VAM AND MODI
METHODIn Solving Transportation Problems
BY: MANIEGO, Karlo & RIVERA,
Ethel Bianca
TRANSPORTATION MODEL
 Linear programming dealing with the issue of
shipping commodities from multiple sources to
multiple destinations.
 Objective: To determine the shipping schedule
that minimizes the total shipping cost while
satisfying supply and demand constraints.
 A comparative tool in business decision-making.
TRANSPORTATION MODEL
 Main applications:
 Location decisions;
 Production planning;
 Capacity planning; and
 Transshipment
 Major Assumptions:
 Items are homogeneous;
 Shipping cost per unit is the same; and
 Only one route is used from place of shipment to the
destination
TRANSPORTATION PROBLEM
 The following must be known before using a method to
find a low-cost solution:
 Capacity Requirements of the sources (Supply) and of the
destinations (Demand)
 An estimation of the costs of transport per unit
 Number of occupied cells/squares in the table, computed
in formula of n + m – 1, where n is the number of sources
(rows) and m is number of destinations (columns)
TRANSPORTATION TABLE
WAREHOU
SE 1
WAREHOU
SE 2
WAREHOU
SE 3
SUPPLY
PLANT 1 2 4 6 300
PLANT 2 8 6 4 200
PLANT 3 2 4 6 100
DEMAND 100 200 300
DESTINATIONS
SOURCES
TRANSPORTATION COST
PER UNIT
CAPACITYOF
SOURCES
REQUIREMENTS OF
DESTINATIONS
OCCUPIED CELLS = n + m – 1 = 3 + 3 – 1 = 5 CELLS
VOGEL’S APPROXIMATION METHOD (VAM)
 Solution obtained is either optimal or near
to the optimal solution.
 Considers the costs associated with each
route alternative.
STEPS OF VAM:
 Find the penalties (opportunity cost), including the dummies.
 Identify the row or column with the greatest opportunity cost
 As many units as possible, assign it to the lowest cost square
in the row or column selected.
 Eliminate any row or column that has just been completely
satisfied by the assignment just made.
 Recompute the cost differences for the transportation table,
omitting rows or columns crossed out in the preceding step.
 Return to step 2 and repeat the steps until an initial feasible
solution has been obtained.
ILLUSTRATION
 ABC Company has 3 production facilities
S1, S2 and S3 with production capacity of 250,
300 and 400 units per week of a product,
respectively. These units are to be shipped to
4 warehouses D1, D2, D3 and D4 with
requirement of 200, 225, 275 and 250 units per week,
respectively. The transportation costs (in
peso) per unit between factories to
warehouses are given in the table.
Total Supply = 250 + 300 + 400 = 950
Total Demand = 200 + 225 + 275 + 250 = 950
(Total Supply = Total Demand)
Number of Occupied Cells = n + m – 1 = 3 + 4 – 1 = 6
Warehouses
D1 D2 D3 D4
Capacit
y
(Supply)
Pro
duc
tion
Fac
iliti
es
S1 11 12 17 14 250
S2 16 18 14 10 300
S3
21 24 13 11
400
Requireme
nt
(Demand)
200 225 275 250 950
STEP 1: Find the penalties (opportunity cost),
including the dummies, of each row and column.
STEP 2: Identify the row or column with the
greatest opportunity cost
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 11 12 17 14 250 1
S2 16 18 14 10 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 5 6 1 1
PENALTY/OPPORTUNITY COST is the difference between the
two lowest unit shipping costs
STEP 3: Assign as many units as possible to the lowest cost square in the row or column selected.
STEP 4: Eliminate any row or column that has just been completely satisfied by the assignment just made.
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 11 17 14 250 1
S2 16 18 14 10 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 5 6 1 1
22
5
12
X
X
STEP 5: Recompute the cost differences for the transportation table,
omitting rows or columns crossed out in the preceding step.
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 11 17 14 250 2
S2 16 18 14 10 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 5 1 1
225
12
X
X
STEP 6: Repeat the steps 2-5 until an initial feasible solution has been obtained.
SECOND VAM ASSIGNMENT:
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 17 14 250 2
S2 16 18 14 10 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 5 1 1
225
12
X
X
25 XX
11
THIRD VAM ASSIGNMENT
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 17 14 250
S2 18 14 10 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 5 1 1
225
12
X
X
25 XX
11
17
5
16
X
FOURTH VAM ASSIGNMENT
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 17 14 250
S2 18 14 300 4
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 1 1
225
12
X
X
25 XX
11
17
5
16
X
10
12
5
X
FINAL VAM ASSIGNMENT
D1 D2 D3 D4
Capacit
y
(Supply
)
Penalties
S1 17 14 250
S2 18 14 300
S3 21 24 13 11 400 2
Requireme
nt
(Demand)
200 225 275 250 950
Penalties 1 1
225
12
X
X
25 XX
11
17
5
16
X
10
12
5
X
27
5
12
5
INITIAL FEASIBLE VAM SOLUTION
D1 D2 D3 D4
Capacit
y
(Supply
)
S1 17 14 250
S2 18 14 300
S3 21 24 13 11 400
Requireme
nt
(Demand)
200 225 275 250 950
225
12
25
11
17
5
16 10
12
5
27
5
12
5
Total Transportation
Cost:
25 units x 11 = 275
225 units x 12 =
2,700
175 units x 16 =
2,800
125 units x 10 =
1,250
275 units x 13 =
3,575
125 units x 11 =
1,375
MODIFIED DISTRIBUTION (MODI) METHOD
 Computing improvement indices quickly
for each unused square without drawing all of
the closed paths.
 The optimality test of the initial feasible
solution
STEPS OF MODI METHOD:
 Obtain an initial solution using any rule or method.
 Set the equations of Ri + Kj = Cij for those squares that are
currently used or occupied.
 After all equations have been written, set R1 = 0
 Solve the system of equations for all R and K values
 Compute the improvement index for each unused square
 Select the largest negative index and proceed to solve the problem
as done using the stepping-stone method. If there are no negative
indices computed, the Initial solution is the feasible solution.
ILLUSTRATION:
 Using the initial VAM solution obtained in the
previous example:
Kj K1 K2 K3 K4
Ri D1 D2 D3 D4 Supply
R1 S1
25
11
225
12 17 14
250
R2 S2
175
16 18 14
125
10
300
R3 S3
21 24
275
13
125
11
400
Demand 200 225 275 250 950
Let:
Ri = value assigned
to row i
Kj = value assigned
to column j
Cij = cost in square
ij (cost of shipping
from source i to
destination j)
STEP 1: Set the equations of Ri + Kj = Cij for those squares that are
currently used or occupied.
 R1 + K1 = 11
 R1 + K2 = 12
 R2 + K1 = 16
 R2 + K4 = 10
 R3 + K3 = 13
 R3 + K4 = 11
Kj K1 K2 K3 K4
Ri D1 D2 D3 D4 Supply
R1 S1
25
11
225
12 17 14
250
R2 S2
175
16 18 14
125
10
300
R3 S3
21 24
275
13
125
11
400
Demand 200 225 275 250 950
STEP 2: After all equations have been written, set R1 = 0
STEP 3: Solve the system of equations for all R and K values
 1. R1 + K1 = 11
0 + K1 = 11K1 = 11
 2. R1 + K2 = 12
0 + K2 = 12 K2 = 12
 
