SlideShare a Scribd company logo
1 of 7
INTRO 
The intention of doing this magazine is to develop a 
deeper understanding towards a certain career. For 
example,its responsibilities,skills required,problems or 
difficulties faced and many more. 
Therefore,on the 2nd of June,my teammates and I 
went and interviewed Mr Lee Ah Nam which had 30 years 
experience as an mechanical and electrical engineer.A few 
questions were prepared for the interview so that we can 
learn more about M&E engineering and their personal 
experience throughout their experience in this career. 
I would like to thank my teammates for working this out 
together as a team and has made this interview went on 
smoothly.I would also like to thank Mr Lee Ah Nam whom we 
interviewed for giving us this opportunity.
What does a 
mechanical & 
electrical 
engineer do? 
How do you balance your work life with your family life? 
• Sometimes there is sacrifice 
• You must know how to distribute your time 
How's the experience throughout working as an M&E 
engineer? 
• Role as M&E engineer is to involve in EPC (engineering,procurement 
&construction) engage and coordinate with private consultant 
• make sure that coordinate well with architect 
• make sure layout fits with the architecture's design 
What's your job in pre-construction,during construction and 
after construction? 
• From day 1 to the end 
• - site visit,acquire design,construction,conclusion and end of work
Problem 
solving in 
M&E 
engineering 
What's the PROBLEM you face as an M&E engineer? 
• Air-cond,firefighting,plumbing work,security surveillance,etc. 
• Make sure to have a coordination drawing 
• Miss out a lot of opening and installation in the coordination drawings 
• ONce there is mistake,you will have ti hack again and redo 
• M&E have to give feedback to architects 
• The room size provided can fit according to the requirement for the installation 
How does the quality and quantity of workers affect the project? 
• have high qualify skilled workers initially but nowadays there are unqualified 
foreigners as workers due to lack of workers 
• These workers will end up wth defect work 
• Nowadays we can't get high quallity buidings 
• Do you agree that a sustainanle building is a successful 
project? 
• Yes 
What are the fundamental aspects in making a sustainable 
building? 
• MAke sure that the quality of work is per what the clients' requirements 
• Have to make sure that specs given are followed 
• If you do not follow the spec,then you are not doing a good job
BIOGRAPHY 
Mr Lee as the senior 
engineering manager of 
M&E has 30 over years 
experience was 
graduated from Nothern 
University. 
His role as an engineer is 
to design and built related 
to the clients' services 
He has worked for 5 years in 
Kuala Terengganu and also 
few more years in Kuantan. 
He quit government and now 
is currently working at IJM 
Construction sdn bhd in 
Petaling Jaya.
MECHANICAL & 
ELECTRICAL 
ENGINEER 
LEE AH 
NAM 
30 OVER YEARS 
EXPERIENCE 
"DO 
THINGS 
RIGHT AT 
THE FIRST 
TIME" 
NO 
REGRETS 
DESIGN,BUILT, 
CONSTRUCTION 
S,SITE VISIT 
NAME: LEE ERN HUI 
ID: 0319703
ACHIEVEMENTS? 
FAILURE? REGRETS? 
Throughtout working as an M&E 
egineer ,do you have any regrets of 
what you've done? 
•No 
•If you've chosen this course,until the 
end, you don't ever regret 
•Had a vision of being as M&E engineer 
from the beginning 
Do you have any mistakes in any 
project? Had any projects come to 
failure? 
•No 
•Any mistake is not allowed 
ADVICES GIVEN BY 
MR LEE 
 Study HARD & study SMART 
 Distribute and balance your life 
 Follow the procedure given 
 Lead and get help from seniors 
 What you don't 
understand,ASK 
 To be successful person in the 
future 
 Not to make mistake in design 
work 
 Did a lot of Putrajaya 
project 
 one of it is Iskandar 
Melawati 
 Finish the job in time and 
made a lot of profit 
 "Once we carry out a 
project,people say do things 
right at the first time" 
 Teamwork is important 
 Coordination work 
between architect,civil 
engineer & M&E engineer is 
very important 
 Do things right at the first 
time,so you can avoid 
redraw or redo again
ACHIEVEMENTS? 
FAILURE? REGRETS? 
Throughtout working as an M&E 
egineer ,do you have any regrets of 
what you've done? 
•No 
•If you've chosen this course,until the 
end, you don't ever regret 
•Had a vision of being as M&E engineer 
from the beginning 
Do you have any mistakes in any 
project? Had any projects come to 
failure? 
•No 
•Any mistake is not allowed 
ADVICES GIVEN BY 
MR LEE 
 Study HARD & study SMART 
 Distribute and balance your life 
 Follow the procedure given 
 Lead and get help from seniors 
 What you don't 
understand,ASK 
 To be successful person in the 
future 
 Not to make mistake in design 
work 
 Did a lot of Putrajaya 
project 
 one of it is Iskandar 
Melawati 
 Finish the job in time and 
made a lot of profit 
 "Once we carry out a 
project,people say do things 
right at the first time" 
 Teamwork is important 
 Coordination work 
between architect,civil 
engineer & M&E engineer is 
very important 
 Do things right at the first 
time,so you can avoid 
redraw or redo again

