WML-G-WWTW | revision 2 | October 2011 Page 1 of 5
GUIDE TO THE PREPARATION OF A WORKING PLAN
WASTEWATER TREATMENT PLANTS
A Working Plan is an essential document and consists of a written statement
accompanied by plans, drawings and specifications detailing how the site is to be
designed, engineered, operated, monitored and restored. The Working Plan is
referred to in waste management licence conditions and the Licence Holder may only
vary it by notification to, and in some respects with the prior consent of, SEPA.
SEPA’s Guide to Waste Management Licensing gives further guidance on waste
management licensing and Working Plans.
It is essential that applicants discuss the need for site engineering and development
works with SEPA at an early stage of preparing a licence application. The site will
require engineered design features such as gates, fences, drainage and concrete
hardstandings. An indication of the engineering works that will be required is given in
this Guidance Note.
The application of Quality Assurance and Quality Control procedures form an
important part of any waste management practice and applicants should bear this in
mind when preparing their Working Plan. This is particularly applicable to the
installation of site infrastructure.
The Working Plan is likely to require amendment as the site develops, it will therefore
be helpful to write the statement in sections with numbered paragraphs and pages,
submitted in loose leaf form so that subsequent approved changes are easier to
incorporate.
The information which must be included in the Working Plan is as follows, and should
correlate with plans as listed in paragraphs 2.1-2.3 below:
1. WRITTEN STATEMENT
The written statement forms an important part of the Working Plan. It must describe
clearly and unambiguously all aspects of the operation on site. A correctly written
statement should contain sufficient information to enable anyone unconnected with
the site to understand how it will be operated.
1.1 General Considerations
General details of the site should include;
a) A brief history of the site giving its previous uses, including any previous waste
management activities.
b) The proposed operating hours at the site including the proposals for Bank
Holiday and other public holiday working, for accepting, treating and removing
waste and the maintenance of plant, buildings and equipment.
c) The types of waste that will be accepted and the maximum quantity of each type
of waste that will be accepted stored and treated (as appropriate) each day. A
throughput rate for wastes should also be indicated.
d) The number of staff to be employed on the site and the minimum number of
people required to operate the site. Details should be provided of how the
WML-G-WWTW | revision 2 | October 2011 Page 2 of 5
technically competent management will control the site including detail on those
involved and a copy of the relevant certification / references.
1.2 Site Infrastructure
This section should detail all pre-development surveys and all engineering and
construction work that will be required before any waste acceptance and treatment
operations may commence.
Where appropriate, the standard and location of the following infrastructure should be
detailed;
a) site roads
b) boundary fencing and gates
c) general pollution control provisions (including odour, litter, noise, etc)
d) buildings (including laboratory facilities, where applicable)
e) weighbridge
f) wheel cleaning facility
g) fuel and waste storage tanks and associated bunds
h) drainage system
i) site surfacing
j) waste storage areas
k) services (water, electricity, telephone etc)
l) lighting
If it is considered more convenient, buildings and other infrastructure can be detailed
as annotations on the site plan(s).
The Working Plan should make it clear whether the waste storage area is in the open
air, covered, enclosed, or in a building, with details of any structure.
1.3 Waste Reception
A full detailed description should be given of the following points, where relevant: -
a) Method of waste transfer and/or treatment processes, including (where
appropriate) the way in which the waste is to be accepted, deposited, assessed,
stored prior to treatment, treated, to what standard, what sampling/analysis is
carried out and detail on any quality and assurance procedures to verify the
same, storage post treatment and removal procedures.
b) Measures taken to ensure the segregation of incompatible wastes. Applicants
are advised to refer to guidance produced by the Health & Safety Executive and
in particular to HSE Guidance Note HS(G) 71.
c) The provisions for waste to be checked to ensure it is acceptable under the terms
of the licence and that it complies with any documentation accompanying the
load, how the quantity is to be measured and recorded, and details of any tests
carried out. A quarantine area for loads to wait whilst appropriate sampling,
testing and analysis is carried out may also be necessary.
WML-G-WWTW | revision 2 | October 2011 Page 3 of 5
d) The procedures to be carried out in the event of waste being delivered which is
not permitted by the licence or not capable of being handled by the equipment
currently available.
1.4 Site Operations
Information on the day-to-day operations should include:-
a) The location and types of treatment processes to be carried out.
b) The method of containment of the waste (i.e impermeable concrete tanks etc)
c) The maximum time that waste will be stored at the facility prior to treatment. The
Working Plan must specify how wastes are to be stored at the site pending
treatment.
d) If waste is to be treated and stored for sale or re-use, type and maximum quantity
