RE-DEVELOPMENT WORKS AT EAST KIDWAI
NAGAR, NEW DELHI
SYNOPSIS
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR
Six Month Industrial Training
At
NBCC Limited (National Buildings Construction Corporation Limited)
(From 10th January, 2014 to 15th April, 2014)
SUBMITTED BY
Jaspreet Singh
Akshay Kaushal
D4CE1B
Civil Engineering Department
GURU NANAK DEV ENGINEERING COLLEGE
LUDHIANA (Pb), INDIA
1.0 Introduction to Company
NBCC Limited (National Buildings Construction Corporation Limited), a Navratna organization
under category I, is a Central Public Sector Undertaking which trades publicly in the market and
is largely owned by Government of India. It primarily provides construction services in three
segments:
 Project Management Consultancy (PMC)
 Real Estate Development & Construction Business
 EPC Contract
Headquartered in New Delhi, NBCC has 10 regional/zonal offices across India. The projects
undertaken by the company are spread across 23 states and 1 Union Territory in India. In
addition, NBCC has also undertaken overseas projects in countries like Iraq, Libya, Nepal,
Mauritius, Turkey, Botswana, Republic of Maldives, Republic of Yemen et al. As on March 31
2014, NBCC’s Order book stands at Rs.14265.93 Crore. NBCC is also designated as the
implementing agency for executing projects under Jawaharlal Nehru National Urban Renewal
Mission (JNNURM), Pradhan Mantri Gram SadakYojna (PMGSY), Solid Waste Management
(SWM) and developmental work in North Eastern Region. A number of Central Government
Ministries and various State Governments are utilizing the services of NBCC as their extended
engineering arm.
2.0 Areas of operations
NBCC's core competency lies in engineering ventures- Power Sector, Real Estate, Environment,
PMC, EPC, Post Completion Maintenance works, Roads, Bridges, Hospitals, Mass Housing,
Institutions & Office Buildings etc.
Project Management & Consultancy business segment includes providing management and
consultancy services for a range of civil construction projects including residential and
commercial complexes, redevelopment of buildings and colonies, hospitals, educational
institutions; infrastructure works for security personnel, border fencing as well as infrastructure
projects such as roads, water supply systems, storm water systems and water storage solutions.
The company’s work in power sector segment includes engineering, designing and construction
services for Civil and structural works for power projects, cooling towers, Chimneys.
NBCC's real estate development segment focuses principally on two types of projects, (i)
residential projects, such as apartments and townships and (ii) commercial projects, such as
corporate office buildings and shopping malls.
3.0 History
NBCC was incorporated in November 1960 as a wholly owned Government of India enterprise
under the erstwhile Ministry of Works, Housing & Supply (MoWHS), which is now known as
the Ministry of Urban Development (MoUD).
In 2007, NBCC paid dividend to the GoI for the first time and since then, it has been paying
dividend to the Government every year. It was declared as a debt free company in 2008. Also, in
the year 2008, the Department of Public Enterprises, Ministry of Heavy Industry and Public
Enterprises, Government of India, through its office memorandum No. 9(8)/2008-GM dated
October 3, 2008 passed on the approval of the Ministry of Urban Development to upgrade
NBCC from a Schedule "B" public sector enterprise to a Schedule "A" public sector enterprise.
Subsequently, on October 14, 2008, the NBCC was granted Schedule "A" PSU status.
NBCC launched IPO in April, 2012 and got the company listed in BSE & NSE. The corporation
in September 2012, has been granted Mini Ratna Category I status by the Government of India.
The Government of India has granted the status of a 'Navratna Company' to NBCC with effect
from June 23, 2014. The coveted status of a 'Navratna PSE' casts additional responsibility on
NBCC to successfully operate in a competitive environment and become a global player.
Keeping this in view, targeted turnover of Rs.10, 000crore by the financial year 2020 has been
set.
4.0 Landmark projects
4.1 National
 NBCC Green View, Sector 37-D, Gurgaon
 235 mts high TV tower in New Delhi
 SCOPE Office complex at New Delhi- houses 25 PSU offices and two central government
banks.
 30 km long 270 Cusec raw water pipeline project from Muradnagar (U.P.) to Sonia Vihar
(Delhi)
 VIBGYOR Towers, Kolkata- Residential Real Estate project
 NBCC Tower, BikajiCama Place, New Delhi- Commercial Real Estate project
 NBCC Plaza, Saket, New Delhi- Commercial Real Estate project
 NBCC Place, PragatiVihar, New Delhi- Commercial Real Estate project
 Bhubaneshwar & Mysore Airport
