................52
Tables=4 GENERAL FEATURES OF SLAB CASTERS.................................57
Tables=5 GENERAL FEATURES OF BLOOM CASTER...............................58
Tables=6 FEATURES OF NEW No. 6 SLAB CASTER...................................58

More Related Content

What's hot

Summer internship at QATAR
Summer internship at QATARSummer internship at QATAR
Summer internship at QATARElise M. Mansour
 
Naita training report Electro serv
Naita training report Electro servNaita training report Electro serv
Naita training report Electro servVishanMadushanka
 
Training Report WSO2 internship
Training Report  WSO2 internshipTraining Report  WSO2 internship
Training Report WSO2 internshipKeet Sugathadasa
 
NVQ 6 Electrical Technology Industrial Training Report
NVQ 6 Electrical Technology Industrial Training ReportNVQ 6 Electrical Technology Industrial Training Report
NVQ 6 Electrical Technology Industrial Training Reportpathumsandaruwan3
 
Internship Report in L&T Constructions
Internship Report in L&T ConstructionsInternship Report in L&T Constructions
Internship Report in L&T Constructionssanjay choudhary
 
A training report by vishal singh
A training report by vishal singhA training report by vishal singh
A training report by vishal singhVISHALSINGH1435
 
L&T MHPS Internship report
L&T MHPS Internship  report L&T MHPS Internship  report
L&T MHPS Internship report Uruf Nezami
 
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)amal babu
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838Bryan Chong Liang Chua
 
internship final report 1
internship final report 1internship final report 1
internship final report 1Rahul Singh
 
In-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEIn-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEMargret Anouncia
 
Contoh Report Latihan Industri
Contoh Report Latihan IndustriContoh Report Latihan Industri
Contoh Report Latihan IndustriDhom Nawhki
 

What's hot (20)

NATPET Report
NATPET ReportNATPET Report
NATPET Report
 
Summer internship at QATAR
Summer internship at QATARSummer internship at QATAR
Summer internship at QATAR
 
In-Plant Training Report
In-Plant Training ReportIn-Plant Training Report
In-Plant Training Report
 
Naita training report Electro serv
Naita training report Electro servNaita training report Electro serv
Naita training report Electro serv
 
Training Report WSO2 internship
Training Report  WSO2 internshipTraining Report  WSO2 internship
Training Report WSO2 internship
 
YANPET Report
YANPET ReportYANPET Report
YANPET Report
 
NVQ 6 Electrical Technology Industrial Training Report
NVQ 6 Electrical Technology Industrial Training ReportNVQ 6 Electrical Technology Industrial Training Report
NVQ 6 Electrical Technology Industrial Training Report
 
A Project Report on CNC Training
A Project Report on CNC TrainingA Project Report on CNC Training
A Project Report on CNC Training
 
Internship Report in L&T Constructions
Internship Report in L&T ConstructionsInternship Report in L&T Constructions
Internship Report in L&T Constructions
 
COOP REPORT
COOP REPORTCOOP REPORT
COOP REPORT
 
A training report by vishal singh
A training report by vishal singhA training report by vishal singh
A training report by vishal singh
 
report
reportreport
report
 
Internship report 2015
Internship report 2015Internship report 2015
Internship report 2015
 
L&T MHPS Internship report
L&T MHPS Internship  report L&T MHPS Internship  report
L&T MHPS Internship report
 
Training Report
Training ReportTraining Report
Training Report
 
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
SUMMER INTERNSHIP REPORT 2016 (MECHANICAL ENGINEERING)
 
QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838QS Industrial Training Report - CHUA CHONG LIANG 1104838
QS Industrial Training Report - CHUA CHONG LIANG 1104838
 
internship final report 1
internship final report 1internship final report 1
internship final report 1
 
In-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSEIn-plant Training Guidelines_SCSE
In-plant Training Guidelines_SCSE
 
Contoh Report Latihan Industri
Contoh Report Latihan IndustriContoh Report Latihan Industri
Contoh Report Latihan Industri
 