of reclaimed material and its storage location.
e) The type, location and size of any waste handling plant machinery and detail of
how it is to be used.
f) Measures to warn of plant malfunctions or overfilling and the procedures to be
implemented in the event of any plant or machinery breaking down or being
unavailable.
g) Any sampling and analysis to be undertaken to confirm the nature of wastes
received at the site.
h) Post treatment sampling and analysis to confirm that the treated sludge is
suitable for land spreading or incineration as appropriate.
i) The arrangements for the storage, handling and disposal of any residues or by-
products produced at the site.
j) The arrangements for traffic movements and vehicle parking during operational
hours and overnight (including precautions to prevent any incident arising from
parked loaded vehicles).
k) A list of technically competent personnel.
The operator must make adequate provision for the maintenance and upkeep of the
site and all plant and equipment. The Working Plan must provide full and precise
details of such maintenance provisions to satisfy SEPA of their suitability. Details of
inspections of infrastructure and storage areas should also be stated.
1.5 Pollution Control
This section should detail the measures to be taken to monitor and/or control the
following:
a) Vermin
b) Insects
c) Noise
d) Dust
e) Spillages
f) Odours
g) Mud
h) Litter
i) Fires
Details of any consents, from SEPA or Scottish Water, held to discharge to any
watercourse or sewer should be appended to the Working Plan.
WML-G-WWTW | revision 2 | October 2011 Page 4 of 5
1.6 Site Completion
The proposals for restoring the site after operations have been concluded should be
included, where applicable.
1.7 Monitoring
This section should include details of any monitoring it is proposed to carry out
including the location and frequency of monitoring and the methodology of sampling
and analysis.
1.8 Records
This section should include details of the manner in which records relating to the site
activities will be kept. In particular the system for recording the types and quantities
of waste received, processed and removed from the site should be detailed.
2. PLANS
Where indicated the scales suggested for the following sections are strongly
recommended, although in some circumstances alternative scales may be more
appropriate. Applicants should discuss alternative plans or scales with SEPA prior to
the submission of the application. All plans should bear a unique identification
number.
The plans required for the Working Plan are as follows:
2.1 Site Location Plan
A plan to identify the site in comparison to the surrounding area. This should be A4
in size and usually at a scale of 1:1250. It must show the area around the site to a
distance of at least 250 m and include all roads, buildings and other developments.
A red line should be placed around the whole area to be licensed, and a blue
line placed around any other areas of land owned or occupied by the applicant.
The area to be licensed must be identical to, or fall within the boundaries of the
area that has been granted, or applied for, in the planning permission,
application or equivalent authorisation.
2.2 Site Survey Plan
An appropriately scaled plan to show details of the site including:-
a) The gradient of the surface of the site.
b) Existing drainage, sumps and outfalls.
c) The location of any surface water features including springs and seepages.
d) Location of previous contamination and sampling points.
e) Public services, and any other features under, on, above or around the site.
2.3 Site Operational and Engineering Plan(s)
a) Gates and boundary fencing.
WML-G-WWTW | revision 2 | October 2011 Page 5 of 5
b) Details of intended drainage provisions, to include foul and surface water
connections and any interceptors, sumps or settlement tanks.
c) Access and vehicle circulation routes, form and construction of site roads.
d) Position of notice board.
e) Reception facilities, site control office and mess facilities, laboratory and other
buildings or fixed equipment on site including wheel cleaner and weighbridge.
f) Provision for daytime and overnight parking, including quarantine area for loads
to wait whilst being checked.
g) Location, construction, size and capacity of storage and treatment area for loads
to wait whilst being checked.
h) Waste discharge facilities (including location of machine and vehicle).
i) Location of external lighting, water supplies, fire extinguishers etc.
j) Areas for the storage of waste inadvertently received at the site pending removal.
k) Location for the storage of material recovered from the waste and segregated for
re-use or re-sale, if appropriate.
l) Litter and noise abatement equipment, dust suppression or extraction equipment.
m) Areas set aside for the storage of empty skips, if appropriate.
In the interests of clarity it may be appropriate to detail the information on a
series of plans.
NOTE TO APPLICANTS
SEPA will usually discuss with the applicant any details in the submitted Working
Plan which it considers to be unacceptable. If SEPA cannot be satisfied with any of
the contents of the Working Plan it will incorporate conditions within the waste
management licence which will override the Working Plan in respect to those points.
License Holder’s Responsibilities
Notwithstanding any requirements of SEPA for site engineering, the applicant should
be aware of his responsibility for ensuring the integrity of such works. Compliance
with SEPA’s minimum standards does not remove the liability of the licence holder
for any water pollution or other environmental damage which may result from the
activities on site.