 Bridge over the river Yamuna in New Delhi
 Indo – Bangladesh/Indo-Pak border fencing works
 Government Pool Residential Accommodation at New MotiBagh, New Delhi
 1200 bedded hospital and medical college at Guwahati, Assam
 Vibgyor Towers- An 876 flats/8 towers residential complex at Kolkata
 Solid Waste Management projects in 8 Airfields towns in India
 LEED certified Green Building project named Indian Institute of Corporate Affairs (IICA) of
the Ministry of Corporate Affairs at Manesar, Haryana
 Hospitals for ESIC all across the country
4.2 Overseas
 Hotel Ninevah Oberoi at Mousul Baghdad
 Baghdad University
 Water Treatment Plant at Kirkuk
 Runway and Terminal building at Ghat and Brak Airport, Libya
 1000 Houses at Beniwalid and 432 houses at Ghat, Libya
 Bir Hospital (Nepal)
 48 km Kohalpur Mahakali Highway Project, Nepal
 Construction of 774 housing units of Dawran, Dhamar, Yemen Arab Republic
 Museum and Library Building, Hetauda, Nepal
 Construction, furnishing and equipping 200 bedded Indira Gandhi Memorial Medical
Hospital at Male, Maldives
 Project Management Consultancy for 3600 housing units at Meer Project in Turkey
4.3 Major projects under execution
 NBCC is executing various development projects in NER for Ministry of Urban
Development & Ministry of Housing & Urban Poverty Alleviation.
 Indo-Bangladesh Border fencing (IBB) & Indo Pak Border fencing (IPB).
 Roads under PradhanMantri Gram SadakYojana/ Bharat Nirman (PMGSY/Bharat Nirman)
which is a national level initiative to build and strengthen the country’s rural road net work in
the state of Bihar, Jharkhand & Tripura.
 The Jawaharlal Nehru National Urban Renewal Mission (JNNURM) has been established to
build world class infrastructure in urban conglomeration. NBCC has been appointed as
executing agency by the State Governments of Haryana, Jharkhand & Tripura.
NBCC, for its performance, has been getting ‘Excellent’ rating from the Govt. of India
consecutively for the last nine years. Company has a consistent track record of paying Dividend
to the Government of India for the seventh successive year in a row. In addition, constant
excellent performance of NBCC in the recent past has earned laurels from the Government and
also from other important quarters.
As a recognition of NBCC’s remarkable performance and significant contribution in national
development, the Company has been recently conferred with a series of awards amongst which
the much coveted ones are mentioned as under:
 Performance Excellence Award by IIIE
 CIDC Vishwakarma Awards 2014 for Best Professionally Managed Company;
 CIDC Vishwakarma Awards 2014 for Outstanding Public Officer conferred on CMD, NBCC
 Indian Buildings Congress (IBC) Awards for Excellence in Built Environment 2012-13;
Commendation Certificate awarded for Indian Institute of Corporate Affairs (IICA),
Manesar, Haryana
 NBCC built India’s first and largest Green Complex awarded Indian Green Building Council
(IGBC) Silver Rating in the year 2014
 Excellence Award 2014: Certificate of Excellence and Gold Medal for NBCC by Indian
Economic Society (IES) for having contributed towards the nation
 Udyog Rattan Award 2014 for Dr. Anoop Kumar Mittal by Indian Economic Society (IES)
 Golden Peacock Award 2013 in Occupational Health & Safety
 Indian Green Building Council Award 2013
 The Special Jury Governance Now PSU Awards 2013
 Engineering Watch Jury Choice Award for Operation Excellence and Special Mention
Awards 2013
 The Super Boss of the Year Award 2013- Star Group and
 Real Estate Company of the Year Award 2013 for Outstanding Contribution in
Infrastructure.
5.0 Introduction To Project
A redevelopment and densification project for a low density Government colony is proposed in
Kidwai Nagar East by NBCC on behalf of MOUD, in the heart of Delhi right opposite DilliHaat
& AIIMS.
5.1 Brief on Redevelopment of Kidwai Nagar (East)
5.2 Background :
The work was awarded to NBCC on 22.06.2012 by the Ministry of Urban Development for the
Redevelopment of Kidwai Nagar (East). The scope of work include the demolishing of 244 Nos.
existing Type – I, II & V Quarters and construction of 4747 houses of Type – II to VII. The
completion period of the project is 5 years. The detail of buildings are as under :-
Dwelling units :-
S.No. Type of Unit Nos.
1. Type – II 936
2. Type – III 1008
3. Type – IV 1458
4. Type – V 1090
5. Type – VI 195
6. Type – VII 60
Total 4747
Social Infrastructures :- 60162.00 m2
(Schools, Local shopping centre (LSC), Dispensary, Service Markets, Milk Booth & Banquet
Hall)
Commercial / Office Space :- 104408.00 m2
The total approved cost of project is Rs. 4264 Crores which include the 30 years maintenance
work of the project. The Project will be financed by lease sale of commercial / office space to
