QUANTITY SURVEYOR
ARCHIMAG
Company History & Profile
HISTORY
Awangsa Bina Sdn Bhd, incorporated in the
year 1993 started from humble beginnings
of small to medium sized construction trade
works.
Awangsa Bina Sdn Bhd is a construction com-
pany specializing in commercial, residential,
and industrial building, as well as civil engi-
neering projects.
From 2004 onwards, they ventured into Main
Builder’s Work through the awarding of main
contracts for various construction work by
their esteemed clients.
At the meantime, they pursued in the imple-
mentation of Quality Management System
and that was successfully attained in 2007.
1
PROFILE
Over the years, they have broad-
ened their management focus into
a green business model for the sus-
tainability of the built environment
and consistently maintaining the
health and safety of their business
operations.
In 2010, they started pursued
in the implementation of Envi-
ronment Management System
and Occupational Safety and
Health Management System. They
achieved the accreditation in 2011.
The integrated management system,
QESH (Quality, Environment, Safety
& Health) Management System is in
place to propel Awangsa to greater
heights.
Basically, Awangsa Bina Sdn Bhd are
the main contractor, they undertake
the whole main building, the M&Es,
infrastructure works for the whole
completion of the building. Then for
their pay master means the devel-
oper, the cover this project, they un-
dertake the contract to construct the
building.
2
Interviewee Profile
PROFILE
Age: 30 years old
Qualification:
• Master in Project Management
• Registered member of Board of
Quantity Surveyors Malaysia Working
experience: 6 years
Previous company: Geopancar Sdn
Bhd (1 year)
Current company: Awangsa Bina Sdn
Bhd (5 year) as Senior Contract Execu-
tive Contractor or Consultancy
Contracted Project involved: 3 project;
1 completed, 2 in-progress
Thought on future:
• Intention to formulate a cost,
time, quality effective and ef-
ficient construction method/
management.
• From design stage to con-
struction stage.
MR.VOO
CHUNG JUN
3
OUR INTERVIEW PROCESS
Mr Voo explain to us very in
detail about the responsibili-
ties of quantity surveyor and
the company he is working at.
He also show us the projects
he handled and explain to us
what are the challenges he
faced through the projects.
We have learnt a
lot through out the
interview. Not just
knowledge about
QS but a way to
fight for survive in
the ‘Real World’.
4
PROJECTS
INVOLVED
BY
THE
INTERVIEWEE
5
PROJECT A- SUNWAY GEO
Single storey to 3 storey.
Retail for sale at Sunway
Geo, within an integrated
development.In Bandar
Sunway next to Malaysia’s
FIRST Elevated BRT (Bus
Rapid Transit)
PROJECT B- CONCERTO NK
Strategically located on
a 5 acre plot in Dutamas,
on the north side of Mont’
Kiara. Concerto North
Kiara is linked to Kuala
Lumpur, Petaling Jaya and
the rest of Klang Valley by
an excellent network of
roads. Overview of Con-
certo North Kiara
6
PROJECT SELECTED
CONCERTO NORTH KIARA
Information of Project
CONCERTO NORTH KIARA
Client: BCB Berhad
Appointed by: BCB Berhad (Devel-
oper)
Location: North Kiara
Type: Condominium
Area of project: 5 Arce
Contract value: RM 250,582,711.80
Time taken of project: 2 year 9
month (expected finish in July 2015)
Proposed Construction of 3
Condominium Blocks, Comprising
of Block 1 30-Storey Condomini-
um (162 Units) Residences; Block 2
32-Storey Condominium (116 units)
Residences; Block 3 30-Storey Con-
dominium (162 Units) Residence;
Podium 4-Storey Car Park and 1
M&E on the Ground Floor; 1 Unit of
Clubhouse; 1 Unit of Guardhouse;
1 Unit of Waste Collection House;
1 Unit L.P.G; Public Amenities For
Residents and Retaining Wall on
Lot PT 25954 (Lot Asal 1844 and
Lot 1845), Segambut, Mukim Batu,
Dalam Bandaraya Kuala Lumpur,
Wilayah Persekutuan.
7
Roles and Responsibility
- Main contractor must undertake the ten-
der
- They need to participate in the tender to
do the pricing and go for tending interview.
- They will get the job after the tender is
confirm by client
- After they get the job, QS is responsible
to procure with the site contractor, engi-
neer and workers who carry out the work.
- Main contractor do not do most of the
works, they will sub their work to the spe-
cialist or sub-contractor to do the work as
well.
Q&A Throughout the Interview
How he deal with cost management?“We tender have
our own budget. We will take quotation from different
contractors, sub-contractors and compare the price but
most probably we are choosing the lowest one. We also
need to check on their specification, their scope of work
which give a cheaper price to prevent unfair competition”
How he deal with cost planning and reporting?“For cost-
ing out in our site, we certify the payment to sub-contrac-
tor, we certify how much we need to pay every month
and our account will quote that payment into a system.
Therefore, inside the system we can capture the catch in
and the catch out”
8
What is the difference compare with Sunway Geo Residences
?
“Bungalow is landed property. This is high rise. Even the ma-
chinery involve like the tower and concrete bum is different. In
the landed, we don’t have this kind of machinery while the high
rise building has a more complicated machinery. The scope of
work of sub-contractor is also different.”
What is the biggest challenge you face through this 2 proj-
ects?
“Sunway is a big company and they are quite strict on quality
issue, whereas Cencerto has a longer time frame and very chill
with project due date, but they also have strict quality require-
ments. Another thing is the time issue. There is a time frame, so
everything is quite tight in submitting the tender.”
(This is just a small part of the Q&A session throughout the
Interview to let us have a surface idea that what is his task
throughout the projects)
Official website ( www.concerto.com.my)
9
GROUP MEMBERS
JANSON CHEN KEN SENG
0323047
LOH MUN TONG
0323680
KIEW CHEE YUAN
0323297
LOW HUI MING
0323827
JUN ZHE
0322076
JIJI NG
0904Y72861
10
QS TEAM
Magazine

