SlideShare a Scribd company logo
1 of 35
Download to read offline
COMPA TECH
LIGHTWEIGHT MODULAR PLATFORM INNOVATION
COMPA TECH
INDEX
• OUR COMPANY
• PLATFORM PRODUCTS
• COMPARAND®
• COMPARON STANDARD®
• COMPARON 1980®
• COMPA STONE®
• COMPARISON OF PLATFORM SYSTEMS
• ACCOMPLISHED PROJECTS
• FEATURES / BENEFITS
• CONCLUSION
MGX GROUP BV
MGX
INNOVATION BV
(COMPA TECH)
MGX
REALIZATION BV
MGX
RESEARCH
CENTRE BV
THE COMPANY
COMPA TECH
THE COMPANY
• DEVELOPMENT AND IMPLEMENTATION OF INNOVATIVE PRODUCTS AND TECHNIQUES IN THE
CIVIL SECTOR
• PRODUCTS FOR THE RAIL MARKET:
• COMPARON®: MODULAR PLATFORM SYSTEM
• COMPARAND®: EDGING SYSTEM FIBRE STRENGTHENED
• COMPA STONE®: EDGING SYSTEM CONCRETE
• OTHER DEVELOPMENTS:
• HOUTON® CONCRETE WITH WOOD (WEIGHT 1600 KG/M3)
• SEVERAL APPLICATIONS BASED ON THE MEGATRAX TECHNOLOGY
COMPA TECH
PLATFORM PRODUCTS
• COMPARAND®
• COMPA STONE®
• COMPARON standard®
• COMPARON 1980®
COMPA TECH
COMPARAND ®
= FIBRE STRENGTHENED SYNTHETIC PROFILE
APPLICATION: CORRECTION PLATFORM HEIGHT AND RENOVATION
COMPA TECH
COMPARAND ®
ADVANTAGES:
• EASY TO INSTALL , NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK
• SHORT INSTALLATION TIME -> HIGH PRODUCTIVITY
• LESS SERVICE SHUTDOWNS
• BALLAST IS NOT SHIFTED -> NO EXTRA TRACK MAINTENANCE
• COST SAVINGS UP TO 50%
COMPA TECH
COMPARAND ®
ADJUSTMENT OF EXISTING PLATFORM
COMPA TECH
COMPARAND ®
PLATFORM RENOVATION
COMPA TECH
COMPA STONE ®
COMPA TECH
COMPA STONE ®
Railway station Wierden 2011
COMPARON standard®
COMPA TECH
COMPARON 1980®
COMPA TECH
COMPARISON OF PLATFORM SYSTEMS CRITERIUM : REALIZATION
• LONG PERIOD OF CONSOLIDATION : - -
• HEAVY EQUIPEMENT / ROLLING STOCK: -
• MANY SERVICE SHUTDOWNS: - -
• TRACK MAINTENANCE AFTER INSTALLATION: -
• INSTALLATION TIME : - -
• HEAVY EQUIPMENT / PILE DRIVER: -
• MANY SERVICE SHUTDOWNS: - -
• TRACK MAINTENANCE AFTER PILE DRIVING : -
• INSTALLATION TIME: -/+
• ACCESIBLE PROVISIONS: - -
• LIGHT EQUIPMENT: +
• LESS SERVICE SHUTDOWNS: +/-
• NO TRACK MAINTENANCE AFTER INSTALLATION: +
• SHORT INSTALLATION TIME: + +
COMPA TECH
COMPARON SYSTEM®
FOUNDATION ON HIGH AND STEEP EMBANKMENT
RAILWAY STATION HEEMSTEDE AERDENHOUT 2005
COMPA TECH
COMPARON SYSTEM®
THE RESULT
RAILWAY STATION HEEMSTEDE AERDENHOUT 2005
COMPA TECH
COMPARON 1980®
RAILWAY STATION SANDERSTEAD UK 2010
COMPA TECH
COMPARON 1980® THE POSSIBILITIES
COMPA TECH
COMPARON 1980® THE POSSIBILITIES
COMPA TECH
COMPARON 1980® GREEN ZONE INSTALLATION SUITABLE FOR THE 24 / 7 RAILWAY
1 2
3 4
COMPA TECH
COMPARISON OF PLATFORM SYSTEMS CRITERIUM : MAINTENANCE
• A LOT OF MAINTENANCE: - -
• CONSOLIDATION / SUBSIDENCE
• SAND LEAKAGE
• REFURBUSHMENT COSTS: - -
