Introduction:
Many Industrial accidents/ injuries are caused by unexpected energization or
startup of machines or equipment, or by an uncontrolled release of energy, during
their maintenance or repairs. These incidents can be prevented by implementing a
proper “KRM LOTO - LOCKOUT TAGOUT procedure”. KRM LOTO - LOCKOUT
TAGOUT system is used to ensure that the energized machines or equipment are
isolated from all potentially hazardous energy sources, and isolation points locked
out before carrying out any repairs or maintenance activities, thus preventing
injuries. Any person upon observing a machine or equipment which is isolated and
locked out shall not attempt to start, energize, or use it.
Section 24 of factories act requires that, when any device which can be
inadvertently shifted from OFF to ON position, is provided within a factory to
cut off power, arrangements shall be provided for locking the device in a safe
position to prevent accidental starting of the transmission machinery or other
machine to which the device is fitted.
KRM LOTO HASP
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
Guidelines:
a) All drives (Motors) shall be provided with separate local lockable
isolators
to ensure safety of personnel required to work on these drives during
preventive or breakdown maintenance.
b) Lockout & tag out procedure shall be established and implemented
during inspection, cleaning, repair or maintenance of any plant,
machinery or equipment, so that if inadvertently activated or energized,
will not cause any bodily injury to any person.
c) Every person carrying out the work shall be fully instructed / trained
on the lock out procedure, applicable lock devices, etc., before
commencing the work.
d) Unit shall identify all energy sources & their isolation points, and
each point shall be given an identification number and a list of isolation
points shall be maintained.
Typical Energy Sources where isolation is required are;
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO PADLOCKS
i. Mechanical Energy Sources: Pumps, Pulley, Gear & pinion, flywheel, prime
movers, hoists, forklifts / stackers etc.
ii. Electrical Energy Sources: Switchgears such as ACB, SFU’s, MCB’s, MCCB’s etc.,
Motors, Generators, switches etc.
iii. Water: Gate valves, Pumps etc.
iv. Acids/ ENA/ Blend lines: Control Valves, Pumps etc.
v. Compressed air: Valves, receiver tanks etc.
vi. Steam : Control valves, isolation valves etc.
vii. Gas : Control / isolation valves etc.
e) Unit must ensure that all electrical isolators in the panels are provided with
locking facilities. Where the isolator does not have built-in locking facility,
external locking facility should be provided.
f) The requirement of KRM LOTO devices (Type as well as Nos.) shall be
assessed and adequate nos. of necessary devices shall be made available in the
unit at all times. Refer section 4.0 for guidance on selection of KRM LOTO devices.
All KRM LOTO devices shall be kept at easily accessible place & in custody of a
responsible person.
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO STATION
Procedure for KRM LOTO - LOCKOUT TAGOUT
a) Manager responsible for the repair / maintenance shall ensure that only trained &
authorized employee’s carry out KRM LOTO
b) Ensure a valid work permit is obtained prior to start of work (where applicable).
c) Identify all energy isolation points such as power supply, compressed air supply, fuel supply,
gas supply etc., for that equipment / machine before locking out.
d) Physically locate and turn the respective switches, valves etc., to “OFF” / “Neutral” position
and provide necessary KRM LOTO devices in such a way that they cannot be bi passed.
e) Prior to starting work on machines or equipment that have been locked and after ensuring
that no personnel are exposed, the authorized person shall operate the push button or normal
operating controls to verify that the appropriate equipment or machine has been de-
energized & make certain it will not operate.
f) If more than one person are required to work on the equipment under isolation, each
person shall put a separate lock on all isolating devices.
g) A Tag consisting of following information shall be fixed to each lock. (Pl see sample tag)
i. Name & department of the Person carrying out repair / maintenance work.
ii. Caution note written as “DANGER- LOCKEDOUT”
h) After the servicing and / or maintenance is completed, authorized person shall inspect the
equipment / machine thoroughly to ensure all non-essential items, tools / tackles etc. are
removed.
i) Supervisor after ensuring that the work is complete, allows the authorized person to remove
lockout devices & energizes the machine.
KRM LOTO TAGS
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
Certified-KRM LOTO - Lockout Tagout + Labels & Signs + Acoustic Seals + Safety Products
KRM LOTO For locking of Isolators
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
Certified-KRM LOTO - Lockout Tagout + Labels & Signs + Acoustic Seals + Safety Products
KRM LOTO For locking of Circuit Breakers
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For locking of Push Buttons
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For Electrical Panel Lockout
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For locking of Gate Valves
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For locking of Butterfly Valves
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For locking of Ball Valves
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
KRM LOTO For locking of Fuse Bases
KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD,
29CFR & 1910.269
Lockout Tagout Guidelines

