© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
PowerPoint
presentation
Unit 220: Erecting and dismantling access
equipment and working platforms
Erecting and dismantling tower scaffolds
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Online resource (HSE website):
www.hse.gov.uk/pubns/cis10.pdf
•  An assessment must be undertaken before starting any work at
height (requirement of Work at Height Regulations 2005).
•  If there is no alternative to working at height, suitable work equipment
must be selected, taking into account the nature of the work.
Regulation
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
•  Mobile access towers are widely used and can provide an
effective and safe means of gaining access to work at height.
•  Inappropriate erection and misuse of towers are the cause of
numerous accidents each year.
•  Aluminium and thin-wall steel towers are light and can easily
overturn if used incorrectly.
Risks
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
•  All parts must be in place to ensure
adequate strength.
•  Towers can collapse if sections are left out.
•  Before selecting or specifying a tower, you
must be satisfied that it is the most suitable
item of equipment for the job.
Risks
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Many types of mobile access towers are available.
Erecting a tower
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
•  Towers should be erected following a safe method of work.
•  The manufacturer or supplier has a duty to provide an instruction
manual explaining the erection sequence, including any bracing
requirements.
•  If the tower has been hired, the hirer has a duty to provide this
information to the person erecting the tower.
Erecting a tower
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
There are two approved methods:
Method 1:
• An advance guard rail system uses specially designed temporary
guard rail units, locked in place from the level below and moved up to the
platform level.
• These will stop the user from falling, and are in place before they fit the
permanent guard rails.
• Gradually fitting guard rails from a protected area at a lower level means
the user is never working on an unguarded platform.
Methods for erecting a tower
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Method 1: advance guard rail
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Method 2:
The through-the-trap (3T) method allows the person erecting the tower
to install guard rails to the next level from a low-risk position.
• The operator works from the trap door of the platform, from where they
can add or remove the components which act as the guard rails on the
level 1 above the platform.
• The operative never stands on an unguarded platform, but installs the
components to a particular level while positioned within the trap door of
that level.
Methods for erecting a tower
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Method 2: 3T
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Remember…
Stability
Make sure the tower is resting on
firm, level ground with the locked
castors or base plates properly
supported.
Never use bricks or building
blocks to take the weight of any
part of the tower.
Always check the safe
working height by referring to
the instruction manual.
Towers should never be erected to
heights above those recommended
by the manufacturer.
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Unless the tower has been specifically designed for such use, avoid:
• sheeting or exposure to strong winds
• loading with heavy equipment
• using the tower to hoist materials or support rubbish chutes.
Remember…
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Using the tower
•  Ensure there is a safe way to get to and from the work platform.
•  This must be on the inside of the tower by an appropriately designed
built-in ladder.
•  It is not safe to climb up the rungs on the end frames unless the rungs
have been specifically designed for the purpose of getting to and from
the working platform.
•  There is rung spacing of between 230mm and 300mm and an anti-slip
surface.
•  If you are in doubt, consult the instruction manual.
.
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
•  as a support for ladders, trestles or other access equipment
•  in weather conditions which are likely to make it unstable
•  with broken or missing parts
•  with incompatible components.
Never use a tower…
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
•  reduce the height to a maximum of 4m
•  check there are no power lines or other obstructions overhead
•  check that the ground is firm, level and free from potholes
•  push or pull using manual effort from the base only – never use
powered vehicles
•  never move it while there are people or materials on the tower
•  never move it in windy conditions.
When moving a tower…
© 2013 City and Guilds of London Institute. All rights reserved.
Level 2 Diploma in Painting and Decorating
Any questions?