• FREQUENT TRACK RAISING AND LEVELING: - -
• MINIMUM MAINTENANCE : +/-
• VERTICAL ADJUSTMENT IS EASY: +/-
• LESS TRACK RAISING AND LEVELING: +/-
• ADAPTABILITY : -/-
• MINIMUM MAINTENANCE: +/-
• VERTICAL ADJUSTMENT : +/-
• LESS TRACK RAISING AND LEVELING: +/-
• ADAPTABILITY : +
COMPA TECH
TRADITIONAL PLATFORM EXTREME SETTLEMENT
Railway station Rotterdam-Lombardijen
COMPA TECH
TRADITIONAL PLATFORM EXTREME SETTLEMENT
Railway station Haarlem Spaarnwoude
COMPA TECH
TRADITIONAL PLATFORM EXTREME SETTLEMENT
Railway station Zaltbommel
COMPA TECH
COMPARISON OF PLATFORM SYSTEMS CRITERIUM : COSTS
• INSTALLATION: EXPENSIVE: +/-
• MAINTENANCE: EXPENSIVE: -
• ADJUSTABILITY: RATHER EXPENSIVE: +/-
• INSTALLATION: VERY EXPENSIVE: - -
• MAINTENANCE: LOW: +
• ADJUSTABILITY: EXPENSIVE: - -
• INSTALLATION: LOW : +
• MAINTENANCE: LOW : +
• ADJUSTABILITY: RATHER LOW: +
COMPA TECH
COMPARON SYSTEMS® REFERENCE : RAILWAY STATION HEEMSTEDE AERDENHOUT 2005
POLYSTYRENE FOUNDATION
COMPA TECH
COMPARON SYSTEMS® REFERENCE : RAILWAY STATION HEEMSTEDE AERDENHOUT 2005
COMPA TECH
COMPARON SYSTEMS® REFERENCE : RAILWAY STATION BEST 2007
COMPA TECH
COMPARON SYSTEMS® REFERENCE : RAILWAY STATION BEST 2008
INSTALLATION OF THE COMPARON MODULES
COMPA TECH
COMPARAND® REFERENCE : RAILWAY STATION PUTTEN 2009
PLATFORM ADJUSTMENT WITH COMPARAND®
COMPA TECH
COMPA STONE ®
COMPARON 1980® REFERENCE : RAILWAY STATION SANDERSTEAD UK 2010
COMPA TECH
COMPARON ® FEATURES / BENEFITS OF THE SYSTEM
• INSTALLATION
• MINIMUM INSTALLATION TIME
• REDUCING TIMESCALES, COSTS AND SAFETY RISKS, IT ALLOWS TO BE BUILD BEHIND THE
1250 MM SAFETY LINES IN THE GREEN ZONE
• NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK
• NO NEED OF TIME CONSUMING GROUND TREATMENT MEASURES
• NO SUPPLEMENTARY TRACK MAINTENANCE AFTER INSTALLATION
• EXPLOITATION
• MINIMUM MAINTENANCE: NO CONSOLIDATION SETTLEMENT / NO SAND LEAKAGE
• UNIQUE SYSTEM ADJUSTABILITY
• LOW LIFE CYCLE COSTS
• DISMANTLE
• MINIMUM OF DISMANTLING TIME
• NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK
• PLATFORM IS RE-USABLE OR RECYCLABLE
COMPA TECH
COMPARON ® CONCLUSION
THE LIGHTWEIGHT MODULAR SYSTEM BY COMPA TECH PROVIDES THE MOST
COST EFFECTIVE SOLUTION TO PLATFORM CONSTRUCTION IN PARTICULAR:
• IN AREAS WITH POOR GROUND CONDITIONS
• ON NARROW AND STEEP EMBANKMENTS
• ON SITES WITH DIFFICULT ACCESS
• IN 24/7 RAILWAY
• FOR TEMPORARY SITUATIONS
COMPA TECH
THANKS FOR YOUR ATTENTION AND INTEREST
IF YOU HAVE ANY QUESTIONS OR YOU NEED MORE INFORMATION ABOUT OUR PRODUCTS, PLEASE CONTACT
US
COMPA TECH
MANGAAN 1
NL – 5234 GD ’s - HERTOGENBOSCH
TEL: +31 73 522 17 31
EMAIL: MDOUDE@MGXGROUP.EU
WWW.MGXGROUP.EU
COMPA TECH

