SlideShare a Scribd company logo
1 of 18
Safety and ESDSafety and ESD
GuidelinesGuidelines
Cray Research, Inc.Cray Research, Inc.
October 11, 2013October 11, 2013
Safety GuidelinesSafety Guidelines
 Alert maintenance and service personnelAlert maintenance and service personnel
to workplace hazardsto workplace hazards
 Help reduce accidents and injuries in theHelp reduce accidents and injuries in the
workplaceworkplace
 Help prevent damage to CRI computerHelp prevent damage to CRI computer
system equipmentsystem equipment
 Mandated by OSHA CFR 1910.147Mandated by OSHA CFR 1910.147
OSHA Injury StatisticsOSHA Injury Statistics
 According to U.S. Department of Labor,According to U.S. Department of Labor,
control of hazardous energy is the 5control of hazardous energy is the 5thth
mostmost
frequently cited OSHA violationfrequently cited OSHA violation
 Fines cost companies hundreds ofFines cost companies hundreds of
thousands of dollars each yearthousands of dollars each year
 Electrocution resulted in 9% of all workplaceElectrocution resulted in 9% of all workplace
fatalities for 2011fatalities for 2011
Lockout/Tagout SafetyLockout/Tagout Safety
 All CRI employees required to followAll CRI employees required to follow
lockout/tagout procedures when servicinglockout/tagout procedures when servicing
equipmentequipment
 Helps ensure that all potentially hazardousHelps ensure that all potentially hazardous
energy is locked out and isolatedenergy is locked out and isolated
 Energy-isolating devices available throughEnergy-isolating devices available through
Logistics Department:Logistics Department:
• Lockout/tagout cards − part # 01670500Lockout/tagout cards − part # 01670500
• Small padlocks − part # 01673600Small padlocks − part # 01673600
• Large padlocks − part # 01673601Large padlocks − part # 01673601
Lock and Tag CriteriaLock and Tag Criteria
Locks shall:Locks shall:
 Be provided by Cray ResearchBe provided by Cray Research
 Be able to withstand exposure to wet andBe able to withstand exposure to wet and
damp conditionsdamp conditions
 Be standardized within the work groupBe standardized within the work group
 Be substantial enough to prevent accidentalBe substantial enough to prevent accidental
removalremoval
Lock and Tag Criteria (cont.)Lock and Tag Criteria (cont.)
Tags shall:Tags shall:
 Be provided by Cray ResearchBe provided by Cray Research
 Be able to withstand exposure to wet andBe able to withstand exposure to wet and
damp conditionsdamp conditions
 Be standardized in print and formatBe standardized in print and format
 Identify the individual by nameIdentify the individual by name
Lockout/Tagout CardLockout/Tagout Card
Definitions and TermsDefinitions and Terms
 Authorized EmployeeAuthorized Employee ─ Employees─ Employees
authorized to implement lockout/tagoutauthorized to implement lockout/tagout
proceduresprocedures
 Affected Employee ─ Employees whoAffected Employee ─ Employees who
operate equipment affected by lockout/tagoutoperate equipment affected by lockout/tagout
proceduresprocedures
 Other Employee ─ Employees who work inOther Employee ─ Employees who work in
the area where lockout/tagout occursthe area where lockout/tagout occurs
Definitions and Terms (cont.)Definitions and Terms (cont.)
 Energized EquipmentEnergized Equipment ─ Equipment that is─ Equipment that is
connected to an energy source or equipmentconnected to an energy source or equipment
that contains residual or stored energythat contains residual or stored energy
 Energy-isolation Device ─ A mechanicalEnergy-isolation Device ─ A mechanical
device that physically prevents thedevice that physically prevents the
transmission or release of energytransmission or release of energy
 Lockout ─ Placement of a lockout device onLockout ─ Placement of a lockout device on
an energy-isolation devicean energy-isolation device
 Lockout Device ─ Holds energy device in aLockout Device ─ Holds energy device in a
safe positionsafe position
Isolating Electrical SourcesIsolating Electrical Sources
 Isolate and lock both electrical andIsolate and lock both electrical and