Viewers also liked

Golden gate
Golden gateGolden gate
Golden gate33henry
 
Loui Byrdziak - bali indonesia manufacturing accessories and sarongs
Loui Byrdziak -  bali indonesia manufacturing accessories and sarongsLoui Byrdziak -  bali indonesia manufacturing accessories and sarongs
Loui Byrdziak - bali indonesia manufacturing accessories and sarongsLoui Byrdziak
 
Llom de conill amb xocolata
Llom de conill amb xocolataLlom de conill amb xocolata
Llom de conill amb xocolataFricash
 
Computação Forense com Software Livre
Computação Forense com Software LivreComputação Forense com Software Livre
Computação Forense com Software LivreFabrício Basto
 
Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5ermesto
 
Tester pyroteknik ågesta 2015 08-25
Tester pyroteknik ågesta 2015 08-25Tester pyroteknik ågesta 2015 08-25
Tester pyroteknik ågesta 2015 08-25Marcus Jerräng
 
Forward Contracting and Investment in Electrical Generation Capacity
Forward Contracting and Investment in Electrical Generation CapacityForward Contracting and Investment in Electrical Generation Capacity
Forward Contracting and Investment in Electrical Generation CapacityGladstone Alves
 
Guia 2 fundamentacion
Guia 2 fundamentacion Guia 2 fundamentacion
Guia 2 fundamentacion jhonfospino
 
Antimicrobianos Em Cirurgia
Antimicrobianos Em CirurgiaAntimicrobianos Em Cirurgia
Antimicrobianos Em CirurgiaRenato Bach
 
Programa semana santa en ayacucho 2014
Programa semana santa en ayacucho 2014Programa semana santa en ayacucho 2014
Programa semana santa en ayacucho 2014Ysa Tours
 
Micosis subcutáneas
Micosis subcutáneas Micosis subcutáneas
Micosis subcutáneas Leonel Lopez
 
Riesgos de la informacion parte b unidad 3
Riesgos de la informacion parte b unidad 3Riesgos de la informacion parte b unidad 3
Riesgos de la informacion parte b unidad 3JAMARO7017
 
Myrddin Wooding Design Portfolio
Myrddin Wooding Design PortfolioMyrddin Wooding Design Portfolio
Myrddin Wooding Design PortfolioMyrddin Wooding
 

Viewers also liked (20)

Diseño arquitectonico
Diseño arquitectonicoDiseño arquitectonico
Diseño arquitectonico
 
Golden gate
Golden gateGolden gate
Golden gate
 
Loui Byrdziak - bali indonesia manufacturing accessories and sarongs
Loui Byrdziak -  bali indonesia manufacturing accessories and sarongsLoui Byrdziak -  bali indonesia manufacturing accessories and sarongs
Loui Byrdziak - bali indonesia manufacturing accessories and sarongs
 
Octavo ejercicio layout1
Octavo ejercicio layout1Octavo ejercicio layout1
Octavo ejercicio layout1
 
Llom de conill amb xocolata
Llom de conill amb xocolataLlom de conill amb xocolata
Llom de conill amb xocolata
 
Gerenciamento de Crises
Gerenciamento de Crises Gerenciamento de Crises
Gerenciamento de Crises
 
Computação Forense com Software Livre
Computação Forense com Software LivreComputação Forense com Software Livre
Computação Forense com Software Livre
 
Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5
 
Alzheimer
AlzheimerAlzheimer
Alzheimer
 
Tester pyroteknik ågesta 2015 08-25
Tester pyroteknik ågesta 2015 08-25Tester pyroteknik ågesta 2015 08-25
Tester pyroteknik ågesta 2015 08-25
 
Forward Contracting and Investment in Electrical Generation Capacity
Forward Contracting and Investment in Electrical Generation CapacityForward Contracting and Investment in Electrical Generation Capacity
Forward Contracting and Investment in Electrical Generation Capacity
 
Guia 2 fundamentacion
Guia 2 fundamentacion Guia 2 fundamentacion
Guia 2 fundamentacion
 
EMS - BNI ORLEANS
EMS - BNI ORLEANSEMS - BNI ORLEANS
EMS - BNI ORLEANS
 
Antimicrobianos Em Cirurgia
Antimicrobianos Em CirurgiaAntimicrobianos Em Cirurgia
Antimicrobianos Em Cirurgia
 