More Related Content

Viewers also liked

Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platformjeevansaral
 
automatic railway platform-mini project
automatic railway platform-mini projectautomatic railway platform-mini project
automatic railway platform-mini projectparvathy s m
 
Platforming_Automated_And_Quickly_Beamer
Platforming_Automated_And_Quickly_BeamerPlatforming_Automated_And_Quickly_Beamer
Platforming_Automated_And_Quickly_BeamerPeter Sels
 
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATION
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATIONFABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATION
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATIONNashit Ahmad
 
Smart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridgeSmart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridgeeSAT Journals
 
Designer U - now with notes
Designer U - now with notesDesigner U - now with notes
Designer U - now with notesMitzie Testani
 
выступление
выступлениевыступление
выступлениеDemanessa
 
Amazing movie maker program final
Amazing movie maker program finalAmazing movie maker program final
Amazing movie maker program finalMuna_Ibrahim
 
Evaluation
EvaluationEvaluation
Evaluationharps123
 
India product story
India product storyIndia product story
India product storyRachitBhagat
 
Gettingalongbetterwith everyone
Gettingalongbetterwith everyoneGettingalongbetterwith everyone
Gettingalongbetterwith everyonenajimbhai
 
พฤติกรรมการดื่มสุรา
พฤติกรรมการดื่มสุราพฤติกรรมการดื่มสุรา
พฤติกรรมการดื่มสุราChatmongkon C-Za
 
A spacious bungalow with additional buildings
A spacious bungalow with additional buildingsA spacious bungalow with additional buildings
A spacious bungalow with additional buildingsCarl Custav
 

Viewers also liked (20)

Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platform
 
automatic railway platform-mini project
automatic railway platform-mini projectautomatic railway platform-mini project
automatic railway platform-mini project
 
Platforming_Automated_And_Quickly_Beamer
Platforming_Automated_And_Quickly_BeamerPlatforming_Automated_And_Quickly_Beamer
Platforming_Automated_And_Quickly_Beamer
 
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATION
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATIONFABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATION
FABRICATION OF SENSOR OPERATED MOBILE PLATFORM FOR RAILWAY STATION
 
Smart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridgeSmart railway crossing embedded with automated platform bridge
Smart railway crossing embedded with automated platform bridge
 
RAGU PPT
RAGU PPTRAGU PPT
RAGU PPT
 
Designer U - now with notes
Designer U - now with notesDesigner U - now with notes
Designer U - now with notes
 
выступление
выступлениевыступление
выступление
 
Amazing movie maker program final
Amazing movie maker program finalAmazing movie maker program final
Amazing movie maker program final
 
Evaluation
EvaluationEvaluation
Evaluation
 
India product story
India product storyIndia product story
India product story
 
Gettingalongbetterwith everyone
Gettingalongbetterwith everyoneGettingalongbetterwith everyone
Gettingalongbetterwith everyone
 
Presentasi agama
Presentasi agamaPresentasi agama
Presentasi agama
 
NeuroplasticityOT
NeuroplasticityOTNeuroplasticityOT
NeuroplasticityOT
 
Shakira's biography
Shakira's biographyShakira's biography
Shakira's biography
 
พฤติกรรมการดื่มสุรา
พฤติกรรมการดื่มสุราพฤติกรรมการดื่มสุรา
พฤติกรรมการดื่มสุรา
 
A spacious bungalow with additional buildings
A spacious bungalow with additional buildingsA spacious bungalow with additional buildings
A spacious bungalow with additional buildings
 
The evil visitor prologue chapters I and II
The evil visitor prologue chapters I and IIThe evil visitor prologue chapters I and II
The evil visitor prologue chapters I and II
 