 3. R2 + K1 = 16
R2 + 11 = 16 R2 = 5
 4. R2 + K4 = 10
5 + K4 = 10 K4 = 5
 5. R3 + K4 = 11
R3 + 5 = 11 R3 = 6
 
 6. R3 + K3 = 13
6 + K3 = 13 K3 = 7
IMPROVED TABLE
Kj K1 = 11 K2 = 12 K3 = 7 K4 = 5
Ri D1 D2 D3 D4 Supply
R1 = 0 S1
25
11
225
12 17 14
250
R2 = 5 S2
175
16 18 14
125
10
300
R3 = 6 S3
21 24
275
13
125
11
400
Demand 200 225 275 250 950
STEP 4: Compute the improvement index for each unused square
STEP 5: Select the largest negative index and proceed to solve the problem as done using the stepping-stone method.
 Improvement index formula (Iij) = Cij - Ri – Kj
 S1-D3 index = 17 – R1 – K3 = 17 – 0 – 7 = 10
 S1-D4 index = 14 – R1 – K4 = 14 – 0 – 5 = 9
 S2-D2 index = 18 – R2 – K2 = 18 – 5 – 12 = 1
 S2-D3 index = 14 – R2 – K3 = 14 – 5 – 7 = 2
 S3-D1 index = 21 – R3 – K1 = 21 – 6 – 11 = 4
 S3-D2 index = 24 – R3 – K2 = 24 – 6 – 12 = 6
Since there is no negative index computed, it means that using
the MODI method, the VAM solution is the optimal solution of
ABC Company.
ANOTHER ILLUSTRATION
 A certain company manufactures a certain
product in its three plants, namely Plant A, B,
and C. The plants’ capacities are 700, 1000, and 1800
respectively. The company needs to meet the
demand of its four distribution centers W,
X, Y, and Z with 500, 800, 700, 1500 units respectively.
The transportation cost per unit is provided on
the table. An initial feasible solution is obtained
by Matrix Minimum method as follows:
P
l
a
n
t
s
Distribution Centers
Kj K1 K2 K3 K4
Ri W X Y Z Supply
R1 A
19 30 50
700
12
700
R2 B
300
70 60
700
40 70
1000
R3 C
200
40
800
10 60
800
20
1800
Demand 500 800 700 1500 3500
Total Supply = 700 + 1000 + 1800 = 3500
Total Demand = 500 + 800 + 700 + 1500 = 3500
(Total Supply = Total Demand)
Number of Occupied Cells = n + m – 1 = 3 + 4 – 1 = 6
SOLUTIONS:
 R1 + K4 = 12
 R2 + K1 = 70
 R2 + K3 = 40
 R3 + K1 = 40
 R3 + K2 = 10
 R3 + K4 = 20
 1. R1 + K4 = 12
0 + K4 = 12
K4 = 12
 2. R3 + K4 = 20
R3 + 12 = 20
R3 = 8
 
