 Operated at Director, VP and President level for 20+ years
 Project Director for major mixed use developments and major infrastructure
 6 Years as Vice President for Facilities Management
 30 Years of experience in the Middle East
 4 years of experience in India
 Expert design management skills across all disciplines
 Construction management
 Excellent interpersonal skills and multi-cultural understanding
 Highly experienced at an international level for all aspects of project design and construction
_______________________________________________________________________________________
Brief Synopsis
My career has been very diverse and enabled me to understand all aspects of the construction industry as a
client, consultant and a contractor. I am able manage all aspects of buildings from foundations through to
Interior Design, and long term facility management. I have expertise in the full spectrum of buildings and
mixed use developments incorporating 5 star hotels, high rise office and residential towers, large scale
shopping malls, palaces and large scale conference facilities. I have also managed large scale infrastructure
projects.
I have worked with the highest level of clients including the Saudi Arabian Royal Family and have dealt with
and presented to the most senior executives of government offices.
I work in a structured manner but also pride myself in the ability to think laterally, be innovative, highly
motivated and skilled in managing people. Value for money and return on investment features high on my
priorities.
I believe that to get the best out of people they have to work with you because they want to and not
because they have to.
Project and Design Management
I have been the Project Director for major projects leading the design process from pre-concept through
concept, schematic and detailed design to construction drawings for all disciplines including interior design,
infrastructure and landscaping. I have then managed the construction to completion and handover to the
client/facilities management team. Within this process I have led the planning, quality and quantity
surveying teams to provide a complete design and construction package with BoQs and achieve the project
management objectives of time, cost and quality.
I have managed major international consultants for all disciplines as well as local consultants where there
has been a transfer from the international to local expertise to gain the maximum benefit to the project
ensuring that the best design is achieved and the local code requirements are met.
I have managed projects using standardised PM forms and reporting structures as well as having set up a
full scale software system called Prolog. Whilst the software driven system is more efficient, both provide
regular concise reporting to the management and client team on the progress and cost of the project,
identifying potential risks before they arise and providing effective change management.
Accurate project planning is critical at the design stage to set up the overall programme within the client’s
timescale and can often affect the construction systems included in the design. This can be taken to Level
10 to assess the labour and materials required on a daily/weekly/monthly basis. With proper value
engineering, life cycle costing analysis and risk analysis an economic design and construction can be
attained.
My experience in Facilities Management also ensures that this is properly identified and incorporated into the
overall design and construction to minimise the cost-in-use for the project.
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 2 of 7
Professional Qualifications
MBIFM Member of the British Institute of Facilities Management
MIET Member of the Institution of Engineering and Technology
ACIBSE Associate Member of the Chartered Institution of Building Services Engineers
Career History
President – Construction
Pioneer Urban Land & Infrastructure Ltd (www.pioneerurban.in) Jan 2013 - Present
Pioneer Urban is a medium size developer in Gurgaon, India. The primary development is a 76 acre site in
Gurgaon comprising some 22 high rise residential towers (10 at 30+ storeys), 12 medium/low rise
commercial buildings with another 11 buildings such as schools, EWS buildings, STPs, clubhouses, etc.
Summary: Roles and Responsibilities
When I joined the company the project was well under construction for 18 of the high rise buildings and 4
yet to start. Pioneer had decided that with the project so far behind with the contractors then engaged that
they would take over the contracts and build it themselves. My role was therefore to develop our sister
construction company (Urban EcoInfra Co. Ltd) and to do it by adopting modern international construction
systems, techniques and methodology and to create an aggressive programme to completion.
The modernisation has included the purchase of new plant and machinery such as System Formwork for
slabs, columns, shear walls and retaining walls; jump form systems for the cores; concrete boom placers to
increase productivity and maximise the efficiency of the Jump form; tower cranes; and specialist material
handling machinery. Laser levelling and total station surveying have been introduced.
The local construction materials, technology and methodology are a challenge to a modern construction
company and it has been necessary to introduce the modern techniques, materials and methodology that I
have been used to in the Middle East to improve productivity and/or quality.
Both quantity surveyors and planners are developing the BoQs and programmes to contractor levels for
Urban EcoInfra to be able to predict the labour and materials for the next day/week/month.
I have a design team of 16 comprising architects, structural Engineers, landscape architects and MEP
Engineers and the team functions as the Project Managers and Client Representatives with some 11 external
consultants. I also have 7 planning engineers, 6 Quantity Surveyors and 10 Quality Engineers directly
responsible to me. I have introduced Project Management software (Prolog from USA) to provide effective
and controlled project management. I have completely restructured the Design Process to bring it into line
with international norms and helped lead a change of the procurement process for design and construction
within Pioneer.
Currently we are about to embark upon design using BIM and 3D drawing with Revet and 4D and 5D for the
integration of programming and BoQs.
Two new buildings are about to start design and we have been considering steel frame instead of RC.
Project Director
IREO Hospitality Company PVT. Ltd. (www.ireoworld.com) June 2011 – Dec 2012
Confluence Project Management, India (www.Confluencepm.com) .
Confluence Project Management Company was awarded the PMC role for the new IREO Sector 58 project in
Gurgaon, India for IREO. The development is a large mixed use commercial and residential complex.
Although still part of Confluence, IREO wanted all project staff to be directly employed by IREO.
Summary: Roles and Responsibilities
The project was in the Detailed Design stage and I managed it through to the tender/GFC stage. The role
for Confluence was for full project management and construction management. I had 15 staff on the team
including two PM’s who are tradesmen and whose role is to train staff on modern construction and finishing
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 3 of 7
methods. Ultimately during construction the team was to be approximately a 100 strong, full construction
management team.
The quality of construction in the Delhi area is poor and it is the client's vision to raise the bar in the quality
of construction, finishing, construction technology and methodology, and Health and Safety. With Grade A