More Related Content

What's hot

PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingPA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingMarcellus Drilling News
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiihydrologyproject001
 
Leaflet contaminated land management
Leaflet contaminated land managementLeaflet contaminated land management
Leaflet contaminated land managementHenk Kuik
 
WASA Wastewater and Potable Water Design Requirements
WASA Wastewater and Potable Water Design RequirementsWASA Wastewater and Potable Water Design Requirements
WASA Wastewater and Potable Water Design RequirementsJeffrey James
 
Draft Revisions to PA Chapter 78 Oil & Gas Drilling Regulations
Draft Revisions to PA Chapter 78 Oil & Gas Drilling RegulationsDraft Revisions to PA Chapter 78 Oil & Gas Drilling Regulations
Draft Revisions to PA Chapter 78 Oil & Gas Drilling RegulationsMarcellus Drilling News
 
EMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryEMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryAlvaro H. Pescador
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleKook Dean
 
Bangladesh environmental conservation rules,1997
Bangladesh environmental conservation rules,1997Bangladesh environmental conservation rules,1997
Bangladesh environmental conservation rules,1997Abdullah Saif
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNew Jersey Future
 
Economic analysis for cvat panama
Economic analysis for cvat panamaEconomic analysis for cvat panama
Economic analysis for cvat panamaofrias1
 
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Global CCS Institute
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsEdgar Tovilla
 

What's hot (17)

Oil & gas
Oil & gasOil & gas
Oil & gas
 
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale DrillingPA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
PA DEP Proposal to Study Radiation Levels Associated with Shale Drilling
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartii
 
Leaflet contaminated land management
Leaflet contaminated land managementLeaflet contaminated land management
Leaflet contaminated land management
 
WASA Wastewater and Potable Water Design Requirements
WASA Wastewater and Potable Water Design RequirementsWASA Wastewater and Potable Water Design Requirements
WASA Wastewater and Potable Water Design Requirements
 
Mira Abdelaziz resume
Mira Abdelaziz resumeMira Abdelaziz resume
Mira Abdelaziz resume
 
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
 
Draft Revisions to PA Chapter 78 Oil & Gas Drilling Regulations
Draft Revisions to PA Chapter 78 Oil & Gas Drilling RegulationsDraft Revisions to PA Chapter 78 Oil & Gas Drilling Regulations
Draft Revisions to PA Chapter 78 Oil & Gas Drilling Regulations
 
EMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil RefineryEMP for 220,000 BPD Oil Refinery
EMP for 220,000 BPD Oil Refinery
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
 
Bangladesh environmental conservation rules,1997
Bangladesh environmental conservation rules,1997Bangladesh environmental conservation rules,1997
Bangladesh environmental conservation rules,1997
 
NJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - MahonNJ Redevelopment Forum 2020 - Mahon
NJ Redevelopment Forum 2020 - Mahon
 
Economic analysis for cvat panama
Economic analysis for cvat panamaEconomic analysis for cvat panama
Economic analysis for cvat panama
 
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
 
RHI Capability Summary
RHI Capability SummaryRHI Capability Summary
RHI Capability Summary
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, Offsets
 
Ge 121 lecture 2 (MINE SURVEYING) by: Broddett Bello abatayo
Ge 121 lecture 2 (MINE SURVEYING) by: Broddett Bello abatayoGe 121 lecture 2 (MINE SURVEYING) by: Broddett Bello abatayo
Ge 121 lecture 2 (MINE SURVEYING) by: Broddett Bello abatayo
 