PSU / Ministry / Govt. Departments.
5.3 Methodology for Execution of Work :
The construction of the work has been divided into 5 Nos. packages as given below :-
I Package –I
Commercial office space 4 block
Ii Package -II
Primary school-1 no., Sr. Secondary school-2 nos, LSC-1, Lal Quarters, Banquet
hall- 1 no., Type VII-61 qtrs, ( 09 Tower ), Type VI-192 qtrs, ( 10 Tower )
5.4 Present Status :
A. Evacuation of existing quarters
Iii Package -III
Type-II (936qtrs.), (11 Tower), Type-III (1008 qtrs.),
( 12 Tower)
Iv Package –IV
Type V-680 qtrs., (12 Tower), Type-IV 606 qtrs., (7 Tower) Dispensary
V Package – V
Type-V-398 qtrs., (7 Towers), Type- IV 866 qtrs., (10 Towers)
S. No. Packages
Evacuation Status
Total qtrs. Vacated Balance
I Package-I
(Commercial office space 4 block) 162 117 45
Ii Package-II
Primary school-1 no, Sr. Secondary
school-2 nos, LSC-1, Lal Quarters,
Banquet hall- 1 no, Type VII-61
qtrs., ( 09 Tower ), Type VI-192
qtrs., ( 10 Tower )
1042 728 314
Iii Package-III
Type-II (936qtrs), (11 Tower), Type-
III (1008 qtrs.), ( 12 Tower) 160 87 73
Iv Package-IV
Type V-680 qtrs., (12 Tower), Type-
IV 606 qtrs., (7 Tower)Dispensary 432 108 324
V Package- V- Type-V-398 qtrs., (7
Towers), Type- IV 866 qtrs., (10
Towers) 648 293 355
2444 1333 1111
B. Award of work:
6.0 Details of Project Cost:
S. NO. PARTICULARS COST
(in crores)
1. Cost of Houses and Commercial Spaces 2724.53
2. Provision for shifting of existing utilities & create a new
corridor for utility services like water, Power, Communication
& Gas etc. (2.5% S.No. 1)
64.27
3. Sub Total (On S.No. 1+2) 2788.80
4. Escalation 15% (on S.No.3) 418.32
5. Contingency 3%(on S.No.3) 83.66
6. Sub Total (On S.No. 3+4+5) 3290.78
7. Cess 1% (On S.No. 3+4+5) 32.90
8. Agency Charges (105 on S.No. 6) 329.08
S. No. Packages Status of tender
I Package-I
(Commercial office space 4 block)
Work awarded vide LOI dated
21/08/2013 to M/s NKG
Infrastructure Ltd.
Ii Package-II
Primary school-1 no., Sr. Secondary school-2
nos, LSC-1, Lal Quarters, Banquet hall- 1 no.,
Type VII-61 qtrs., ( 09 Tower ), Type VI-192
qtrs., ( 10 Tower )
Work awarded vide LOI dated
21/08/2013 to M/s NCC Ltd.
Iii Package-III
Type-II (936qtrs.), (11 Tower), Type-III (1008
qtrs.), ( 12 Tower)
Work awarded vide LOI dated
25/10/2013 to M/s Indu Projects
Ltd.
Iv Package-IV
Type V-680 qtrs., (12 Tower), Type-IV 606
qtrs., (7 Tower) Dispensary
Tendering in progress and work to
be awarded by 31/12/2013
V Package- V
Type-V-398 qtrs., (7 Towers), Type- IV 866
qtrs., (10 Towers)
Tendering in progress and work to
be awarded by 31/01/2014
9. Service Tax on agency Charges (10.3% On S.No. 8) 33.89
10. Total as on 01.04.2010 Cost Index
(On S.No. 6+7+8+9)
3686.65
11. Say 3687.00
12. Add 15% IRR 227.00
13. Total Cost Including IRR 3914.00
14. Add for Maintenance 30 Years 350.00
15. Total Cost Including Maintenance 4264.00
7.0 PLANNING/METHODOLOGY OF WORK
For the proper continuation and execution of work, responsibilities are divided into a number of
departments at site. These are controlled and inspected by each other and depend on each other.
This helps to maintain the continuity of work and also maintains the quality of work executed.
These departments are:
 Administration
 Planning department
 Execution department
 Quality Control and Quality Assurance
 Billing department
 Site safety department
 PMV department
8.0 Site coordination process and responsibility matrix:
Organization and responsibility Project manager
Contract & Drawing control Planning department
Planning, Billing & Client Planning / Billing dept.
Process control system Planning / QA/QC
Quality records QA/QC
Inspection and Testing QA/QC
Production and Construction Every department
Calibration and Test Equipment control QA/QC
Machinery control and Inspection PMV
Supervision of work on site Execution department
Handling and storage Store
Project Quality Audit QA/QC
9.0 Glimpses of The Site
Fig. 1 C&D Waste Bricks
Fig. 2 C&D Waste Plant
Fig. 3 Concrete Pump
Fig. 4 Sand Filling
Fig. 5 Bar Bending
Fig. 6 Tower Crane
Fig. 7 Total Station
Fig. 8 Excavation
Fig. 9 RMC Plant
10.0 My Role As A Trainee:
As a trainee my role is;
 To learn the basic engineering and management skills required at site and to understand
the various engineering drawings.
 To learn to exploit the available resources wisely and conveniently.
 To get acquainted with the machinery involved in construction like backhoe excavator,
concrete pumps, total station etc.
 To make daily report of the work done at the site.
 To learn to work in a team and meeting the deadlines.
 To learn the quotidian tricks of on-site work like managing labour and overcoming any
obstacles faced during everyday construction.