consultants from the UK, Hong Kong and USA the project will be the Clients centrepiece in their
development portfolio. A significant element of our role is to introduce “international” construction methods
and innovation into the project.
When I left the project was about to go to tender for the civil works, facade and sewage treatment plants.
The construction is compounded by having the raft foundations 5m below the water table. In this area of
India this is relatively uncommon and finding contractors that can carry out this work was difficult.
Buildability was a big issue to the client. There were some significant challenges in the construction that
were unusual in Delhi and therefore a degree of client education was required so that they understood what
was required.
Project Director
Confluence Abu Dhabi LLC (www.Confluencepm.com) July 2009 – June 2011
The Abu Dhabi Office won the Najmat Project on Reem Island owned by Reem Developers. The project is
for the infrastructure development of Najmat which is approximately 1.8km2 of land occupying around 20%
of Reem Island in Abu Dhabi. Confluence replaced the previous Project Managers in July 2009. The project
then was only 35% to 40% complete. The project had been mismanaged and needed restructuring with
proper controls and direction for a completion in March 2012.
(http://www.reeminvestments.com/reem-developers/najmat-abu-dhabi/)
Summary: Roles and Responsibilities
As the Project Director, with 14 Confluence staff on site, my role was to create a new regime that requires a
revamp of the consultants organisation and methods of working and at the same time bring the project back
on target with proper time, cost and quality management. Safety management is also a huge task with a
local Main Contractor and a Chinese Marine Contractor having no regard to following the rules.
The project has around 4.7M m2 of GFA and is effectively a small town with high rise offices, commercial,
retail and mixed use complexes, hotels, apartment buildings, villas, a school, hospital and public services
facilities together with community amenities such as parks, a marina and canal, man made beaches,
landscape and streetscape. The population for this development will eventually reach 80,000.
A significant part of my responsibilities, apart from managing the team, is to get actively involved with the
Master Planning consultant in the planning of Phase 2 and 3 of the development roll out. This was in
disarray when Confluence took over the Project Management and required micro managing to get it
approved by the Client.
A major overhaul of the cost management was also required and I had a Senior Commercial Manager and a
Commercial Assistant to provide this.
Phase 2 and 3 of the development required the production of major RFPs for Master Planning services,
Landscape and Streetscape, Cost Consultancy, Specialist design for specific amenities around the marina and
canal. Renegotiation of the Consultants contract and the Main Contractors contract was required to reflect
the large difference between the original and current Master Plans. Restructuring of the District Cooling was
also necessary to reduce costs in the overall infrastructure.
Unusually for Project Management companies, Confluence also provided Plot Coordination for the 164 plots
being sold by Reem Developers (who only provide infrastructure and had not up until then built buildings).
For this we had in the team, a plot coordinator and an assistant, who liaised with and guided the third party
developers through the vagaries of approvals from UPC and other Authorities.
Outside of my Project Management function I also led, on behalf of Reem Developers, the strategic
management of Reem Island wide facilities such as waste management, sewage treatment, water resources,
estate management and FM, and Community Services Charges including billing, Island governance and
liaising with the legal team that will deal with Strata Law when it is introduced.
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 4 of 7
Construction Manager
Hines Abu Dhabi LLC (www.hines.com) Oct 2008 – May 2009
Hines is one of the largest privately owned real estate owner developers in the world with some 400M m2 of
real estate either owned or under direct management. They opened in 2007 in Abu Dhabi as the MENA
group within the European operation.
Summary: Roles and Responsibilities
My role included detailed design analysis for Due Dilligence on new and existing developments.
 A project in Jordan was a masterplan for a 1.8km2 development of a prime land in Amman and
included a new but existing Army GHQ with 112,000m2 GFA to be converted to a Class A commercial
office development.
 Within the existing GHQ complex was an underground bunker earmarked by the client as low income
storage space. Seeing that the whole complex was nuclear proof and had complete state of the art ICT
network with a connection the FLAG international data superhighway within the site, I recommended
and it was accepted by the client to put together a business opportunity led by myself for a major
company in Jordan to establish a national/international facility for data disaster recovery, mass data
storage, call centers, e-government, ICT training and multi ISP operation. This would put Jordan as a
major international ICT player and an ICT hub for the Middle East.
 A design review of new mixed use development incorporating a 500 key 5-star hotel, office complex
and an auditorium/exhibition hall in Abu Dhabi.
 The outline specification of a new 320 villa compound in Riyadh. This included the villa specification
for materials and standards to be achieved and the specification of the site infrastructure including
sustainability measures.
Director – Technical Services
Tourism Development and Investment Co (www.tdic.ae) Jan 2007 – Oct 2008
TDIC is an owner developer company that specialises in the development of Tourist Destinations within Abu
Dhabi on behalf of the Abu Dhabi Tourism Authority. Whilst it is wholly owned by the ADTA it operates as a
private company.
TDIC is currently engaged in developing major projects such as the 27km2 Saadiyat Island, the 84km2 Sir
Bani Yas Island as part of the Desert Islands project, the desert fort resort Qasr Al Sarab and numerous
hotels. These projects and others can be seen on the TDIC website www.tdic.ae
Summary: Roles and Responsibilities
I was responsible as the Owners Representative for the Saadiyat Island and Desert Islands Projects. I was
also responsible for the setting up of a new Joint Venture to create a Facilities Management Division within
TDIC for which I was the TDIC Representative as General Manager. A large element of the work was around
the management of the various design teams urban planners, architects, consultants, specialist designers
and advisors to ensure the ultimate result meets the design intent. This also involved significant
presentations of the projects to the various government offices to outline the implications of the
developments.
The government’s proposed development of the western region raised serious implications for transportation
within Abu Dhabi from just a tourism perspective. Extend this into the rest of the emirates and it became
clear that a domestic air service was necessary. TDIC, led by myself, entered into discussions with DoT and
ADAC to provide an air link between Abu Dhabi (city) with Sir Bani Yas Island, Sila (on the Saudi border) and
the Liwa Oasis. This would was discussed as a likely start of a regional and national facility.
Saadiyat Island is a 27km2 island only 500m off the Abu Dhabi city coast. The development is over 15 years
and incorporates major road infrastructure connecting the Dubai expressway to the heart of Abu Dhabi,
inclusion in the 400kV electrical national network, large scale sewage treatment systems and water