 3. R3 + K1 = 40
8 + K1 = 40
K1 = 32
 4. R3 + K2 = 10
8 + K2 = 10
K2 = 2
 5. R2 + K1 = 70
R2 + 32 = 70
R2 = 38
 6. R2 + K3 = 40
38 + K3 = 40
K3 = 2
IMPROVED TABLE
P
l
a
n
t
s
Distribution Centers
Kj K1 = 32 K2 = 2 K3 = 2 K4 = 12
Ri W X Y Z Supply
R1 = 0 A 19 30 50
700 12
700
R2 = 38 B 300 70 60
700 40 70
1000
R3 = 8 C 200 40800 10 60800 20 1800
Demand 500 800 700 1500 3500
STEP 5: Select the largest negative index and proceed to solve the problem as
done using the stepping-stone method.
 The Improvement Indices (Iij) are computed as follows:
A-W index = 19 – R1 – K1 = 19 – 0 – 32 = -13
A-X index = 30 – R1 – K2 = 30 – 0 – 2 = 28
A-Y index = 50 – R1 – K3 = 50 – 0 – 2 = 48
B-X index = 30 – R2 – K2 = 60 – 38 – 2 = 20
B-Z index = 60 – R2 – K4 = 60 – 38 – 12 = 10
C-Y index = 60 – R3 – K3 = 60 – 8 – 2 = 50
STEPPING STONE METHOD
 Beginning at the square with the best improvement index, trace a closed path
back to the original square via squares that are currently being used or occupied.
 Beginning with a plus (+) sign at the unused square, place alternate minus (-)
signs and plus signs on each corner square of the closed path just traced.
 Select the smallest quantity found in those squares containing minus signs.
Add that number to all squares on the closed path with plus signs; subtract the
number from all squares assigned minus signs.
 Compute new improvement indices for this new solution using the MODI
method.
STEP 1: Trace a closed path back to the original square
STEP 2: Place alternate plus signs and minus signs on the squares of the traced path
P
l
a
n
t
s
Distribution Centers
W X Y Z Supply
A 19 30 50
700 12
700
B 300 70 60
700 40 70
1000
C 200 40800 10 60800 20 1800
Demand 500 800 700 1500 3500
-
+
+
-
STEP 3: Select the smallest quantity found in those squares
containing minus signs.
Add that number to all squares on the closed path with plus signs;
subtract the number from all squares assigned minus signs.
P
l
a
n
t
s
Distribution Centers
W X Y Z Supply
A 19 30 50
700 12
700
B 300 70 60
700 40 70
1000
C 200 40800 10 60800 20 1800
Demand 500 800 700 1500 3500
-
+
+
-
200
200
200200
NEW MODI SOLUTION
Pla
nts
Distribution Centers
Kj K1 K2 K3 K4
Ri W X Y Z Supply
R1 A
200
19 30 50
500
12
700
R2 B
300
70 60
700
40 70
1000
R3 C
40
800
10 60
1000
20
1800
Demand 500 800 700 1500 3500
SOLUTIONS:
 R1 + K1 = 19
 R1 + K4 = 12
 R2 + K1 = 70
 R2 + K3 = 40
 R3 + K2 = 10
 R3 + K4 = 20
 1. R1 + K4 = 12
0 + K4 = 12 K4 = 12
 2. R1 + K1 = 19
0 + K1 = 19
K1 = 19
 3. R2 + K1 = 70
R2 + 19 = 70
R2 = 51
 4. R2 + K3 = 40
51 + K3 = 40
K3 = -11
 5. R3 + K4 = 20
R3 + 12 = 20
R3 = 8
 6. R3 + K2 = 10
8 + K2 = 10
K2 = 2
IMPROVED NEW MODI SOLUTION
Pla
nts
Distribution Centers
Kj K1 = 19 K2 = 2 K3 = -11 K4 = 12
Ri W X Y Z Supply
R1 = 0 A
200
19 30 50
500
12
700
R2 = 51 B
300
70 60
700
40 70
1000
R3 = 8 C
40
800
10 60
1000
20
1800
Demand 500 800 700 1500 3500
 The Improvement Indices (Iij) are computed as follows:
 A-X index = 30 – R1 – K2 = 30 – 0 – 2 = 28
 A-Y index = 50 – R1 – K3 = 50 – 0 – (-11) = 61
 B-X index = 30 – R2 – K2 = 60 – 51 – 2 = 7
 B-Z index = 70 – R2 – K4 = 70 – 51 – 12 = 7
 C-W index = 40 – R3 – K1 = 40 – 8 – 19 = 13
 C-Y index = 60 – R3 – K3 = 60 – 8 – (-11) = 63
 Since there are no more negative indices computed, the optimal solution of
the company is obtained.
TRANSPORTATION COST
 200 units x 19 = 3,800
 500 units x 12 = 6,000
 300 units x 70 = 21,000
 700 units x 40 = 28,000
 800 units x 10 = 8,000
 1000 units x 20 = 20,000
 Total 86,800
UNBALANCED TRANSPORTATION PROBLEM
 Total Supply ≠ Total Demand
 To solve for this, a dummy supply or demand is
added to the transportation table for the excess to
make it balanced; with the transportation costs of the
dummy cells valued zero (0).
 SUPPLY > DEMAND = DUMMY DEMAND
 DEMAND > SUPPLY = DUMMY SUPPLY
ILLUSTRATION
Warehouse 1 Warehouse 2 Warehouse 3 Supply
Retailer A
10 25 10
3,000
Retailer B
15 8 8
2,000
Demand 2,000 2,000 1,500
Total Supply = 3000 + 2000 = 5000
Total Demand = 2000+ 2000+ 1000 = 5500
(Total Demand > Total Supply = 500 UNITS)
BALANCED TABLE
Warehouse 1 Warehouse 2 Warehouse 3 Supply
Retailer A
10 25 10
3,000
Retailer B
15 8 8
2,000
Dummy Supply
0 0 0
500
Demand 2,000 2,000 1,500 5,500
Number of Occupied Cells = n + m – 1 = 3 + 3 – 1
= 5
OBTAINING INITIAL VAM SOLUTION
FIRST VAM ASSIGNMENT
Warehouse
1
Warehouse
2
Warehouse
3
Supply Penalties
Retailer A
10 25 10
3000 0
Retailer B
15 8 8
2000 0
Dummy
Supply
0 0
500 0
Demand 2000 2000 1500 5500
Penalties 10 8 6
0
50
0
X X
OBTAINING INITIAL VAM SOLUTION
SECOND VAM ASSIGNMENT
Warehouse
1
Warehouse
2
Warehouse
3
Supply Penalties
Retailer A
10 25 10
3000 0
Retailer B
15 8 8
2000 0
Dummy
Supply
0 0
500
Demand 2000 2000 1500 5500
Penalties 5 17 8
0
50
0
X X
2000
X
OBTAINING INITIAL VAM SOLUTION
FINAL VAM ASSIGNMENT
Warehouse
1
Warehouse
2
Warehouse
3
Supply Penalties
Retailer A
10 25 10
3000 0
Retailer B
15 8 8
2000 0
Dummy
Supply
0 0
500
Demand 2000 2000 1500 5500
Penalties 5 8
0
50
0
X X
2000
X 15001500
XX
INITIAL FEASIBLE VAM SOLUTION
Warehouse
1
Warehouse
2
Warehouse
3
Supply Penalties
Retailer A
10 25 10
3000 0
Retailer B
15 8 8
2000 0
Dummy
Supply
0 0
500
Demand 2000 2000 1500 5500
Penalties 5 8
0
50
0
0
2000
15001500
SOLUTIONS USING MODI METHOD:
 R1 + K1 = 10
 R1 + K3 = 10
 R2 + K2 = 8
 R3 + K1 = 0
 R3 + K2 = 0
 1. R1 + K1 = 10
0 + K1 = 10
K1 = 10
 2. R1 + K3 = 10
0 + K3 = 10
K3 = 10
 
 3. R3 + K1 = 0
R3 + 10 = 0 R3 = -10
 
 4. R3 + K2 = 0
-10 + K2 = 0 K2 = 10
 5. R2 + K2 = 8
R2 + 10 = 8 R2 = -2
Since there is no negative index computed, it means that using the
MODI method, the VAM solution is the optimal solution of the company.
 The Improvement Indices (Iij) are computed as follows:
 
 RA-W2 index = 25 – R1 – K2 = 25 – 0 – 10 = 15
 RB-W1 index = 15 – R2 – K1 = 15 – (-2) – 10 = 7
 RB-W3 index = 8 – R2 – K3 = 8 – (-2) – 10 = 0
 RD-W3 index = 0 – R3 – K3 = 0 – (-10) – 10 = 0
TRANSPORTATION COST
 1500 units x 10 = 15,000
 1500 units x 10 = 15,000
 2000 units x 8 = 16,000
 500 units x 0 = 0
 Total 46,000