More Related Content

What's hot

Introduction of the BUS 255 Team Projects
Introduction of the BUS 255 Team ProjectsIntroduction of the BUS 255 Team Projects
Introduction of the BUS 255 Team ProjectsBrendan Fleishans
 
Writing Essays: Freelance Writing Services
Writing Essays: Freelance Writing ServicesWriting Essays: Freelance Writing Services
Writing Essays: Freelance Writing ServicesSteven Brough
 
Advancedinterviewing
AdvancedinterviewingAdvancedinterviewing
Advancedinterviewingsylviaszabo
 
Electrical contractor application letter
Electrical contractor application letterElectrical contractor application letter
Electrical contractor application letterloadjonhs
 
Electrical inspector recommendation letter
Electrical inspector recommendation letterElectrical inspector recommendation letter
Electrical inspector recommendation letterKumr14
 
Construction inspector recommendation letter
Construction inspector recommendation letterConstruction inspector recommendation letter
Construction inspector recommendation letterhuxmr14
 
PEP review from CH2M
PEP review from CH2MPEP review from CH2M
PEP review from CH2MAdam Wahab
 

What's hot (9)

Introduction of the BUS 255 Team Projects
Introduction of the BUS 255 Team ProjectsIntroduction of the BUS 255 Team Projects
Introduction of the BUS 255 Team Projects
 
Writing Essays: Freelance Writing Services
Writing Essays: Freelance Writing ServicesWriting Essays: Freelance Writing Services
Writing Essays: Freelance Writing Services
 
Advancedinterviewing
AdvancedinterviewingAdvancedinterviewing
Advancedinterviewing
 
Electrical contractor application letter
Electrical contractor application letterElectrical contractor application letter
Electrical contractor application letter
 
Electrical inspector recommendation letter
Electrical inspector recommendation letterElectrical inspector recommendation letter
Electrical inspector recommendation letter
 
LinkedIn_ProRef_MZirklebach_CIO_LLUMC_02Jul16
LinkedIn_ProRef_MZirklebach_CIO_LLUMC_02Jul16LinkedIn_ProRef_MZirklebach_CIO_LLUMC_02Jul16
LinkedIn_ProRef_MZirklebach_CIO_LLUMC_02Jul16
 
Construction inspector recommendation letter
Construction inspector recommendation letterConstruction inspector recommendation letter
Construction inspector recommendation letter
 
Buddy's letter
Buddy's letterBuddy's letter
Buddy's letter
 
PEP review from CH2M
PEP review from CH2MPEP review from CH2M
PEP review from CH2M
 

Viewers also liked

Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01
Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01
Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01Chromus
 
Encouraging Internal Compliance Communication Webinar
Encouraging Internal Compliance Communication WebinarEncouraging Internal Compliance Communication Webinar
Encouraging Internal Compliance Communication WebinarCase IQ
 