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 5 of 7
reticulation. This was all integrated into the overall masterplan for the island which will become the pre-
eminent tourist destination in Abu Dhabi
Desert Islands is a AED 3 Billion development consisting of 8 islands 250km west of Abu Dhabi City. The
principle island, Sir Baniyas (87km2) is a national animal tourism destination combined with eco-tourism
where the island will become 100% sustainable from renewable energy and water technology.
The Facilities Management Division. I could see that TDIC as an owner developer needed a FM Company to
look after all the hard and soft maintenance and operation of the TDIC owned and managed properties
including buildings, roads, parks and general infrastructure. The company took this up and I set up the initial
start up of a JV with Theis from Australia. This role was to incorporate the evaluation of designs for
compliance with TDIC requirements including sustainability, life cycle costing and audits of existing facilities.
I set up the company from nothing
Vice President Engineering
Al Khozama Management Company (www.kff.com) August 2000 – Jan 2007
Al Khozama Management Company Ltd is a real estate management company that buildings totalling some
400,000m2 including the Al Faisaliah Complex, in Riyadh. This comprises the Faisaliah Tower, Faisaliah Hotel
(Rosewood Group), the Prince Sultan Grand Hall, Faisaliah Residences, Faisaliah Mall, Al Khairia Office
Complex, Al Khozama Hotel and Al Khozama Centre.
Summary: Roles and Responsibilities
I was the Project Manager for the Consultants during the construction of the Faisaliah Center which was
handed over to the client in May 2000. I joined Al Khozama Management Company, the real estate company
for the King Faisal Foundation, in August 2000 to head up the Facilities Management of the Faisaliah Center
and their other existing portfolio.
I had 115 staff and a maintenance budget of SR11M per annum and an energy budget of (SR 25M/yr).
Some of the key functions that I have been responsible for are as follows;
 Responsible for all Engineering and Maintenance of the mixed commercial and retail complexes and the
Owners Representative monitoring the maintenance of the Rosewood Hotels operation.
 Developing the following Energy Saving systems including;
 Misting Air Cooled Chillers – Produced a saving of 12-15% of the complex’s chiller consumptions
 Chilled Water Systems – Provided effective control of night setback temperature control
 Lighting Systems – Developed the systems to use the latest low energy lamps and control criteria
 Developed and manufactured the specialist lighting for the Globe Restaurant dining areas in the
Faisaliah Tower.
I also developed and managed the following businesses for the Al Khozama Management Company at Al
Faisaliah
 A Contract Maintenance Division from start up
 A Construction Division providing fit-out and general construction from start up
 Co-Director of an event management company, which provided audio visual live show events for
company and product launches, conferences, weddings, festival opening ceremonies and so on. This is
from Startup
 Director of a JV with an on-site Internet Service Provider, within Al Faisaliah Tower.
Director of Technical Services
Buro Happold Consulting Engineers
Aug 1992 – Aug 2000
Buro Happold is one of the world’s leading consulting engineering practises. The Riyadh Office had a full
complement of Architects, civil structural and building services engineers. It provides high end design and
supervision for construction projects around Saudi Arabia and the rest of the Middle East.
Roles and Responsibilities
Responsible for all the Middle Eastern Building Services Technical design, design management and project
management for Buro Happold. Some of my functions included;
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 6 of 7
Al Faisaliah Center
Project Manager and Principal Electrical Engineer for Al Faisaliah Center, Riyadh. Contract value SR1,200M
(1997). The project team comprised Foster & Partners and Buro Happold (the lead consultant during the
construction) with myself leading the team which peaked at 35 professional staff, from Architects, Structural
and MEP Engineers, Commercial Managers and site supervision staff.
The Al Faisaliah Complex is 250,000m2 of space in Riyadh, consisting of:
 Faisaliah Tower, 267m high with 30 storeys of Grade A offices, a golden globe at nearly 200m above
ground containing 3 floors of restaurants and surmounted by functioning communications decks.
This was the first skyscraper in Saudi Arabia.
 Faisaliah Hotel operated by the Rosewood Group. A deluxe 5 star+ 224 key hotel.
 Faisaliah Residences comprising 100 apartment units managed by Rosewood Hotels
 Prince Sultan Hall (also operated by Rosewood Hotels) and which is a 4000m2 multi-purpose
banquet hall with a 900m2 dedicated banquet facility, which together can cater for a Royal Wedding
of up to 2000 guests.
 Faisaliah Mall with over 150 retail units and was the first western style retail mall to be built in Saudi
Arabia.
The Faisaliah Tower had a 24m high ground floor lobby, 30 occupied floors, 8 technical floors in the
tower section, 3 floors of restaurants in the high level globe, 2 technical floors below the lobby, 2
basements and 6 open communication floors at the very top of the building. At 267m above the road
level it was the equivalent of 50+ storeys.
Other Projects
Include headquarters offices, A new 21 bed Intensive Care and Coronary Care Unit for at the King Khalid
National Guard Hospital, Jeddah, Electrical design for a Storm Water Pumping Station with a capacity of
35m3/s, Water treatment plant for 3000m3/day, a lighting laboratory for Saudi Lighting Co., a cable car
installation for a tourist area in the Azir Region and Palaces for various Saudi families
Regional Associate
WS Atkins 1987-1992
WS Atkins is one of the largest UK consulting engineering practises with offices throughout the UK and
internationally.
Roles and Responsibilities
Responsible for the Electrical Section and for marketing in Devon & Cornwall whilst in the Bristol Office.
Opened the Building division of the Exeter Office. Responsible for developing and managing the business in
Devon & Cornwall for all aspects of the consultancy including the design management of projects involving
staff from disparate offices of WS Atkins.
Skills Strengths
Design Management  Architecture  Landscape Architecture
 Structural Engineering  Programming
 MEP  Quantity Surveying
Construction  Client Liaison  Project and construction management
 Project Management  Programming
 Contract Administration  Contracts
Facility Management  Client Management  Architectural & structural maintenance
 Services Maintenance  Landscaping
 Computerised Maintenance
Systems
 Building Management System
Development
Management  Company Business Planning  Human Resources & Man Management
 Financial control  Marketing
 Joint Venture contracts
Computer Literacy  Maintenance Management  Microsoft Word, Excel, Access.
 Building Services Design  Microsoft PowerPoint
 Scheduling Programmes  Microsoft Visio
 AutoCad Drafting Package  Microsoft Project
Curriculum Vitae – Peter deBoeck – March 2015
Private and Confidential Page 7 of 7
Personal Details
Driving: Full driving licence UK and UAE. Previously in Saudi Arabia.
Languages: English (mother tongue)
Additional
Information:
I have spent around 33 years working on projects in the Middle East and South Asia.
15 years living in Saudi Arabia, 5 years in Abu Dhabi and for the last 4 years in India.
British Patent and a Chinese Patent for a new type of electrical wiring accessory.
I have designed my own villa in Spain, including the architecture and building services
I enjoy golf, reading and off road driving and enjoy learning new skills