More Related Content

What's hot

Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsKrupesh Shah
 
Vogel’s Approximation Method (VAM)
Vogel’s Approximation Method (VAM)Vogel’s Approximation Method (VAM)
Vogel’s Approximation Method (VAM)dkpawar
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemAlvin Niere
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.pptanubhuti18
 
Transportation model
Transportation modelTransportation model
Transportation modelLokesh Payasi
 
Assignment problem
Assignment problemAssignment problem
Assignment problemAbu Bashar
 
MODI Method (Operations Research)
MODI Method (Operations Research) MODI Method (Operations Research)
MODI Method (Operations Research) Nilraj Vasandia
 
Transportation model
Transportation modelTransportation model
Transportation modelmsn007
 
Transportation problem
Transportation problemTransportation problem
Transportation problemKamel Attar
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation ProblemVivekSaurabh7
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)Dinesh Suthar
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation pptDeepika Bansal
 
transporation problem
transporation problemtransporation problem
transporation problemVivek Lohani
 

What's hot (20)

Transportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete MathsTransportation Modelling - Quantitative Analysis and Discrete Maths
Transportation Modelling - Quantitative Analysis and Discrete Maths
 
Vam
VamVam
Vam
 
Vogel’s Approximation Method (VAM)
Vogel’s Approximation Method (VAM)Vogel’s Approximation Method (VAM)
Vogel’s Approximation Method (VAM)
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
Assignment problems
Assignment problemsAssignment problems
Assignment problems
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
transportation-model.ppt
transportation-model.ppttransportation-model.ppt
transportation-model.ppt
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Assignment problem
Assignment problemAssignment problem
Assignment problem
 
MODI Method (Operations Research)
MODI Method (Operations Research) MODI Method (Operations Research)
MODI Method (Operations Research)
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Modi method
Modi methodModi method
Modi method
 
Transportation problem
Transportation problemTransportation problem
Transportation problem
 
Transportation model
Transportation modelTransportation model
Transportation model
 
Transportation Problem
Transportation ProblemTransportation Problem
Transportation Problem
 
Modified distribution method (modi method)
Modified distribution method (modi method)Modified distribution method (modi method)
Modified distribution method (modi method)
 
Assignment model
Assignment modelAssignment model
Assignment model
 
Stepping Stone Method
Stepping Stone MethodStepping Stone Method
Stepping Stone Method
 
Deepika(14 mba5012) transportation ppt
Deepika(14 mba5012)  transportation pptDeepika(14 mba5012)  transportation ppt
Deepika(14 mba5012) transportation ppt
 
transporation problem
transporation problemtransporation problem
transporation problem
 

Viewers also liked

MODI Method- Optimization of transportation problem
MODI Method- Optimization of transportation problemMODI Method- Optimization of transportation problem
MODI Method- Optimization of transportation problemraajeeradha
 
transporation problem - stepping stone method
transporation problem - stepping stone methodtransporation problem - stepping stone method
transporation problem - stepping stone methodoragon291764
 
Solving Transportation Problem in Operations Research
Solving Transportation Problem in Operations ResearchSolving Transportation Problem in Operations Research
Solving Transportation Problem in Operations ResearchChandan Pahelwani
 
Thermax Cooling - VAM chiler
Thermax Cooling - VAM chilerThermax Cooling - VAM chiler
Thermax Cooling - VAM chilersaumil shah
 
Single effect vs double effect vam
Single effect vs double effect vamSingle effect vs double effect vam
Single effect vs double effect vamThermax India
 
Indian edible oil
Indian edible oilIndian edible oil
Indian edible oilnitesh
 
Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method Lakshminarayan Ramjee
 
Pa 906.transportation problem and algorithms final
Pa 906.transportation problem and algorithms finalPa 906.transportation problem and algorithms final
Pa 906.transportation problem and algorithms finalhsur2010
 
Bba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment modelsBba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment modelsStephen Ong
 
Transportation and Assignment
Transportation and AssignmentTransportation and Assignment
Transportation and AssignmentLokesh Payasi
 
A comprehensive grammar of the english language quirk greenbaum leech svartvik
A comprehensive grammar of the english language quirk greenbaum leech svartvikA comprehensive grammar of the english language quirk greenbaum leech svartvik
A comprehensive grammar of the english language quirk greenbaum leech svartvikIvana Jovanovic
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation AssignmentNilam Kabra
 
Improve your English: Hindi to English Practice Exercises
Improve your English: Hindi to English Practice ExercisesImprove your English: Hindi to English Practice Exercises
Improve your English: Hindi to English Practice Exercisesmyenglishshoes
 

Viewers also liked (20)

MODI Method- Optimization of transportation problem
MODI Method- Optimization of transportation problemMODI Method- Optimization of transportation problem
MODI Method- Optimization of transportation problem
 
transporation problem - stepping stone method
transporation problem - stepping stone methodtransporation problem - stepping stone method
transporation problem - stepping stone method
 
Solving Transportation Problem in Operations Research
Solving Transportation Problem in Operations ResearchSolving Transportation Problem in Operations Research
Solving Transportation Problem in Operations Research
 
Vam
VamVam
Vam
 
Thermax Cooling - VAM chiler
Thermax Cooling - VAM chilerThermax Cooling - VAM chiler
Thermax Cooling - VAM chiler
 
Single effect vs double effect vam
Single effect vs double effect vamSingle effect vs double effect vam
Single effect vs double effect vam
 
VAM ppt
VAM  pptVAM  ppt
VAM ppt
 
Stereolithography
StereolithographyStereolithography
Stereolithography
 
Indian edible oil
Indian edible oilIndian edible oil
Indian edible oil
 
Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method Transportation Problem- Stepping Stone Method
Transportation Problem- Stepping Stone Method
 
Pa 906.transportation problem and algorithms final
Pa 906.transportation problem and algorithms finalPa 906.transportation problem and algorithms final
Pa 906.transportation problem and algorithms final
 
e-Manufacturing; before and after
e-Manufacturing; before and aftere-Manufacturing; before and after
e-Manufacturing; before and after
 
E manufacturing
E manufacturingE manufacturing
E manufacturing
 
Bba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment modelsBba 3274 qm week 9 transportation and assignment models
Bba 3274 qm week 9 transportation and assignment models
 