More Related Content

What's hot

New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...kmnalam
 
Tnt Job Photos
Tnt Job PhotosTnt Job Photos
Tnt Job Photostonytredway
 
The Everkleen promise
The Everkleen promiseThe Everkleen promise
The Everkleen promiseScottDWiele
 
larry - resume (3)
larry - resume (3)larry - resume (3)
larry - resume (3)Larry Gill
 
Magazine 02
Magazine 02Magazine 02
Magazine 02pigxd123
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineSheng Zhe
 
Jonjo updated CV
Jonjo updated CVJonjo updated CV
Jonjo updated CVJonjo McGovern
 
Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Hicks
 

What's hot (11)

New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
New Product Idea is Reverse Osmosis for Exclusive Apartments For Real Estate ...
 
Tnt Job Photos
Tnt Job PhotosTnt Job Photos
Tnt Job Photos
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
The Everkleen promise
The Everkleen promiseThe Everkleen promise
The Everkleen promise
 
larry - resume (3)
larry - resume (3)larry - resume (3)
larry - resume (3)
 
CV HBP-12.07.15
CV HBP-12.07.15CV HBP-12.07.15
CV HBP-12.07.15
 
Magazine 02
Magazine 02Magazine 02
Magazine 02
 
COE Scan
COE ScanCOE Scan
COE Scan
 
ICI PROJECT 2 Magazine
ICI PROJECT 2 MagazineICI PROJECT 2 Magazine
ICI PROJECT 2 Magazine
 
Jonjo updated CV
Jonjo updated CVJonjo updated CV
Jonjo updated CV
 
Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2Robin Mark Hicks 2015 resume 2
Robin Mark Hicks 2015 resume 2
 

Similar to Magazine

Ici magazine
Ici magazineIci magazine
Ici magazineChan Yifung
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2rachaelcheong
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B MagazineForestedTiger
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2rachaelcheong
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)tfkc1212
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentKailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentShze Hwa Lee
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINETheresa Thia
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering Eric Teo
 
Ici project 2
Ici project 2Ici project 2
Ici project 2zerkai
 
Ici magazine (
Ici magazine (Ici magazine (
Ici magazine (kiraly93
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck
 
Ms compiled report
Ms compiled reportMs compiled report
Ms compiled reportHasif Alias
 
ICI Project 1b: Magazine
ICI Project 1b: MagazineICI Project 1b: Magazine
ICI Project 1b: MagazineAtiqah Ghazali
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI SANKET SENAPATI
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE kimberleyfay
 

Similar to Magazine (20)