More Related Content

What's hot

most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for collegeindrajeet kumar
 
summer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnasummer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnakishore1192
 
training report
training reporttraining report
training reportLilonheart
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship ReportHari Krishnan
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship reportMd Mohsin Mohsin
 
Internship Report
Internship ReportInternship Report
Internship ReportBala Murali
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
 
CV of GIRISH BABU PALAKEEZHIL Nov 2015
CV of GIRISH BABU  PALAKEEZHIL Nov 2015CV of GIRISH BABU  PALAKEEZHIL Nov 2015
CV of GIRISH BABU PALAKEEZHIL Nov 2015Girishbabu Kargil
 
SUMMER INTERSHIP PROJECT REPORT
SUMMER INTERSHIP PROJECT REPORTSUMMER INTERSHIP PROJECT REPORT
SUMMER INTERSHIP PROJECT REPORTSunil Kumar Behera
 
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportCentral Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportAman Gupta
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkAkshathaBhandary
 
Summer internship report on soil testing,Bitumen & aggregate
Summer internship report on soil testing,Bitumen & aggregateSummer internship report on soil testing,Bitumen & aggregate
Summer internship report on soil testing,Bitumen & aggregateAnup singh
 

What's hot (20)

most final report of industrial training for college
most final report of industrial training for collegemost final report of industrial training for college
most final report of industrial training for college
 
summer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patnasummer Internship report L&T_ Bihar museum_Patna
summer Internship report L&T_ Bihar museum_Patna
 
training report
training reporttraining report
training report
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
Design of fixture for pressing bearings in component
Design of fixture for pressing bearings in componentDesign of fixture for pressing bearings in component
Design of fixture for pressing bearings in component
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
Summer Internship Report
Summer Internship ReportSummer Internship Report
Summer Internship Report
 
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE“DESIGN AND DEVELOPMENT OF FIXTURE FOR  FIXING BEARING IN CRANK-CASE
“DESIGN AND DEVELOPMENT OF FIXTURE FOR FIXING BEARING IN CRANK-CASE
 
Civil engineering internship report
Civil engineering internship reportCivil engineering internship report
Civil engineering internship report
 
Final report
Final reportFinal report
Final report
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Final Report
Final ReportFinal Report
Final Report
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 
CV of GIRISH BABU PALAKEEZHIL Nov 2015
CV of GIRISH BABU  PALAKEEZHIL Nov 2015CV of GIRISH BABU  PALAKEEZHIL Nov 2015
CV of GIRISH BABU PALAKEEZHIL Nov 2015
 
SUMMER INTERSHIP PROJECT REPORT
SUMMER INTERSHIP PROJECT REPORTSUMMER INTERSHIP PROJECT REPORT
SUMMER INTERSHIP PROJECT REPORT
 
Central Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training reportCentral Public Works Department (CPWD) summer training report
Central Public Works Department (CPWD) summer training report
 
Internship Report Construction Site and Office Work
Internship Report Construction Site and Office WorkInternship Report Construction Site and Office Work
Internship Report Construction Site and Office Work
 
Summer internship report on soil testing,Bitumen & aggregate
Summer internship report on soil testing,Bitumen & aggregateSummer internship report on soil testing,Bitumen & aggregate
Summer internship report on soil testing,Bitumen & aggregate
 
Resume
ResumeResume
Resume
 

Similar to Synopsis

Aritra Final Report Declaration
Aritra Final Report DeclarationAritra Final Report Declaration
Aritra Final Report DeclarationAritra Dhua
 
New vedic city plot call 9582995583
New vedic city plot call 9582995583New vedic city plot call 9582995583
New vedic city plot call 9582995583nadeem malik
 
Ndlc
NdlcNdlc
NdlcNDLC
 
Real estate for Urban Management (Industrial Estates in National Capital Terr...
Real estate for Urban Management (Industrial Estates in National Capital Terr...Real estate for Urban Management (Industrial Estates in National Capital Terr...
Real estate for Urban Management (Industrial Estates in National Capital Terr...Ar. Avitesh
 
1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdf1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdfAnahatVikram3
 
Project on working capital
Project on working capitalProject on working capital
Project on working capitalSonu Pramanick
 
Tata Projects Ltd. | 42nd annual report 2020-21
Tata Projects Ltd. | 42nd annual report 2020-21Tata Projects Ltd. | 42nd annual report 2020-21
Tata Projects Ltd. | 42nd annual report 2020-21mukeshbhatt39
 
L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 Sunil Kumar
 
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...Arijit Acharya
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Suresh Thakur
 