More Related Content

What's hot

What is LOTO Procedure?
What is LOTO Procedure?What is LOTO Procedure?
What is LOTO Procedure?Jamelle Blanco
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingKJP Consulting
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Noel Regalado
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutWRDSB
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Panduit Safety
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Julian Kalac P.Eng
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag OutHvacmach
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag outyasharf
 
Control of hazardous energy
Control of hazardous energyControl of hazardous energy
Control of hazardous energyMarlowe Chica
 

What's hot (20)

What is LOTO Procedure?
What is LOTO Procedure?What is LOTO Procedure?
What is LOTO Procedure?
 
Loto online slides
Loto online slidesLoto online slides
Loto online slides
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Lockout Tagout by SETON
Lockout Tagout by SETONLockout Tagout by SETON
Lockout Tagout by SETON
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag Out
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
Lock out tag out procedures
Lock out  tag out proceduresLock out  tag out procedures
Lock out tag out procedures
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag out
 
Lockout/Tagout
Lockout/TagoutLockout/Tagout
Lockout/Tagout
 
Lock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UWLock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UW
 
Loto training
Loto trainingLoto training
Loto training
 
Control of hazardous energy
Control of hazardous energyControl of hazardous energy
Control of hazardous energy
 
Lock Out / Tag Out
Lock Out / Tag OutLock Out / Tag Out
Lock Out / Tag Out
 

Viewers also liked

Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Panduit Safety
 
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...Thorne & Derrick International
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009txn4_8
 
Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?Toyota Material Handling Ohio
 
mechanical components & maintenance
mechanical components & maintenancemechanical components & maintenance
mechanical components & maintenancemaizatul fazira
 
An OSHA - LOTO Presentation
An OSHA - LOTO PresentationAn OSHA - LOTO Presentation
An OSHA - LOTO PresentationJacqueline Chau
 
10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around MachinesCreative Safety Supply
 

Viewers also liked (11)

Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
CATU Lockout Tagout - Locking Systems, Locking Padlocks, Fluid Locking, Multi...
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?Operator Safety - Why are Pre Operation Forklift Inspections so Important?
Operator Safety - Why are Pre Operation Forklift Inspections so Important?
 
mechanical components & maintenance
mechanical components & maintenancemechanical components & maintenance
mechanical components & maintenance
 
LOTO 2
LOTO 2LOTO 2
LOTO 2
 
An OSHA - LOTO Presentation
An OSHA - LOTO PresentationAn OSHA - LOTO Presentation
An OSHA - LOTO Presentation
 
10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines10 Rules for Working Safely Around Machines
10 Rules for Working Safely Around Machines
 
Safety in cement plant
Safety in cement plantSafety in cement plant
Safety in cement plant
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
 
Electrical Safety Training by ISRI
Electrical Safety Training by ISRIElectrical Safety Training by ISRI
Electrical Safety Training by ISRI
 

Similar to Lockout Tagout Guidelines

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxNigel Brown
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014H&K Equipment Group
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptMichaelCazes1
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_ptJon Hilden
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxSyed Neyaz Ahmad
 

Similar to Lockout Tagout Guidelines (20)

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)
 
LOTO LIVE WIRE CS
LOTO LIVE WIRE CSLOTO LIVE WIRE CS
LOTO LIVE WIRE CS
 
loto
lotoloto
loto
 
Loto.pptx
Loto.pptxLoto.pptx
Loto.pptx
 
LOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptxLOTO 2022 - Energy Isolation Process .pptx
LOTO 2022 - Energy Isolation Process .pptx
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
Loto basics.
Loto basics.Loto basics.
Loto basics.
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014
 
Lockout-Tagout 2023.ppt
Lockout-Tagout 2023.pptLockout-Tagout 2023.ppt
Lockout-Tagout 2023.ppt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
Unit 9 loto pwr_pt
Unit 9 loto pwr_ptUnit 9 loto pwr_pt
Unit 9 loto pwr_pt
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 

Recently uploaded

BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 

Recently uploaded (20)

Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 

Lockout Tagout Guidelines

  • 1.
  • 2. Introduction: Many Industrial accidents/ injuries are caused by unexpected energization or startup of machines or equipment, or by an uncontrolled release of energy, during their maintenance or repairs. These incidents can be prevented by implementing a proper “KRM LOTO - LOCKOUT TAGOUT procedure”. KRM LOTO - LOCKOUT TAGOUT system is used to ensure that the energized machines or equipment are isolated from all potentially hazardous energy sources, and isolation points locked out before carrying out any repairs or maintenance activities, thus preventing injuries. Any person upon observing a machine or equipment which is isolated and locked out shall not attempt to start, energize, or use it. Section 24 of factories act requires that, when any device which can be inadvertently shifted from OFF to ON position, is provided within a factory to cut off power, arrangements shall be provided for locking the device in a safe position to prevent accidental starting of the transmission machinery or other machine to which the device is fitted. KRM LOTO HASP KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 3. Guidelines: a) All drives (Motors) shall be provided with separate local lockable isolators to ensure safety of personnel required to work on these drives during preventive or breakdown maintenance. b) Lockout & tag out procedure shall be established and implemented during inspection, cleaning, repair or maintenance of any plant, machinery or equipment, so that if inadvertently activated or energized, will not cause any bodily injury to any person. c) Every person carrying out the work shall be fully instructed / trained on the lock out procedure, applicable lock devices, etc., before commencing the work. d) Unit shall identify all energy sources & their isolation points, and each point shall be given an identification number and a list of isolation points shall be maintained. Typical Energy Sources where isolation is required are; KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269 KRM LOTO PADLOCKS
  • 4. i. Mechanical Energy Sources: Pumps, Pulley, Gear & pinion, flywheel, prime movers, hoists, forklifts / stackers etc. ii. Electrical Energy Sources: Switchgears such as ACB, SFU’s, MCB’s, MCCB’s etc., Motors, Generators, switches etc. iii. Water: Gate valves, Pumps etc. iv. Acids/ ENA/ Blend lines: Control Valves, Pumps etc. v. Compressed air: Valves, receiver tanks etc. vi. Steam : Control valves, isolation valves etc. vii. Gas : Control / isolation valves etc. e) Unit must ensure that all electrical isolators in the panels are provided with locking facilities. Where the isolator does not have built-in locking facility, external locking facility should be provided. f) The requirement of KRM LOTO devices (Type as well as Nos.) shall be assessed and adequate nos. of necessary devices shall be made available in the unit at all times. Refer section 4.0 for guidance on selection of KRM LOTO devices. All KRM LOTO devices shall be kept at easily accessible place & in custody of a responsible person. KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269 KRM LOTO STATION
  • 5. Procedure for KRM LOTO - LOCKOUT TAGOUT a) Manager responsible for the repair / maintenance shall ensure that only trained & authorized employee’s carry out KRM LOTO b) Ensure a valid work permit is obtained prior to start of work (where applicable). c) Identify all energy isolation points such as power supply, compressed air supply, fuel supply, gas supply etc., for that equipment / machine before locking out. d) Physically locate and turn the respective switches, valves etc., to “OFF” / “Neutral” position and provide necessary KRM LOTO devices in such a way that they cannot be bi passed. e) Prior to starting work on machines or equipment that have been locked and after ensuring that no personnel are exposed, the authorized person shall operate the push button or normal operating controls to verify that the appropriate equipment or machine has been de- energized & make certain it will not operate. f) If more than one person are required to work on the equipment under isolation, each person shall put a separate lock on all isolating devices. g) A Tag consisting of following information shall be fixed to each lock. (Pl see sample tag) i. Name & department of the Person carrying out repair / maintenance work. ii. Caution note written as “DANGER- LOCKEDOUT” h) After the servicing and / or maintenance is completed, authorized person shall inspect the equipment / machine thoroughly to ensure all non-essential items, tools / tackles etc. are removed. i) Supervisor after ensuring that the work is complete, allows the authorized person to remove lockout devices & energizes the machine. KRM LOTO TAGS KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 6. Certified-KRM LOTO - Lockout Tagout + Labels & Signs + Acoustic Seals + Safety Products KRM LOTO For locking of Isolators KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 7. Certified-KRM LOTO - Lockout Tagout + Labels & Signs + Acoustic Seals + Safety Products KRM LOTO For locking of Circuit Breakers KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 8. KRM LOTO For locking of Push Buttons KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 9. KRM LOTO For Electrical Panel Lockout KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 10. KRM LOTO For locking of Gate Valves KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 11. KRM LOTO For locking of Butterfly Valves KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 12. KRM LOTO For locking of Ball Valves KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269
  • 13. KRM LOTO For locking of Fuse Bases KRM LOTO guidelines for LOCKOUT TAGOUT System to meet OSHA LOCKOUT/TAGOUT STANDARD, 29CFR & 1910.269