I have been involved in a number of transformer failures. I am taking this opportunity to
show you these failures of transformers and how an expert can be of service to you.
Transformer
Transformers are used to step up or down supply voltages. Essentially, there are two types
of transformer, dry and liquid immersed. A dry transformer is most suitable for installation in
a commercial building because of its small size, light weight and simple maintenance.
A liquid immersed transformer, in particular, the oil filled type, is versatile as it can be
installed indoor or outdoor environments.
2
Of the range of oil-filled transformers, there are three general types: distribution, power and
generator step-up (GSU). Distribution transformers are typically installed in distribution
networks, such as, at consumers’ premises. They are generally not more than 200MVA,
with operating voltages ≤11kV. Power transformers can be installed in electricity
transmission systems or at large commercial premises where there is high demand for
electricity consumption. They are generally rated from 200MVA, with operating voltages
≥33kV. GSU transformers are installed at electrical power stations. Their capacity generally
starts from several hundreds of MVA. The transformers are used to step up voltages of
turbine generators to that of transmission systems, which may reach 800kV.
3
4
In a typical oil-filled transformer, each of the three phase (R, S and T) windings has four
layers of winding coils: two are low-voltage (LV), comprising an inner and an outer coil; and
two are high-voltage (HV), comprising a main and a coarse regulation (CR) / fine regulation
(FR) coil. Each of the coils comprises many turns of copper conductors, each coil is
wrapped with paper insulation, for example, kraft or nomex. The LV coils are housed
concentrically within the HV coils and wound onto a laminated sheet steel core.
5
OLTC
R-phase
Winding
S-phase
Winding
T-phase
Winding
Fine regulation winding leads
Figure 1 above shows a plan view of the R, S and T winding phases.
HV Course/Fine Regulation coils
Vertical spacer sandwiched
by two pressboard cylinders
HV Main coil
5 layers of alternate vertical
spacer and pressboard cylinder
LV inner coil
Laminated core
LV outer coil
Figure 2 above shows the internal construction of a typical phase winding.
6
There are insulating spacers separating each individual concentric layer of LV and HV coils,
constructed in cylinder form from pressboard sheets, and vertical strips from wood.
The top and bottom of each of the three phase windings are stacked with wooden blocks,
and there are wooden structures compressing the blocks and the windings.
In most large transformers, there is an on load tap changer (OLTC), which automatically
regulates the voltage of the transformer in the event of load variation.
The purposes of investigating transformer failures are,
- To determine compliance with regulatory body or insurance policy’s conditions.
- To identify any future risk in operating similar equipment.
- To identify any potential for recovery of loss.
- To identify possible fraudulent insurance claims.
In addition to physical damage to the transformer and its resulting downtime, failures of
transformers can lead to power interruption to the premises and significant business
interruption losses. It is usual for there to be preventative maintenance programmes in place
for operational transformers. Despite this, failures can sometime occur.
The leading cause of transformer failure is breakdown of electrical insulation of the windings,
which can result from poor installation, inadequate maintenance, defective material or
deteriorating insulation due to aging or mechanical damage associated with vibration.
Potential causes of failures external to the transformer unit include over-voltages involving
lightning activity or switching transients in the transmission lines.
During a preliminary investigation, exterior damage is recorded and appropriate testing is
performed. The tests may comprise some or all of the followings:
Dissolved gas analysis (DGA)
Testing a sample of the insulation oil for the quantity of particular gases that could be related
to certain failures in the windings of an oil-filled transformer. Typically these gases are
hydrogen (H2), methane (CH4), acetylene (C2H2), ethylene (C2H4), ethane (C2H6),
carbon monoxide (CO) and carbon dioxide (CO2). With the exception of CO2, these gases
are combustible.
7
Oil insulation test,
To test for signs of oil deterioration, such as, reduced dielectric strength, increased moisture