Projects excuted 001
Projects excuted 001Projects excuted 001
Projects excuted 001SURESH CHAWLA
 
Presentation1
Presentation1Presentation1
Presentation1iManySusu
 
Presentation1
Presentation1Presentation1
Presentation1iManySusu
 
Presentation1
Presentation1Presentation1
Presentation1iManySusu
 
Construction and Architecture magazine 03 jan feb 2010
Construction and Architecture magazine 03 jan feb 2010Construction and Architecture magazine 03 jan feb 2010
Construction and Architecture magazine 03 jan feb 2010Remona Divekar
 
recruitment and selection policy of reliance
recruitment and selection policy of reliancerecruitment and selection policy of reliance
recruitment and selection policy of reliancebunnysharma
 

Similar to Synopsis (20)

Vishwa
VishwaVishwa
Vishwa
 
Aritra Final Report Declaration
Aritra Final Report DeclarationAritra Final Report Declaration
Aritra Final Report Declaration
 
New vedic city plot call 9582995583
New vedic city plot call 9582995583New vedic city plot call 9582995583
New vedic city plot call 9582995583
 
Ndlc
NdlcNdlc
Ndlc
 
Real estate for Urban Management (Industrial Estates in National Capital Terr...
Real estate for Urban Management (Industrial Estates in National Capital Terr...Real estate for Urban Management (Industrial Estates in National Capital Terr...
Real estate for Urban Management (Industrial Estates in National Capital Terr...
 
1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdf1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdf
 
Project on working capital
Project on working capitalProject on working capital
Project on working capital
 
Tata Projects Ltd. | 42nd annual report 2020-21
Tata Projects Ltd. | 42nd annual report 2020-21Tata Projects Ltd. | 42nd annual report 2020-21
Tata Projects Ltd. | 42nd annual report 2020-21
 
L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017 L&T DMRC Summer Internship 2017
L&T DMRC Summer Internship 2017
 
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...
Summer Training Report at Simplex Infrastructures and Salarpuria Joint Ventur...
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
prject report
prject reportprject report
prject report
 
Projects excuted 001
Projects excuted 001Projects excuted 001
Projects excuted 001
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Era infra engineering
Era infra engineeringEra infra engineering
Era infra engineering
 
Construction and Architecture magazine 03 jan feb 2010
Construction and Architecture magazine 03 jan feb 2010Construction and Architecture magazine 03 jan feb 2010
Construction and Architecture magazine 03 jan feb 2010
 
recruitment and selection policy of reliance
recruitment and selection policy of reliancerecruitment and selection policy of reliance
recruitment and selection policy of reliance
 

More from Jaspreet singh

Project Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdfProject Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdfJaspreet singh
 
Soft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdfSoft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdfJaspreet singh
 
Export Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdfExport Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdfJaspreet singh
 
Assignment -02 HR & OB.docx
Assignment -02 HR & OB.docxAssignment -02 HR & OB.docx
Assignment -02 HR & OB.docxJaspreet singh
 
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdfHuman Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdfJaspreet singh
 
Martig Construction Assi (1).pdf
Martig Construction Assi (1).pdfMartig Construction Assi (1).pdf
Martig Construction Assi (1).pdfJaspreet singh
 
Legal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdfLegal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdfJaspreet singh
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWJaspreet singh
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiJaspreet singh
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materialsJaspreet singh
 
Minor project 2011 goup f
Minor project 2011 goup fMinor project 2011 goup f
Minor project 2011 goup fJaspreet singh
 

More from Jaspreet singh (18)

Project Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdfProject Quality Management-Assinment.pdf
Project Quality Management-Assinment.pdf
 
Soft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdfSoft Skills - Teams Building and Leadership Skills.pdf
Soft Skills - Teams Building and Leadership Skills.pdf
 
Export Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdfExport Procedures and Documentation Assinement.pdf
Export Procedures and Documentation Assinement.pdf
 
MSP
MSPMSP
MSP
 
Assignment -02 HR & OB.docx
Assignment -02 HR & OB.docxAssignment -02 HR & OB.docx
Assignment -02 HR & OB.docx
 
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdfHuman Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
Human Resources Practices and Policies at MGCPL.Assinment-01 (1).pdf
 
Martig Construction Assi (1).pdf
Martig Construction Assi (1).pdfMartig Construction Assi (1).pdf
Martig Construction Assi (1).pdf
 
Legal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdfLegal Aspects of Project Management Assignments.pdf
Legal Aspects of Project Management Assignments.pdf
 
tcc primavera
tcc primaveratcc primavera
tcc primavera
 
staad pro
staad prostaad pro
staad pro
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Paperspace
PaperspacePaperspace
Paperspace
 
Paper rca
Paper rcaPaper rca
Paper rca
 
Solid wealth
Solid wealthSolid wealth
Solid wealth
 
Alternate building materials
Alternate building materialsAlternate building materials
Alternate building materials
 