Viewers also liked

Personal Branding Working Plan
Personal Branding Working PlanPersonal Branding Working Plan
Personal Branding Working PlanStefano Principato
 
Tài liệu tham khảo lập kế hoạch công việc
Tài liệu tham khảo lập kế hoạch công việcTài liệu tham khảo lập kế hoạch công việc
Tài liệu tham khảo lập kế hoạch công việcTổ chức Đào tạo PTC
 
Hướng dẫn Lập kế hoạch cho Người mới
Hướng dẫn Lập kế hoạch cho Người mới Hướng dẫn Lập kế hoạch cho Người mới
Hướng dẫn Lập kế hoạch cho Người mới Viet Duong Nguyen
 
Kĩ năng lập kế hoạch
Kĩ năng lập kế hoạchKĩ năng lập kế hoạch
Kĩ năng lập kế hoạchyouthvietnam
 
Understanding the everyday use of images on the web
Understanding the everyday use of images on the webUnderstanding the everyday use of images on the web
Understanding the everyday use of images on the webNammin Lee
 
Chuyencaigoc
ChuyencaigocChuyencaigoc
Chuyencaigocleduyhung
 
Economia y estado actividad 7
Economia y estado actividad 7Economia y estado actividad 7
Economia y estado actividad 7nanita15
 
Can ho resort ven sông 5 sao
Can ho resort ven sông 5 saoCan ho resort ven sông 5 sao
Can ho resort ven sông 5 saopenlovely1806
 
ApresentaçãO Citi Annual Brazil Equity Conference
ApresentaçãO Citi   Annual Brazil Equity ConferenceApresentaçãO Citi   Annual Brazil Equity Conference
ApresentaçãO Citi Annual Brazil Equity ConferenceTIM RI
 
ο μικρος αδελφος, μπουρέκας χρ.
ο μικρος αδελφος, μπουρέκας χρ.ο μικρος αδελφος, μπουρέκας χρ.
ο μικρος αδελφος, μπουρέκας χρ.Σταυριανάκη Νίκη
 
Vega Profile
Vega ProfileVega Profile
Vega ProfileIwill
 
Institutional regulations
Institutional regulationsInstitutional regulations
Institutional regulationskwestwood
 
La segunda república española
La segunda república españolaLa segunda república española
La segunda república española2pcpi
 

Viewers also liked (18)

Personal Branding Working Plan
Personal Branding Working PlanPersonal Branding Working Plan
Personal Branding Working Plan
 
Tài liệu tham khảo lập kế hoạch công việc
Tài liệu tham khảo lập kế hoạch công việcTài liệu tham khảo lập kế hoạch công việc
Tài liệu tham khảo lập kế hoạch công việc
 
Hướng dẫn Lập kế hoạch cho Người mới
Hướng dẫn Lập kế hoạch cho Người mới Hướng dẫn Lập kế hoạch cho Người mới
Hướng dẫn Lập kế hoạch cho Người mới
 
Kĩ năng lập kế hoạch
Kĩ năng lập kế hoạchKĩ năng lập kế hoạch
Kĩ năng lập kế hoạch
 
Company Appstore Suite
Company Appstore SuiteCompany Appstore Suite
Company Appstore Suite
 
Understanding the everyday use of images on the web
Understanding the everyday use of images on the webUnderstanding the everyday use of images on the web
Understanding the everyday use of images on the web
 
Chuyencaigoc
ChuyencaigocChuyencaigoc
Chuyencaigoc
 
Cs
CsCs
Cs
 
A 05
A 05A 05
A 05
 
Economia y estado actividad 7
Economia y estado actividad 7Economia y estado actividad 7
Economia y estado actividad 7
 
Can ho resort ven sông 5 sao
Can ho resort ven sông 5 saoCan ho resort ven sông 5 sao
Can ho resort ven sông 5 sao
 
ApresentaçãO Citi Annual Brazil Equity Conference
ApresentaçãO Citi   Annual Brazil Equity ConferenceApresentaçãO Citi   Annual Brazil Equity Conference
ApresentaçãO Citi Annual Brazil Equity Conference
 
ο μικρος αδελφος, μπουρέκας χρ.
ο μικρος αδελφος, μπουρέκας χρ.ο μικρος αδελφος, μπουρέκας χρ.
ο μικρος αδελφος, μπουρέκας χρ.
 