More Related Content

What's hot

CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil EngineerMohammad Sarowar
 
Integrated project
Integrated projectIntegrated project
Integrated projectSasi Cool
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Ullah Khan
 
The role of project management consultants
The role of project management consultantsThe role of project management consultants
The role of project management consultantsShah & Talati
 
nilesh moon resume
nilesh moon resumenilesh moon resume
nilesh moon resumeNilesh Moon
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual AssignmentArissa Loh
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07Khalid Alismail
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of constructionSANJEEV Wazir
 
Senior Civil Engineer
Senior Civil EngineerSenior Civil Engineer
Senior Civil EngineerDeepak Jacob
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Bernie Buenavent
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16 Babu Mama
 
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016maged mahmoud
 

What's hot (20)

RED CV
RED CVRED CV
RED CV
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Integrated project
Integrated projectIntegrated project
Integrated project
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
 
The role of project management consultants
The role of project management consultantsThe role of project management consultants
The role of project management consultants
 
nilesh moon resume
nilesh moon resumenilesh moon resume
nilesh moon resume
 
Project Management Individual Assignment
Project Management Individual AssignmentProject Management Individual Assignment
Project Management Individual Assignment
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. StructuresM.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
M.Kamran Bashir- PMP, LEED AP BD+C, M.E. Structures
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
CV
CVCV
CV
 
Unit 1 basics of construction
Unit 1 basics of constructionUnit 1 basics of construction
Unit 1 basics of construction
 
Senior Civil Engineer
Senior Civil EngineerSenior Civil Engineer
Senior Civil Engineer
 
Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017Resume_Bernard Estrada Buenaventura._Updated as of 2017
Resume_Bernard Estrada Buenaventura._Updated as of 2017
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
Personal CV (Mohd) BM
Personal CV (Mohd) BMPersonal CV (Mohd) BM
Personal CV (Mohd) BM
 
CV Jadid iPms
CV Jadid  iPms CV Jadid  iPms
CV Jadid iPms
 
Ahmed Nounou C.V. 2014
Ahmed Nounou C.V.  2014Ahmed Nounou C.V.  2014
Ahmed Nounou C.V. 2014
 