mechanical energy sourcesmechanical energy sources
 Energy sources include:Energy sources include:
 HydraulicsHydraulics
 PneumaticsPneumatics
 Pressurized waterPressurized water
 SteamSteam
 RefrigerantsRefrigerants
Isolating Electrical andIsolating Electrical and
Mechanical SourcesMechanical Sources
 Lock and tag all equipment thatLock and tag all equipment that
uses/produces electrical sourcesuses/produces electrical sources
 Isolate and lock all equipment that storesIsolate and lock all equipment that stores
mechanical energymechanical energy
 Isolate hydraulic linesIsolate hydraulic lines
 Isolate pneumatic linesIsolate pneumatic lines
Isolating Electrical andIsolating Electrical and
Mechanical Sources (cont.)Mechanical Sources (cont.)
 Isolate refrigeration linesIsolate refrigeration lines
 Isolate valves on equipment with pressurizedIsolate valves on equipment with pressurized
water or steamwater or steam
Lockout/Tagout ProcedureLockout/Tagout Procedure
Refer to handout:Refer to handout:
1.1. Survey area to locate all energy sourcesSurvey area to locate all energy sources
2.2. Notify all affected employees thatNotify all affected employees that
lockout/tagout is requiredlockout/tagout is required
3.3. Verify correct operation of voltage testerVerify correct operation of voltage tester
4.4. Shut off equipment to be serviced byShut off equipment to be serviced by
normal meansnormal means
Lockout/Tagout ProcedureLockout/Tagout Procedure
(cont.)(cont.)
5.5. Operate all switches, valves, or levers toOperate all switches, valves, or levers to
ensure stored energy is disconnectedensure stored energy is disconnected
6.6. Lock and tag the energy-isolation deviceLock and tag the energy-isolation device
with assigned lock and tagwith assigned lock and tag
7.7. Use a voltage tester to verify no voltage isUse a voltage tester to verify no voltage is
present on equipment’s electrical circuitpresent on equipment’s electrical circuit
8.8. Activate equipment controls to ensureActivate equipment controls to ensure
equipment will not operateequipment will not operate
Group Lockout/TagoutGroup Lockout/Tagout
ProcedureProcedure
If more than one person is required to lock andIf more than one person is required to lock and
tag a piece of equipment:tag a piece of equipment:
 Each person must place lock and tag onEach person must place lock and tag on
energy-isolation deviceenergy-isolation device
 If device cannot accept multiple locks, useIf device cannot accept multiple locks, use
a multiple lockout haspa multiple lockout hasp
Restoring Equipment to ServiceRestoring Equipment to Service
To restore electrical equipment to service:To restore electrical equipment to service:
1.1. Remove all tools from work areaRemove all tools from work area
2.2. If applicable, restore any previouslyIf applicable, restore any previously
removed machine guardsremoved machine guards
3.3. Check the area to ensure no personnel areCheck the area to ensure no personnel are
near equipmentnear equipment
4.4. Remove all locks and tags from the energy-Remove all locks and tags from the energy-
isolation device(s)isolation device(s)
5.5. Test-run the equipment and inspect forTest-run the equipment and inspect for
normal operationnormal operation
Removing locks and tagsRemoving locks and tags
installed by other employeesinstalled by other employees
Remove a lock and tag installed by anotherRemove a lock and tag installed by another
employee only if:employee only if:
 The employee who installed the lock and tagThe employee who installed the lock and tag
has left the facilityhas left the facility
 Reasonable efforts have been made toReasonable efforts have been made to
contact the employee to remove the lock andcontact the employee to remove the lock and
tagtag
 Supervisor of absent employee must removeSupervisor of absent employee must remove
lock and taglock and tag
ReferencesReferences
 Cray Research, Inc. (1994). SafetyCray Research, Inc. (1994). Safety
and ESD guidelines. Publicationand ESD guidelines. Publication
number HG-016-Anumber HG-016-A