Programa semana santa en ayacucho 2014
Programa semana santa en ayacucho 2014Programa semana santa en ayacucho 2014
Programa semana santa en ayacucho 2014
 
Maluma
Maluma Maluma
Maluma
 
Micosis subcutáneas
Micosis subcutáneas Micosis subcutáneas
Micosis subcutáneas
 
Hoja de vida heliodoro huertas
Hoja de vida heliodoro huertasHoja de vida heliodoro huertas
Hoja de vida heliodoro huertas
 
Riesgos de la informacion parte b unidad 3
Riesgos de la informacion parte b unidad 3Riesgos de la informacion parte b unidad 3
Riesgos de la informacion parte b unidad 3
 
Myrddin Wooding Design Portfolio
Myrddin Wooding Design PortfolioMyrddin Wooding Design Portfolio
Myrddin Wooding Design Portfolio
 

Similar to Front

InternshipReportFormat.docx
InternshipReportFormat.docxInternshipReportFormat.docx
InternshipReportFormat.docxssuser2fe708
 
Fyp report UNIKL MFI tengku
Fyp report UNIKL MFI tengkuFyp report UNIKL MFI tengku
Fyp report UNIKL MFI tengkuhafiz zahari
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training ReportAalap Valia
 
Highway wind turbine report
Highway wind turbine reportHighway wind turbine report
Highway wind turbine reportAli Rehman
 
Training report for nbc
Training report for nbcTraining report for nbc
Training report for nbcHitesh Sharma
 
Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Viswanath Raju Indukuri
 
rigid and flexiable pavement of highway Project bbjr report
rigid and flexiable pavement of highway Project bbjr reportrigid and flexiable pavement of highway Project bbjr report
rigid and flexiable pavement of highway Project bbjr reportrakeshchoudhary129
 
Dual-Band Mobile Phone Jammer
Dual-Band Mobile Phone JammerDual-Band Mobile Phone Jammer
Dual-Band Mobile Phone JammerMohamed Atef
 
Industrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectIndustrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectMohamed Juzaafi
 
Industrial Training Report - SLT
Industrial Training Report - SLTIndustrial Training Report - SLT
Industrial Training Report - SLTsivakumar haameshan
 
3 d pringting report pdf
3 d pringting report pdf3 d pringting report pdf
3 d pringting report pdfANKIT SHARMA
 
Report on power line career communication by ramanand sagar
Report on power line career communication by ramanand sagarReport on power line career communication by ramanand sagar
Report on power line career communication by ramanand sagarRamanand Sagar
 
Internship report-csit-isp_networking
 Internship report-csit-isp_networking Internship report-csit-isp_networking
Internship report-csit-isp_networkingsagarAcharya35
 
2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Trainingahmadravian317
 
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningRole of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningPavan Josyula
 
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)Kamalendu Ghosh
 

Similar to Front (20)

InternshipReportFormat.docx
InternshipReportFormat.docxInternshipReportFormat.docx
InternshipReportFormat.docx
 
Fyp report UNIKL MFI tengku
Fyp report UNIKL MFI tengkuFyp report UNIKL MFI tengku
Fyp report UNIKL MFI tengku
 
Summer Training Report
Summer Training ReportSummer Training Report
Summer Training Report
 
Experience at WSO2 as an Intern
Experience at WSO2 as an InternExperience at WSO2 as an Intern
Experience at WSO2 as an Intern
 
Highway wind turbine report
Highway wind turbine reportHighway wind turbine report
Highway wind turbine report
 
P[1].hd book director 2_1
P[1].hd book director 2_1P[1].hd book director 2_1
P[1].hd book director 2_1
 
Training report for nbc
Training report for nbcTraining report for nbc
Training report for nbc
 
Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.Report on Steamt Turbines, BHEL HYDERABAD.
Report on Steamt Turbines, BHEL HYDERABAD.
 
rigid and flexiable pavement of highway Project bbjr report
rigid and flexiable pavement of highway Project bbjr reportrigid and flexiable pavement of highway Project bbjr report
rigid and flexiable pavement of highway Project bbjr report
 