Air Compressor
Air CompressorAir Compressor
Air Compressor
 
Transportation and Assignment
Transportation and AssignmentTransportation and Assignment
Transportation and Assignment
 
A comprehensive grammar of the english language quirk greenbaum leech svartvik
A comprehensive grammar of the english language quirk greenbaum leech svartvikA comprehensive grammar of the english language quirk greenbaum leech svartvik
A comprehensive grammar of the english language quirk greenbaum leech svartvik
 
Transportation Assignment
Transportation AssignmentTransportation Assignment
Transportation Assignment
 
Purchase management
Purchase managementPurchase management
Purchase management
 
Improve your English: Hindi to English Practice Exercises
Improve your English: Hindi to English Practice ExercisesImprove your English: Hindi to English Practice Exercises
Improve your English: Hindi to English Practice Exercises
 

Similar to VAM and MODI Method in Solving Transportation Problems

Lecture (3) _transportation problem31-10-2020.pdf
Lecture (3) _transportation problem31-10-2020.pdfLecture (3) _transportation problem31-10-2020.pdf
Lecture (3) _transportation problem31-10-2020.pdfamrhebafamily
 
transportationoperationresearch-210111101338.pptx
transportationoperationresearch-210111101338.pptxtransportationoperationresearch-210111101338.pptx
transportationoperationresearch-210111101338.pptxProfessionalDeeksha
 
Transportation Method Operation Research
Transportation Method Operation ResearchTransportation Method Operation Research
Transportation Method Operation ResearchR A Shah
 
Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation MethodUsharaniRavikumar
 
VOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODVOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODSwethaShree13
 
A.Consider the transportation problem where costs are to be minimi.docx
A.Consider the transportation problem where costs are to be minimi.docxA.Consider the transportation problem where costs are to be minimi.docx
A.Consider the transportation problem where costs are to be minimi.docxransayo
 
Transportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionTransportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionDrDeepaChauhan
 
Unit.5. transportation and assignment problems
Unit.5. transportation and assignment problemsUnit.5. transportation and assignment problems
Unit.5. transportation and assignment problemsDagnaygebawGoshme
 
unit2 linear programming problem in .pdf
unit2 linear programming problem in .pdfunit2 linear programming problem in .pdf
unit2 linear programming problem in .pdfbizuayehuadmasu1
 
unit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdfunit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdfbizuayehuadmasu1
 
04 Jan 30 Class SCM 416 (LP1).pptx
04 Jan 30 Class SCM 416 (LP1).pptx04 Jan 30 Class SCM 416 (LP1).pptx
04 Jan 30 Class SCM 416 (LP1).pptxAhmedghanem772804
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMJournal For Research
 
MODI_SteppingStone.pptx
MODI_SteppingStone.pptxMODI_SteppingStone.pptx
MODI_SteppingStone.pptxVivekSaurabh7
 
IRJET- Developed Method for Optimal Solution of Transportation Problem
IRJET- Developed Method for Optimal Solution of Transportation ProblemIRJET- Developed Method for Optimal Solution of Transportation Problem
IRJET- Developed Method for Optimal Solution of Transportation ProblemIRJET Journal
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptxAjinRk2
 
Solution of matlab chapter 3
Solution of matlab chapter 3Solution of matlab chapter 3
Solution of matlab chapter 3AhsanIrshad8
 

Similar to VAM and MODI Method in Solving Transportation Problems (20)

Lecture (3) _transportation problem31-10-2020.pdf
Lecture (3) _transportation problem31-10-2020.pdfLecture (3) _transportation problem31-10-2020.pdf
Lecture (3) _transportation problem31-10-2020.pdf
 
transportationoperationresearch-210111101338.pptx
transportationoperationresearch-210111101338.pptxtransportationoperationresearch-210111101338.pptx
transportationoperationresearch-210111101338.pptx
 
Transportation Method Operation Research
Transportation Method Operation ResearchTransportation Method Operation Research
Transportation Method Operation Research
 
Vogel's Approximation Method
Vogel's Approximation MethodVogel's Approximation Method
Vogel's Approximation Method
 
VOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHODVOGEL'S APPROXIMATION METHOD
VOGEL'S APPROXIMATION METHOD
 
A.Consider the transportation problem where costs are to be minimi.docx
A.Consider the transportation problem where costs are to be minimi.docxA.Consider the transportation problem where costs are to be minimi.docx
A.Consider the transportation problem where costs are to be minimi.docx
 
Rsh qam11 ch09 ge
Rsh qam11 ch09 geRsh qam11 ch09 ge
Rsh qam11 ch09 ge
 
Transportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible SolutionTransportation Problem- Initial Basic Feasible Solution
Transportation Problem- Initial Basic Feasible Solution
 
Chap 10
Chap 10Chap 10
Chap 10
 
Unit.5. transportation and assignment problems
Unit.5. transportation and assignment problemsUnit.5. transportation and assignment problems
Unit.5. transportation and assignment problems
 
unit2 linear programming problem in .pdf
unit2 linear programming problem in .pdfunit2 linear programming problem in .pdf
unit2 linear programming problem in .pdf
 
unit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdfunit-5 Transportation problem in operation research ppt.pdf
unit-5 Transportation problem in operation research ppt.pdf
 
SOMANI’S Approximation Method (SAM): An Innovative Method for finding optimal...
SOMANI’S Approximation Method (SAM): An Innovative Method for finding optimal...SOMANI’S Approximation Method (SAM): An Innovative Method for finding optimal...
SOMANI’S Approximation Method (SAM): An Innovative Method for finding optimal...
 