More Related Content

What's hot

Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Panduit Safety
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag outyasharf
 
LOTO Training
LOTO TrainingLOTO Training
LOTO TrainingCM Tiwari
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009txn4_8
 
Lockout fatalities construction
Lockout fatalities constructionLockout fatalities construction
Lockout fatalities constructionJohn Newquist
 
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...Triumvirate Environmental
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIAtlantic Training, LLC.
 
Lockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceLockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceAtlantic Training, LLC.
 
OSHA Lockout / Tagout Rule
OSHA Lockout / Tagout RuleOSHA Lockout / Tagout Rule
OSHA Lockout / Tagout RuleRon Harvey
 
Overcoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout ProgramOvercoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout ProgramTENAQUIP
 

What's hot (18)

LOTO 2
LOTO 2LOTO 2
LOTO 2
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
Lock out tag out
Lock out tag outLock out tag out
Lock out tag out
 
LOTO Training
LOTO TrainingLOTO Training
LOTO Training
 
Loto presentation
Loto presentationLoto presentation
Loto presentation
 
Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009Lockout tagout safety awareness - online 2009
Lockout tagout safety awareness - online 2009
 
Lockout fatalities construction
Lockout fatalities constructionLockout fatalities construction
Lockout fatalities construction
 
Lockout Tagout by FirstSource
Lockout Tagout by FirstSourceLockout Tagout by FirstSource
Lockout Tagout by FirstSource
 
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
 
Manufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMICManufacturing Lockout Tagout by FMIC
Manufacturing Lockout Tagout by FMIC
 
The Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPIThe Control of Hazardous Energy by SAPPI
The Control of Hazardous Energy by SAPPI
 
Lockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural InsuranceLockout/Tagout by Horticultural Insurance
Lockout/Tagout by Horticultural Insurance
 
OSHA Lockout / Tagout Rule
OSHA Lockout / Tagout RuleOSHA Lockout / Tagout Rule
OSHA Lockout / Tagout Rule
 
Overcoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout ProgramOvercoming The Challenges of Implementing a Lockout Program
Overcoming The Challenges of Implementing a Lockout Program
 
Lock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UWLock Out Tag Out (LOTO) by UW
Lock Out Tag Out (LOTO) by UW
 
Lockout Tagout Safety Resources
Lockout Tagout Safety ResourcesLockout Tagout Safety Resources
Lockout Tagout Safety Resources
 
Uno dm-installation-manual
Uno dm-installation-manualUno dm-installation-manual
Uno dm-installation-manual
 

Viewers also liked

E front enterprise and educational software
E front enterprise and educational softwareE front enterprise and educational software
E front enterprise and educational softwareJon Hilden
 
Unit 6 presentation final
Unit 6 presentation finalUnit 6 presentation final
Unit 6 presentation finalJon Hilden
 
Unit 9 system install_pwr_point
Unit 9 system install_pwr_pointUnit 9 system install_pwr_point
Unit 9 system install_pwr_pointJon Hilden
 
Unit 6 presentation
Unit 6 presentationUnit 6 presentation
Unit 6 presentationJon Hilden
 
E front enterprise and educational software
E front enterprise and educational softwareE front enterprise and educational software
E front enterprise and educational softwareJon Hilden
 
Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702sahilkharkara1
 
Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252sahilkharkara1
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252sahilkharkara1
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252sahilkharkara1
 
Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252sahilkharkara1
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252sahilkharkara1
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252sahilkharkara1
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252sahilkharkara1
 
Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252sahilkharkara1
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252sahilkharkara1
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252sahilkharkara1
 

Viewers also liked (20)

E front enterprise and educational software
E front enterprise and educational softwareE front enterprise and educational software
E front enterprise and educational software
 
Unit 6 presentation final
Unit 6 presentation finalUnit 6 presentation final
Unit 6 presentation final
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
Unit 9 system install_pwr_point
Unit 9 system install_pwr_pointUnit 9 system install_pwr_point
Unit 9 system install_pwr_point
 
Unit 6 presentation
Unit 6 presentationUnit 6 presentation
Unit 6 presentation
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
Unit 5 ppt
Unit 5 pptUnit 5 ppt
Unit 5 ppt
 
E front enterprise and educational software
E front enterprise and educational softwareE front enterprise and educational software
E front enterprise and educational software
 
Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702Ansal Pioneer city Broucher,9136824702
Ansal Pioneer city Broucher,9136824702
 
Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252Ald Royal Square Neemrana,8459137252
Ald Royal Square Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252
 
Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252Studio apartment In Neemrana,8459137252
Studio apartment In Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252Ald Royal Square Neemrana ,8459137252
Ald Royal Square Neemrana ,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 
Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252Commercial Project in Neemrana,8459137252
Commercial Project in Neemrana,8459137252
 

Similar to Unit 9 loto pwr_pt

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014H&K Equipment Group
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Julian Kalac P.Eng
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagoutvtsiri
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag OutHvacmach
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfAssem27
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYjasonmorgan
 
Lockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualLockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualAtlantic Training, LLC.
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system supportMuhammed Fuad Al-Barznji
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Panduit Safety
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standardAnbr Cama
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxSyed Neyaz Ahmad
 

Similar to Unit 9 loto pwr_pt (20)

Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014Lock Out - Tag Out - Try Out Safety Course 2014
Lock Out - Tag Out - Try Out Safety Course 2014
 
Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure Lock Out Tag Out Safe Work Procedure
Lock Out Tag Out Safe Work Procedure
 
LOTO LIVE WIRE CS
LOTO LIVE WIRE CSLOTO LIVE WIRE CS
LOTO LIVE WIRE CS
 
Lockout Tagout
Lockout TagoutLockout Tagout
Lockout Tagout
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdfblinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
blinding-deblinding-best-practices-lessons-from-of-adnoc-gas-processing___.pdf
 
loto
lotoloto
loto
 
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGYLOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
LOCKOUT-TAGOUT-SAFETY PRESENTATION-CONTROL OF HAZARDOUS ENERGY
 