Minor project 2011 goup f
Minor project 2011 goup fMinor project 2011 goup f
Minor project 2011 goup f
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 

Recently uploaded

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Synopsis

  • 1. RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW DELHI SYNOPSIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR Six Month Industrial Training At NBCC Limited (National Buildings Construction Corporation Limited) (From 10th January, 2014 to 15th April, 2014) SUBMITTED BY Jaspreet Singh Akshay Kaushal D4CE1B Civil Engineering Department GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA (Pb), INDIA
  • 2. 1.0 Introduction to Company NBCC Limited (National Buildings Construction Corporation Limited), a Navratna organization under category I, is a Central Public Sector Undertaking which trades publicly in the market and is largely owned by Government of India. It primarily provides construction services in three segments:  Project Management Consultancy (PMC)  Real Estate Development & Construction Business  EPC Contract Headquartered in New Delhi, NBCC has 10 regional/zonal offices across India. The projects undertaken by the company are spread across 23 states and 1 Union Territory in India. In addition, NBCC has also undertaken overseas projects in countries like Iraq, Libya, Nepal, Mauritius, Turkey, Botswana, Republic of Maldives, Republic of Yemen et al. As on March 31 2014, NBCC’s Order book stands at Rs.14265.93 Crore. NBCC is also designated as the implementing agency for executing projects under Jawaharlal Nehru National Urban Renewal Mission (JNNURM), Pradhan Mantri Gram SadakYojna (PMGSY), Solid Waste Management (SWM) and developmental work in North Eastern Region. A number of Central Government Ministries and various State Governments are utilizing the services of NBCC as their extended engineering arm. 2.0 Areas of operations NBCC's core competency lies in engineering ventures- Power Sector, Real Estate, Environment, PMC, EPC, Post Completion Maintenance works, Roads, Bridges, Hospitals, Mass Housing, Institutions & Office Buildings etc. Project Management & Consultancy business segment includes providing management and consultancy services for a range of civil construction projects including residential and commercial complexes, redevelopment of buildings and colonies, hospitals, educational institutions; infrastructure works for security personnel, border fencing as well as infrastructure projects such as roads, water supply systems, storm water systems and water storage solutions. The company’s work in power sector segment includes engineering, designing and construction services for Civil and structural works for power projects, cooling towers, Chimneys.
  • 3. NBCC's real estate development segment focuses principally on two types of projects, (i) residential projects, such as apartments and townships and (ii) commercial projects, such as corporate office buildings and shopping malls. 3.0 History NBCC was incorporated in November 1960 as a wholly owned Government of India enterprise under the erstwhile Ministry of Works, Housing & Supply (MoWHS), which is now known as the Ministry of Urban Development (MoUD). In 2007, NBCC paid dividend to the GoI for the first time and since then, it has been paying dividend to the Government every year. It was declared as a debt free company in 2008. Also, in the year 2008, the Department of Public Enterprises, Ministry of Heavy Industry and Public Enterprises, Government of India, through its office memorandum No. 9(8)/2008-GM dated October 3, 2008 passed on the approval of the Ministry of Urban Development to upgrade NBCC from a Schedule "B" public sector enterprise to a Schedule "A" public sector enterprise. Subsequently, on October 14, 2008, the NBCC was granted Schedule "A" PSU status. NBCC launched IPO in April, 2012 and got the company listed in BSE & NSE. The corporation in September 2012, has been granted Mini Ratna Category I status by the Government of India. The Government of India has granted the status of a 'Navratna Company' to NBCC with effect from June 23, 2014. The coveted status of a 'Navratna PSE' casts additional responsibility on NBCC to successfully operate in a competitive environment and become a global player. Keeping this in view, targeted turnover of Rs.10, 000crore by the financial year 2020 has been set. 4.0 Landmark projects 4.1 National  NBCC Green View, Sector 37-D, Gurgaon  235 mts high TV tower in New Delhi  SCOPE Office complex at New Delhi- houses 25 PSU offices and two central government banks.  30 km long 270 Cusec raw water pipeline project from Muradnagar (U.P.) to Sonia Vihar (Delhi)  VIBGYOR Towers, Kolkata- Residential Real Estate project  NBCC Tower, BikajiCama Place, New Delhi- Commercial Real Estate project  NBCC Plaza, Saket, New Delhi- Commercial Real Estate project  NBCC Place, PragatiVihar, New Delhi- Commercial Real Estate project  Bhubaneshwar & Mysore Airport  Bridge over the river Yamuna in New Delhi  Indo – Bangladesh/Indo-Pak border fencing works  Government Pool Residential Accommodation at New MotiBagh, New Delhi