More Related Content

Viewers also liked

unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
Health and safety in the workplace
Health and safety in the workplaceHealth and safety in the workplace
Health and safety in the workplacemichael mcewan
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
Access equipment and working platforms 4
Access equipment and working platforms 4Access equipment and working platforms 4
Access equipment and working platforms 4michael mcewan
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingkevin porter
 

Viewers also liked (10)

unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
FTN Architecture
FTN ArchitectureFTN Architecture
FTN Architecture
 
Health and safety in the workplace
Health and safety in the workplaceHealth and safety in the workplace
Health and safety in the workplace
 
Protection
ProtectionProtection
Protection
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
Access equipment and working platforms 4
Access equipment and working platforms 4Access equipment and working platforms 4
Access equipment and working platforms 4
 
Innovation Solutions
Innovation SolutionsInnovation Solutions
Innovation Solutions
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 
unit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofingunit 207 carry out first fix flooring and roofing
unit 207 carry out first fix flooring and roofing
 

Similar to Erecting and dismantling tower scaffolds 4

UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...michael mcewan
 
Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...michael mcewan
 
Unit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in constructionUnit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in constructiongsr101
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionMuizz Anibire
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Jervain Ng
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252zul husni
 
6708 13 l1_121_presentation_2
6708 13 l1_121_presentation_26708 13 l1_121_presentation_2
6708 13 l1_121_presentation_2Robbie Blake
 
working at height-210602170723 (1).pdf
working at height-210602170723 (1).pdfworking at height-210602170723 (1).pdf
working at height-210602170723 (1).pdfNeerajTiwari551245
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docxDwarika Bhushan Sharma
 
Mobile Towers and Access Equipment
Mobile Towers  and  Access EquipmentMobile Towers  and  Access Equipment
Mobile Towers and Access EquipmentDjCurrie
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاOsamaAbdelbaset2
 
BCON Project 1: Experiencing Construction
BCON Project 1: Experiencing Construction BCON Project 1: Experiencing Construction
BCON Project 1: Experiencing Construction Charlotte Chin
 

Similar to Erecting and dismantling tower scaffolds 4 (20)

Power point 3
Power point 3Power point 3
Power point 3
 
Power point 3
Power point 3Power point 3
Power point 3
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...
 
Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...Know about access equipment and working at heights, and how to work with elec...
Know about access equipment and working at heights, and how to work with elec...
 
Unit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in constructionUnit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in construction
 
unit 211 PPT 3
unit 211 PPT 3unit 211 PPT 3
unit 211 PPT 3
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
 
Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1 Sem 2 Building Construction Project 1
Sem 2 Building Construction Project 1
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
6708 13 l1_121_presentation_2
6708 13 l1_121_presentation_26708 13 l1_121_presentation_2
6708 13 l1_121_presentation_2
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
Work at Height
Work at HeightWork at Height
Work at Height
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
working at height-210602170723 (1).pdf
working at height-210602170723 (1).pdfworking at height-210602170723 (1).pdf
working at height-210602170723 (1).pdf
 
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
 
Mobile Towers and Access Equipment
Mobile Towers  and  Access EquipmentMobile Towers  and  Access Equipment
Mobile Towers and Access Equipment
 
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتهاالروافع البرجيه واخطارها والتعامل معها. ومكوناتها
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
 
BCON Project 1: Experiencing Construction
BCON Project 1: Experiencing Construction BCON Project 1: Experiencing Construction
BCON Project 1: Experiencing Construction
 

More from michael mcewan

More from michael mcewan (20)

Colour theory presentation
Colour theory presentationColour theory presentation
Colour theory presentation
 
Colour schemes lesson 2
Colour schemes lesson 2Colour schemes lesson 2
Colour schemes lesson 2
 
Colour schemes lesson 1
Colour schemes lesson 1Colour schemes lesson 1
Colour schemes lesson 1
 
appreciation_of_access_platforms_and_equipment
appreciation_of_access_platforms_and_equipmentappreciation_of_access_platforms_and_equipment
appreciation_of_access_platforms_and_equipment
 
Steps and working platforms
Steps and working platformsSteps and working platforms
Steps and working platforms
 
Health and safety
Health and safetyHealth and safety
Health and safety
 
Painting & Decorating induction
Painting & Decorating inductionPainting & Decorating induction
Painting & Decorating induction
 
Wallpaper history
Wallpaper historyWallpaper history
Wallpaper history
 
Paperhanning tools
Paperhanning toolsPaperhanning tools
Paperhanning tools
 
Patterned paper power point
Patterned paper power pointPatterned paper power point
Patterned paper power point
 
Paperhanning
PaperhanningPaperhanning
Paperhanning
 
Paint application
Paint applicationPaint application
Paint application
 
Colour
ColourColour
Colour
 
Surface coatings
Surface coatingsSurface coatings
Surface coatings
 
Preparing and painting surfaces
Preparing and painting surfacesPreparing and painting surfaces
Preparing and painting surfaces
 