04 Jan 30 Class SCM 416 (LP1).pptx
04 Jan 30 Class SCM 416 (LP1).pptx04 Jan 30 Class SCM 416 (LP1).pptx
04 Jan 30 Class SCM 416 (LP1).pptx
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
 
MODI_SteppingStone.pptx
MODI_SteppingStone.pptxMODI_SteppingStone.pptx
MODI_SteppingStone.pptx
 
MODI
MODIMODI
MODI
 
IRJET- Developed Method for Optimal Solution of Transportation Problem
IRJET- Developed Method for Optimal Solution of Transportation ProblemIRJET- Developed Method for Optimal Solution of Transportation Problem
IRJET- Developed Method for Optimal Solution of Transportation Problem
 
OR presentation.pptx
OR presentation.pptxOR presentation.pptx
OR presentation.pptx
 
Solution of matlab chapter 3
Solution of matlab chapter 3Solution of matlab chapter 3
Solution of matlab chapter 3
 

Recently uploaded

GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubaijaehdlyzca
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 

Recently uploaded (20)

GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 

VAM and MODI Method in Solving Transportation Problems

  • 1. VAM AND MODI METHODIn Solving Transportation Problems BY: MANIEGO, Karlo & RIVERA, Ethel Bianca
  • 2. TRANSPORTATION MODEL  Linear programming dealing with the issue of shipping commodities from multiple sources to multiple destinations.  Objective: To determine the shipping schedule that minimizes the total shipping cost while satisfying supply and demand constraints.  A comparative tool in business decision-making.
  • 3. TRANSPORTATION MODEL  Main applications:  Location decisions;  Production planning;  Capacity planning; and  Transshipment  Major Assumptions:  Items are homogeneous;  Shipping cost per unit is the same; and  Only one route is used from place of shipment to the destination
  • 4. TRANSPORTATION PROBLEM  The following must be known before using a method to find a low-cost solution:  Capacity Requirements of the sources (Supply) and of the destinations (Demand)  An estimation of the costs of transport per unit  Number of occupied cells/squares in the table, computed in formula of n + m – 1, where n is the number of sources (rows) and m is number of destinations (columns)
  • 5. TRANSPORTATION TABLE WAREHOU SE 1 WAREHOU SE 2 WAREHOU SE 3 SUPPLY PLANT 1 2 4 6 300 PLANT 2 8 6 4 200 PLANT 3 2 4 6 100 DEMAND 100 200 300 DESTINATIONS SOURCES TRANSPORTATION COST PER UNIT CAPACITYOF SOURCES REQUIREMENTS OF DESTINATIONS OCCUPIED CELLS = n + m – 1 = 3 + 3 – 1 = 5 CELLS
  • 6. VOGEL’S APPROXIMATION METHOD (VAM)  Solution obtained is either optimal or near to the optimal solution.  Considers the costs associated with each route alternative.
  • 7. STEPS OF VAM:  Find the penalties (opportunity cost), including the dummies.  Identify the row or column with the greatest opportunity cost  As many units as possible, assign it to the lowest cost square in the row or column selected.  Eliminate any row or column that has just been completely satisfied by the assignment just made.  Recompute the cost differences for the transportation table, omitting rows or columns crossed out in the preceding step.  Return to step 2 and repeat the steps until an initial feasible solution has been obtained.
  • 8. ILLUSTRATION  ABC Company has 3 production facilities S1, S2 and S3 with production capacity of 250, 300 and 400 units per week of a product, respectively. These units are to be shipped to 4 warehouses D1, D2, D3 and D4 with requirement of 200, 225, 275 and 250 units per week, respectively. The transportation costs (in peso) per unit between factories to warehouses are given in the table.
  • 9. Total Supply = 250 + 300 + 400 = 950 Total Demand = 200 + 225 + 275 + 250 = 950 (Total Supply = Total Demand) Number of Occupied Cells = n + m – 1 = 3 + 4 – 1 = 6 Warehouses D1 D2 D3 D4 Capacit y (Supply) Pro duc tion Fac iliti es S1 11 12 17 14 250 S2 16 18 14 10 300 S3 21 24 13 11 400 Requireme nt (Demand) 200 225 275 250 950
  • 10. STEP 1: Find the penalties (opportunity cost), including the dummies, of each row and column. STEP 2: Identify the row or column with the greatest opportunity cost D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 11 12 17 14 250 1 S2 16 18 14 10 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 5 6 1 1 PENALTY/OPPORTUNITY COST is the difference between the two lowest unit shipping costs
  • 11. STEP 3: Assign as many units as possible to the lowest cost square in the row or column selected. STEP 4: Eliminate any row or column that has just been completely satisfied by the assignment just made. D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 11 17 14 250 1 S2 16 18 14 10 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 5 6 1 1 22 5 12 X X
  • 12. STEP 5: Recompute the cost differences for the transportation table, omitting rows or columns crossed out in the preceding step. D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 11 17 14 250 2 S2 16 18 14 10 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 5 1 1 225 12 X X
  • 13. STEP 6: Repeat the steps 2-5 until an initial feasible solution has been obtained. SECOND VAM ASSIGNMENT: D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 17 14 250 2 S2 16 18 14 10 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 5 1 1 225 12 X X 25 XX 11