Dual-Band Mobile Phone Jammer
Dual-Band Mobile Phone JammerDual-Band Mobile Phone Jammer
Dual-Band Mobile Phone Jammer
 
Industrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development ProjectIndustrial Training Report, UmaOya Downstream Development Project
Industrial Training Report, UmaOya Downstream Development Project
 
Industrial Training Report - SLT
Industrial Training Report - SLTIndustrial Training Report - SLT
Industrial Training Report - SLT
 
Report 2
Report 2Report 2
Report 2
 
3 d pringting report pdf
3 d pringting report pdf3 d pringting report pdf
3 d pringting report pdf
 
project report erp
project report erpproject report erp
project report erp
 
Report on power line career communication by ramanand sagar
Report on power line career communication by ramanand sagarReport on power line career communication by ramanand sagar
Report on power line career communication by ramanand sagar
 
Internship report-csit-isp_networking
 Internship report-csit-isp_networking Internship report-csit-isp_networking
Internship report-csit-isp_networking
 
2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training2 university haider report.pdf Supervised Industrial Training
2 university haider report.pdf Supervised Industrial Training
 
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground MiningRole of Rock Mechanics in Mining Industry : Applications in Underground Mining
Role of Rock Mechanics in Mining Industry : Applications in Underground Mining
 
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)
Numerical Analysis of Tuned Liquid Dampers - Kamalendu Ghosh (09CE3112)
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Front