Protection
ProtectionProtection
Protection
 
Surface coatings
Surface coatingsSurface coatings
Surface coatings
 
Surface & Tin defects
Surface & Tin defectsSurface & Tin defects
Surface & Tin defects
 
Surface defects
Surface defectsSurface defects
Surface defects
 
Health and safety
Health and safetyHealth and safety
Health and safety
 

Recently uploaded

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 

Recently uploaded (20)

How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 

Erecting and dismantling tower scaffolds 4

  • 1. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating PowerPoint presentation Unit 220: Erecting and dismantling access equipment and working platforms Erecting and dismantling tower scaffolds
  • 2. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Online resource (HSE website): www.hse.gov.uk/pubns/cis10.pdf •  An assessment must be undertaken before starting any work at height (requirement of Work at Height Regulations 2005). •  If there is no alternative to working at height, suitable work equipment must be selected, taking into account the nature of the work. Regulation
  • 3. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating •  Mobile access towers are widely used and can provide an effective and safe means of gaining access to work at height. •  Inappropriate erection and misuse of towers are the cause of numerous accidents each year. •  Aluminium and thin-wall steel towers are light and can easily overturn if used incorrectly. Risks
  • 4. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating •  All parts must be in place to ensure adequate strength. •  Towers can collapse if sections are left out. •  Before selecting or specifying a tower, you must be satisfied that it is the most suitable item of equipment for the job. Risks
  • 5. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Many types of mobile access towers are available. Erecting a tower
  • 6. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating •  Towers should be erected following a safe method of work. •  The manufacturer or supplier has a duty to provide an instruction manual explaining the erection sequence, including any bracing requirements. •  If the tower has been hired, the hirer has a duty to provide this information to the person erecting the tower. Erecting a tower
  • 7. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating There are two approved methods: Method 1: • An advance guard rail system uses specially designed temporary guard rail units, locked in place from the level below and moved up to the platform level. • These will stop the user from falling, and are in place before they fit the permanent guard rails. • Gradually fitting guard rails from a protected area at a lower level means the user is never working on an unguarded platform. Methods for erecting a tower
  • 8. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Method 1: advance guard rail
  • 9. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Method 2: The through-the-trap (3T) method allows the person erecting the tower to install guard rails to the next level from a low-risk position. • The operator works from the trap door of the platform, from where they can add or remove the components which act as the guard rails on the level 1 above the platform. • The operative never stands on an unguarded platform, but installs the components to a particular level while positioned within the trap door of that level. Methods for erecting a tower
  • 10. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Method 2: 3T
  • 11. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Remember… Stability Make sure the tower is resting on firm, level ground with the locked castors or base plates properly supported. Never use bricks or building blocks to take the weight of any part of the tower. Always check the safe working height by referring to the instruction manual. Towers should never be erected to heights above those recommended by the manufacturer.
  • 12. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Unless the tower has been specifically designed for such use, avoid: • sheeting or exposure to strong winds • loading with heavy equipment • using the tower to hoist materials or support rubbish chutes. Remember…
  • 13. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Using the tower •  Ensure there is a safe way to get to and from the work platform. •  This must be on the inside of the tower by an appropriately designed built-in ladder. •  It is not safe to climb up the rungs on the end frames unless the rungs have been specifically designed for the purpose of getting to and from the working platform. •  There is rung spacing of between 230mm and 300mm and an anti-slip surface. •  If you are in doubt, consult the instruction manual. .
  • 14. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating •  as a support for ladders, trestles or other access equipment •  in weather conditions which are likely to make it unstable •  with broken or missing parts •  with incompatible components. Never use a tower…
  • 15. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating •  reduce the height to a maximum of 4m •  check there are no power lines or other obstructions overhead •  check that the ground is firm, level and free from potholes •  push or pull using manual effort from the base only – never use powered vehicles •  never move it while there are people or materials on the tower •  never move it in windy conditions. When moving a tower…
  • 16. © 2013 City and Guilds of London Institute. All rights reserved. Level 2 Diploma in Painting and Decorating Any questions?