Blog screencaps
Blog screencapsBlog screencaps
Blog screencaps
 
Who Am I
Who Am IWho Am I
Who Am I
 

Similar to Presentation Railway Platforms

General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringFred Strijbos
 
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...Nett Technologies: Emission Control Systems
 
Seismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsSeismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsPradeep Satyanarayana
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Communications Branding
 
Lefebvre engineering fzc ppt
Lefebvre engineering fzc pptLefebvre engineering fzc ppt
Lefebvre engineering fzc pptSHRAVAN KUMAR
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerVijayEngineeringandM1
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial ServicesMaribel Renteria
 
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentation
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentationNett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentation
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentationNett Technologies: Emission Control Systems
 
Dimasimma Group: general presentation aluminium field
Dimasimma Group: general presentation aluminium fieldDimasimma Group: general presentation aluminium field
Dimasimma Group: general presentation aluminium fieldAGViA Ballotti Sistemi srl
 
Arkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceArkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceMatt Koshinski
 
Lefebvre engineering fabrication
Lefebvre engineering  fabricationLefebvre engineering  fabrication
Lefebvre engineering fabricationSHRAVAN KUMAR
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3Bruce Brymer
 
Simcenter engineering solutions for intake and exhaust
Simcenter engineering solutions for intake and exhaustSimcenter engineering solutions for intake and exhaust
Simcenter engineering solutions for intake and exhaustAlfredo De Seta
 
1200+ FME Workspaces in Hand
1200+ FME Workspaces in Hand1200+ FME Workspaces in Hand
1200+ FME Workspaces in HandSafe Software
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.VijayEngineeringandM1
 

Similar to Presentation Railway Platforms (20)

camlift-hydraulic-pumping-unit-ps
camlift-hydraulic-pumping-unit-pscamlift-hydraulic-pumping-unit-ps
camlift-hydraulic-pumping-unit-ps
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_Engineering
 
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...
Nett Technologies Inc. - The Ninth Annual Southeast Diesel Collaborative Part...
 
Seismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipmentsSeismic Qualification of Nuclear Power Plant equipments
Seismic Qualification of Nuclear Power Plant equipments
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
 
INTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptxINTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptx
 
Lefebvre engineering fzc ppt
Lefebvre engineering fzc pptLefebvre engineering fzc ppt
Lefebvre engineering fzc ppt
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions Vedam Design: Dredging Solutions
Vedam Design: Dredging Solutions
 
The Access Rail System.
The Access Rail System.The Access Rail System.
The Access Rail System.
 
20150709 - Americas Industrial Services
20150709 - Americas Industrial Services20150709 - Americas Industrial Services
20150709 - Americas Industrial Services
 
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentation
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentationNett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentation
Nett Technologies Inc's 2013 Mining Diesel Emissions Council (MDEC) presentation
 
Dimasimma Group: general presentation aluminium field
Dimasimma Group: general presentation aluminium fieldDimasimma Group: general presentation aluminium field
Dimasimma Group: general presentation aluminium field
 
Arkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceArkos _ Compressor Maintenance
Arkos _ Compressor Maintenance
 
Lefebvre engineering fabrication
Lefebvre engineering  fabricationLefebvre engineering  fabrication
Lefebvre engineering fabrication
 
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
The_Practical_Application_of_Technology_in_the_Roy_Hill_Railway_Ver 3
 
VX - ARS
VX  - ARS VX  - ARS
VX - ARS
 
Simcenter engineering solutions for intake and exhaust
Simcenter engineering solutions for intake and exhaustSimcenter engineering solutions for intake and exhaust
Simcenter engineering solutions for intake and exhaust
 
1200+ FME Workspaces in Hand
1200+ FME Workspaces in Hand1200+ FME Workspaces in Hand
1200+ FME Workspaces in Hand
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.
 