content and change in colour of the oil, in accordance with the applicable standards.
Polarization index (PI)
It indicates the moisture content and possible deposition of conductive dusts on the surface
of insulation material.
Applied voltage (Hi-Pot) test
To test the insulation between two windings, and between the windings and the earthed
chassis.
Frequencyresponse analysis
To evaluate whether there is any displacement of the transformer core, windings and
holding structures.
Partial discharge (PD) measurement
This is to detect any localised dielectric breakdown or deposits of conductive dusts on solid
insulation of the windings.
Excitation current test
This test detects winding problems including incipient damage associated with any
unintended movements in the windings that were caused by external short-circuit events or
mechanical impact during transportation.
Winding insulation test
To determine the condition of the winding insulation by measuring the resistance between
windings, and between each winding and the earthed chassis.
Winding resistance test
The test results may indicate a disconnected winding conductor, an inter-turn shorting or
a problem associated with high electrical resistance at a connection.
Coil ratio test
To detect for an inter-turn shorting within a winding.
8
Following inspection of the equipment damage on site and the collection of background
information pertaining to the equipment, it is often necessary to inspect the internal
windings1
of the transformer for any physical evidence of the failure. The internal inspection
is best performed in the facility of the manufacturers or compatible contractors, where
hoisting equipment, tools for dismantling and test equipment are available in the facility.
Findings are then tested rigorously against the evidence available, which would include
reviewing of all history of the condition of the equipment and interpretation of the test results.
Once the cause of the failure has been established it may be possible to review the existing
maintenance programme, and make any recommendations to prevent a recurrence of the
failure.
1 A winding comprised an outer set of high voltage coils and an inner set of low voltage coils,
both of which were concentrically wound.
9
Below are two examples of failures resulting from a manufacturer’s defect, involving a dry
and an oil-filled transformer.
Case I - Failure of a dry transformer, in the cabin of a newly installed
wind turbine generator
10
11
W
16
15
14
13
The point of
arc damage
observed from
the exterior
The area of
overlapping
HV winding
turns
V U
A transformer inside the cabin of a newly erected 80m tall wind turbine generator abruptly
failed during a site commissioning test, resulting in a severe and rapid spread of fire that
completely consumed the fibre reinforced plastic cabin walls. There was an unusual burn
pattern on the transformer surface. Following a detailed examination at the facility of the
equipment manufacturers in Spain, it was determined that there was a manufacturing defect
within the internal layers of the windings, where a conductive turn was displaced and had
almost overlapped on another, separated by a very thin layer of insulation. This led to
localised arcing following a breakdown of the thin insulation upon initial energisation on site
and the subsequent electrical discharge from the windings to the electrical chassis. The
findings were unanimous and were accepted by all parties. Further findings revealed that
during the assembly stages at production, the windings of the transformer were not secured
when lowered to the moulding machine, for encapsulation in epoxy resin.
12
Case II - Failure of an oil-filled transformer
13
The buckling or deformation of the inner windings in this core-form transformer was caused
by inadequate mechanical strength that held the winding turns and the spacer supports.
Electromechanical force produced during an external electrical fault, for example, short-
circuiting, can lead to movements in the winding turns. In some severe situations,
the winding displaces, and abrasion to the windings’ paper insulation occurs, to the extent
that conductors of separate turns are exposed. Subsequently, localised arc damage can
occur at one or more points of the adjacent winding turns. In this instance, there were
several locations of arcing involving displaced turns. Although the initiating event was an
external electrical short circuit, the root cause was a manufacturing defect in the winding
assembly.