Codelect candidates skill testing platform 2014- Get started today
Codelect candidates skill testing platform 2014- Get started todayCodelect candidates skill testing platform 2014- Get started today
Codelect candidates skill testing platform 2014- Get started todayBryan Len
 
Sintesis informativa 20 08 2014
Sintesis informativa 20 08 2014Sintesis informativa 20 08 2014
Sintesis informativa 20 08 2014megaradioexpress
 
Create free website
Create free websiteCreate free website
Create free websitefullerhqim
 
Dinámicas grupales b. animación, trabajo en equipo
Dinámicas grupales   b. animación, trabajo en equipoDinámicas grupales   b. animación, trabajo en equipo
Dinámicas grupales b. animación, trabajo en equipoberenicez
 
What is SlideShare?
What is SlideShare?What is SlideShare?
What is SlideShare?Nico Véliz
 
Estácio: Apresentação Reunião Pública APIMEC 2014
Estácio: Apresentação Reunião Pública APIMEC 2014Estácio: Apresentação Reunião Pública APIMEC 2014
Estácio: Apresentação Reunião Pública APIMEC 2014Estácio Participações
 
16-17 financial aid presentation
16-17 financial aid presentation16-17 financial aid presentation
16-17 financial aid presentationlnthibs
 

Viewers also liked (13)

Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01
Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01
Vidaemortedem j-gonzaga-2a-2014-110516155952-phpapp01
 
Encouraging Internal Compliance Communication Webinar
Encouraging Internal Compliance Communication WebinarEncouraging Internal Compliance Communication Webinar
Encouraging Internal Compliance Communication Webinar
 
Codelect candidates skill testing platform 2014- Get started today
Codelect candidates skill testing platform 2014- Get started todayCodelect candidates skill testing platform 2014- Get started today
Codelect candidates skill testing platform 2014- Get started today
 
Sintesis informativa 20 08 2014
Sintesis informativa 20 08 2014Sintesis informativa 20 08 2014
Sintesis informativa 20 08 2014
 
Draft 2 planning
Draft 2 planningDraft 2 planning
Draft 2 planning
 
Create free website
Create free websiteCreate free website
Create free website
 
Dinámicas grupales b. animación, trabajo en equipo
Dinámicas grupales   b. animación, trabajo en equipoDinámicas grupales   b. animación, trabajo en equipo
Dinámicas grupales b. animación, trabajo en equipo
 
What is SlideShare?
What is SlideShare?What is SlideShare?
What is SlideShare?
 
Estácio: Apresentação Reunião Pública APIMEC 2014
Estácio: Apresentação Reunião Pública APIMEC 2014Estácio: Apresentação Reunião Pública APIMEC 2014
Estácio: Apresentação Reunião Pública APIMEC 2014
 
Lego Serious Play. Russian language. v1.0
Lego Serious Play. Russian language. v1.0Lego Serious Play. Russian language. v1.0
Lego Serious Play. Russian language. v1.0
 
16-17 financial aid presentation
16-17 financial aid presentation16-17 financial aid presentation
16-17 financial aid presentation
 
ABC Como plantar caju
ABC Como plantar cajuABC Como plantar caju
ABC Como plantar caju
 
ILTA 2014: LexisNexis Software Company Update
ILTA 2014:  LexisNexis Software Company UpdateILTA 2014:  LexisNexis Software Company Update
ILTA 2014: LexisNexis Software Company Update
 

Similar to Ici magazine

[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...
[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...
[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...DevDay.org
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering Eric Teo
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
Introduction to Constructed Industry
Introduction to Constructed IndustryIntroduction to Constructed Industry
Introduction to Constructed IndustryMELVIN tan
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdfFoo Zhi Fung
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2 khaikeat16
 
Ici project 2
Ici project 2Ici project 2
Ici project 2czlun
 
Magazine pg 5
Magazine pg 5Magazine pg 5
Magazine pg 5Momo Poyi
 
Magazine pg5
Magazine pg5Magazine pg5
Magazine pg5Momo Poyi
 
Magazine pg5
Magazine pg5Magazine pg5
Magazine pg5Momo Poyi
 
National Institute of Technology
National Institute of TechnologyNational Institute of Technology
National Institute of TechnologyNI BT
 