Presentation Railway Platforms

  • 1. COMPA TECH LIGHTWEIGHT MODULAR PLATFORM INNOVATION
  • 2. COMPA TECH INDEX • OUR COMPANY • PLATFORM PRODUCTS • COMPARAND® • COMPARON STANDARD® • COMPARON 1980® • COMPA STONE® • COMPARISON OF PLATFORM SYSTEMS • ACCOMPLISHED PROJECTS • FEATURES / BENEFITS • CONCLUSION
  • 3. MGX GROUP BV MGX INNOVATION BV (COMPA TECH) MGX REALIZATION BV MGX RESEARCH CENTRE BV THE COMPANY COMPA TECH
  • 4. THE COMPANY • DEVELOPMENT AND IMPLEMENTATION OF INNOVATIVE PRODUCTS AND TECHNIQUES IN THE CIVIL SECTOR • PRODUCTS FOR THE RAIL MARKET: • COMPARON®: MODULAR PLATFORM SYSTEM • COMPARAND®: EDGING SYSTEM FIBRE STRENGTHENED • COMPA STONE®: EDGING SYSTEM CONCRETE • OTHER DEVELOPMENTS: • HOUTON® CONCRETE WITH WOOD (WEIGHT 1600 KG/M3) • SEVERAL APPLICATIONS BASED ON THE MEGATRAX TECHNOLOGY COMPA TECH
  • 5. PLATFORM PRODUCTS • COMPARAND® • COMPA STONE® • COMPARON standard® • COMPARON 1980® COMPA TECH
  • 6. COMPARAND ® = FIBRE STRENGTHENED SYNTHETIC PROFILE APPLICATION: CORRECTION PLATFORM HEIGHT AND RENOVATION COMPA TECH
  • 7. COMPARAND ® ADVANTAGES: • EASY TO INSTALL , NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK • SHORT INSTALLATION TIME -> HIGH PRODUCTIVITY • LESS SERVICE SHUTDOWNS • BALLAST IS NOT SHIFTED -> NO EXTRA TRACK MAINTENANCE • COST SAVINGS UP TO 50% COMPA TECH
  • 8. COMPARAND ® ADJUSTMENT OF EXISTING PLATFORM COMPA TECH
  • 11. COMPA STONE ® Railway station Wierden 2011
  • 14. COMPARISON OF PLATFORM SYSTEMS CRITERIUM : REALIZATION • LONG PERIOD OF CONSOLIDATION : - - • HEAVY EQUIPEMENT / ROLLING STOCK: - • MANY SERVICE SHUTDOWNS: - - • TRACK MAINTENANCE AFTER INSTALLATION: - • INSTALLATION TIME : - - • HEAVY EQUIPMENT / PILE DRIVER: - • MANY SERVICE SHUTDOWNS: - - • TRACK MAINTENANCE AFTER PILE DRIVING : - • INSTALLATION TIME: -/+ • ACCESIBLE PROVISIONS: - - • LIGHT EQUIPMENT: + • LESS SERVICE SHUTDOWNS: +/- • NO TRACK MAINTENANCE AFTER INSTALLATION: + • SHORT INSTALLATION TIME: + + COMPA TECH
  • 15. COMPARON SYSTEM® FOUNDATION ON HIGH AND STEEP EMBANKMENT RAILWAY STATION HEEMSTEDE AERDENHOUT 2005 COMPA TECH
  • 16. COMPARON SYSTEM® THE RESULT RAILWAY STATION HEEMSTEDE AERDENHOUT 2005 COMPA TECH
  • 17. COMPARON 1980® RAILWAY STATION SANDERSTEAD UK 2010 COMPA TECH
  • 18. COMPARON 1980® THE POSSIBILITIES COMPA TECH
  • 19. COMPARON 1980® THE POSSIBILITIES COMPA TECH
  • 20. COMPARON 1980® GREEN ZONE INSTALLATION SUITABLE FOR THE 24 / 7 RAILWAY 1 2 3 4 COMPA TECH