  • 1. REPORT ON PRACTICAL TRAINING A SAIL( BHILAI STEEL PLANT) Submitted in the partial fulfillment of Bachelor of Technology Degree of Jodhpur National University, Jodhpur. SUBMITTED To: SUBMITTED BY : Ms.------------------ Narendra Singh Shekhawat Seminar Incharge Roll No.: 14ET405205 Department of MECH 4th Year (7th semester) DEPARTMENT OF ELECTRONICS & COMMUNICATION ENGINEERING FACULTY OF ENGINEERING & TECHNOLOGY JODHPUR NATIONAL UNIVERSITY, JODHPUR (RAJ.) 2015-2016
  • 2. Acknowledgement As the technologically advancement will enable us to get the environment we desire. The basic beatitude, bliss, euphoria & our endeavor to achieve complete and perfect knowledge in the field we choose that accompany the successful completion of any task would not be complete without the expression of appreciation of simple virtues to the people who made it possible. So, with reverence honor I acknowledge all those guidance and encouragement has made successful completion of training. I am thankful to Mr. S.K.Marathe, H.R.D. Department, for his constant cooperation and able guidance & without his support this work would not have been so understandable. I am also thankful to Ms¸ , HOD Mechanical Department, JNU . who is always mentor to us. I am also very thankful to all respected persons who have directly or indirectly helped me in my earnest effort to accomplish this training. Submitted By Narendra Singh Shekhawat
  • 4. Content CHAPTER-1......................................................................................................1-5 1.1 INTRODUCTION..........................................................................................1 1.2 BHILAI STEEL PLANT................................................................................1 1.3HUMAN PROFILE........................................................................................ 3 1.4 BHILAI STEEL PLANT - MAJOR LANDMARKS....................................5 CHAPTER-2......................................................................................................6-8 2.1 ORE HANDLING PLANT .....................................................................6 2.2 SALIENT FEATURES OF OHP………………………………………….. 6 2.3 RECEIPT / UNLOADING OF RAW MATERIALS…………………….... 7 2.4 STORAGE / BEDDING -BLENDING OF RAW MATERIALS…………. 7 2.5 SUPPLY OF RAW MATERIALS TO CONSUMER SHOPS …………….7 2.6 OBJECTIVES OF OHP……………………………………………………. 8 CHAPTER-3....................................................................................................9-11 3.1 SINTERING PLANT -1.................................................................................9 3.2 FUNCTION....................................................................................................9 3.3 RAW MATERIALS RECEIVING SECTION..............................................9 3.4 RAW MATERIALS SCREENING AND FLUX CRUSHING...................10 3.4.1 SECTION........................................................................................10 3.5 FUEL CRUSHING & FLUX SCREENING SECTION..............................10 3.6 MACHINE BUILDING...............................................................................10 CHAPTER-4..................................................................................................12-14 4.1 SINTERING PLANT –II..............................................................................12 4.2 GENERAL....................................................................................................12 4.3 RAW MATERIALS.....................................................................................12 4.4 RAW MATERIAL SECTION......................................................................13 4.5 INSTALLATION OF RAW MATERIAL SCREEN................................. 13 CHAPTER-5..................................................................................................15-17 5.1 COKE OVEN...............................................................................................15 5.2 IMPORTANCE OF COKE IN IRON & STEEL INDUSTRY....................15 5.3 FUNCTION OF COKE OVEN..............................................................15 5.4 THE COKE OVEN DEPARTMENT SUB-SECTION .........................16 5.5 CONVERSION OF COAL INTO COKE..............................................16 5.6 COMPOSITIONOF COKE OVEN GAS ...................................................17
  • 5. CHAPTER-6..................................................................................................18-24 6.1 BLAST FURNACE......................................................................................18 6.1.1 IRON PRODUCTIONBASICS...............................................................18 6.2 WHAT IS A BLAST FURNACE?..............................................................19 6.3 BLAST FURNACE CONSTRUCTIONALFEATURES...........................20 6.4 THE BASIC RAW MATERIALS AND THEIR FUNCTION...................21 6.5 DIFFERENT TEMPERATURE IN BF.......................................................22 6.6 VITAL FUNCTION OF THE HOT GAS ...............................................22 6.7 TAPPING................................................................................................23 6.8 REACTION IN THE THE BLAST FURNACE......................................23 6.8.1 UPPER STACK ZONE.............................................................23 6.8.2 MIDDLE STACK ZONE...............................................................24 6.8.3 LOWER STACK ZONE................................................................24 CHAPTER-7..................................................................................................25-30 7.1 STEEL MELTING SHOP-I .........................................................................25 7.1.1 MIXER............................................................................................26 7.1.2 STOCKYARD............................................................................... 27 7.1.3 FURNACE..................................................................................... 28 7.1.4STRIPPER YARD...........................................................................29 CHAPTER-8..................................................................................................31-35 8.1 MERCHANT MILL ....................................................................................31 8.2 RAW MATERIALS.....................................................................................32 8.3 IMPORTANT TECHNICAL PARAMETERS OF THE FURNACE........32 8.4 THE WORKING OF THE MILL.................................................................33 8.5 NOTES ON IMPORTANT MODIFICATIONS ........................................ 35 CHAPTER-9..................................................................................................36-64 9.1 STEEL MELTING SHOP-II.......................................................................36 9.2 BSP STEEL MAKING:CONV. & CONCAST ROUTE........................... 37 9.3 OPERATION CYCLE ................................................................................37 9.4 CONVERTOR SHOP: KEY POINTS ...................................................38 9.5 REACTIONS......................................................................................38 9.5.1 De-Siliconisation............................................................................ 38 9.5.2 De-Phosphorisation ........................................................................38 9.5.3 Manganese Removal ......................................................................39