Etamax engineering classes, ulhasnagar
Etamax engineering classes, ulhasnagarEtamax engineering classes, ulhasnagar
Etamax engineering classes, ulhasnagarAmit Chawla
 
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...University of Nottingham
 

Similar to Ici magazine (20)

Magazine
Magazine Magazine
Magazine
 
[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...
[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...
[DevDay2018] So you wanna be a project manager - By: Steve Choi, Program Dire...
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
VISANITY MAGAZINE
VISANITY MAGAZINEVISANITY MAGAZINE
VISANITY MAGAZINE
 
Magazine of Civil Engineering
Magazine of Civil Engineering Magazine of Civil Engineering
Magazine of Civil Engineering
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
Introduction to Constructed Industry
Introduction to Constructed IndustryIntroduction to Constructed Industry
Introduction to Constructed Industry
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI project 2 (1).pdf
ICI project 2 (1).pdfICI project 2 (1).pdf
ICI project 2 (1).pdf
 
ICI Project 2
ICI Project 2 ICI Project 2
ICI Project 2
 
Ici project 2
Ici project 2Ici project 2
Ici project 2
 
Magazine pg 5
Magazine pg 5Magazine pg 5
Magazine pg 5
 
Magazine pg5
Magazine pg5Magazine pg5
Magazine pg5
 
Magazine pg5
Magazine pg5Magazine pg5
Magazine pg5
 
National Institute of Technology
National Institute of TechnologyNational Institute of Technology
National Institute of Technology
 
Etamax engineering classes, ulhasnagar
Etamax engineering classes, ulhasnagarEtamax engineering classes, ulhasnagar
Etamax engineering classes, ulhasnagar
 
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
SEMESTER 1 Introduction to Construction Industry Project 2 - Building Team : ...
 

More from Michelle Lee Ern Hui (20)

Construction technology
Construction technologyConstruction technology
Construction technology
 
Fm brief
Fm briefFm brief
Fm brief
 
management science report
management science reportmanagement science report
management science report
 
Presentation 5
Presentation 5Presentation 5
Presentation 5
 
Building services-i
Building services-iBuilding services-i
Building services-i
 
CT 2
CT 2CT 2
CT 2
 
Psy
PsyPsy
Psy
 
social psychology
social psychologysocial psychology
social psychology
 
Social psychology journal
Social psychology journalSocial psychology journal
Social psychology journal
 
Journal 2 advertisement
Journal 2  advertisementJournal 2  advertisement
Journal 2 advertisement
 
Oral presentation 2
Oral presentation 2Oral presentation 2
Oral presentation 2
 
Oral presentation 1.1
Oral presentation 1.1Oral presentation 1.1
Oral presentation 1.1
 
English 2-final-3
English 2-final-3English 2-final-3
English 2-final-3
 
Accounting assignment
Accounting assignmentAccounting assignment
Accounting assignment
 
Parkinsonvery new-one
Parkinsonvery new-oneParkinsonvery new-one
Parkinsonvery new-one
 