  • 4.  1200 bedded hospital and medical college at Guwahati, Assam  Vibgyor Towers- An 876 flats/8 towers residential complex at Kolkata  Solid Waste Management projects in 8 Airfields towns in India  LEED certified Green Building project named Indian Institute of Corporate Affairs (IICA) of the Ministry of Corporate Affairs at Manesar, Haryana  Hospitals for ESIC all across the country 4.2 Overseas  Hotel Ninevah Oberoi at Mousul Baghdad  Baghdad University  Water Treatment Plant at Kirkuk  Runway and Terminal building at Ghat and Brak Airport, Libya  1000 Houses at Beniwalid and 432 houses at Ghat, Libya  Bir Hospital (Nepal)  48 km Kohalpur Mahakali Highway Project, Nepal  Construction of 774 housing units of Dawran, Dhamar, Yemen Arab Republic  Museum and Library Building, Hetauda, Nepal  Construction, furnishing and equipping 200 bedded Indira Gandhi Memorial Medical Hospital at Male, Maldives  Project Management Consultancy for 3600 housing units at Meer Project in Turkey 4.3 Major projects under execution  NBCC is executing various development projects in NER for Ministry of Urban Development & Ministry of Housing & Urban Poverty Alleviation.  Indo-Bangladesh Border fencing (IBB) & Indo Pak Border fencing (IPB).  Roads under PradhanMantri Gram SadakYojana/ Bharat Nirman (PMGSY/Bharat Nirman) which is a national level initiative to build and strengthen the country’s rural road net work in the state of Bihar, Jharkhand & Tripura.  The Jawaharlal Nehru National Urban Renewal Mission (JNNURM) has been established to build world class infrastructure in urban conglomeration. NBCC has been appointed as executing agency by the State Governments of Haryana, Jharkhand & Tripura. NBCC, for its performance, has been getting ‘Excellent’ rating from the Govt. of India consecutively for the last nine years. Company has a consistent track record of paying Dividend to the Government of India for the seventh successive year in a row. In addition, constant excellent performance of NBCC in the recent past has earned laurels from the Government and also from other important quarters. As a recognition of NBCC’s remarkable performance and significant contribution in national development, the Company has been recently conferred with a series of awards amongst which the much coveted ones are mentioned as under:
  • 5.  Performance Excellence Award by IIIE  CIDC Vishwakarma Awards 2014 for Best Professionally Managed Company;  CIDC Vishwakarma Awards 2014 for Outstanding Public Officer conferred on CMD, NBCC  Indian Buildings Congress (IBC) Awards for Excellence in Built Environment 2012-13; Commendation Certificate awarded for Indian Institute of Corporate Affairs (IICA), Manesar, Haryana  NBCC built India’s first and largest Green Complex awarded Indian Green Building Council (IGBC) Silver Rating in the year 2014  Excellence Award 2014: Certificate of Excellence and Gold Medal for NBCC by Indian Economic Society (IES) for having contributed towards the nation  Udyog Rattan Award 2014 for Dr. Anoop Kumar Mittal by Indian Economic Society (IES)  Golden Peacock Award 2013 in Occupational Health & Safety  Indian Green Building Council Award 2013  The Special Jury Governance Now PSU Awards 2013  Engineering Watch Jury Choice Award for Operation Excellence and Special Mention Awards 2013  The Super Boss of the Year Award 2013- Star Group and  Real Estate Company of the Year Award 2013 for Outstanding Contribution in Infrastructure.
  • 6. 5.0 Introduction To Project A redevelopment and densification project for a low density Government colony is proposed in Kidwai Nagar East by NBCC on behalf of MOUD, in the heart of Delhi right opposite DilliHaat & AIIMS. 5.1 Brief on Redevelopment of Kidwai Nagar (East)
  • 7. 5.2 Background : The work was awarded to NBCC on 22.06.2012 by the Ministry of Urban Development for the Redevelopment of Kidwai Nagar (East). The scope of work include the demolishing of 244 Nos. existing Type – I, II & V Quarters and construction of 4747 houses of Type – II to VII. The completion period of the project is 5 years. The detail of buildings are as under :- Dwelling units :- S.No. Type of Unit Nos. 1. Type – II 936 2. Type – III 1008 3. Type – IV 1458 4. Type – V 1090 5. Type – VI 195 6. Type – VII 60 Total 4747 Social Infrastructures :- 60162.00 m2 (Schools, Local shopping centre (LSC), Dispensary, Service Markets, Milk Booth & Banquet Hall) Commercial / Office Space :- 104408.00 m2 The total approved cost of project is Rs. 4264 Crores which include the 30 years maintenance work of the project. The Project will be financed by lease sale of commercial / office space to PSU / Ministry / Govt. Departments. 5.3 Methodology for Execution of Work : The construction of the work has been divided into 5 Nos. packages as given below :- I Package –I Commercial office space 4 block Ii Package -II Primary school-1 no., Sr. Secondary school-2 nos, LSC-1, Lal Quarters, Banquet hall- 1 no., Type VII-61 qtrs, ( 09 Tower ), Type VI-192 qtrs, ( 10 Tower )