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
 

Similar to Peter deBoeck CV August 2015

Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)vinay sinha
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Robert watson cv June 2018 a
Robert watson cv June 2018 aRobert watson cv June 2018 a
Robert watson cv June 2018 aRob watson
 
''Resume DT - Abbas A. khan
''Resume DT - Abbas A. khan''Resume DT - Abbas A. khan
''Resume DT - Abbas A. khanAbbas Khan
 
Raajesh rastoogi (international)
Raajesh rastoogi  (international)Raajesh rastoogi  (international)
Raajesh rastoogi (international)Rustogii Rajeesh
 
2016-11-24-FCD Group Company profile
2016-11-24-FCD Group Company profile2016-11-24-FCD Group Company profile
2016-11-24-FCD Group Company profileBinoy Kumar Das
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 
Project Management for beginners
Project Management for beginnersProject Management for beginners
Project Management for beginnersPraveen Nair
 

Similar to Peter deBoeck CV August 2015 (20)

Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)
 
Resume
ResumeResume
Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
Robert watson cv June 2018 a
Robert watson cv June 2018 aRobert watson cv June 2018 a
Robert watson cv June 2018 a
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
''Resume DT - Abbas A. khan
''Resume DT - Abbas A. khan''Resume DT - Abbas A. khan
''Resume DT - Abbas A. khan
 
CV RESUME -20.11.2016.docx AGM
CV  RESUME -20.11.2016.docx  AGM  CV  RESUME -20.11.2016.docx  AGM
CV RESUME -20.11.2016.docx AGM
 
Ahmed EL Gamal CV
Ahmed EL Gamal CVAhmed EL Gamal CV
Ahmed EL Gamal CV
 
RESUME DETAILS
RESUME DETAILS RESUME DETAILS
RESUME DETAILS
 
Raajesh rastoogi (international)
Raajesh rastoogi  (international)Raajesh rastoogi  (international)
Raajesh rastoogi (international)
 
Gopinath_CVP
Gopinath_CVPGopinath_CVP
Gopinath_CVP
 
KK IT PM v5.0
KK IT PM v5.0KK IT PM v5.0
KK IT PM v5.0
 
Update CV
Update CVUpdate CV
Update CV
 
2016-11-24-FCD Group Company profile
2016-11-24-FCD Group Company profile2016-11-24-FCD Group Company profile
2016-11-24-FCD Group Company profile
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
Project Management for beginners
Project Management for beginnersProject Management for beginners
Project Management for beginners
 