  • 14. THIRD VAM ASSIGNMENT D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 17 14 250 S2 18 14 10 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 5 1 1 225 12 X X 25 XX 11 17 5 16 X
  • 15. FOURTH VAM ASSIGNMENT D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 17 14 250 S2 18 14 300 4 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 1 1 225 12 X X 25 XX 11 17 5 16 X 10 12 5 X
  • 16. FINAL VAM ASSIGNMENT D1 D2 D3 D4 Capacit y (Supply ) Penalties S1 17 14 250 S2 18 14 300 S3 21 24 13 11 400 2 Requireme nt (Demand) 200 225 275 250 950 Penalties 1 1 225 12 X X 25 XX 11 17 5 16 X 10 12 5 X 27 5 12 5
  • 17. INITIAL FEASIBLE VAM SOLUTION D1 D2 D3 D4 Capacit y (Supply ) S1 17 14 250 S2 18 14 300 S3 21 24 13 11 400 Requireme nt (Demand) 200 225 275 250 950 225 12 25 11 17 5 16 10 12 5 27 5 12 5 Total Transportation Cost: 25 units x 11 = 275 225 units x 12 = 2,700 175 units x 16 = 2,800 125 units x 10 = 1,250 275 units x 13 = 3,575 125 units x 11 = 1,375
  • 18. MODIFIED DISTRIBUTION (MODI) METHOD  Computing improvement indices quickly for each unused square without drawing all of the closed paths.  The optimality test of the initial feasible solution
  • 19. STEPS OF MODI METHOD:  Obtain an initial solution using any rule or method.  Set the equations of Ri + Kj = Cij for those squares that are currently used or occupied.  After all equations have been written, set R1 = 0  Solve the system of equations for all R and K values  Compute the improvement index for each unused square  Select the largest negative index and proceed to solve the problem as done using the stepping-stone method. If there are no negative indices computed, the Initial solution is the feasible solution.
  • 20. ILLUSTRATION:  Using the initial VAM solution obtained in the previous example: Kj K1 K2 K3 K4 Ri D1 D2 D3 D4 Supply R1 S1 25 11 225 12 17 14 250 R2 S2 175 16 18 14 125 10 300 R3 S3 21 24 275 13 125 11 400 Demand 200 225 275 250 950 Let: Ri = value assigned to row i Kj = value assigned to column j Cij = cost in square ij (cost of shipping from source i to destination j)
  • 21. STEP 1: Set the equations of Ri + Kj = Cij for those squares that are currently used or occupied.  R1 + K1 = 11  R1 + K2 = 12  R2 + K1 = 16  R2 + K4 = 10  R3 + K3 = 13  R3 + K4 = 11 Kj K1 K2 K3 K4 Ri D1 D2 D3 D4 Supply R1 S1 25 11 225 12 17 14 250 R2 S2 175 16 18 14 125 10 300 R3 S3 21 24 275 13 125 11 400 Demand 200 225 275 250 950
  • 22. STEP 2: After all equations have been written, set R1 = 0 STEP 3: Solve the system of equations for all R and K values  1. R1 + K1 = 11 0 + K1 = 11K1 = 11  2. R1 + K2 = 12 0 + K2 = 12 K2 = 12    3. R2 + K1 = 16 R2 + 11 = 16 R2 = 5  4. R2 + K4 = 10 5 + K4 = 10 K4 = 5  5. R3 + K4 = 11 R3 + 5 = 11 R3 = 6    6. R3 + K3 = 13 6 + K3 = 13 K3 = 7
  • 23. IMPROVED TABLE Kj K1 = 11 K2 = 12 K3 = 7 K4 = 5 Ri D1 D2 D3 D4 Supply R1 = 0 S1 25 11 225 12 17 14 250 R2 = 5 S2 175 16 18 14 125 10 300 R3 = 6 S3 21 24 275 13 125 11 400 Demand 200 225 275 250 950
  • 24. STEP 4: Compute the improvement index for each unused square STEP 5: Select the largest negative index and proceed to solve the problem as done using the stepping-stone method.  Improvement index formula (Iij) = Cij - Ri – Kj  S1-D3 index = 17 – R1 – K3 = 17 – 0 – 7 = 10  S1-D4 index = 14 – R1 – K4 = 14 – 0 – 5 = 9  S2-D2 index = 18 – R2 – K2 = 18 – 5 – 12 = 1  S2-D3 index = 14 – R2 – K3 = 14 – 5 – 7 = 2  S3-D1 index = 21 – R3 – K1 = 21 – 6 – 11 = 4  S3-D2 index = 24 – R3 – K2 = 24 – 6 – 12 = 6 Since there is no negative index computed, it means that using the MODI method, the VAM solution is the optimal solution of ABC Company.
  • 25. ANOTHER ILLUSTRATION  A certain company manufactures a certain product in its three plants, namely Plant A, B, and C. The plants’ capacities are 700, 1000, and 1800 respectively. The company needs to meet the demand of its four distribution centers W, X, Y, and Z with 500, 800, 700, 1500 units respectively. The transportation cost per unit is provided on the table. An initial feasible solution is obtained by Matrix Minimum method as follows:
  • 26. P l a n t s Distribution Centers Kj K1 K2 K3 K4 Ri W X Y Z Supply R1 A 19 30 50 700 12 700 R2 B 300 70 60 700 40 70 1000 R3 C 200 40 800 10 60 800 20 1800 Demand 500 800 700 1500 3500 Total Supply = 700 + 1000 + 1800 = 3500 Total Demand = 500 + 800 + 700 + 1500 = 3500 (Total Supply = Total Demand) Number of Occupied Cells = n + m – 1 = 3 + 4 – 1 = 6
  • 27. SOLUTIONS:  R1 + K4 = 12  R2 + K1 = 70  R2 + K3 = 40  R3 + K1 = 40  R3 + K2 = 10  R3 + K4 = 20  1. R1 + K4 = 12 0 + K4 = 12 K4 = 12  2. R3 + K4 = 20 R3 + 12 = 20 R3 = 8    3. R3 + K1 = 40 8 + K1 = 40 K1 = 32  4. R3 + K2 = 10 8 + K2 = 10 K2 = 2  5. R2 + K1 = 70 R2 + 32 = 70 R2 = 38  6. R2 + K3 = 40 38 + K3 = 40 K3 = 2
  • 28. IMPROVED TABLE P l a n t s Distribution Centers Kj K1 = 32 K2 = 2 K3 = 2 K4 = 12 Ri W X Y Z Supply R1 = 0 A 19 30 50 700 12 700 R2 = 38 B 300 70 60 700 40 70 1000 R3 = 8 C 200 40800 10 60800 20 1800 Demand 500 800 700 1500 3500
  • 29. STEP 5: Select the largest negative index and proceed to solve the problem as done using the stepping-stone method.  The Improvement Indices (Iij) are computed as follows: A-W index = 19 – R1 – K1 = 19 – 0 – 32 = -13 A-X index = 30 – R1 – K2 = 30 – 0 – 2 = 28 A-Y index = 50 – R1 – K3 = 50 – 0 – 2 = 48 B-X index = 30 – R2 – K2 = 60 – 38 – 2 = 20 B-Z index = 60 – R2 – K4 = 60 – 38 – 12 = 10 C-Y index = 60 – R3 – K3 = 60 – 8 – 2 = 50