Lock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by RykoLock Out-Tag Out Training by Ryko
Lock Out-Tag Out Training by Ryko
 
LOTO.pptx
LOTO.pptxLOTO.pptx
LOTO.pptx
 
Manufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMICManufacturing Lockout/Tagout by FMIC
Manufacturing Lockout/Tagout by FMIC
 
Lockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry MutualLockout Tagout Training by Forestry Mutual
Lockout Tagout Training by Forestry Mutual
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
Hazardous Energy Control by MSHA
Hazardous Energy Control by MSHAHazardous Energy Control by MSHA
Hazardous Energy Control by MSHA
 
5980 dual column floor frames system support
5980 dual column floor frames system support5980 dual column floor frames system support
5980 dual column floor frames system support
 
LOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdfLOCKOUT TAGOUT.pdf
LOCKOUT TAGOUT.pdf
 
Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)Lockout/Tagout Training (OEM Version)
Lockout/Tagout Training (OEM Version)
 
Lockout tagout standard
Lockout tagout standardLockout tagout standard
Lockout tagout standard
 
LOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptxLOTO & ENERGY ISOLATION.pptx
LOTO & ENERGY ISOLATION.pptx
 

Recently uploaded

Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 

Unit 9 loto pwr_pt

  • 1. Safety and ESDSafety and ESD GuidelinesGuidelines Cray Research, Inc.Cray Research, Inc. October 11, 2013October 11, 2013
  • 2. Safety GuidelinesSafety Guidelines  Alert maintenance and service personnelAlert maintenance and service personnel to workplace hazardsto workplace hazards  Help reduce accidents and injuries in theHelp reduce accidents and injuries in the workplaceworkplace  Help prevent damage to CRI computerHelp prevent damage to CRI computer system equipmentsystem equipment  Mandated by OSHA CFR 1910.147Mandated by OSHA CFR 1910.147
  • 3. OSHA Injury StatisticsOSHA Injury Statistics  According to U.S. Department of Labor,According to U.S. Department of Labor, control of hazardous energy is the 5control of hazardous energy is the 5thth mostmost frequently cited OSHA violationfrequently cited OSHA violation  Fines cost companies hundreds ofFines cost companies hundreds of thousands of dollars each yearthousands of dollars each year  Electrocution resulted in 9% of all workplaceElectrocution resulted in 9% of all workplace fatalities for 2011fatalities for 2011
  • 4. Lockout/Tagout SafetyLockout/Tagout Safety  All CRI employees required to followAll CRI employees required to follow lockout/tagout procedures when servicinglockout/tagout procedures when servicing equipmentequipment  Helps ensure that all potentially hazardousHelps ensure that all potentially hazardous energy is locked out and isolatedenergy is locked out and isolated  Energy-isolating devices available throughEnergy-isolating devices available through Logistics Department:Logistics Department: • Lockout/tagout cards − part # 01670500Lockout/tagout cards − part # 01670500 • Small padlocks − part # 01673600Small padlocks − part # 01673600 • Large padlocks − part # 01673601Large padlocks − part # 01673601
  • 5. Lock and Tag CriteriaLock and Tag Criteria Locks shall:Locks shall:  Be provided by Cray ResearchBe provided by Cray Research  Be able to withstand exposure to wet andBe able to withstand exposure to wet and damp conditionsdamp conditions  Be standardized within the work groupBe standardized within the work group  Be substantial enough to prevent accidentalBe substantial enough to prevent accidental removalremoval
  • 6. Lock and Tag Criteria (cont.)Lock and Tag Criteria (cont.) Tags shall:Tags shall:  Be provided by Cray ResearchBe provided by Cray Research  Be able to withstand exposure to wet andBe able to withstand exposure to wet and damp conditionsdamp conditions  Be standardized in print and formatBe standardized in print and format  Identify the individual by nameIdentify the individual by name
  • 8. Definitions and TermsDefinitions and Terms  Authorized EmployeeAuthorized Employee ─ Employees─ Employees authorized to implement lockout/tagoutauthorized to implement lockout/tagout proceduresprocedures  Affected Employee ─ Employees whoAffected Employee ─ Employees who operate equipment affected by lockout/tagoutoperate equipment affected by lockout/tagout proceduresprocedures  Other Employee ─ Employees who work inOther Employee ─ Employees who work in the area where lockout/tagout occursthe area where lockout/tagout occurs