More Related Content

What's hot

Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4Md Irshad Ahmad
 
Transformer failure case study
Transformer failure case studyTransformer failure case study
Transformer failure case studyLeonardo ENERGY
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protectionBinit Das
 
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...Netram Meena
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset managementMuthar Hussain
 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisHamedPasha1
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protectionRishi Tandon
 
transformer protection from over heating
transformer protection from over heatingtransformer protection from over heating
transformer protection from over heatingbishow kandel
 
Differential protection of power transformer
Differential protection of power transformerDifferential protection of power transformer
Differential protection of power transformerSaad Muftah
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Distribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsDistribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsToshaliMohapatra
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3Md Irshad Ahmad
 
Types of the Transformer Protection
Types of the Transformer Protection Types of the Transformer Protection
Types of the Transformer Protection Basiony Shehata
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protectionmichaeljmack
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerRaveendranath Macherla
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Md Abu Jauad Khan Aliv
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
25 9-2014 design and development of micro-controller base differential protec...
25 9-2014 design and development of micro-controller base differential protec...25 9-2014 design and development of micro-controller base differential protec...
25 9-2014 design and development of micro-controller base differential protec...rajdoshi94
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers PremanandDesai
 

What's hot (20)

Switchgear and protection 4
Switchgear and protection 4Switchgear and protection 4
Switchgear and protection 4
 
Transformer failure case study
Transformer failure case studyTransformer failure case study
Transformer failure case study
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...
MICROCONTROLLER BASED HARMONIC RESTRAINT DIFFERENTIAL PROTECTION OF POWER TRA...
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Transformer
TransformerTransformer
Transformer
 
Transformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response AnalysisTransformer Diagnostics | Sweep Frequency Response Analysis
Transformer Diagnostics | Sweep Frequency Response Analysis
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
transformer protection from over heating
transformer protection from over heatingtransformer protection from over heating
transformer protection from over heating
 
Differential protection of power transformer
Differential protection of power transformerDifferential protection of power transformer
Differential protection of power transformer
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Distribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent FaultsDistribution Transformer Protection for Differential and Overcurrent Faults
Distribution Transformer Protection for Differential and Overcurrent Faults
 
Switchgear and protection 3
Switchgear and protection 3Switchgear and protection 3
Switchgear and protection 3
 
Types of the Transformer Protection
Types of the Transformer Protection Types of the Transformer Protection
Types of the Transformer Protection
 
Power transformer protection
Power transformer protectionPower transformer protection
Power transformer protection
 
Frequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformerFrequency response analysis (FRA) of transformer
Frequency response analysis (FRA) of transformer
 
Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
25 9-2014 design and development of micro-controller base differential protec...
25 9-2014 design and development of micro-controller base differential protec...25 9-2014 design and development of micro-controller base differential protec...
25 9-2014 design and development of micro-controller base differential protec...
 
Unit 04 Protection of generators and transformers
Unit  04 Protection of generators and transformers Unit  04 Protection of generators and transformers
Unit 04 Protection of generators and transformers
 

Similar to Edwin Newsletter on transformer failures on 13 October 2015

Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_finalSnehangshu Ghosh
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET Journal
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationFawaz Baik
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143sanjeet kumar
 
BUCHHOLZ RELAY TESTING KIT
BUCHHOLZ RELAY TESTING KITBUCHHOLZ RELAY TESTING KIT
BUCHHOLZ RELAY TESTING KITIRJET Journal
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgearAdnan Sayed
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses reportkamal soni
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshHT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshMohit Bathineni
 
Proposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorProposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorIOSR Journals
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Electrical Saftey.pptx
Electrical Saftey.pptxElectrical Saftey.pptx
Electrical Saftey.pptxabell37
 

Similar to Edwin Newsletter on transformer failures on 13 October 2015 (20)

G04714245
G04714245G04714245
G04714245
 
Why transformers fail_final
Why transformers fail_finalWhy transformers fail_final
Why transformers fail_final
 
Standing type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unitStanding type outdoor full sf6 gas insualted ring main unit
Standing type outdoor full sf6 gas insualted ring main unit
 
Standing type GIS RMU
Standing type GIS RMUStanding type GIS RMU
Standing type GIS RMU
 
TRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptxTRANSFORMER DESIGN.pptx
TRANSFORMER DESIGN.pptx
 
IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 
transformer Sales, after sales & service presentation
transformer Sales, after sales & service presentationtransformer Sales, after sales & service presentation
transformer Sales, after sales & service presentation
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143
 
Makpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in IndiaMakpower - Furnace Transformer Manufacturer in India
Makpower - Furnace Transformer Manufacturer in India
 