Vega Profile
Vega ProfileVega Profile
Vega Profile
 
Institutional regulations
Institutional regulationsInstitutional regulations
Institutional regulations
 
Emerald
EmeraldEmerald
Emerald
 
La segunda república española
La segunda república españolaLa segunda república española
La segunda república española
 
PresentacióN1
PresentacióN1PresentacióN1
PresentacióN1
 

Similar to Working plan guidance_wwtp

Wasa guidelines for design of water and wastewater systems
Wasa   guidelines for design of water and wastewater systemsWasa   guidelines for design of water and wastewater systems
Wasa guidelines for design of water and wastewater systemsJeffrey James
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Adam Cohen
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 
ESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfEdmundQuartey1
 
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]Frank Costanzo Connelly
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample MemoChad Colton
 
Hazardous Waste Management-ppt-25_06_2019.pptx
Hazardous Waste Management-ppt-25_06_2019.pptxHazardous Waste Management-ppt-25_06_2019.pptx
Hazardous Waste Management-ppt-25_06_2019.pptxDeekshithAN11
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviihydrologyproject001
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptxFARSANA26
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES / IAQM
 
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
3 BHK & 4 BHK Flats in Bandra | Flats in Bandrashikhadesai1990
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartihydrologyproject001
 
Guidance on ems regulatory requirements in ontario
Guidance on ems regulatory requirements in ontarioGuidance on ems regulatory requirements in ontario
Guidance on ems regulatory requirements in ontariojameschisholm
 
3 swpp ps for const sites tonning ksa apr 2010
3 swpp ps for const sites   tonning ksa apr 20103 swpp ps for const sites   tonning ksa apr 2010
3 swpp ps for const sites tonning ksa apr 2010guest7dbf4
 

Similar to Working plan guidance_wwtp (20)

Cec application form_a
Cec application form_aCec application form_a
Cec application form_a
 
Wasa guidelines for design of water and wastewater systems
Wasa   guidelines for design of water and wastewater systemsWasa   guidelines for design of water and wastewater systems
Wasa guidelines for design of water and wastewater systems
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010Three County Fairgrounds Stormwater Drainage Report 11-03-2010
Three County Fairgrounds Stormwater Drainage Report 11-03-2010
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
ESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdf
 
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
WWTS Sanctuary Belize Marina Village Request for proposal[mm2][fc3][final]
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Hazardous Waste Management-ppt-25_06_2019.pptx
Hazardous Waste Management-ppt-25_06_2019.pptxHazardous Waste Management-ppt-25_06_2019.pptx
Hazardous Waste Management-ppt-25_06_2019.pptx
 
GMP Sub Part - C
GMP Sub Part - CGMP Sub Part - C
GMP Sub Part - C
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 
HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
 
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra 3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
3 BHK & 4 BHK Flats in Bandra | Flats in Bandra
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 
Guidance on ems regulatory requirements in ontario
Guidance on ems regulatory requirements in ontarioGuidance on ems regulatory requirements in ontario
Guidance on ems regulatory requirements in ontario
 
3 swpp ps for const sites tonning ksa apr 2010
3 swpp ps for const sites   tonning ksa apr 20103 swpp ps for const sites   tonning ksa apr 2010
3 swpp ps for const sites tonning ksa apr 2010
 

Recently uploaded

PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...katerynaivanenko1
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 

Recently uploaded (20)

PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
MT. Marseille an Archipelago. Strategies for Integrating Residential Communit...
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 

