1. Jayesh Patel
HEADLINE: Piping Foreman / Pipe Fitter / Maintenance Fitter
SUMMARY:
I am an astute professional with 18 years of rich experience in Operations & Maintenance, Verification, Process
Enhancements and testing equipment to check system for leak. I played a vital role in formulating a layout and plan the
sequence of work to be done. I gained strong knowledge of layout assembles, fabricate, maintain and repair piping
system as well as involved in the study of blueprints, P & ID, Isometric and specifications to determine the type of pipe
and tools.
I started my career as Quality Control Inspector with M/s. Span Heat Transfer Pvt. Ltd. and gradually rose to a level of
Mechanical Foreman with M/s. Al Melehy Trading. I am instrumentally involved in planning & scheduling effective
preventive and corrective maintenance schedule for enhancing systems with annual maintenance budgets. I
demonstrated strong abilities in working on maintenance initiatives, thereby bringing down equipment breakdown &
achieving annual costs savings.
In addition to this, I hold a good command in the usage knowledge of Micro-meter, d ail-gauges, vernier-Calibers and
other related tools. I was also involved in conducting periodic checks to ensure performance of various equipments as
well as building, erecting, repairing, testing and maintaining tanks, vessels & performing all type of structural and plate
work. I am conversant with pipe schedule and materials, Valves type and class, fitting schedule and type, material
certification as well as familiar with single and double isolation, Installation and alignment of Valves, Flange, Pipes, etc.
Specialties: ♦ Maintenance Operations ♦ Quality Assurance ♦ Process Enhancements ♦ Fabrication Work ♦ Preventive
Maintenance ♦ Plant Maintenance ♦ Leadership Skills ♦ Interpersonal Skills ♦ Negotiation Skills ♦ Team Management ♦
EXPERIENCE:
Feb 2011 to Sep 2014 with Adma-Opco, Abu Dhabi, UAE (Offshore); worked through M/s Al Melehy Trading
as Foreman – Mechanical/Piping/Fabrication
I was instrumentally involved in managing a team of over 50 persons. I was proficient at conducting WHT maintenance,
installation of Aluminium Helideck, New Tie-In Joints, Hook Up, New Structural Platform Installation & Repair, Piping
Repair activities done. I played a vital role in performing the pigging operation, pipe spools removal, installation, spading
and de-spading, open up and closed flanges, isolate and de-isolate the pipe lines, di-oiling process, hot bolting, hydro
testing , obey safety standard as per PTW system, etc.
Apr’10 – Aug’10: M/s. Chemical of Africa, Congo, Africa as Tank Fabricator
I hold the distinction of receiving work assignment from the foreman as well as involved in working with small team to
erect, fabricate, tank and structural and piping work.
Sept’07 – May’09: M/s. Group Five International, Mali, West Africa as Boilermaker Foreman
I received the drawings and instruction from superiors for the task. I looked into the co-ordination and control of the
work, daily safety and quality group meeting, inspect documents, check available assembly materials and delegate to the
personnel. I also maintained daily work progress report and handed over the same to Supervisor to end of the day. I was
stellar in working out fabrication and installation problems as well as discussed the same with superiors.
Feb’07 – Aug’07: M/s. Redis Construction Africa Ltd., Congo, Africa as Pipe Fitter
I actively took part in fabrication of support, tees, elbows of various degrees as per task requirement, installation around
9 to 10 Kilometer pipe Lines from one phase to another phase. I was involved in fitting different type of flanges. I also
verified good housekeeping of work area and ensured that tools & equipments are properly used and stored.
May’06 – Nov’06: M/s. Kenana Sugar Co. Ltd., Sudan, Africa as Fabricator
I played a vital role in the plant maintenance task, removed corroded pipe lines, installed new lines, fabrication for screw
conveyor for the mud filter, fabrication for miter elbows, reducer, vacuum drums, etc.
Dec’05 – Mar’06: M/s. Lamprell Dubai L.L.C., Dubai, UAE as Fabricator
I successfully handled the rig maintenance job, replaced damaged pipes, plates, structure and installed new pipes,
plates, structures, hydro static test of piping and fittings. I also took the field measurement as per requirement.
May’05 – May’05: M/s. Power Engg. – QAFCO - Shutdown, Doha, Qatar as Fabricator
I was pivotal in handling the plant maintenance, corroded pipe line cut by grinder, gas torch with permit, and fabricated
new line as per Isometric drawings, checked actual plant measurement, erection and fitting work.
May’04 – Nov’04: M/s. Kenana Sugar Co. Ltd., Sudan, Africa as Fabricator
Feb’04 – Apr’04: M/s. Ad yard Abu Dhabi L.L.C. - Rig Project, Abu Dhabi, UAE as Pipe Fitter
2. May’03 – Nov’03: M/s. Kenana Sugar Co. Ltd., Sudan, Africa as Fabricator
May’02 – Nov’02: M/s. Kenana Sugar Co. Ltd., Sudan, Africa as Fabricator
Apr’01 – Jun’01: M/s. Finesco International - For K.N.P.C. - Shutdown, Kuwait as Plant Mechanic / Pipe Fitter
Jun’00 – Dec’00: M/s. Petro Chem. Eng. - For N.R.C., Iraq as Fitter
Jul’98 – Oct’99: M/s. Dodsal & Co. - For L.N.G. Project, Oman as Pipe Fitter
Aug’95 – May’97: M/s. Rockwell Engg., Kenya, Africa as Fitter - Fabricator
Jun’89 – Dec’93: M/s. Span Heat Transfer Pvt. Ltd., Navsari, Gujarat, India as Quality Control Inspector
PLANT SAFETY –TRAININGS:
Follow up all safety rules and a guideline established by offshore-onshore and actively participates in safety meetings and
programs.
Good knowledge in permit to work system, entailing Safe Job Plan/Job Safety Analysis, Material Safety Data Sheet, Tool
Box Talk, etc.
Impart Job Knowledge and Training to the team in the field. Understand and apply to plant safety standards and
maintenance producer while performing the task.
EDUCATION:
Pursuing; Diploma in Mechanical Engineering; Swami Vivekananda Institute, Baroda, Gujarat
Piping Supervisor Course; Meghdoot Technical Private College, Mumbai; 2009
I.T.I. with Draftsman Mechanical Trade; 1986
SSC—Gujarat Government; 1982