Ici magazine
Ici magazineIci magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017Kbcl construction presentation mar 2017
Kbcl construction presentation mar 2017
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
ICI Project 1B Magazine
ICI Project 1B MagazineICI Project 1B Magazine
ICI Project 1B Magazine
 
Ici magazine 1 2
Ici magazine 1 2Ici magazine 1 2
Ici magazine 1 2
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Managementscienceassignment (2)
Managementscienceassignment (2)Managementscienceassignment (2)
Managementscienceassignment (2)
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
Resume bkj
Resume bkjResume bkj
Resume bkj
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Ici magazine (
Ici magazine (Ici magazine (
Ici magazine (
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015
 
Ms compiled report
Ms compiled reportMs compiled report
Ms compiled report
 
ICI Project 1b: Magazine
ICI Project 1b: MagazineICI Project 1b: Magazine
ICI Project 1b: Magazine
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
 

More from Arissa Loh

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final ReportArissa Loh
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final ReportArissa Loh
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation SlidesArissa Loh
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of ContractArissa Loh
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost AppraisalArissa Loh
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final ReportArissa Loh
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation SlidesArissa Loh
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Arissa Loh
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentationArissa Loh
 
PP2 final report
PP2 final reportPP2 final report
PP2 final reportArissa Loh
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808Arissa Loh
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesArissa Loh
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slidesArissa Loh
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation Arissa Loh
 
Tender Presentation
Tender PresentationTender Presentation
Tender PresentationArissa Loh
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishesArissa Loh
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesArissa Loh
 

More from Arissa Loh (20)

Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Project Management Group Assignment Final Report
Project Management Group Assignment Final ReportProject Management Group Assignment Final Report
Project Management Group Assignment Final Report
 
Project Management Presentation Slides
Project Management Presentation SlidesProject Management Presentation Slides
Project Management Presentation Slides
 
Remedies for Breach of Contract
Remedies for Breach of ContractRemedies for Breach of Contract
Remedies for Breach of Contract
 
Be De Workshop Cost Appraisal
Be De Workshop Cost AppraisalBe De Workshop Cost Appraisal
Be De Workshop Cost Appraisal
 
Financial Management Final Report
Financial Management Final ReportFinancial Management Final Report
Financial Management Final Report
 
CSI Presentation Slides
CSI Presentation SlidesCSI Presentation Slides
CSI Presentation Slides
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
BE slides presentation
BE slides presentationBE slides presentation
BE slides presentation
 
PP2 final report
PP2 final reportPP2 final report
PP2 final report
 
Pp2 coursework 2 201808
Pp2 coursework 2   201808Pp2 coursework 2   201808
Pp2 coursework 2 201808
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
 
Pp1 group presentation
Pp1 group presentation  Pp1 group presentation
Pp1 group presentation
 
Tender Presentation
Tender PresentationTender Presentation
Tender Presentation
 
Int. ceiling finishes
Int. ceiling finishesInt. ceiling finishes
Int. ceiling finishes
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 

Recently uploaded

OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 

Recently uploaded (20)

OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 

Magazine

  • 2. Company History & Profile HISTORY Awangsa Bina Sdn Bhd, incorporated in the year 1993 started from humble beginnings of small to medium sized construction trade works. Awangsa Bina Sdn Bhd is a construction com- pany specializing in commercial, residential, and industrial building, as well as civil engi- neering projects. From 2004 onwards, they ventured into Main Builder’s Work through the awarding of main contracts for various construction work by their esteemed clients. At the meantime, they pursued in the imple- mentation of Quality Management System and that was successfully attained in 2007. 1
  • 3. PROFILE Over the years, they have broad- ened their management focus into a green business model for the sus- tainability of the built environment and consistently maintaining the health and safety of their business operations. In 2010, they started pursued in the implementation of Envi- ronment Management System and Occupational Safety and Health Management System. They achieved the accreditation in 2011. The integrated management system, QESH (Quality, Environment, Safety & Health) Management System is in place to propel Awangsa to greater heights. Basically, Awangsa Bina Sdn Bhd are the main contractor, they undertake the whole main building, the M&Es, infrastructure works for the whole completion of the building. Then for their pay master means the devel- oper, the cover this project, they un- dertake the contract to construct the building. 2
  • 4. Interviewee Profile PROFILE Age: 30 years old Qualification: • Master in Project Management • Registered member of Board of Quantity Surveyors Malaysia Working experience: 6 years Previous company: Geopancar Sdn Bhd (1 year) Current company: Awangsa Bina Sdn Bhd (5 year) as Senior Contract Execu- tive Contractor or Consultancy Contracted Project involved: 3 project; 1 completed, 2 in-progress Thought on future: • Intention to formulate a cost, time, quality effective and ef- ficient construction method/ management. • From design stage to con- struction stage. MR.VOO CHUNG JUN 3
  • 5. OUR INTERVIEW PROCESS Mr Voo explain to us very in detail about the responsibili- ties of quantity surveyor and the company he is working at. He also show us the projects he handled and explain to us what are the challenges he faced through the projects. We have learnt a lot through out the interview. Not just knowledge about QS but a way to fight for survive in the ‘Real World’. 4
  • 7. PROJECT A- SUNWAY GEO Single storey to 3 storey. Retail for sale at Sunway Geo, within an integrated development.In Bandar Sunway next to Malaysia’s FIRST Elevated BRT (Bus Rapid Transit) PROJECT B- CONCERTO NK Strategically located on a 5 acre plot in Dutamas, on the north side of Mont’ Kiara. Concerto North Kiara is linked to Kuala Lumpur, Petaling Jaya and the rest of Klang Valley by an excellent network of roads. Overview of Con- certo North Kiara 6
  • 8. PROJECT SELECTED CONCERTO NORTH KIARA Information of Project CONCERTO NORTH KIARA Client: BCB Berhad Appointed by: BCB Berhad (Devel- oper) Location: North Kiara Type: Condominium Area of project: 5 Arce Contract value: RM 250,582,711.80 Time taken of project: 2 year 9 month (expected finish in July 2015) Proposed Construction of 3 Condominium Blocks, Comprising of Block 1 30-Storey Condomini- um (162 Units) Residences; Block 2 32-Storey Condominium (116 units) Residences; Block 3 30-Storey Con- dominium (162 Units) Residence; Podium 4-Storey Car Park and 1 M&E on the Ground Floor; 1 Unit of Clubhouse; 1 Unit of Guardhouse; 1 Unit of Waste Collection House; 1 Unit L.P.G; Public Amenities For Residents and Retaining Wall on Lot PT 25954 (Lot Asal 1844 and Lot 1845), Segambut, Mukim Batu, Dalam Bandaraya Kuala Lumpur, Wilayah Persekutuan. 7
  • 9. Roles and Responsibility - Main contractor must undertake the ten- der - They need to participate in the tender to do the pricing and go for tending interview. - They will get the job after the tender is confirm by client - After they get the job, QS is responsible to procure with the site contractor, engi- neer and workers who carry out the work. - Main contractor do not do most of the works, they will sub their work to the spe- cialist or sub-contractor to do the work as well. Q&A Throughout the Interview How he deal with cost management?“We tender have our own budget. We will take quotation from different contractors, sub-contractors and compare the price but most probably we are choosing the lowest one. We also need to check on their specification, their scope of work which give a cheaper price to prevent unfair competition” How he deal with cost planning and reporting?“For cost- ing out in our site, we certify the payment to sub-contrac- tor, we certify how much we need to pay every month and our account will quote that payment into a system. Therefore, inside the system we can capture the catch in and the catch out” 8
  • 10. What is the difference compare with Sunway Geo Residences ? “Bungalow is landed property. This is high rise. Even the ma- chinery involve like the tower and concrete bum is different. In the landed, we don’t have this kind of machinery while the high rise building has a more complicated machinery. The scope of work of sub-contractor is also different.” What is the biggest challenge you face through this 2 proj- ects? “Sunway is a big company and they are quite strict on quality issue, whereas Cencerto has a longer time frame and very chill with project due date, but they also have strict quality require- ments. Another thing is the time issue. There is a time frame, so everything is quite tight in submitting the tender.” (This is just a small part of the Q&A session throughout the Interview to let us have a surface idea that what is his task throughout the projects) Official website ( www.concerto.com.my) 9
  • 11. GROUP MEMBERS JANSON CHEN KEN SENG 0323047 LOH MUN TONG 0323680 KIEW CHEE YUAN 0323297 LOW HUI MING 0323827 JUN ZHE 0322076 JIJI NG 0904Y72861 10 QS TEAM