  • 21. COMPARISON OF PLATFORM SYSTEMS CRITERIUM : MAINTENANCE • A LOT OF MAINTENANCE: - - • CONSOLIDATION / SUBSIDENCE • SAND LEAKAGE • REFURBUSHMENT COSTS: - - • FREQUENT TRACK RAISING AND LEVELING: - - • MINIMUM MAINTENANCE : +/- • VERTICAL ADJUSTMENT IS EASY: +/- • LESS TRACK RAISING AND LEVELING: +/- • ADAPTABILITY : -/- • MINIMUM MAINTENANCE: +/- • VERTICAL ADJUSTMENT : +/- • LESS TRACK RAISING AND LEVELING: +/- • ADAPTABILITY : + COMPA TECH
  • 22. TRADITIONAL PLATFORM EXTREME SETTLEMENT Railway station Rotterdam-Lombardijen COMPA TECH
  • 23. TRADITIONAL PLATFORM EXTREME SETTLEMENT Railway station Haarlem Spaarnwoude COMPA TECH
  • 24. TRADITIONAL PLATFORM EXTREME SETTLEMENT Railway station Zaltbommel COMPA TECH
  • 25. COMPARISON OF PLATFORM SYSTEMS CRITERIUM : COSTS • INSTALLATION: EXPENSIVE: +/- • MAINTENANCE: EXPENSIVE: - • ADJUSTABILITY: RATHER EXPENSIVE: +/- • INSTALLATION: VERY EXPENSIVE: - - • MAINTENANCE: LOW: + • ADJUSTABILITY: EXPENSIVE: - - • INSTALLATION: LOW : + • MAINTENANCE: LOW : + • ADJUSTABILITY: RATHER LOW: + COMPA TECH
  • 26. COMPARON SYSTEMS® REFERENCE : RAILWAY STATION HEEMSTEDE AERDENHOUT 2005 POLYSTYRENE FOUNDATION COMPA TECH
  • 27. COMPARON SYSTEMS® REFERENCE : RAILWAY STATION HEEMSTEDE AERDENHOUT 2005 COMPA TECH
  • 28. COMPARON SYSTEMS® REFERENCE : RAILWAY STATION BEST 2007 COMPA TECH
  • 29. COMPARON SYSTEMS® REFERENCE : RAILWAY STATION BEST 2008 INSTALLATION OF THE COMPARON MODULES COMPA TECH
  • 30. COMPARAND® REFERENCE : RAILWAY STATION PUTTEN 2009 PLATFORM ADJUSTMENT WITH COMPARAND® COMPA TECH
  • 32. COMPARON 1980® REFERENCE : RAILWAY STATION SANDERSTEAD UK 2010 COMPA TECH
  • 33. COMPARON ® FEATURES / BENEFITS OF THE SYSTEM • INSTALLATION • MINIMUM INSTALLATION TIME • REDUCING TIMESCALES, COSTS AND SAFETY RISKS, IT ALLOWS TO BE BUILD BEHIND THE 1250 MM SAFETY LINES IN THE GREEN ZONE • NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK • NO NEED OF TIME CONSUMING GROUND TREATMENT MEASURES • NO SUPPLEMENTARY TRACK MAINTENANCE AFTER INSTALLATION • EXPLOITATION • MINIMUM MAINTENANCE: NO CONSOLIDATION SETTLEMENT / NO SAND LEAKAGE • UNIQUE SYSTEM ADJUSTABILITY • LOW LIFE CYCLE COSTS • DISMANTLE • MINIMUM OF DISMANTLING TIME • NO USE OF HEAVY EQUIPMENT OR ROLLING STOCK • PLATFORM IS RE-USABLE OR RECYCLABLE COMPA TECH
  • 34. COMPARON ® CONCLUSION THE LIGHTWEIGHT MODULAR SYSTEM BY COMPA TECH PROVIDES THE MOST COST EFFECTIVE SOLUTION TO PLATFORM CONSTRUCTION IN PARTICULAR: • IN AREAS WITH POOR GROUND CONDITIONS • ON NARROW AND STEEP EMBANKMENTS • ON SITES WITH DIFFICULT ACCESS • IN 24/7 RAILWAY • FOR TEMPORARY SITUATIONS COMPA TECH
  • 35. THANKS FOR YOUR ATTENTION AND INTEREST IF YOU HAVE ANY QUESTIONS OR YOU NEED MORE INFORMATION ABOUT OUR PRODUCTS, PLEASE CONTACT US COMPA TECH MANGAAN 1 NL – 5234 GD ’s - HERTOGENBOSCH TEL: +31 73 522 17 31 EMAIL: MDOUDE@MGXGROUP.EU WWW.MGXGROUP.EU COMPA TECH