Peter deBoeck CV August 2015

  • 1. Private and Confidential Page 1 of 7 Peter deBoeck 112 Sora, The Redwoods, Quirino Highway, Novaliches Quezon City, Metro Manila, Philippines Mobile: +63 9152995522 • E-mail: peter@deboeck.co.uk  Operated at Director, VP and President level for 20+ years  Project Director for major mixed use developments and major infrastructure  6 Years as Vice President for Facilities Management  30 Years of experience in the Middle East  4 years of experience in India  Expert design management skills across all disciplines  Construction management  Excellent interpersonal skills and multi-cultural understanding  Highly experienced at an international level for all aspects of project design and construction _______________________________________________________________________________________ Brief Synopsis My career has been very diverse and enabled me to understand all aspects of the construction industry as a client, consultant and a contractor. I am able manage all aspects of buildings from foundations through to Interior Design, and long term facility management. I have expertise in the full spectrum of buildings and mixed use developments incorporating 5 star hotels, high rise office and residential towers, large scale shopping malls, palaces and large scale conference facilities. I have also managed large scale infrastructure projects. I have worked with the highest level of clients including the Saudi Arabian Royal Family and have dealt with and presented to the most senior executives of government offices. I work in a structured manner but also pride myself in the ability to think laterally, be innovative, highly motivated and skilled in managing people. Value for money and return on investment features high on my priorities. I believe that to get the best out of people they have to work with you because they want to and not because they have to. Project and Design Management I have been the Project Director for major projects leading the design process from pre-concept through concept, schematic and detailed design to construction drawings for all disciplines including interior design, infrastructure and landscaping. I have then managed the construction to completion and handover to the client/facilities management team. Within this process I have led the planning, quality and quantity surveying teams to provide a complete design and construction package with BoQs and achieve the project management objectives of time, cost and quality. I have managed major international consultants for all disciplines as well as local consultants where there has been a transfer from the international to local expertise to gain the maximum benefit to the project ensuring that the best design is achieved and the local code requirements are met. I have managed projects using standardised PM forms and reporting structures as well as having set up a full scale software system called Prolog. Whilst the software driven system is more efficient, both provide regular concise reporting to the management and client team on the progress and cost of the project, identifying potential risks before they arise and providing effective change management. Accurate project planning is critical at the design stage to set up the overall programme within the client’s timescale and can often affect the construction systems included in the design. This can be taken to Level 10 to assess the labour and materials required on a daily/weekly/monthly basis. With proper value engineering, life cycle costing analysis and risk analysis an economic design and construction can be attained. My experience in Facilities Management also ensures that this is properly identified and incorporated into the overall design and construction to minimise the cost-in-use for the project.
  • 2. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 2 of 7 Professional Qualifications MBIFM Member of the British Institute of Facilities Management MIET Member of the Institution of Engineering and Technology ACIBSE Associate Member of the Chartered Institution of Building Services Engineers Career History President – Construction Pioneer Urban Land & Infrastructure Ltd (www.pioneerurban.in) Jan 2013 - Present Pioneer Urban is a medium size developer in Gurgaon, India. The primary development is a 76 acre site in Gurgaon comprising some 22 high rise residential towers (10 at 30+ storeys), 12 medium/low rise commercial buildings with another 11 buildings such as schools, EWS buildings, STPs, clubhouses, etc. Summary: Roles and Responsibilities When I joined the company the project was well under construction for 18 of the high rise buildings and 4 yet to start. Pioneer had decided that with the project so far behind with the contractors then engaged that they would take over the contracts and build it themselves. My role was therefore to develop our sister construction company (Urban EcoInfra Co. Ltd) and to do it by adopting modern international construction systems, techniques and methodology and to create an aggressive programme to completion. The modernisation has included the purchase of new plant and machinery such as System Formwork for slabs, columns, shear walls and retaining walls; jump form systems for the cores; concrete boom placers to increase productivity and maximise the efficiency of the Jump form; tower cranes; and specialist material handling machinery. Laser levelling and total station surveying have been introduced. The local construction materials, technology and methodology are a challenge to a modern construction company and it has been necessary to introduce the modern techniques, materials and methodology that I have been used to in the Middle East to improve productivity and/or quality. Both quantity surveyors and planners are developing the BoQs and programmes to contractor levels for Urban EcoInfra to be able to predict the labour and materials for the next day/week/month. I have a design team of 16 comprising architects, structural Engineers, landscape architects and MEP Engineers and the team functions as the Project Managers and Client Representatives with some 11 external consultants. I also have 7 planning engineers, 6 Quantity Surveyors and 10 Quality Engineers directly responsible to me. I have introduced Project Management software (Prolog from USA) to provide effective and controlled project management. I have completely restructured the Design Process to bring it into line with international norms and helped lead a change of the procurement process for design and construction within Pioneer. Currently we are about to embark upon design using BIM and 3D drawing with Revet and 4D and 5D for the integration of programming and BoQs. Two new buildings are about to start design and we have been considering steel frame instead of RC. Project Director IREO Hospitality Company PVT. Ltd. (www.ireoworld.com) June 2011 – Dec 2012 Confluence Project Management, India (www.Confluencepm.com) . Confluence Project Management Company was awarded the PMC role for the new IREO Sector 58 project in Gurgaon, India for IREO. The development is a large mixed use commercial and residential complex. Although still part of Confluence, IREO wanted all project staff to be directly employed by IREO. Summary: Roles and Responsibilities The project was in the Detailed Design stage and I managed it through to the tender/GFC stage. The role for Confluence was for full project management and construction management. I had 15 staff on the team including two PM’s who are tradesmen and whose role is to train staff on modern construction and finishing