Working plan guidance_wwtp

  • 1. WML-G-WWTW | revision 2 | October 2011 Page 1 of 5 GUIDE TO THE PREPARATION OF A WORKING PLAN WASTEWATER TREATMENT PLANTS A Working Plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications detailing how the site is to be designed, engineered, operated, monitored and restored. The Working Plan is referred to in waste management licence conditions and the Licence Holder may only vary it by notification to, and in some respects with the prior consent of, SEPA. SEPA’s Guide to Waste Management Licensing gives further guidance on waste management licensing and Working Plans. It is essential that applicants discuss the need for site engineering and development works with SEPA at an early stage of preparing a licence application. The site will require engineered design features such as gates, fences, drainage and concrete hardstandings. An indication of the engineering works that will be required is given in this Guidance Note. The application of Quality Assurance and Quality Control procedures form an important part of any waste management practice and applicants should bear this in mind when preparing their Working Plan. This is particularly applicable to the installation of site infrastructure. The Working Plan is likely to require amendment as the site develops, it will therefore be helpful to write the statement in sections with numbered paragraphs and pages, submitted in loose leaf form so that subsequent approved changes are easier to incorporate. The information which must be included in the Working Plan is as follows, and should correlate with plans as listed in paragraphs 2.1-2.3 below: 1. WRITTEN STATEMENT The written statement forms an important part of the Working Plan. It must describe clearly and unambiguously all aspects of the operation on site. A correctly written statement should contain sufficient information to enable anyone unconnected with the site to understand how it will be operated. 1.1 General Considerations General details of the site should include; a) A brief history of the site giving its previous uses, including any previous waste management activities. b) The proposed operating hours at the site including the proposals for Bank Holiday and other public holiday working, for accepting, treating and removing waste and the maintenance of plant, buildings and equipment. c) The types of waste that will be accepted and the maximum quantity of each type of waste that will be accepted stored and treated (as appropriate) each day. A throughput rate for wastes should also be indicated. d) The number of staff to be employed on the site and the minimum number of people required to operate the site. Details should be provided of how the
  • 2. WML-G-WWTW | revision 2 | October 2011 Page 2 of 5 technically competent management will control the site including detail on those involved and a copy of the relevant certification / references. 1.2 Site Infrastructure This section should detail all pre-development surveys and all engineering and construction work that will be required before any waste acceptance and treatment operations may commence. Where appropriate, the standard and location of the following infrastructure should be detailed; a) site roads b) boundary fencing and gates c) general pollution control provisions (including odour, litter, noise, etc) d) buildings (including laboratory facilities, where applicable) e) weighbridge f) wheel cleaning facility g) fuel and waste storage tanks and associated bunds h) drainage system i) site surfacing j) waste storage areas k) services (water, electricity, telephone etc) l) lighting If it is considered more convenient, buildings and other infrastructure can be detailed as annotations on the site plan(s). The Working Plan should make it clear whether the waste storage area is in the open air, covered, enclosed, or in a building, with details of any structure. 1.3 Waste Reception A full detailed description should be given of the following points, where relevant: - a) Method of waste transfer and/or treatment processes, including (where appropriate) the way in which the waste is to be accepted, deposited, assessed, stored prior to treatment, treated, to what standard, what sampling/analysis is carried out and detail on any quality and assurance procedures to verify the same, storage post treatment and removal procedures. b) Measures taken to ensure the segregation of incompatible wastes. Applicants are advised to refer to guidance produced by the Health & Safety Executive and in particular to HSE Guidance Note HS(G) 71. c) The provisions for waste to be checked to ensure it is acceptable under the terms of the licence and that it complies with any documentation accompanying the load, how the quantity is to be measured and recorded, and details of any tests carried out. A quarantine area for loads to wait whilst appropriate sampling, testing and analysis is carried out may also be necessary.