BUCHHOLZ RELAY TESTING KIT
BUCHHOLZ RELAY TESTING KITBUCHHOLZ RELAY TESTING KIT
BUCHHOLZ RELAY TESTING KIT
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
How to reduced transformer losses report
How to reduced transformer losses reportHow to reduced transformer losses report
How to reduced transformer losses report
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra PradeshHT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
HT & LT Bus Ducts Manufacturer in Telangana and Andhra Pradesh
 
Proposal Technique for an Static Var Compensator
Proposal Technique for an Static Var CompensatorProposal Technique for an Static Var Compensator
Proposal Technique for an Static Var Compensator
 
Psg 5 2 mark
Psg 5 2 markPsg 5 2 mark
Psg 5 2 mark
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Electrical Saftey.pptx
Electrical Saftey.pptxElectrical Saftey.pptx
Electrical Saftey.pptx
 
Testing
TestingTesting
Testing
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 

Edwin Newsletter on transformer failures on 13 October 2015

  • 1. 1 I have been involved in a number of transformer failures. I am taking this opportunity to show you these failures of transformers and how an expert can be of service to you. Transformer Transformers are used to step up or down supply voltages. Essentially, there are two types of transformer, dry and liquid immersed. A dry transformer is most suitable for installation in a commercial building because of its small size, light weight and simple maintenance. A liquid immersed transformer, in particular, the oil filled type, is versatile as it can be installed indoor or outdoor environments.
  • 2. 2 Of the range of oil-filled transformers, there are three general types: distribution, power and generator step-up (GSU). Distribution transformers are typically installed in distribution networks, such as, at consumers’ premises. They are generally not more than 200MVA, with operating voltages ≤11kV. Power transformers can be installed in electricity transmission systems or at large commercial premises where there is high demand for electricity consumption. They are generally rated from 200MVA, with operating voltages ≥33kV. GSU transformers are installed at electrical power stations. Their capacity generally starts from several hundreds of MVA. The transformers are used to step up voltages of turbine generators to that of transmission systems, which may reach 800kV.
  • 3. 3
  • 4. 4 In a typical oil-filled transformer, each of the three phase (R, S and T) windings has four layers of winding coils: two are low-voltage (LV), comprising an inner and an outer coil; and two are high-voltage (HV), comprising a main and a coarse regulation (CR) / fine regulation (FR) coil. Each of the coils comprises many turns of copper conductors, each coil is wrapped with paper insulation, for example, kraft or nomex. The LV coils are housed concentrically within the HV coils and wound onto a laminated sheet steel core.
  • 5. 5 OLTC R-phase Winding S-phase Winding T-phase Winding Fine regulation winding leads Figure 1 above shows a plan view of the R, S and T winding phases. HV Course/Fine Regulation coils Vertical spacer sandwiched by two pressboard cylinders HV Main coil 5 layers of alternate vertical spacer and pressboard cylinder LV inner coil Laminated core LV outer coil Figure 2 above shows the internal construction of a typical phase winding.
  • 6. 6 There are insulating spacers separating each individual concentric layer of LV and HV coils, constructed in cylinder form from pressboard sheets, and vertical strips from wood. The top and bottom of each of the three phase windings are stacked with wooden blocks, and there are wooden structures compressing the blocks and the windings. In most large transformers, there is an on load tap changer (OLTC), which automatically regulates the voltage of the transformer in the event of load variation. The purposes of investigating transformer failures are, - To determine compliance with regulatory body or insurance policy’s conditions. - To identify any future risk in operating similar equipment. - To identify any potential for recovery of loss. - To identify possible fraudulent insurance claims. In addition to physical damage to the transformer and its resulting downtime, failures of transformers can lead to power interruption to the premises and significant business interruption losses. It is usual for there to be preventative maintenance programmes in place for operational transformers. Despite this, failures can sometime occur. The leading cause of transformer failure is breakdown of electrical insulation of the windings, which can result from poor installation, inadequate maintenance, defective material or deteriorating insulation due to aging or mechanical damage associated with vibration. Potential causes of failures external to the transformer unit include over-voltages involving lightning activity or switching transients in the transmission lines. During a preliminary investigation, exterior damage is recorded and appropriate testing is performed. The tests may comprise some or all of the followings: Dissolved gas analysis (DGA) Testing a sample of the insulation oil for the quantity of particular gases that could be related to certain failures in the windings of an oil-filled transformer. Typically these gases are hydrogen (H2), methane (CH4), acetylene (C2H2), ethylene (C2H4), ethane (C2H6), carbon monoxide (CO) and carbon dioxide (CO2). With the exception of CO2, these gases are combustible.