  • 3. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 3 of 7 methods. Ultimately during construction the team was to be approximately a 100 strong, full construction management team. The quality of construction in the Delhi area is poor and it is the client's vision to raise the bar in the quality of construction, finishing, construction technology and methodology, and Health and Safety. With Grade A consultants from the UK, Hong Kong and USA the project will be the Clients centrepiece in their development portfolio. A significant element of our role is to introduce “international” construction methods and innovation into the project. When I left the project was about to go to tender for the civil works, facade and sewage treatment plants. The construction is compounded by having the raft foundations 5m below the water table. In this area of India this is relatively uncommon and finding contractors that can carry out this work was difficult. Buildability was a big issue to the client. There were some significant challenges in the construction that were unusual in Delhi and therefore a degree of client education was required so that they understood what was required. Project Director Confluence Abu Dhabi LLC (www.Confluencepm.com) July 2009 – June 2011 The Abu Dhabi Office won the Najmat Project on Reem Island owned by Reem Developers. The project is for the infrastructure development of Najmat which is approximately 1.8km2 of land occupying around 20% of Reem Island in Abu Dhabi. Confluence replaced the previous Project Managers in July 2009. The project then was only 35% to 40% complete. The project had been mismanaged and needed restructuring with proper controls and direction for a completion in March 2012. (http://www.reeminvestments.com/reem-developers/najmat-abu-dhabi/) Summary: Roles and Responsibilities As the Project Director, with 14 Confluence staff on site, my role was to create a new regime that requires a revamp of the consultants organisation and methods of working and at the same time bring the project back on target with proper time, cost and quality management. Safety management is also a huge task with a local Main Contractor and a Chinese Marine Contractor having no regard to following the rules. The project has around 4.7M m2 of GFA and is effectively a small town with high rise offices, commercial, retail and mixed use complexes, hotels, apartment buildings, villas, a school, hospital and public services facilities together with community amenities such as parks, a marina and canal, man made beaches, landscape and streetscape. The population for this development will eventually reach 80,000. A significant part of my responsibilities, apart from managing the team, is to get actively involved with the Master Planning consultant in the planning of Phase 2 and 3 of the development roll out. This was in disarray when Confluence took over the Project Management and required micro managing to get it approved by the Client. A major overhaul of the cost management was also required and I had a Senior Commercial Manager and a Commercial Assistant to provide this. Phase 2 and 3 of the development required the production of major RFPs for Master Planning services, Landscape and Streetscape, Cost Consultancy, Specialist design for specific amenities around the marina and canal. Renegotiation of the Consultants contract and the Main Contractors contract was required to reflect the large difference between the original and current Master Plans. Restructuring of the District Cooling was also necessary to reduce costs in the overall infrastructure. Unusually for Project Management companies, Confluence also provided Plot Coordination for the 164 plots being sold by Reem Developers (who only provide infrastructure and had not up until then built buildings). For this we had in the team, a plot coordinator and an assistant, who liaised with and guided the third party developers through the vagaries of approvals from UPC and other Authorities. Outside of my Project Management function I also led, on behalf of Reem Developers, the strategic management of Reem Island wide facilities such as waste management, sewage treatment, water resources, estate management and FM, and Community Services Charges including billing, Island governance and liaising with the legal team that will deal with Strata Law when it is introduced.
  • 4. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 4 of 7 Construction Manager Hines Abu Dhabi LLC (www.hines.com) Oct 2008 – May 2009 Hines is one of the largest privately owned real estate owner developers in the world with some 400M m2 of real estate either owned or under direct management. They opened in 2007 in Abu Dhabi as the MENA group within the European operation. Summary: Roles and Responsibilities My role included detailed design analysis for Due Dilligence on new and existing developments.  A project in Jordan was a masterplan for a 1.8km2 development of a prime land in Amman and included a new but existing Army GHQ with 112,000m2 GFA to be converted to a Class A commercial office development.  Within the existing GHQ complex was an underground bunker earmarked by the client as low income storage space. Seeing that the whole complex was nuclear proof and had complete state of the art ICT network with a connection the FLAG international data superhighway within the site, I recommended and it was accepted by the client to put together a business opportunity led by myself for a major company in Jordan to establish a national/international facility for data disaster recovery, mass data storage, call centers, e-government, ICT training and multi ISP operation. This would put Jordan as a major international ICT player and an ICT hub for the Middle East.  A design review of new mixed use development incorporating a 500 key 5-star hotel, office complex and an auditorium/exhibition hall in Abu Dhabi.  The outline specification of a new 320 villa compound in Riyadh. This included the villa specification for materials and standards to be achieved and the specification of the site infrastructure including sustainability measures. Director – Technical Services Tourism Development and Investment Co (www.tdic.ae) Jan 2007 – Oct 2008 TDIC is an owner developer company that specialises in the development of Tourist Destinations within Abu Dhabi on behalf of the Abu Dhabi Tourism Authority. Whilst it is wholly owned by the ADTA it operates as a private company. TDIC is currently engaged in developing major projects such as the 27km2 Saadiyat Island, the 84km2 Sir Bani Yas Island as part of the Desert Islands project, the desert fort resort Qasr Al Sarab and numerous hotels. These projects and others can be seen on the TDIC website www.tdic.ae Summary: Roles and Responsibilities I was responsible as the Owners Representative for the Saadiyat Island and Desert Islands Projects. I was also responsible for the setting up of a new Joint Venture to create a Facilities Management Division within TDIC for which I was the TDIC Representative as General Manager. A large element of the work was around the management of the various design teams urban planners, architects, consultants, specialist designers and advisors to ensure the ultimate result meets the design intent. This also involved significant presentations of the projects to the various government offices to outline the implications of the developments. The government’s proposed development of the western region raised serious implications for transportation within Abu Dhabi from just a tourism perspective. Extend this into the rest of the emirates and it became clear that a domestic air service was necessary. TDIC, led by myself, entered into discussions with DoT and ADAC to provide an air link between Abu Dhabi (city) with Sir Bani Yas Island, Sila (on the Saudi border) and the Liwa Oasis. This would was discussed as a likely start of a regional and national facility. Saadiyat Island is a 27km2 island only 500m off the Abu Dhabi city coast. The development is over 15 years and incorporates major road infrastructure connecting the Dubai expressway to the heart of Abu Dhabi, inclusion in the 400kV electrical national network, large scale sewage treatment systems and water