  • 6. 9.5.4 De-Carburization............................................................................ 39 9.5.5 De-Sulphurisation ...........................................................................39 9.6 SAMPLE ANALYSIS AND TEMP. MEASUREMENT .......................39 9.7CONCEPT OF RE-BLOW.................................................................... 40 9.8 TAPPING OF STEEL ..........................................................................41 9.9 SLAG SPLASHING............................................................................. 41 9.10DIFFERENT SECTIONS OF CONVERTER SHOP................................ 42 9.10.1 SCRAP YARD....................................................................... 42 9.10.2 MIXER SECTION........................................................................43 9.10.2.1 PURPOSE.......................................................................44 9.10.3 HOT METAL DESULPHURISATION .....................................45 9.10.3.1PROCESS STEPS ...........................................................46 9.10.4 LADLE PREPARATIONSECTION......................................... 47 9.10.4.1 ACTIVITIES ..................................................................47 9.10.5 SLAG POT HANDLING SECTION..........................................47 9.10.5.1ACTIVITIES....................................................................47 9.10.6 FERRO ALLOY HANDLING SECTION ................................47 9.10.7 BULK MATERIAL HANDLING SECTION ............................48 9.10.8 GAS CLEANING PLANT ..........................................................49 9.11 ARGON RINSING BAY ..........................................................................49 9.11.1 ARGON RINSING UNIT .....................................................50 9.12 SMS-II SECONDARY REFINING UNITS COMPRIS THREE UNITS 50 9.13 LF OPERATION........................................................................................51 9.13.1 LF OPERATION CYCLE........................................................52 9.14 OBJECTIVES OF RH DEGASSER..........................................................53 9.14.1 RH OPERATIONCYCLE………………………………………54 9.14.2DESIGNPARAMETERS OF RH DEGASSER.....................................55 9.15 CONTINUOUS CASTING SHOP............................................................ 55 9.16 TUNDISH PREPARATIONBAY ............................................................55 9.17CASTING BAY..........................................................................................57 9.18 GENERAL FEATURES OF BLOOM CASTER......................................58 9.19 FEATURES OF NEW No. 6 SLAB CASTER..........................................58 9.20 CASTING PROCESS ……………………………………………………60 9.21 LADLE SUPPORT...............................................................................61 9.22 TUNDISH........................................................................................... 61 9.23 MOULDS AND MOULD OSCILLATION..............................................62 9.24 TYPES OF COOLING PROCESS ............................................................62
  • 7. 9.24.1 PRIMARY COOLING................................................................. 62 9.24.2 SECONDARY COOLING............................................................63 9.24.3 RADIATIVE COOLING..............................................................63 9.25 MAINTENANCE BAY............................................................................ 64 9.26 DISCHARGE BAY ..................................................................................64 9.27 SLAB & BLOOM STORAGEYARD ......................................................64
  • 8. List of Figures Figures=1 PLANT LAYOUT ........................................................................4 Figures=2 ORE HANDLING PLANT............................................................6 Figures=3 ELECTROTATIC PRECIPITATOR...........................................14 Figures=4 COKE OVEN.............................................................................15 Figures=5 CONVERSION OF COAL INTO COKE.........................................16 Figures=6 COKE OVEN LAYOUT...................................................................17 Figures=7 BLAST FURNACE......................................................................18 Figures=8 BLAST FURNACE CONSTRUCTIONALFEATURES................20 Figures=9 DIFFERENT TEMPERATURE IN BF...........................................22 Figures=10 STEEL MAKING ANIMATION..............................................24 Figures=11 STEEL MELTING SHOP-I............................................................25 Figures=12 FURNACE......................................................................................28 Figures=13 MERCHANT MILL........................................................................31 Figures=14 STEEL MELTING SHOP-II...........................................................36 Figures=15 STEEL MAKING:CONV. & CONCAST ROUTE........................37 Figures=16 CONCEPT OF RE-BLOW..........................................................40 Figures=17 SCRAP YARD................................................................................42 Figures=18 SCRAP YARD..............................................................................42 Figures=19 MIXER SECTION..........................................................................43 Figures=20 MIXER SECTION..........................................................................44 Figures=21 HOT METAL DESULPHURISATION..........................................45 Figures=22 HOT METAL DESULPHURISATION.........................................46 Figures=23 BULK MATERIAL HANDLING SECTION................................48 Figures=24 LF OPERATION............................................................................51 Figures=25 LF OPERATION CYCLE...............................................................52 Figures=26 OBJECTIVES OF RH DEGASSER..............................................53 Figures=27 RH OPERATIONCYCLE............................................................54 Figures=28 CASTING BAY.............................................................................56 Figures=29 CASTING PROCESS....................................................................60 Figures=30 TUNDISH:....................................................................................61 Figures=31 PRIMARY COOLING..................................................................62 Figures=32 SECONDARY COOLING............................................................63
  • 9. List of Tables Tables=1 BATTERY DATA..............................................................................17 Tables=2 OPERATION CYCLE........................................................................37 Tables=3 LF OPERATIONCYCLE..................................................................52 Tables=4 GENERAL FEATURES OF SLAB CASTERS.................................57 Tables=5 GENERAL FEATURES OF BLOOM CASTER...............................58 Tables=6 FEATURES OF NEW No. 6 SLAB CASTER...................................58