  • 9. Definitions and Terms (cont.)Definitions and Terms (cont.)  Energized EquipmentEnergized Equipment ─ Equipment that is─ Equipment that is connected to an energy source or equipmentconnected to an energy source or equipment that contains residual or stored energythat contains residual or stored energy  Energy-isolation Device ─ A mechanicalEnergy-isolation Device ─ A mechanical device that physically prevents thedevice that physically prevents the transmission or release of energytransmission or release of energy  Lockout ─ Placement of a lockout device onLockout ─ Placement of a lockout device on an energy-isolation devicean energy-isolation device  Lockout Device ─ Holds energy device in aLockout Device ─ Holds energy device in a safe positionsafe position
  • 10. Isolating Electrical SourcesIsolating Electrical Sources  Isolate and lock both electrical andIsolate and lock both electrical and mechanical energy sourcesmechanical energy sources  Energy sources include:Energy sources include:  HydraulicsHydraulics  PneumaticsPneumatics  Pressurized waterPressurized water  SteamSteam  RefrigerantsRefrigerants
  • 11. Isolating Electrical andIsolating Electrical and Mechanical SourcesMechanical Sources  Lock and tag all equipment thatLock and tag all equipment that uses/produces electrical sourcesuses/produces electrical sources  Isolate and lock all equipment that storesIsolate and lock all equipment that stores mechanical energymechanical energy  Isolate hydraulic linesIsolate hydraulic lines  Isolate pneumatic linesIsolate pneumatic lines
  • 12. Isolating Electrical andIsolating Electrical and Mechanical Sources (cont.)Mechanical Sources (cont.)  Isolate refrigeration linesIsolate refrigeration lines  Isolate valves on equipment with pressurizedIsolate valves on equipment with pressurized water or steamwater or steam
  • 13. Lockout/Tagout ProcedureLockout/Tagout Procedure Refer to handout:Refer to handout: 1.1. Survey area to locate all energy sourcesSurvey area to locate all energy sources 2.2. Notify all affected employees thatNotify all affected employees that lockout/tagout is requiredlockout/tagout is required 3.3. Verify correct operation of voltage testerVerify correct operation of voltage tester 4.4. Shut off equipment to be serviced byShut off equipment to be serviced by normal meansnormal means
  • 14. Lockout/Tagout ProcedureLockout/Tagout Procedure (cont.)(cont.) 5.5. Operate all switches, valves, or levers toOperate all switches, valves, or levers to ensure stored energy is disconnectedensure stored energy is disconnected 6.6. Lock and tag the energy-isolation deviceLock and tag the energy-isolation device with assigned lock and tagwith assigned lock and tag 7.7. Use a voltage tester to verify no voltage isUse a voltage tester to verify no voltage is present on equipment’s electrical circuitpresent on equipment’s electrical circuit 8.8. Activate equipment controls to ensureActivate equipment controls to ensure equipment will not operateequipment will not operate
  • 15. Group Lockout/TagoutGroup Lockout/Tagout ProcedureProcedure If more than one person is required to lock andIf more than one person is required to lock and tag a piece of equipment:tag a piece of equipment:  Each person must place lock and tag onEach person must place lock and tag on energy-isolation deviceenergy-isolation device  If device cannot accept multiple locks, useIf device cannot accept multiple locks, use a multiple lockout haspa multiple lockout hasp
  • 16. Restoring Equipment to ServiceRestoring Equipment to Service To restore electrical equipment to service:To restore electrical equipment to service: 1.1. Remove all tools from work areaRemove all tools from work area 2.2. If applicable, restore any previouslyIf applicable, restore any previously removed machine guardsremoved machine guards 3.3. Check the area to ensure no personnel areCheck the area to ensure no personnel are near equipmentnear equipment 4.4. Remove all locks and tags from the energy-Remove all locks and tags from the energy- isolation device(s)isolation device(s) 5.5. Test-run the equipment and inspect forTest-run the equipment and inspect for normal operationnormal operation
  • 17. Removing locks and tagsRemoving locks and tags installed by other employeesinstalled by other employees Remove a lock and tag installed by anotherRemove a lock and tag installed by another employee only if:employee only if:  The employee who installed the lock and tagThe employee who installed the lock and tag has left the facilityhas left the facility  Reasonable efforts have been made toReasonable efforts have been made to contact the employee to remove the lock andcontact the employee to remove the lock and tagtag  Supervisor of absent employee must removeSupervisor of absent employee must remove lock and taglock and tag
  • 18. ReferencesReferences  Cray Research, Inc. (1994). SafetyCray Research, Inc. (1994). Safety and ESD guidelines. Publicationand ESD guidelines. Publication number HG-016-Anumber HG-016-A