  • 8. 5.4 Present Status : A. Evacuation of existing quarters Iii Package -III Type-II (936qtrs.), (11 Tower), Type-III (1008 qtrs.), ( 12 Tower) Iv Package –IV Type V-680 qtrs., (12 Tower), Type-IV 606 qtrs., (7 Tower) Dispensary V Package – V Type-V-398 qtrs., (7 Towers), Type- IV 866 qtrs., (10 Towers) S. No. Packages Evacuation Status Total qtrs. Vacated Balance I Package-I (Commercial office space 4 block) 162 117 45 Ii Package-II Primary school-1 no, Sr. Secondary school-2 nos, LSC-1, Lal Quarters, Banquet hall- 1 no, Type VII-61 qtrs., ( 09 Tower ), Type VI-192 qtrs., ( 10 Tower ) 1042 728 314 Iii Package-III Type-II (936qtrs), (11 Tower), Type- III (1008 qtrs.), ( 12 Tower) 160 87 73 Iv Package-IV Type V-680 qtrs., (12 Tower), Type- IV 606 qtrs., (7 Tower)Dispensary 432 108 324 V Package- V- Type-V-398 qtrs., (7 Towers), Type- IV 866 qtrs., (10 Towers) 648 293 355 2444 1333 1111
  • 9. B. Award of work: 6.0 Details of Project Cost: S. NO. PARTICULARS COST (in crores) 1. Cost of Houses and Commercial Spaces 2724.53 2. Provision for shifting of existing utilities & create a new corridor for utility services like water, Power, Communication & Gas etc. (2.5% S.No. 1) 64.27 3. Sub Total (On S.No. 1+2) 2788.80 4. Escalation 15% (on S.No.3) 418.32 5. Contingency 3%(on S.No.3) 83.66 6. Sub Total (On S.No. 3+4+5) 3290.78 7. Cess 1% (On S.No. 3+4+5) 32.90 8. Agency Charges (105 on S.No. 6) 329.08 S. No. Packages Status of tender I Package-I (Commercial office space 4 block) Work awarded vide LOI dated 21/08/2013 to M/s NKG Infrastructure Ltd. Ii Package-II Primary school-1 no., Sr. Secondary school-2 nos, LSC-1, Lal Quarters, Banquet hall- 1 no., Type VII-61 qtrs., ( 09 Tower ), Type VI-192 qtrs., ( 10 Tower ) Work awarded vide LOI dated 21/08/2013 to M/s NCC Ltd. Iii Package-III Type-II (936qtrs.), (11 Tower), Type-III (1008 qtrs.), ( 12 Tower) Work awarded vide LOI dated 25/10/2013 to M/s Indu Projects Ltd. Iv Package-IV Type V-680 qtrs., (12 Tower), Type-IV 606 qtrs., (7 Tower) Dispensary Tendering in progress and work to be awarded by 31/12/2013 V Package- V Type-V-398 qtrs., (7 Towers), Type- IV 866 qtrs., (10 Towers) Tendering in progress and work to be awarded by 31/01/2014
  • 10. 9. Service Tax on agency Charges (10.3% On S.No. 8) 33.89 10. Total as on 01.04.2010 Cost Index (On S.No. 6+7+8+9) 3686.65 11. Say 3687.00 12. Add 15% IRR 227.00 13. Total Cost Including IRR 3914.00 14. Add for Maintenance 30 Years 350.00 15. Total Cost Including Maintenance 4264.00 7.0 PLANNING/METHODOLOGY OF WORK For the proper continuation and execution of work, responsibilities are divided into a number of departments at site. These are controlled and inspected by each other and depend on each other. This helps to maintain the continuity of work and also maintains the quality of work executed. These departments are:  Administration  Planning department  Execution department  Quality Control and Quality Assurance  Billing department  Site safety department  PMV department
  • 11. 8.0 Site coordination process and responsibility matrix: Organization and responsibility Project manager Contract & Drawing control Planning department Planning, Billing & Client Planning / Billing dept. Process control system Planning / QA/QC Quality records QA/QC Inspection and Testing QA/QC Production and Construction Every department Calibration and Test Equipment control QA/QC
  • 12. Machinery control and Inspection PMV Supervision of work on site Execution department Handling and storage Store Project Quality Audit QA/QC 9.0 Glimpses of The Site Fig. 1 C&D Waste Bricks Fig. 2 C&D Waste Plant
  • 13. Fig. 3 Concrete Pump Fig. 4 Sand Filling Fig. 5 Bar Bending
  • 14. Fig. 6 Tower Crane Fig. 7 Total Station Fig. 8 Excavation
  • 15. Fig. 9 RMC Plant 10.0 My Role As A Trainee: As a trainee my role is;  To learn the basic engineering and management skills required at site and to understand the various engineering drawings.  To learn to exploit the available resources wisely and conveniently.  To get acquainted with the machinery involved in construction like backhoe excavator, concrete pumps, total station etc.  To make daily report of the work done at the site.  To learn to work in a team and meeting the deadlines.  To learn the quotidian tricks of on-site work like managing labour and overcoming any obstacles faced during everyday construction.