  • 30. STEPPING STONE METHOD  Beginning at the square with the best improvement index, trace a closed path back to the original square via squares that are currently being used or occupied.  Beginning with a plus (+) sign at the unused square, place alternate minus (-) signs and plus signs on each corner square of the closed path just traced.  Select the smallest quantity found in those squares containing minus signs. Add that number to all squares on the closed path with plus signs; subtract the number from all squares assigned minus signs.  Compute new improvement indices for this new solution using the MODI method.
  • 31. STEP 1: Trace a closed path back to the original square STEP 2: Place alternate plus signs and minus signs on the squares of the traced path P l a n t s Distribution Centers W X Y Z Supply A 19 30 50 700 12 700 B 300 70 60 700 40 70 1000 C 200 40800 10 60800 20 1800 Demand 500 800 700 1500 3500 - + + -
  • 32. STEP 3: Select the smallest quantity found in those squares containing minus signs. Add that number to all squares on the closed path with plus signs; subtract the number from all squares assigned minus signs. P l a n t s Distribution Centers W X Y Z Supply A 19 30 50 700 12 700 B 300 70 60 700 40 70 1000 C 200 40800 10 60800 20 1800 Demand 500 800 700 1500 3500 - + + - 200 200 200200
  • 33. NEW MODI SOLUTION Pla nts Distribution Centers Kj K1 K2 K3 K4 Ri W X Y Z Supply R1 A 200 19 30 50 500 12 700 R2 B 300 70 60 700 40 70 1000 R3 C 40 800 10 60 1000 20 1800 Demand 500 800 700 1500 3500
  • 34. SOLUTIONS:  R1 + K1 = 19  R1 + K4 = 12  R2 + K1 = 70  R2 + K3 = 40  R3 + K2 = 10  R3 + K4 = 20  1. R1 + K4 = 12 0 + K4 = 12 K4 = 12  2. R1 + K1 = 19 0 + K1 = 19 K1 = 19  3. R2 + K1 = 70 R2 + 19 = 70 R2 = 51  4. R2 + K3 = 40 51 + K3 = 40 K3 = -11  5. R3 + K4 = 20 R3 + 12 = 20 R3 = 8  6. R3 + K2 = 10 8 + K2 = 10 K2 = 2
  • 35. IMPROVED NEW MODI SOLUTION Pla nts Distribution Centers Kj K1 = 19 K2 = 2 K3 = -11 K4 = 12 Ri W X Y Z Supply R1 = 0 A 200 19 30 50 500 12 700 R2 = 51 B 300 70 60 700 40 70 1000 R3 = 8 C 40 800 10 60 1000 20 1800 Demand 500 800 700 1500 3500
  • 36.  The Improvement Indices (Iij) are computed as follows:  A-X index = 30 – R1 – K2 = 30 – 0 – 2 = 28  A-Y index = 50 – R1 – K3 = 50 – 0 – (-11) = 61  B-X index = 30 – R2 – K2 = 60 – 51 – 2 = 7  B-Z index = 70 – R2 – K4 = 70 – 51 – 12 = 7  C-W index = 40 – R3 – K1 = 40 – 8 – 19 = 13  C-Y index = 60 – R3 – K3 = 60 – 8 – (-11) = 63  Since there are no more negative indices computed, the optimal solution of the company is obtained.
  • 37. TRANSPORTATION COST  200 units x 19 = 3,800  500 units x 12 = 6,000  300 units x 70 = 21,000  700 units x 40 = 28,000  800 units x 10 = 8,000  1000 units x 20 = 20,000  Total 86,800
  • 38. UNBALANCED TRANSPORTATION PROBLEM  Total Supply ≠ Total Demand  To solve for this, a dummy supply or demand is added to the transportation table for the excess to make it balanced; with the transportation costs of the dummy cells valued zero (0).  SUPPLY > DEMAND = DUMMY DEMAND  DEMAND > SUPPLY = DUMMY SUPPLY
  • 39. ILLUSTRATION Warehouse 1 Warehouse 2 Warehouse 3 Supply Retailer A 10 25 10 3,000 Retailer B 15 8 8 2,000 Demand 2,000 2,000 1,500 Total Supply = 3000 + 2000 = 5000 Total Demand = 2000+ 2000+ 1000 = 5500 (Total Demand > Total Supply = 500 UNITS)
  • 40. BALANCED TABLE Warehouse 1 Warehouse 2 Warehouse 3 Supply Retailer A 10 25 10 3,000 Retailer B 15 8 8 2,000 Dummy Supply 0 0 0 500 Demand 2,000 2,000 1,500 5,500 Number of Occupied Cells = n + m – 1 = 3 + 3 – 1 = 5
  • 41. OBTAINING INITIAL VAM SOLUTION FIRST VAM ASSIGNMENT Warehouse 1 Warehouse 2 Warehouse 3 Supply Penalties Retailer A 10 25 10 3000 0 Retailer B 15 8 8 2000 0 Dummy Supply 0 0 500 0 Demand 2000 2000 1500 5500 Penalties 10 8 6 0 50 0 X X
  • 42. OBTAINING INITIAL VAM SOLUTION SECOND VAM ASSIGNMENT Warehouse 1 Warehouse 2 Warehouse 3 Supply Penalties Retailer A 10 25 10 3000 0 Retailer B 15 8 8 2000 0 Dummy Supply 0 0 500 Demand 2000 2000 1500 5500 Penalties 5 17 8 0 50 0 X X 2000 X
  • 43. OBTAINING INITIAL VAM SOLUTION FINAL VAM ASSIGNMENT Warehouse 1 Warehouse 2 Warehouse 3 Supply Penalties Retailer A 10 25 10 3000 0 Retailer B 15 8 8 2000 0 Dummy Supply 0 0 500 Demand 2000 2000 1500 5500 Penalties 5 8 0 50 0 X X 2000 X 15001500 XX
  • 44. INITIAL FEASIBLE VAM SOLUTION Warehouse 1 Warehouse 2 Warehouse 3 Supply Penalties Retailer A 10 25 10 3000 0 Retailer B 15 8 8 2000 0 Dummy Supply 0 0 500 Demand 2000 2000 1500 5500 Penalties 5 8 0 50 0 0 2000 15001500
  • 45. SOLUTIONS USING MODI METHOD:  R1 + K1 = 10  R1 + K3 = 10  R2 + K2 = 8  R3 + K1 = 0  R3 + K2 = 0  1. R1 + K1 = 10 0 + K1 = 10 K1 = 10  2. R1 + K3 = 10 0 + K3 = 10 K3 = 10    3. R3 + K1 = 0 R3 + 10 = 0 R3 = -10    4. R3 + K2 = 0 -10 + K2 = 0 K2 = 10  5. R2 + K2 = 8 R2 + 10 = 8 R2 = -2
  • 46. Since there is no negative index computed, it means that using the MODI method, the VAM solution is the optimal solution of the company.  The Improvement Indices (Iij) are computed as follows:    RA-W2 index = 25 – R1 – K2 = 25 – 0 – 10 = 15  RB-W1 index = 15 – R2 – K1 = 15 – (-2) – 10 = 7  RB-W3 index = 8 – R2 – K3 = 8 – (-2) – 10 = 0  RD-W3 index = 0 – R3 – K3 = 0 – (-10) – 10 = 0
  • 47. TRANSPORTATION COST  1500 units x 10 = 15,000  1500 units x 10 = 15,000  2000 units x 8 = 16,000  500 units x 0 = 0  Total 46,000