  • 5. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 5 of 7 reticulation. This was all integrated into the overall masterplan for the island which will become the pre- eminent tourist destination in Abu Dhabi Desert Islands is a AED 3 Billion development consisting of 8 islands 250km west of Abu Dhabi City. The principle island, Sir Baniyas (87km2) is a national animal tourism destination combined with eco-tourism where the island will become 100% sustainable from renewable energy and water technology. The Facilities Management Division. I could see that TDIC as an owner developer needed a FM Company to look after all the hard and soft maintenance and operation of the TDIC owned and managed properties including buildings, roads, parks and general infrastructure. The company took this up and I set up the initial start up of a JV with Theis from Australia. This role was to incorporate the evaluation of designs for compliance with TDIC requirements including sustainability, life cycle costing and audits of existing facilities. I set up the company from nothing Vice President Engineering Al Khozama Management Company (www.kff.com) August 2000 – Jan 2007 Al Khozama Management Company Ltd is a real estate management company that buildings totalling some 400,000m2 including the Al Faisaliah Complex, in Riyadh. This comprises the Faisaliah Tower, Faisaliah Hotel (Rosewood Group), the Prince Sultan Grand Hall, Faisaliah Residences, Faisaliah Mall, Al Khairia Office Complex, Al Khozama Hotel and Al Khozama Centre. Summary: Roles and Responsibilities I was the Project Manager for the Consultants during the construction of the Faisaliah Center which was handed over to the client in May 2000. I joined Al Khozama Management Company, the real estate company for the King Faisal Foundation, in August 2000 to head up the Facilities Management of the Faisaliah Center and their other existing portfolio. I had 115 staff and a maintenance budget of SR11M per annum and an energy budget of (SR 25M/yr). Some of the key functions that I have been responsible for are as follows;  Responsible for all Engineering and Maintenance of the mixed commercial and retail complexes and the Owners Representative monitoring the maintenance of the Rosewood Hotels operation.  Developing the following Energy Saving systems including;  Misting Air Cooled Chillers – Produced a saving of 12-15% of the complex’s chiller consumptions  Chilled Water Systems – Provided effective control of night setback temperature control  Lighting Systems – Developed the systems to use the latest low energy lamps and control criteria  Developed and manufactured the specialist lighting for the Globe Restaurant dining areas in the Faisaliah Tower. I also developed and managed the following businesses for the Al Khozama Management Company at Al Faisaliah  A Contract Maintenance Division from start up  A Construction Division providing fit-out and general construction from start up  Co-Director of an event management company, which provided audio visual live show events for company and product launches, conferences, weddings, festival opening ceremonies and so on. This is from Startup  Director of a JV with an on-site Internet Service Provider, within Al Faisaliah Tower. Director of Technical Services Buro Happold Consulting Engineers Aug 1992 – Aug 2000 Buro Happold is one of the world’s leading consulting engineering practises. The Riyadh Office had a full complement of Architects, civil structural and building services engineers. It provides high end design and supervision for construction projects around Saudi Arabia and the rest of the Middle East. Roles and Responsibilities Responsible for all the Middle Eastern Building Services Technical design, design management and project management for Buro Happold. Some of my functions included;
  • 6. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 6 of 7 Al Faisaliah Center Project Manager and Principal Electrical Engineer for Al Faisaliah Center, Riyadh. Contract value SR1,200M (1997). The project team comprised Foster & Partners and Buro Happold (the lead consultant during the construction) with myself leading the team which peaked at 35 professional staff, from Architects, Structural and MEP Engineers, Commercial Managers and site supervision staff. The Al Faisaliah Complex is 250,000m2 of space in Riyadh, consisting of:  Faisaliah Tower, 267m high with 30 storeys of Grade A offices, a golden globe at nearly 200m above ground containing 3 floors of restaurants and surmounted by functioning communications decks. This was the first skyscraper in Saudi Arabia.  Faisaliah Hotel operated by the Rosewood Group. A deluxe 5 star+ 224 key hotel.  Faisaliah Residences comprising 100 apartment units managed by Rosewood Hotels  Prince Sultan Hall (also operated by Rosewood Hotels) and which is a 4000m2 multi-purpose banquet hall with a 900m2 dedicated banquet facility, which together can cater for a Royal Wedding of up to 2000 guests.  Faisaliah Mall with over 150 retail units and was the first western style retail mall to be built in Saudi Arabia. The Faisaliah Tower had a 24m high ground floor lobby, 30 occupied floors, 8 technical floors in the tower section, 3 floors of restaurants in the high level globe, 2 technical floors below the lobby, 2 basements and 6 open communication floors at the very top of the building. At 267m above the road level it was the equivalent of 50+ storeys. Other Projects Include headquarters offices, A new 21 bed Intensive Care and Coronary Care Unit for at the King Khalid National Guard Hospital, Jeddah, Electrical design for a Storm Water Pumping Station with a capacity of 35m3/s, Water treatment plant for 3000m3/day, a lighting laboratory for Saudi Lighting Co., a cable car installation for a tourist area in the Azir Region and Palaces for various Saudi families Regional Associate WS Atkins 1987-1992 WS Atkins is one of the largest UK consulting engineering practises with offices throughout the UK and internationally. Roles and Responsibilities Responsible for the Electrical Section and for marketing in Devon & Cornwall whilst in the Bristol Office. Opened the Building division of the Exeter Office. Responsible for developing and managing the business in Devon & Cornwall for all aspects of the consultancy including the design management of projects involving staff from disparate offices of WS Atkins. Skills Strengths Design Management  Architecture  Landscape Architecture  Structural Engineering  Programming  MEP  Quantity Surveying Construction  Client Liaison  Project and construction management  Project Management  Programming  Contract Administration  Contracts Facility Management  Client Management  Architectural & structural maintenance  Services Maintenance  Landscaping  Computerised Maintenance Systems  Building Management System Development Management  Company Business Planning  Human Resources & Man Management  Financial control  Marketing  Joint Venture contracts Computer Literacy  Maintenance Management  Microsoft Word, Excel, Access.  Building Services Design  Microsoft PowerPoint  Scheduling Programmes  Microsoft Visio  AutoCad Drafting Package  Microsoft Project
  • 7. Curriculum Vitae – Peter deBoeck – March 2015 Private and Confidential Page 7 of 7 Personal Details Driving: Full driving licence UK and UAE. Previously in Saudi Arabia. Languages: English (mother tongue) Additional Information: I have spent around 33 years working on projects in the Middle East and South Asia. 15 years living in Saudi Arabia, 5 years in Abu Dhabi and for the last 4 years in India. British Patent and a Chinese Patent for a new type of electrical wiring accessory. I have designed my own villa in Spain, including the architecture and building services I enjoy golf, reading and off road driving and enjoy learning new skills