  • 7. 7 Oil insulation test, To test for signs of oil deterioration, such as, reduced dielectric strength, increased moisture content and change in colour of the oil, in accordance with the applicable standards. Polarization index (PI) It indicates the moisture content and possible deposition of conductive dusts on the surface of insulation material. Applied voltage (Hi-Pot) test To test the insulation between two windings, and between the windings and the earthed chassis. Frequencyresponse analysis To evaluate whether there is any displacement of the transformer core, windings and holding structures. Partial discharge (PD) measurement This is to detect any localised dielectric breakdown or deposits of conductive dusts on solid insulation of the windings. Excitation current test This test detects winding problems including incipient damage associated with any unintended movements in the windings that were caused by external short-circuit events or mechanical impact during transportation. Winding insulation test To determine the condition of the winding insulation by measuring the resistance between windings, and between each winding and the earthed chassis. Winding resistance test The test results may indicate a disconnected winding conductor, an inter-turn shorting or a problem associated with high electrical resistance at a connection. Coil ratio test To detect for an inter-turn shorting within a winding.
  • 8. 8 Following inspection of the equipment damage on site and the collection of background information pertaining to the equipment, it is often necessary to inspect the internal windings1 of the transformer for any physical evidence of the failure. The internal inspection is best performed in the facility of the manufacturers or compatible contractors, where hoisting equipment, tools for dismantling and test equipment are available in the facility. Findings are then tested rigorously against the evidence available, which would include reviewing of all history of the condition of the equipment and interpretation of the test results. Once the cause of the failure has been established it may be possible to review the existing maintenance programme, and make any recommendations to prevent a recurrence of the failure. 1 A winding comprised an outer set of high voltage coils and an inner set of low voltage coils, both of which were concentrically wound.
  • 9. 9 Below are two examples of failures resulting from a manufacturer’s defect, involving a dry and an oil-filled transformer. Case I - Failure of a dry transformer, in the cabin of a newly installed wind turbine generator
  • 10. 10
  • 11. 11 W 16 15 14 13 The point of arc damage observed from the exterior The area of overlapping HV winding turns V U A transformer inside the cabin of a newly erected 80m tall wind turbine generator abruptly failed during a site commissioning test, resulting in a severe and rapid spread of fire that completely consumed the fibre reinforced plastic cabin walls. There was an unusual burn pattern on the transformer surface. Following a detailed examination at the facility of the equipment manufacturers in Spain, it was determined that there was a manufacturing defect within the internal layers of the windings, where a conductive turn was displaced and had almost overlapped on another, separated by a very thin layer of insulation. This led to localised arcing following a breakdown of the thin insulation upon initial energisation on site and the subsequent electrical discharge from the windings to the electrical chassis. The findings were unanimous and were accepted by all parties. Further findings revealed that during the assembly stages at production, the windings of the transformer were not secured when lowered to the moulding machine, for encapsulation in epoxy resin.
  • 12. 12 Case II - Failure of an oil-filled transformer
  • 13. 13 The buckling or deformation of the inner windings in this core-form transformer was caused by inadequate mechanical strength that held the winding turns and the spacer supports. Electromechanical force produced during an external electrical fault, for example, short- circuiting, can lead to movements in the winding turns. In some severe situations, the winding displaces, and abrasion to the windings’ paper insulation occurs, to the extent that conductors of separate turns are exposed. Subsequently, localised arc damage can occur at one or more points of the adjacent winding turns. In this instance, there were several locations of arcing involving displaced turns. Although the initiating event was an external electrical short circuit, the root cause was a manufacturing defect in the winding assembly.