Math statistic
Math statisticMath statistic
Math statistic
 
Presentation1 math
Presentation1 mathPresentation1 math
Presentation1 math
 
Presentation1 math
Presentation1 mathPresentation1 math
Presentation1 math
 
English 2-final
English 2-finalEnglish 2-final
English 2-final
 
English 2-final
English 2-finalEnglish 2-final
English 2-final
 

Recently uploaded

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Ici magazine

  • 1. INTRO The intention of doing this magazine is to develop a deeper understanding towards a certain career. For example,its responsibilities,skills required,problems or difficulties faced and many more. Therefore,on the 2nd of June,my teammates and I went and interviewed Mr Lee Ah Nam which had 30 years experience as an mechanical and electrical engineer.A few questions were prepared for the interview so that we can learn more about M&E engineering and their personal experience throughout their experience in this career. I would like to thank my teammates for working this out together as a team and has made this interview went on smoothly.I would also like to thank Mr Lee Ah Nam whom we interviewed for giving us this opportunity.
  • 2. What does a mechanical & electrical engineer do? How do you balance your work life with your family life? • Sometimes there is sacrifice • You must know how to distribute your time How's the experience throughout working as an M&E engineer? • Role as M&E engineer is to involve in EPC (engineering,procurement &construction) engage and coordinate with private consultant • make sure that coordinate well with architect • make sure layout fits with the architecture's design What's your job in pre-construction,during construction and after construction? • From day 1 to the end • - site visit,acquire design,construction,conclusion and end of work
  • 3. Problem solving in M&E engineering What's the PROBLEM you face as an M&E engineer? • Air-cond,firefighting,plumbing work,security surveillance,etc. • Make sure to have a coordination drawing • Miss out a lot of opening and installation in the coordination drawings • ONce there is mistake,you will have ti hack again and redo • M&E have to give feedback to architects • The room size provided can fit according to the requirement for the installation How does the quality and quantity of workers affect the project? • have high qualify skilled workers initially but nowadays there are unqualified foreigners as workers due to lack of workers • These workers will end up wth defect work • Nowadays we can't get high quallity buidings • Do you agree that a sustainanle building is a successful project? • Yes What are the fundamental aspects in making a sustainable building? • MAke sure that the quality of work is per what the clients' requirements • Have to make sure that specs given are followed • If you do not follow the spec,then you are not doing a good job
  • 4. BIOGRAPHY Mr Lee as the senior engineering manager of M&E has 30 over years experience was graduated from Nothern University. His role as an engineer is to design and built related to the clients' services He has worked for 5 years in Kuala Terengganu and also few more years in Kuantan. He quit government and now is currently working at IJM Construction sdn bhd in Petaling Jaya.
  • 5. MECHANICAL & ELECTRICAL ENGINEER LEE AH NAM 30 OVER YEARS EXPERIENCE "DO THINGS RIGHT AT THE FIRST TIME" NO REGRETS DESIGN,BUILT, CONSTRUCTION S,SITE VISIT NAME: LEE ERN HUI ID: 0319703
  • 6. ACHIEVEMENTS? FAILURE? REGRETS? Throughtout working as an M&E egineer ,do you have any regrets of what you've done? •No •If you've chosen this course,until the end, you don't ever regret •Had a vision of being as M&E engineer from the beginning Do you have any mistakes in any project? Had any projects come to failure? •No •Any mistake is not allowed ADVICES GIVEN BY MR LEE  Study HARD & study SMART  Distribute and balance your life  Follow the procedure given  Lead and get help from seniors  What you don't understand,ASK  To be successful person in the future  Not to make mistake in design work  Did a lot of Putrajaya project  one of it is Iskandar Melawati  Finish the job in time and made a lot of profit  "Once we carry out a project,people say do things right at the first time"  Teamwork is important  Coordination work between architect,civil engineer & M&E engineer is very important  Do things right at the first time,so you can avoid redraw or redo again
  • 7. ACHIEVEMENTS? FAILURE? REGRETS? Throughtout working as an M&E egineer ,do you have any regrets of what you've done? •No •If you've chosen this course,until the end, you don't ever regret •Had a vision of being as M&E engineer from the beginning Do you have any mistakes in any project? Had any projects come to failure? •No •Any mistake is not allowed ADVICES GIVEN BY MR LEE  Study HARD & study SMART  Distribute and balance your life  Follow the procedure given  Lead and get help from seniors  What you don't understand,ASK  To be successful person in the future  Not to make mistake in design work  Did a lot of Putrajaya project  one of it is Iskandar Melawati  Finish the job in time and made a lot of profit  "Once we carry out a project,people say do things right at the first time"  Teamwork is important  Coordination work between architect,civil engineer & M&E engineer is very important  Do things right at the first time,so you can avoid redraw or redo again