  • 3. WML-G-WWTW | revision 2 | October 2011 Page 3 of 5 d) The procedures to be carried out in the event of waste being delivered which is not permitted by the licence or not capable of being handled by the equipment currently available. 1.4 Site Operations Information on the day-to-day operations should include:- a) The location and types of treatment processes to be carried out. b) The method of containment of the waste (i.e impermeable concrete tanks etc) c) The maximum time that waste will be stored at the facility prior to treatment. The Working Plan must specify how wastes are to be stored at the site pending treatment. d) If waste is to be treated and stored for sale or re-use, type and maximum quantity of reclaimed material and its storage location. e) The type, location and size of any waste handling plant machinery and detail of how it is to be used. f) Measures to warn of plant malfunctions or overfilling and the procedures to be implemented in the event of any plant or machinery breaking down or being unavailable. g) Any sampling and analysis to be undertaken to confirm the nature of wastes received at the site. h) Post treatment sampling and analysis to confirm that the treated sludge is suitable for land spreading or incineration as appropriate. i) The arrangements for the storage, handling and disposal of any residues or by- products produced at the site. j) The arrangements for traffic movements and vehicle parking during operational hours and overnight (including precautions to prevent any incident arising from parked loaded vehicles). k) A list of technically competent personnel. The operator must make adequate provision for the maintenance and upkeep of the site and all plant and equipment. The Working Plan must provide full and precise details of such maintenance provisions to satisfy SEPA of their suitability. Details of inspections of infrastructure and storage areas should also be stated. 1.5 Pollution Control This section should detail the measures to be taken to monitor and/or control the following: a) Vermin b) Insects c) Noise d) Dust e) Spillages f) Odours g) Mud h) Litter i) Fires Details of any consents, from SEPA or Scottish Water, held to discharge to any watercourse or sewer should be appended to the Working Plan.
  • 4. WML-G-WWTW | revision 2 | October 2011 Page 4 of 5 1.6 Site Completion The proposals for restoring the site after operations have been concluded should be included, where applicable. 1.7 Monitoring This section should include details of any monitoring it is proposed to carry out including the location and frequency of monitoring and the methodology of sampling and analysis. 1.8 Records This section should include details of the manner in which records relating to the site activities will be kept. In particular the system for recording the types and quantities of waste received, processed and removed from the site should be detailed. 2. PLANS Where indicated the scales suggested for the following sections are strongly recommended, although in some circumstances alternative scales may be more appropriate. Applicants should discuss alternative plans or scales with SEPA prior to the submission of the application. All plans should bear a unique identification number. The plans required for the Working Plan are as follows: 2.1 Site Location Plan A plan to identify the site in comparison to the surrounding area. This should be A4 in size and usually at a scale of 1:1250. It must show the area around the site to a distance of at least 250 m and include all roads, buildings and other developments. A red line should be placed around the whole area to be licensed, and a blue line placed around any other areas of land owned or occupied by the applicant. The area to be licensed must be identical to, or fall within the boundaries of the area that has been granted, or applied for, in the planning permission, application or equivalent authorisation. 2.2 Site Survey Plan An appropriately scaled plan to show details of the site including:- a) The gradient of the surface of the site. b) Existing drainage, sumps and outfalls. c) The location of any surface water features including springs and seepages. d) Location of previous contamination and sampling points. e) Public services, and any other features under, on, above or around the site. 2.3 Site Operational and Engineering Plan(s) a) Gates and boundary fencing.
  • 5. WML-G-WWTW | revision 2 | October 2011 Page 5 of 5 b) Details of intended drainage provisions, to include foul and surface water connections and any interceptors, sumps or settlement tanks. c) Access and vehicle circulation routes, form and construction of site roads. d) Position of notice board. e) Reception facilities, site control office and mess facilities, laboratory and other buildings or fixed equipment on site including wheel cleaner and weighbridge. f) Provision for daytime and overnight parking, including quarantine area for loads to wait whilst being checked. g) Location, construction, size and capacity of storage and treatment area for loads to wait whilst being checked. h) Waste discharge facilities (including location of machine and vehicle). i) Location of external lighting, water supplies, fire extinguishers etc. j) Areas for the storage of waste inadvertently received at the site pending removal. k) Location for the storage of material recovered from the waste and segregated for re-use or re-sale, if appropriate. l) Litter and noise abatement equipment, dust suppression or extraction equipment. m) Areas set aside for the storage of empty skips, if appropriate. In the interests of clarity it may be appropriate to detail the information on a series of plans. NOTE TO APPLICANTS SEPA will usually discuss with the applicant any details in the submitted Working Plan which it considers to be unacceptable. If SEPA cannot be satisfied with any of the contents of the Working Plan it will incorporate conditions within the waste management licence which will override the Working Plan in respect to those points. License Holder’s Responsibilities Notwithstanding any requirements of SEPA for site engineering, the applicant should be aware of his responsibility for ensuring the integrity of such works. Compliance with SEPA’s minimum standards does not remove the liability of the licence holder for any water pollution or other environmental damage which may result from the activities on site.